Statewide Oregon Road Conditions
Highways with no adverse conditions do not show up on this report.
Current Travel Conditions By Route
Closure
ORE127, Intersection with NW Skyline Blvd MP 4
A vehicle fire has closed the road. Use an alternate route.
- Updated
- 5/16/2026 2:15:00 PM
Closure with Detour
US30, 4 miles South of Haines MP 44
Road construction has closed the road. Follow detour.
- Updated
- 5/15/2026 7:45:00 AM
Closure
ORE229, 10 miles North of Siletz MP 14 - 15
A landslide has occurred. Use an alternate route.
- Updated
- 5/14/2026 7:57:00 PM
Conditional Closure
US30, 6 miles West of The Dalles MP 67 - 69
The highway is open to local traffic and local deliveries only. No through traffic allowed.
- Updated
- 5/12/2026 5:47:00 AM
Weather Alert
East Slopes of the Cascades, Upper Slopes of the Eastern Washington Cascades Crest
Winter Weather Advisory
Weather Alert
North Oregon Cascades, Cascades of Marion and Linn Counties, Cascades of Lane County, South Washington Cascades
Winter Weather Advisory
I-105: EB MP 0.89 to 9.97
I-105, Eugene
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 6:06 AM
I-105: EB MP 1.21
I-105, Eugene
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 7:05 AM
I-205: NB MP 0 to 8.82
I-205, Interstate 5
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/13/2026 2:35 PM
I-205: NB MP 1.2 to 8.82
I-205, 1 mile North of Interstate 5
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 9:59 AM
I-205: MP 8.56 to 9.56
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, February 25, 2026, this section of I-205 northbound will be restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is May 30, 2026
- Last Updated
- 5/16/2026 1:00 PM
I-205: MP 8.56 to 9.9
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective March 2, 2026, this section of I-205 southbound will be intermittently restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is May 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-205: SB MP 8.8 to 9.3
I-205, OR 99E
Construction Work
Estimated delay under 20 minutes
- Comments
- Traffic Impacts: Lane and ramp closures in Oregon City and West Linn with pedestrian detours on OR 43 and OR 99E. Nighttime ramp closures: o I-205 northbound to OR99E (Exit 9 NB) Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. o OR43 to I-205 northbound Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. o I-205 Southbound to OR43 (Exit 8 SB) Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. nighttime lane closures: o OR 99E Northbound Lanes Monday and Tuesday 8:00 pm to 6:00 am. o I-205 northbound Monday through Thursday 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. Flagging: o Main St Monday through Saturday 7:00 am to 5:30 pm. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
- Last Updated
- 5/10/2026 6:14 AM
I-205: NB MP 9
I-205, OR 99E
Construction Work
No to Minimum Delay
Off Ramp
- Comments
- Road construction will have the off ramp closed at Exit 9 . Use caution and watch for workers. Ramps Affected.
- Last Updated
- 4/27/2026 10:41 PM
I-205: MP 9.01
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective April 27, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is May 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-205: MP 9.23
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 NB Exit 9 off-ramp to OR99E NB (Oregon City) Effective February 25, 2026, the I-205 northbound Exit 9 off-ramp to OR99E northbound will be closed Monday through Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. The estimated completion date for this work is May 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-205: MP 9.56
I-205, OR 213 Park Place
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective April 6, 2026, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently restricted to 9 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 9 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-205: NB MP 16.6 to 24.5
I-205, Intersection with SE Johnson Creek Blvd
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/04/2026 3:13 PM
I-205: NB MP 23 to 12
I-205, NE Prescott St
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22772)
- Last Updated
- 4/16/2026 10:44 AM
I-205: SB MP 24 to 16
I-205, Portland
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 2:20 PM
I-205: SB MP 24.8 to 16
I-205, Oregon Washington Border
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 2:29 PM
I-405: SB MP 0.37
I-405, Interstate 5
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 2:43 PM
I-405: MP 1.6 to 1.94
I-405, Intersection with US26
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/6/2026 12:00:00 AM
- Details
- Alert: I-405 NB Exit 2A off-ramp to Salmon St/Providence Park (Portland) Effective June 6, 2026, the I-405 northbound Exit 2A off-ramp to Salmon Street/Providence Park will be closed between the hours of 4:30 PM & 11:30 PM. The estimated completion date for this work is June 6, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-405: NB MP 2.2 to 2.1
I-405, Intersection with US26
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/13/2026 2:31 PM
I-405: SB MP 2.2 to 2.1
I-405, Intersection with US26
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 2:27 PM
I-405: NB MP 2.2 to 2.1
I-405, Intersection with US26
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 9:59 AM
I-405: SB MP 3.29
I-405, Intersection with US30
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 2:35 PM
I-5: NB MP 58.18 to 66.7
I-5, Intersection with Pacific Highway ORE99
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) , Shoulder (Northbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. <!--Links Start Here--> [Link to additional information](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D&reserved=0)
- Last Updated
- 4/28/2026 5:51 PM
I-5: MP 58.3
I-5, Intersection with Pacific Highway ORE99
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/17/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 58 on-ramp from OR99/US199/NE Scoville Rd (Grants Pass) Effective May 17, 2026, the I-5 northbound Exit 58 on-ramp from OR99/US199/NE Scoville Road will be closed Sunday night through Monday morning from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 18, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 58.52 to 61.68
I-5, Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 58.52 to 61.68 (Grants Pass) Effective November 20, 2025, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 59.94
I-5, 2 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 59.94 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 17 feet 1 inches in height Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. The estimated completion date for this work is October 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 61
I-5, 3 miles North of Grants Pass
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/17/2026 12:00:00 AM
- Details
- Alert: I-5 SB Exit 61 on-ramp from Monument Drive (Grants Pass) Effective May 17, 2026, the I-5 southbound Exit 61 on-ramp from Monument Drive, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 21, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 61.5
I-5, 4 miles North of Grants Pass
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 61 on-ramp from Merlin Road (Grants Pass) Effective May 19, 2026, the I-5 northbound on-ramp from Merlin Road will be closed at night between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is May 21, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 61.5
I-5, 4 miles North of Grants Pass
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 61 off-ramp to Merlin Road (Grants Pass) Effective May 19, 2026, the I-5 northbound Exit 61 off-ramp to Merlin Road will be closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is May 21, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 62 to 58.17
I-5, 4 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 62.00 to 58.17 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 66
I-5, 8 miles North of Grants Pass
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 66 off-ramp to Monument Dr (Grants Pass) Effective May 26, 2026, the I-5 northbound Exit 66 off-ramp to Monument Drive will be closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is May 28, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 66
I-5, 8 miles North of Grants Pass
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/1/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 66 on- and off-ramp to/from Monument Dr (Grants Pass) Effective June 1, 2026, the I-5 northbound Exit 66 on- and off-ramp to/from Monument Drive will be closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is June 5, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: SB MP 68
I-5, 8 miles South of Wolf Creek
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) , Shoulder
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 5/05/2026 10:09 PM
I-5: NB MP 103
I-5, 5 miles North of Canyonville
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 10:55 AM
I-5: MP 119.3 to 119.7
I-5, Intersection with Coos Bay - Roseburg Highway ORE42
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/31/2026 12:00:00 AM
- Details
- Alert: I-5 SB Exit 119 on/off-ramps to/from OR42 (Winston) Effective May 31, 2026, the I-5 southbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is June 5, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 119.7 to 119.9
I-5, 5 miles South of Roseburg
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 119 on/off-ramps to/from OR42 (Winston) Effective May 26, 2026, the I-5 northbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is May 29, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 129.1 to 128.71
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: I-5 SB MP 129.10 to 128.71 (Roseburg) Effective May 26, 2026, this section of I-5 southbound will be restricted to 14 feet 10 inches in width daily Monday through Thursday between the hours of 7:00 AM and 6:00 PM and Friday from 7:00 AM until Sunday at 6:00 PM. The estimated completion date for this work is July 1, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 129.1 to 128.71
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/21/2026 12:00:00 AM
- Details
- Alert: I-5 NB MP 128.75 to MP 129.15 (Roseburg) Effective June 21, 2026, this section of I-5 northbound will be restricted to 9 feet 08 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 8:00 AM. The estimated completion date for this work is July 24, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 129.1 to 128.71
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: I-5 SB MP 129.10 to 128.71 (Roseburg) Effective May 26, 2026, this section of I-5 southbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 6:00 PM and 7:00 AM. The estimated completion date for this work is July 1, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 129.15 to 128.75
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/21/2026 12:00:00 AM
- Details
- Alert: I-5 NB MP 128.75 to MP 129.15 (Roseburg) Effective June 21, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width daily Monday through Thursday between the hours of 8:00 AM and 7:00 PM and Friday from 8:00 AM until Sunday at 7:00 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is July 24, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 129.17 to 128.5
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: I-5 SB Exit 129 on-ramp from Del Rio Rd (Roseburg) Effective May 26, 2026, the I-5 southbound on-ramp from Del Rio Road will be restricted to 10 feet 00 inches in width at all times. The estimated completion date for this work is July 1, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: NB MP 131
I-5, 5 miles South of Sutherlin
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/13/2026 6:37 AM
I-5: NB MP 140
I-5, 4 miles North of Sutherlin
Information
No to Minimum Delay
- Comments
- Burning is taking place along the highway causing no to minimum delays. Use caution.
- Last Updated
- 5/15/2026 10:58 AM
I-5: NB MP 168 to 135
I-5, 6 miles South of Cottage Grove
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/08/2026 2:33 PM
I-5: NB MP 169.2 to 175.02
I-5, 5 miles South of Cottage Grove
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Construction starts April 26, 2026, expect: Single lane closures, 7:00 P.M. to 8:00 A.M. Exit 172 and 174 ramp closures with detours as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22938)
- Last Updated
- 5/07/2026 8:01 AM
I-5: MP 172.46
I-5, 2 miles South of Cottage Grove
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/20/2026 12:00:00 AM
- Details
- Alert: I-5 SB Exit 172 off-ramp to 6th St (Cottage Grove) Effective May 20, 2026, the I-5 southbound Exit 172 off-ramp to 6th Street will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is May 21, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 172.46
I-5, 2 miles South of Cottage Grove
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/21/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 172 on-ramp from 6th St (Cottage Grove) Effective May 21, 2026, the I-5 northbound Exit 172 on-ramp from 6th Street will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: NB MP 174 to 209
I-5, Cottage Grove
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 5:57 AM
I-5: MP 174.76
I-5, Cottage Grove
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/3/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 174 off-ramp to OR99/Row River Rd (Cottage Grove) Effective June 3, 2026, the I-5 northbound Exit 174 off-ramp to OR99/Row River Road will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is June 4, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 174.83
I-5, Cottage Grove
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/31/2026 12:00:00 AM
- Details
- Alert: I-5 SB Exit 174 on-ramp from OR99/Row River Rd (Cottage Grove) Effective May 31, 2026, the I-5 southbound Exit 174 on-ramp from OR99/Row River Road will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is June 1, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 175.02
I-5, Cottage Grove
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/1/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 174 on-ramp OR99/Row River Rd (Cottage Grove) Effective June 1, 2026, the I-5 northbound Exit 174 on-ramp from OR99/Row River Road will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is June 3, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: NB MP 209 to 174
I-5, 14 miles North of Intersection with Beltline Highway
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/07/2026 6:20 AM
I-5: NB MP 210 to 244
I-5, 15 miles North of Intersection with Beltline Highway
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 2:35 AM
I-5: MP 235.73
I-5, 2 miles North of Albany
Commercial Vehicle Information
Informational only
- Details
- Alert: Century Dr/I-5 Frontage Rd NB & SB 235.73 (Murder Creek Bridge - Millersburg) Effective May 4, 2026, this section of Century Drive/I-5 Frontage Road northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday between the hours of 7:00 AM and 4:30 PM. The estimated completion date for this work is May 21, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: SB MP 244 to 209
I-5, 10 miles South of Intersection with ORE22, in Salem
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 2:35 AM
I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/01/2026 8:32 PM
I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
Off Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/01/2026 8:32 PM
I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Estimated delay under 20 minutes
Off Ramp
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. Southbound Commercial Street on ramp will be closed will be 5/7/26 at 6 am to 5/9/26 6 am. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/07/2026 10:37 AM
I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/01/2026 8:33 PM
I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027.
- Last Updated
- 5/16/2026 1:00 PM
I-5: NB MP 253.89 to 259
I-5, Intersection with ORE22, in Salem
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/07/2026 12:39 PM
I-5: NB MP 260 to 281
I-5, 6 miles North of Intersection with ORE22, in Salem
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 4:07 PM
I-5: NB MP 265 to 254
I-5, 7 miles South of Woodburn
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 6:46 PM
I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
- Last Updated
- 5/15/2026 4:20 AM
I-5: NB MP 291.95
I-5, Highway 217
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 12:02 PM
I-5: NB MP 293.49 to 300
I-5, 1 mile North of Highway 217
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 2:32 PM
I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
- Last Updated
- 4/15/2026 4:11 PM
I-5: MP 299.21 to 299.35
I-5, I-405 South Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/18/2026 12:00:00 AM
- Details
- Alert: I-5 NB MP 299.21 to MP 299.35 (Portland) Effective May 18, 2026, this section of I-5 northbound will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 16 feet 00 inches in width, may be accommodated on a case-by-case basis. The estimated completion date for this work is May 21, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 299.21 to 299.35
I-5, I-405 South Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/8/2026 12:00:00 AM
- Details
- Alert: I-5 NB MP 299.21 to MP 299.35 (Portland) Effective June 8, 2026, this section of I-5 northbound will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 16 feet 00 inches in width, may be accommodated on a case-by-case basis. The estimated completion date for this work is June 10, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.29 to 301.23
I-5, Interstate 84
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/17/2026 12:00:00 AM
- Details
- Alert: I-5 SB MP 301.29 to MP 301.23 (Portland) Effective May 17, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours 10 PM & 5 AM, and Friday through Saturday nights between the hours of 10 PM & 6 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 18th, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.29 to 301.23
I-5, Interstate 84
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/8/2026 12:00:00 AM
- Details
- Alert: I-5 SB MP 301.29 to MP 301.23 (Portland) Effective June 8, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours 10 PM & 5 AM, and Friday through Saturday nights between the hours of 10 PM & 6 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 10, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: NB MP 301.35
I-5, Interstate 84
Crash/Hazard
No to Minimum Delay
On Ramp
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety. Ramps Affected.
- Last Updated
- 5/16/2026 1:42 PM
I-5: MP 301.35 to 303.47
I-5, Interstate 84
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 7/10/2026 12:00:00 AM
- Details
- Alert: I-5 NB and SB MP 301.35 to MP 303.47 (Portland) Effective July 10, 2026, this section of I-5 northbound and southbound will be closed beginning Friday at 10 PM until Sunday at 12 PM (noon). The estimated completion date for this work is July 12, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.35 to 300.89
I-5, Interstate 84
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 301.35 to MP 300.89 (Portland) Effective May 11, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 21, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.35 to 300.89
I-5, Interstate 84
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 301.06 (Portland) Effective April 27, 2026, this section of I-5 southbound will be restricted to 14 feet 11 inches in height Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 18, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.5 to 302.7
I-5, 1 mile South of I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in Sunday night thru Friday night between the hours of 10 PM and 5 AM and Saturday night between the hours of 10 PM and 8 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 9, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.58
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 301.58 (Portland) Effective May 7, 2026, this section of I-5 southbound will be restricted to 14 feet 7 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 14 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 7, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.6 to 302.8
I-5, I-405 North Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/21/2026 12:00:00 AM
- Details
- Alert: I-5 SB MP 302.80 to MP 301.60 (Portland) Effective May 21, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 12, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.7
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 300B off-ramp to US26 EB / OR99E (Portland) Effective May 11, 2026, the I-5 southbound Exit 300B off-ramp to US26 eastbound / OR99E will be closed Monday through Friday night between the hours of 10 PM to 5 AM. The estimated completion date for this work is June 7, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 301.7
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 300B off-ramp to US26/OR99E/OMSI/Oregon City (Portland) Effective May 15, 2026, the I-5 southbound Exit 300B off-ramp to US26/OR99E/OMSI/Oregon City will be closed from 2 AM to 6 AM. The estimated completion date for this work is May 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange
Construction Work
No to Minimum Delay
- Comments
- Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
- Last Updated
- 4/03/2026 4:28 PM
I-5: MP 301.91
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 301 off-ramp to I-84 EB (Portland) Effective May 11, 2026, the I-5 southbound Exit 301 off-ramp to I-84 eastbound will be closed Monday through Friday night between the hours of 10 PM & 5 AM. The estimated completion date for this work is June 7, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: MP 302.33
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 302.33 (Portland) Effective May 7, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 7, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-5: SB MP 303.08 to 300.28
I-5, 1 mile South of Portland, Intersection with Going St
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/15/2026 11:57 AM
I-5: SB MP 308 to 301
I-5, Oregon Washington Border
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 11:40 AM
I-84: EB MP 0 to 16
I-84, Interstate 5
Construction Work
No to Minimum Delay
- Comments
- Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 4/10/2026 3:31 PM
I-84: WB MP 0 to 16
I-84, Interstate 5
Construction Work
No to Minimum Delay
- Comments
- Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 4/10/2026 3:19 PM
I-84: EB MP 0 to 9.7
I-84, Interstate 5
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/08/2026 3:02 PM
I-84: MP 0.2
I-84, Interstate 5
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 WB off-ramp to Holladay St/1st Ave/Moda Center (Portland) Effective May 15, 2026, the I-84 westbound off-ramp to Holladay Street/1st Avenue/Moda Center will be closed at all hours. The estimated completion date for this work is June 8, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 10 to 17
I-84, Portland, Intersection with 122nd Ave
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/07/2026 2:01 PM
I-84: WB MP 18
I-84, 1 mile East of Troutdale
Construction Work
No to Minimum Delay
- Comments
- Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 4/10/2026 3:21 PM
I-84: MP 35.58 to 39
I-84, 5 miles East of Multnomah Falls
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 WB MP 35 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 36 to 39
I-84, 5 miles East of Multnomah Falls
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB MP 36 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 eastbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 37 to 38
I-84, 6 miles East of Multnomah Falls
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) Median , 1 Lane
- Comments
- Road work has the EB left lane closed at mile post 37. The onramp from Warrendale to EB is closed. Prepare to slow or move over for worker safety. Ramps Affected.
- Last Updated
- 3/01/2026 2:11 PM
I-84: MP 37 to 37.6
I-84, 6 miles East of Multnomah Falls
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB on-ramp from NE Frontage Rd/Hwy 100 (Warrendale) Effective March 1, 2026, the I-84 eastbound on-ramp from NE Frontage Road/Highway 100 will be closed at all hours. The estimated completion date for this work is July 7, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls
Construction Work
Estimated delay under 20 minutes
- Comments
- Expect EB and WB lane closures on I-84 at McCord Creek BR. with one lane open each direction. Traffic revisions in place. Frontage Rd onramp closed. We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
- Last Updated
- 4/15/2026 5:59 PM
I-84: WB MP 38.5 to 37.5
I-84, 7 miles West of Cascade Locks
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 1 Lane
- Comments
- Road work has the WB left lane closed at mile post 38.5. Prepare to slow or move over for worker safety.
- Last Updated
- 3/01/2026 12:56 PM
I-84: EB MP 42 to 64
I-84, 3 miles West of Cascade Locks
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 12:09 PM
I-84: EB MP 70.5
I-84, 7 miles East of Hood River
Crash/Hazard
Unconfirmed
- Comments
- An unconfirmed report of hazardous debris has been received. Use caution.
- Last Updated
- 5/16/2026 1:31 PM
I-84: EB MP 87 to 138.9
I-84, The Dalles
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 2 Lanes (Eastbound) 2 Lanes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures 24 hours per day, 7 days per week. Watch for speed reduction throughout workzone(s). Use caution, prepare to slow.
- Last Updated
- 5/11/2026 1:54 AM
I-84: MP 108 to 109.78
I-84, 3 miles East of Biggs Junction
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB & WB MP 107.90 to MP 109.90 (Rufus) Effective January 5, 2026 this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 108.5 to 109.5
I-84, 4 miles East of Biggs Junction
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/17/2026 12:00:00 AM
- Details
- Alert: I-84 EB & WB MP 108.5 to MP 109.5 (Rufus) Effective May 17, 2026, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM and 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 26, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 137.6 to 138.1
I-84, Arlington
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB & WB MP 137.60 to MP 138.10 (Arlington) Effective January 5, 2026 this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 137.6 to 138.1
I-84, Arlington
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/17/2026 12:00:00 AM
- Details
- Alert: I-84 EB & WB MP 137.60 to MP 138.10 (Arlington) Effective May 17, 2026, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM and 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 26, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 159.3
I-84, 5 miles West of Boardman
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect flagging and single lane closures on Tower Bridge overpass 5/4/26 - 5/8/26. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22880)
- Last Updated
- 5/15/2026 7:44 AM
I-84: MP 159.3
I-84, 5 miles West of Boardman
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB Exit 159 off-ramp to Tower Rd NB (Boardman) Effective May 11, 2026, the I-84 EB Exit 159 off-ramp to Tower Road northbound will be closed at all hours. The estimated completion date for this work is May 18, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 159.3
I-84, 5 miles West of Boardman
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB (Boardman) Effective May 11, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is May 18, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 159.3
I-84, 5 miles West of Boardman
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB (Boardman) Effective May 26, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound will be closed at all hours. The estimated completion date for this work is June 2, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 159.3
I-84, 5 miles West of Boardman
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: I-84 EB Exit 159 off-ramp to Tower Rd NB (Boardman) Effective May 26, 2026, the I-84 eastbound Exit 159 off-ramp to Tower Road northbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is June 2, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 159.5
I-84, 5 miles West of Boardman
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/3/2026 12:00:00 AM
- Details
- Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB & I-84 EB Exit159 off-ramp to Tower Rd NB (Boardman) Effective June 3, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound and the I-84 eastbound Exit 159 off-ramp to Tower Road northbound will be closed at all hours. The estimated completion date for this work is July 2, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: WB MP 167.73 to 177
US730, Intersection with Columbia River Highway I-84
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 2:25 PM
I-84: EB MP 216 to 193
I-84, 7 miles East of Pendleton
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 3:45 PM
I-84: MP 217.7 to 238
I-84, 9 miles East of Pendleton
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 WB MP 217.7 to MP 238.0 (Meacham) Effective May 15, 2026, this section of I-84 westbound will be restricted to 15 feet 00 inches in width Monday through Friday between the hours of 6 AM and 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 217.77 to 238
I-84, 9 miles East of Pendleton
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 5/15/2026 8:54 AM
I-84: WB MP 222.5 to 216
I-84, 14 miles East of Pendleton
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 12:59 PM
I-84: EB MP 223.8
I-84, 15 miles East of Pendleton
Crash/Hazard
No to Minimum Delay
- Comments
- A disabled vehicle is creating a hazard, causing minimal delay to traffic. Use caution.
- Last Updated
- 5/16/2026 1:54 PM
I-84: MP 226.6 to 238
I-84, 18 miles East of Pendleton
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: I-84 EB MP 226.6 to MP 238.0 (Meacham) Effective May 19, 2026, this section of I-84 eastbound will be restricted to 15 feet 00 inches in width Monday through Friday between the hours of 6 AM and 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 26, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 233.94
I-84, 25 miles East of Pendleton
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 WB 233.94 (Meacham) Effective May 15, 2026, this section of I-84 westbound will be restricted to 16 feet 00 inches in height Monday through Friday between the hours of 6 AM and 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 233.95
I-84, 25 miles East of Pendleton
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: I-84 EB MP 233.95 (Meacham) Effective May 19, 2026, this section of I-84 eastbound will be restricted to 16 feet 00 inches in height Monday through Friday between the hours of 6 AM and 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 26, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 238
I-84, 21 miles West of La Grande
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 4:00 PM
I-84: WB MP 241
I-84, 18 miles West of La Grande
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/16/2026 12:08 PM
I-84: MP 249.2 to 259.3
I-84, 10 miles West of La Grande
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: I-84 EB & WB MP 249.2 to MP 259.3 (La Grande) Effective May 19, 2026, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 6 AM & 6 PM. Loads exceeding these dimensions may be accommodated on case-by-case basis. Contact the Over-Dimension Permit Unit for Information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 249.25 to 259.3
I-84, 10 miles West of La Grande
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 5/15/2026 8:54 AM
I-84: MP 256.4
I-84, 3 miles West of La Grande
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: I-84 EB MP 256.4 (La Grande) Effective May 19, 2026, this section of I-84 eastbound will be restricted to 17 feet 5 inches in height Monday through Friday between the hours of 6 AM & 6 PM. Loads exceeding these dimensions may be accommodated on case-by-case basis. Contact the Over-Dimension Permit Unit for Information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 256.4
I-84, 3 miles West of La Grande
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: I-84 WB MP 256.4 (La Grande) Effective May 19, 2026, this section of I-84 westbound will be restricted to 16 feet 9 inches in height Monday through Friday between the hours of 6 AM & 6 PM. Loads exceeding these dimensions may be accommodated on case-by-case basis. Contact the Over-Dimension Permit Unit for Information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 270.4 to 274
I-84, 9 miles East of La Grande
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 5/15/2026 8:55 AM
I-84: MP 270.4 to 274
I-84, 9 miles East of La Grande
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/18/2026 12:00:00 AM
- Details
- Alert: I-84 WB MP 270.4 to MP 274.0 (La Grande) Effective May 18, 2026, this section of I-84 westbound will be restricted to 18 feet 00 inches in width Monday through Friday between the hours of 6 AM and 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-dimension Permit Unit for information. The estimated completion date for this work is May 20, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: WB MP 272.5
I-84, 12 miles East of La Grande
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/16/2026 10:46 AM
I-84: EB MP 273
I-84, 12 miles East of La Grande
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/16/2026 12:09 PM
I-84: WB MP 292
I-84, 6 miles East of North Powder
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/16/2026 10:13 AM
I-84: EB MP 304
I-84, Intersection with Whitney Highway ORE7
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 4:18 PM
I-84: MP 330.7 to 345.8
I-84, 15 miles West of Huntington
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB & WB MP 330.7 to MP 345.8 (Huntington) Effective May 11, 2026, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 6 AM and 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact Over-Dimension Permit Unit for information. The estimated completion date for this work is May 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 335.76 to 376
I-84, 10 miles West of Huntington
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/1/2026 12:00:00 AM
- Details
- Alert: I-84 EB and WB MP 335.76 to MP 376.00 (Weatherby to Ontario) Effective June 1, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Thursday between the hours of 6 AM & 6 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is June 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 338 to 344
I-84, 8 miles West of Huntington
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/12/2026 7:58 AM
I-84: MP 351 to 356
I-84, 5 miles East of Huntington
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB & WB MP 351.0 to 356.0 (Huntington) Effective March 20, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: MP 351 to 356
I-84, 5 miles East of Huntington
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 WB Exit 356 on-ramp from OR201 (Huntington) Effective May 4, 2026, the I-84 westbound Exit 356 on-ramp from OR201 will be closed at all hours. The estimated completion date for this work will be July 03, 2026.
- Last Updated
- 5/16/2026 1:00 PM
I-84: EB MP 352.05 to 368.16
I-84, Baker - Malheur County Line
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Crews will be onsite continuing work. All traffic has transitioned to the eastbound side of the freeway. Follow traffic signs, be prepared to slow and use caution while passing through workzone(s).
- Last Updated
- 5/11/2026 2:00 AM
I-84: MP 353
I-84, 7 miles East of Huntington
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/15/2026 12:00:00 AM
- Details
- Alert: I-84 WB Exit 353 off-ramp to US30 (Huntington) Effective June 15, 2026, the I-84 westbound Exit 353 off- ramp to US30 will be closed at all hours. The estimated completion date for this work is June 18, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US101: MP 4.91
US101, Astoria
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/2/2026 12:00:00 AM
- Details
- Alert: US101 NB & SB MP 4.91 (New Young's Bay Bridge - Astoria) Effective June 2, 2026, this section of US101 northbound and southbound will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is June 4, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US101: MP 28.8 to 31.27
US101, Cannon Beach
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/01/2026 8:37 PM
US101: MP 35 to 21
US101, 5 miles South of Cannon Beach
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 12:23 PM
US101: MP 112.35 to 121.44
US101, Lincoln City
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect nighttime lane closures and delays for ADA curb ramp construction. No lane closures will occur over the weekend. Some night work may occur as needed. From N 34th Street to SW 51st Street / SE 51st Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
- Last Updated
- 5/01/2026 8:40 PM
US101: MP 127.61
US101, Depoe Bay
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
- Last Updated
- 5/01/2026 8:37 PM
US101: MP 134
US101, 7 miles North of Newport
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/01/2026 8:30 PM
US101: MP 136
US101, 5 miles North of Newport
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/01/2026 8:30 PM
US101: MP 205 to 229
US101, 4 miles North of Gardiner
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 5:57 AM
US101: NB MP 236 to 236.5
US101, North Bend
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Lane closure causing minimal delay to traffic. Use caution.
- Last Updated
- 1/17/2026 1:13 PM
US101: NB MP 239.5 to 235.09
US101, 2 miles South of Coos Bay
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 6:43 AM
US101: MP 243 to 261
US101, 1 mile North of Intersection with Coos Bay - Roseburg Highway ORE42
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 1:24 PM
US101: MP 243 to 199
US101, 1 mile North of Intersection with Coos Bay - Roseburg Highway ORE42
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 3:04 PM
US101: NB MP 244 to 240.38
US101, Intersection with Coos Bay - Roseburg Highway ORE42
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 8:50 AM
US101: MP 254 to 261
US101, 10 miles South of Intersection with Coos Bay - Roseburg Highway ORE42
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 12:54 PM
US101: MP 275 to 300
US101, Bandon
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 10:25 AM
US101: MP 312
US101, 12 miles South of Port Orford
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/28/2026 5:47 PM
US101: MP 324
US101, 3 miles North of Wedderburn
Crash/Hazard
No to Minimum Delay
- Comments
- An abandoned vehicle is creating a hazard with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/14/2026 8:05 AM
US101: MP 327.4 to 329.5
US101, Wedderburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/28/2026 5:47 PM
US101: MP 354.8 to 359.3
US101, Brookings
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/28/2026 5:47 PM
US101B: WB MP 0.82 to 0.9
US101B, Warrenton
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/11/2026 8:01 AM
US101B: MP 4.5 to 7
US101B, 3 miles West of Astoria
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/11/2026 8:02 AM
US199: NB MP 2.15
US199, Grants Pass
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement on pathway is causing minimal delay to traffic. Pedestrians and bicyclists use caution.
- Last Updated
- 2/06/2026 12:45 PM
US20: MP 1.75
US20, Albany
Construction Work
Future Event: Estimated delay under 20 minutes
- Expected Start Date
- 6/17/2026 6:00:00 AM
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Work is currently scheduled from 6 a.m. to 4 p.m. on 6/17/2026.
- Last Updated
- 5/11/2026 10:22 AM
US20: MP 1.82 to 2.8
US20, N.E. Purcell Blvd. (Bend)
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22442)
- Last Updated
- 5/11/2026 1:57 AM
US20: MP 19.8 to 19.7
US20, 1 mile South of Intersection with The Dalles - California Highway US97
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/1/2026 12:00:00 AM
- Details
- Alert: US20 EB & WB on- and off-ramps to/from Division St (Bend) Effective October 1, 2026, the US20 eastbound and westbound on- and off-ramps to/from Division Street will be closed at all hours. The estimated completion date for this work is April 30, 2027.
- Last Updated
- 5/16/2026 1:00 PM
US20: NB MP 84 to 84.06
ORE99W, Intersection with Corvallis - Newport Highway US20
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis)
- Last Updated
- 3/30/2026 6:21 PM
US20: MP 84
US20, Lake - Harney County Line
Crash/Hazard
No to Minimum Delay
- Comments
- The road surface has collapsed causing minimal delay to traffic. Use caution.
- Last Updated
- 5/11/2026 1:23 PM
US20: MP 92.29 to 92.7
ORE126, Sisters
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect nightly single lane closures with flaggers throughout work zone Monday - Thursday, pm to 7am. Use caution, prepare to stop.
- Last Updated
- 5/11/2026 1:57 AM
US20: MP 99.75 to 99.99
US20, Sisters
Commercial Vehicle Information
Informational only
- Details
- Alert: US20 EB & WB MP 99.75 to MP 99.99 (Sisters) Effective October 1, 2025, this section of US20 eastbound and westbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US20: MP 99.75 to 99.99
US20, Sisters
Commercial Vehicle Information
Informational only
- Details
- Alert: US20 EB & WB MP 99.75 to MP 99.99 (Sisters) Effective October 1, 2025, this section of US20 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US20: MP 100.5
US20, 5 miles West of Riley
Crash/Hazard
No to Minimum Delay
- Comments
- An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
- Last Updated
- 5/13/2026 5:55 AM
US26: MP 5.85 to 9.96
US26, Portland
Construction Work
Informational only
- Comments
- Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. • SE 174 Avenue will close south of SE Powell Blvd. April 19 – 26. Signed detours will be available. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic.
- Last Updated
- 4/19/2026 8:42 AM
US26: MP 5.87 to 7.9
US26, Portland
Commercial Vehicle Information
Informational only
- Details
- Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 3, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US26: MP 7.9 to 9.96
US26, Portland
Commercial Vehicle Information
Informational only
- Details
- Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width from at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US26: MP 8 to 0
US26, 1 mile West of Necanicum
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 8:45 AM
US26: MP 11 to 13
US26, 11 miles South of Intersection with The Dalles - California Highway US97
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/15/2026 6:16 AM
US26: MP 13
US26, 4 miles East of Necanicum
Crash/Hazard
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 2 Lanes (Eastbound) 1 Lane
- Comments
- Sunken grade. Prepare to slow.
- Last Updated
- 5/04/2026 11:49 AM
US26: MP 16 to 26.1
US26, 10 miles North of Prineville
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/08/2026 8:48 AM
US26: MP 26.06 to 24.31
US26, Intersection with Ochoco Highway ORE126
Maintenance Work
No to Minimum Delay
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/15/2026 6:21 AM
US26: MP 26.66
US26, 8 miles East of Prineville
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/16/2026 8:22 AM
US26: MP 33
US26, 2 miles East of Cherryville
Crash/Hazard
Unconfirmed
- Comments
- An unconfirmed report of a disabled vehicle, creating a hazard, has been received. Use caution.
- Last Updated
- 5/16/2026 2:21 PM
US26: MP 49 to 98
US26, 17 miles West of Mitchell
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/15/2026 11:56 AM
US26: MP 50 to 52
US26, 8 miles West of Intersection with Mount Hood Highway OR35
Commercial Vehicle Information
Informational only
- Details
- Alert: US26 EB and WB MP 50 to MP 52 (Government Camp) Effective May 11, 2026, this section of US26 eastbound and westbound will be restricted to 12 feet 00 inches in width and 100 feet 00 inches in length between the hours of 5 AM and 5 PM. The estimated completion date for this work is May 14, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US26: MP 55
US26, 11 miles West of Mitchell
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/13/2026 10:42 PM
US26: MP 60.86
US26, Intersection with Helvetia Rd
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/13/2026 12:00:00 AM
- Details
- Alert: US26 EB Exit 61 off-ramp's left turn to Brookwood Pkwy/NW Helvetia Rd (Hillsboro) Effective June 13, 2026, the US26 eastbound left turn lane to northbound Brookwood Parkway/NW Helvetia Road, will be closed between the hours of 6:30 AM and 12:00 PM (noon). The estimated completion date for this work is June 13, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US26: MP 61.05
US26, Intersection with Helvetia Rd
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/13/2026 12:00:00 AM
- Details
- Alert: US26 WB Exit 61A off-ramp to NW Helvetia Rd SB (Hillsboro) Effective June 13th, 2026, the US26 westbound Exit 61A off-ramp to NW Helvetia Road southbound will be closed between the hours of 6:30 AM and 12:00 PM (noon). The estimated completion date for this work is June 13th, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US26: MP 72.97 to 73.55
US26, 1 mile West of Portland, Vista Ridge Tunnel
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/19/2026 12:00:00 AM
- Details
- Alert: US26 EB Exit 73 off-ramp to Jefferson St (Portland) Effective May 19, 2026, the US26 eastbound Exit 73 off-ramp to Jefferson St will be closed at night between the hours of 10:00 PM and 4:00 AM. The estimated completion date for this work is May 20, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US26: MP 81.59
US26, 16 miles East of Mitchell
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/15/2026 2:39 PM
US26: MP 172
US26, 3 miles North of Prairie City
Crash/Hazard
Unconfirmed
- Comments
- An unconfirmed report of hazardous debris has been received. Use caution.
- Last Updated
- 5/14/2026 7:18 PM
US26: MP 190 to 231
US26, 15 miles South of Prairie City
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 12:05 PM
US30: EB MP 2.81 to 3.61
US30, Pendleton
Construction Work
No to Minimum Delay
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite to continue work on an ADA Curb Ramp project. Use caution, obey all signs while passing through the work zone.
- Last Updated
- 5/12/2026 5:53 AM
US30: MP 16.03 to 16.71
ORE203, Union
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/12/2026 12:00:00 AM
- Details
- Alert: OR237/OR203 NB & SB MP 16.03 to MP 16.71 (Union) Effective Friday June 12, 2026, this section of OR237/OR203 northbound and southbound will be closed from Grape Street (mile point 16.03) to Fulton Street (mile point 16.71) from 2 PM to 4 PM for the Eastern Oregon Livestock Show Parade. The estimated completion date is June 12, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US30: MP 43.93 to 44.11
US30, 4 miles South of Haines
Construction Work
Closure with Detour
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- Road construction has closed the road. Follow detour. Crews will be onsite for paving and striping. US30 will be closed from MP 43.86 - MP 44.11. Follow detour, use caution, watch for wet paint and expect minimal delay. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23045)
- Last Updated
- 5/15/2026 7:45 AM
US30: MP 63.39
US30, 1 mile West of Clatskanie
Maintenance Work
Future Event: No to Minimum Delay
- Expected Start Date
- 5/18/2026 8:00:00 AM
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/14/2026 6:03 PM
US30: MP 66.52 to 69.4
US30, 6 miles West of The Dalles
Crash/Hazard
Conditional Closure
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
- Comments
- The highway is open to local traffic and local deliveries only. No through traffic allowed.
- Last Updated
- 5/12/2026 5:47 AM
US30: MP 69
US30, 3 miles West of The Dalles
Crash/Hazard
Unconfirmed
- Comments
- An unconfirmed report of a crash has been received. Use caution.
- Last Updated
- 5/16/2026 7:47 AM
US30: MP 70 to 18
US30, Columbia - Clatsop County Line
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 4:24 PM
US30: EB MP 98.45 to 100
US30, Astoria
Maintenance Work
No to Minimum Delay
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 4/27/2026 7:46 AM
US30: MP 99 to 99.34
US30, Astoria
Maintenance Work
No to Minimum Delay
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 4/27/2026 7:47 AM
US30: MP 99.15 to 99.05
US30, Astoria
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane
- Comments
- Utility work is occurring. Prepare to slow. NW Natural Utility Work.
- Last Updated
- 4/29/2026 7:43 AM
US30BY: WB MP 0.25 to 0.26
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. Project Description: This project restores the bridge on NW Bridge Ave. northwest of the St. Johns Bridge, connecting to U.S. 30 <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21704)
- Last Updated
- 4/19/2026 8:43 AM
US30BY: MP 6.14 to 9.21
US30BP, 1 mile East of Intersection with Pacific Highway I-5
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 2:27 PM
US30BY: MP 8.29
US30BP, 3 miles West of Intersection with East Portland Highway I-205
Commercial Vehicle Information
Informational only
- Details
- Alert: US30 Bypass WB MP 8.29 (Portland) Effective May 8, 2026, this section of US30 Bypass will be restricted to 15 feet 1 inch in height at all hours. The estimated completion date for this work is September 1, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US395: MP 4.33 to 6.03
US395, Hermiston
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite conducting work along side the highway. Traffic control devices will be in place while work is being performed. Exercise caution and obey all traffic control signs while passing through the work zone(s). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23430)
- Last Updated
- 5/12/2026 5:50 AM
US395: MP 73.2
US395, 16 miles North of Long Creek
Information
No to Minimum Delay
- Lanes Affected
- (Southbound) , Shoulder
- Comments
- Highway erosion is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/14/2026 7:35 PM
US395: MP 93
US395, 4 miles South of Long Creek
Information
Informational only
Rest Area
- Comments
- Carter rest area is closed for the season.
- Last Updated
- 5/09/2026 6:46 AM
US395: MP 145 to 157
US395, 2 miles South of Lakeview
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 12:57 AM
US95: MP 21
US95, Jordan Valley
Crash/Hazard
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- A disabled vehicle is creating a hazard, causing minimal delay to traffic. Use caution.
- Last Updated
- 5/16/2026 1:22 PM
US95: MP 112
US95, 9 miles North of McDermitt
Crash/Hazard
No to Minimum Delay
- Comments
- A disabled vehicle is creating a hazard, causing minimal delay to traffic. Use caution.
- Last Updated
- 5/15/2026 10:21 AM
US97: MP 18.88 to 27.4
US97, 1 mile South of Moro
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/7/2026 12:00:00 AM
- Details
- Alert: US97 NB & SB MP 18.88 to MP 27.4 (Moro & Grass Valley) Effective June 7, 2026, this section of US97 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM and 7 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US97: MP 114.56 to 116.56
US97, 1 mile North of Terrebonne
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Beginning Monday, April 27 at 7am, the Lower Bridge Way intersection at U.S. 97 will be closed to all traffic. There will be no access to or from Lower Bridge Way at U.S. 97, but U.S. 97 will remain open. Follow posted detours. Access to 11th Street will be closed on the north end of Terrebonne, use Central Avenue. Access to 11th St at south end of Terrebonne will be limited, use Smith Rock Way, Central Avenue and C Street. Prepare to slow, use caution, follow detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21162)
- Last Updated
- 5/13/2026 1:08 AM
US97: MP 114.75 to 116.41
US97, 1 mile North of Terrebonne
Commercial Vehicle Information
Informational only
- Details
- Alert: US97 NB & SB MP 114.75 to MP 116.41 (Terrebonne) Effective May 11, 2026, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width at all hours. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US97: MP 115.23
US97, 1 mile North of Terrebonne
Commercial Vehicle Information
Informational only
- Details
- Alert: US97 NB & SB on- and off-ramps to/from Lower Bridge Way (Terrebonne) Effective April 27, 2026, the US97 northbound & southbound on- and off-ramps to/from Lower Bridge Way will be closed. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 5/16/2026 1:00 PM
US97: MP 129.09
US97, 6 miles North of Bend
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/14/2026 6:54 PM
US97: MP 130.38
US97, 5 miles North of Bend
Crash/Hazard
Unconfirmed
- Comments
- An unconfirmed report of hazardous debris has been received. Use caution.
- Last Updated
- 5/16/2026 11:42 AM
ORE10: SB MP 1.44 to 7.65
ORE99W, I-405 South Interchange
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 2:33 PM
ORE104: MP 1 to 3
ORE104, Warrenton
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/14/2026 4:24 PM
ORE126: MP 0.22 to 13.5
ORE126, Redmond
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20167)
- Last Updated
- 4/06/2026 1:51 AM
ORE126: MP 1.3 to 1.5
ORE126B, Springfield
Commercial Vehicle Information
Informational only
- Details
- Alert: OR126 Bus WB MP 1.3 to MP 1.5 (Willamette River Bridge - Springfield) Effective May 3, 2026, this section of OR126 Business westbound will be restricted to 13 feet 6 inches in width Sunday through Thursday nights between the hours of 7 PM & 5 AM. The estimated completion date for this work is May 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE126: MP 1.37
ORE126, Redmond
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/8/2026 12:00:00 AM
- Details
- Alert: OR126 EB & WB on- and off-ramp/turn to/from SE Veterans Way (Redmond) Effective June 8, 2026, beginning at 7 AM the OR126 eastbound & westbound on- and off-ramp/turn to/from SE Veterans Way will be closed at all hours. The estimated completion date for this work is June 14, 2026 at 5 PM.
- Last Updated
- 5/16/2026 1:00 PM
ORE126: EB MP 3.93 to 7.11
ORE126, Springfield
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-springfield)
- Last Updated
- 5/01/2026 8:35 PM
ORE126: MP 16 to 55
ORE126, Prineville
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/08/2026 4:05 PM
ORE126: MP 92.25 to 92.68
ORE126, Sisters
Commercial Vehicle Information
Informational only
- Details
- Alert: OR126 EB & WB MP 92.25 to MP 92.68 (Sisters) Effective October 1, 2025, this section of OR126 eastbound and westbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE126: MP 92.25 to 92.68
ORE126, Sisters
Commercial Vehicle Information
Informational only
- Details
- Alert: OR126 EB & WB MP 92.25 to MP 92.68 (Sisters) Effective October 1, 2025, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE126: MP 110.65 to 111.97
ORE126, Redmond
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures between 5th and 15th to construct new ADA ramps and enhance signal operations. Various corners will be closed to pedestrian traffic during this time. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
- Last Updated
- 5/11/2026 1:55 AM
ORE126B: WB MP 1.3 to 1.5
ORE126B, Springfield
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Bridge work is occurring. Prepare to slow. Week of the May 4th the contractor will be doing single lane closures at night from 7 PM - 5 AM. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21762)
- Last Updated
- 5/01/2026 8:39 PM
ORE130: MP 0 to 7.55
ORE130, Intersection with Pacific Coast Highway US101
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: OR130 EB & WB MP 0 to MP 7.55 (Dolph) Effective May 26, 2026, this section of OR130 eastbound and westbound will be closed between the hours of 9 AM & 5 PM. The estimated completion date for this work is May 28, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE138: MP 0.5 to 1.4
ORE138, Roseburg
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/28/2026 5:49 PM
ORE138: MP 26 to 0
ORE138, 9 miles East of Glide
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/15/2026 9:37 AM
ORE140: MP 54 to 61
ORE140, Bly
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/04/2026 2:17 PM
ORE140: MP 95 to 85
ORE140, 1 mile West of Lakeview
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 12:15 PM
ORE141: MP 3.8 to 4.44
ORE141, Tigard
Construction Work
Estimated delay under 20 minutes
- Comments
- Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
- Last Updated
- 10/19/2025 6:14 AM
ORE141: MP 7.07 to 3.3
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
- Last Updated
- 6/08/2025 6:59 AM
ORE141: MP 7.07 to 5.01
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
- Last Updated
- 11/09/2025 5:54 PM
ORE153: MP 6 to 7
ORE153, Amity
Commercial Vehicle Information
Informational only
- Details
- Alert: OR153 EB & WB MP 6 to MP 7 (Amity) Effective January 5, 2026, this section of OR153 eastbound and westbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE18B: MP 2 to 2.67
ORE18B, Willamina
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 5/01/2026 8:37 PM
ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 5/01/2026 8:31 PM
ORE19: MP 99
ORE19, 6 miles North of Kimberly
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/16/2026 2:13 AM
ORE201: MP 29.5
ORE201, Ontario
Crash/Hazard
No to Minimum Delay
- Comments
- The road surface has collapsed causing minimal delay to traffic. Use caution.
- Last Updated
- 5/11/2026 1:23 PM
ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld
Maintenance Work
No to Minimum Delay
- Comments
- Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 10/28/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117)
- Last Updated
- 5/13/2026 5:20 AM
ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld
Commercial Vehicle Information
Informational only
- Details
- Alert: OR202 EB & WB MP 38.5 to 38.63 (Vesper) Effective March 11, 2026, this section of OR202 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is October 27, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE202: MP 45 to 27
ORE202, 1 mile North of Mist
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 3:11 PM
ORE206: MP 73 to 54
ORE206, Intersection with Heppner - Spray Highway ORE207
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 4:27 PM
ORE207: MP 0 to 20
ORE207, Intersection with Heppner Highway ORE74
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 3:29 PM
ORE207: MP 0 to 24
ORE207, Intersection with Wasco - Heppner Highway ORE206
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 4:19 PM
ORE207: MP 1 to 16
ORE207, 1 mile South of Intersection with John Day Highway ORE19
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/15/2026 4:05 PM
ORE207: MP 7 to 20
ORE207, 7 miles East of Lexington
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 9:12 AM
ORE207: MP 17.3
ORE207, 8 miles South of Hardman
Crash/Hazard
No to Minimum Delay
- Comments
- A hazardous materials cleanup is causing minimal delay to traffic. Use caution.
- Last Updated
- 4/30/2026 5:14 PM
ORE211: MP 11.8
ORE211, Molalla
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
- Last Updated
- 9/28/2025 8:36 AM
ORE213: MP 7.23 to 7.41
ORE213, Portland
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
- Last Updated
- 5/05/2026 4:46 PM
ORE217: SB MP 0 to 5.9
ORE217, US 26
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 2:32 PM
ORE217: SB MP 4.94
ORE217, 5 miles South of US 26
Crash/Hazard
No to Minimum Delay
- Comments
- A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/16/2026 2:49 PM
ORE219: MP 18.35 to 20.8
ORE219, Newberg
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 5/01/2026 8:39 PM
ORE22: MP 13.1 to 13.3
ORE22, 12 miles West of Intersection with Salmon River Highway ORE18
Construction Work
Future Event: Estimated delay under 20 minutes
- Expected Start Date
- 5/18/2026 7:00:00 AM
- Lanes Affected
- (Westbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/12/2026 12:02 PM
ORE22: WB MP 17 to 15.34
ORE22, 8 miles West of Salem
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 4:24 PM
ORE22: MP 21 to 24.07
ORE22, 4 miles West of Salem
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
- Last Updated
- 5/01/2026 8:40 PM
ORE223: MP 2.13 to 4.28
ORE223, Dallas
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 5/01/2026 8:33 PM
ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/17/2025 3:08 PM
ORE224: MP 36 to 37
ORE224, 13 miles East of Estacada
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts expected. Project Description: Repairs are being made on OR 224 at milepost 36.7 (approximately 10 miles east of Estacada) after a winter storm event in December.
- Last Updated
- 4/10/2026 2:53 PM
ORE229: MP 14.1 to 14.3
ORE229, 10 miles North of Siletz
Commercial Vehicle Information
Informational only
- Details
- Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time.
- Last Updated
- 5/16/2026 1:00 PM
ORE229: MP 14.2 to 15.1
ORE229, 10 miles North of Siletz
Crash/Hazard
Closure
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- A landslide has occurred. Use an alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)
- Last Updated
- 5/14/2026 7:57 PM
ORE234: MP 14.66 to 15.37
ORE234, 3 miles West of Intersection with Crater Lake Highway ORE62
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Sunken pavement; use caution. Crews will return in the spring to complete repairs and install safety features. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M25033)
- Last Updated
- 3/09/2026 10:41 AM
ORE237: MP 31.54 to 32.15
ORE237, North Powder
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be on site prepping, forming, pouring, milling, paving and working on landscape. Use caution, prepare to slow, obey all traffic signs throughout work zone(s).
- Last Updated
- 5/12/2026 5:50 AM
ORE240: MP 11.04 to 11.26
ORE240, Newberg
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 3/30/2026 6:34 PM
ORE241: EB MP 0 to 15
ORE241, Intersection with Oregon Coast Highway US101
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 11:10 AM
ORE241: MP 3.5 to 3.8
ORE241, 3 miles East of Coos Bay
Maintenance Work
No to Minimum Delay
- Comments
- Bridge work is occurring causing minimal delay to traffic. Use caution.
- Last Updated
- 4/28/2026 5:47 PM
ORE241: MP 3.55 to 3.82
ORE241, 3 miles East of Coos Bay
Commercial Vehicle Information
Informational only
- Details
- Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective August 13, 2025, this section of OR241 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE241: MP 3.55 to 3.82
ORE241, 3 miles East of Coos Bay
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/12/2026 12:00:00 AM
- Details
- Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective June 12, 2026, at 6:00 PM, this section of OR241 eastbound and westbound will be closed at all hours. The estimated completion date for this work is June 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE241: MP 3.55 to 3.82
ORE241, 3 miles East of Coos Bay
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/19/2026 12:00:00 AM
- Details
- Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective June 19, 2026, at 6:00 PM, this section of OR241 eastbound and westbound will be closed at all hours. The estimated completion date for this work is June 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE242: MP 61.91 to 84
ORE242, 7 miles East of Intersection with McKenzie Highway ORE126
Information
Seasonal Closure
- Comments
- The highway is closed for the season. Use alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/mckenzie-highway.aspx)
- Last Updated
- 2/03/2026 9:46 AM
ORE260: MP 15.2
ORE260, 7 miles East of Intersection with Redwood Highway US199
Crash/Hazard
No to Minimum Delay
- Lanes Affected
- (Westbound) 1 Lane
- Comments
- A landslide has occurred causing minimal delay to traffic. Use caution.
- Last Updated
- 3/31/2026 4:12 PM
ORE31: MP 29 to 45
ORE31, 18 miles North of Silver Lake
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 3:51 PM
ORE31: MP 60 to 61
ORE31, 9 miles North of Summer Lake
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/07/2026 7:05 PM
ORE31: MP 82 to 90
ORE31, 13 miles South of Summer Lake
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/04/2026 3:07 PM
ORE31: MP 82 to 89
ORE31, 13 miles South of Summer Lake
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 1:25 PM
ORE38: MP 4.9
ORE38, 5 miles East of Intersection with Oregon Coast Highway US101
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/10/2026 1:29 AM
ORE38: MP 36 to 0
ORE38, Elkton
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 11:07 AM
ORE402: MP 23 to 33
ORE402, 9 miles East of Monument
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 3:38 PM
ORE413: MP 11.03 to 11.45
ORE413, Intersection with Pine Creek Highway
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 3/24/2026 1:09 PM
ORE42: EB MP 0 to 9.7
ORE42, Intersection with Oregon Coast Highway US101
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/28/2026 5:41 PM
ORE42: WB MP 0 to 21
ORE42, Intersection with Oregon Coast Highway US101
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/07/2026 7:51 AM
ORE42: MP 20.8 to 21.9
ORE42, Myrtle Point
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/28/2026 5:41 PM
ORE42: MP 21 to 0
ORE42, Myrtle Point
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/07/2026 4:09 PM
ORE42: MP 36.1
ORE42, 1 mile West of Remote
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 4/28/2026 5:46 PM
ORE42: MP 72 to 77
ORE42, 1 mile West of Winston
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/08/2026 1:44 AM
ORE42: MP 72.54 to 76.95
ORE42, Winston
Commercial Vehicle Information
Informational only
- Details
- Alert: OR42 EB & WB MP 72.54 to MP 76.95 (Winston) Effective April 26, 2026, this section of OR42 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours beginning Sundays at 6 PM through Fridays at 3 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE43: SB MP 0 to 11.55
ORE43, Intersection with Mount Hood Highway US26
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 2:33 PM
ORE43: MP 11.08
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective April 6, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Monday through Thursday nights between the hours of 10 PM and 5 AM, Friday nights between the hours of 10 PM and 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. The estimated completion date for this work is May 23, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE43: MP 11.13 to 11.18
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective March 2, 2026, this section of OR43 northbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is May 23, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE43: MP 11.13 to 11.18
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, March 2, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is May 23, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE47: MP 0 to 11
ORE47, Intersection with Lower Columbia River Highway US30
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/14/2026 2:46 PM
ORE47: MP 1.47
ORE47, Clatskanie
Maintenance Work
Future Event: No to Minimum Delay
- Expected Start Date
- 5/18/2026 9:00:00 AM
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/14/2026 5:51 PM
ORE51: MP 5.81 to 6.34
ORE51, Independence
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
- Last Updated
- 5/01/2026 8:34 PM
ORE53: MP 11
ORE53, Clatsop - Tillamook County Line
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 3/30/2026 6:35 PM
ORE540: MP 0.79 to 0.9
ORE540, North Bend
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/06/2026 7:01 PM
ORE540: SB MP 4 to 10
ORE540, 3 miles South of North Bend
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 7:33 AM
ORE542: MP 18 to 18.91
ORE542, Powers
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 9:34 AM
ORE569: EB MP 4.5 to 13
ORE569, Eugene
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 6:05 AM
ORE58: MP 42 to 44
ORE58, 3 miles West of McCredie Springs
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557)
- Last Updated
- 1/04/2026 12:26 PM
ORE58: MP 48.7 to 69.52
Snow Zone
Informational only
- Affected Area
- Willamette Pass Summit (Elev. 5128') - East of McCreadie Springs to Odell Lake
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
- Last Updated
- 5/11/2026 10:23 AM
ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood
Commercial Vehicle Information
Informational only
- Details
- Alert: OR6 EB & WB MP 19.78 to 19.88 (Fisherman's Foot Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is May 15 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
- Last Updated
- 5/01/2026 8:36 PM
ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood
Commercial Vehicle Information
Informational only
- Details
- Alert: OR6 EB & WB MP 32.05 to 32.1 (Devils Lake Fork Wilson River Bridge) Effective February 9, 2026, this section of OR6 eastbound and westbound will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs GVW, Weight Table 2, for all loads at all hours. The estimated completion date for this work is August 28, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE6: MP 33 to 42
ORE6, Tillamook - Washington County Line
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Watch for flaggers and workers. New guardrail will be installed the week of 1/19/26.
- Last Updated
- 5/01/2026 8:31 PM
ORE6: MP 49 to 51
ORE6, Intersection with Nehalem Highway ORE47
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 5/01/2026 8:32 PM
ORE62: MP 18 to 20
ORE62, Shady Cove
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/14/2026 9:18 AM
ORE62: MP 21
ORE62, Shady Cove
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 5/13/2026 9:38 AM
ORE62: MP 35.23 to 35.54
ORE62, 15 miles East of Shady Cove
Commercial Vehicle Information
Informational only
- Details
- Alert: OR62 EB & WB MP 35.23 to MP 35.54 (Shady Cove) Effective April 29, 2026, this section of OR62 eastbound and westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE62: MP 35.23 to 35.54
ORE62, 15 miles East of Shady Cove
Commercial Vehicle Information
Informational only
- Details
- Alert: OR62 EB & WB MP 35.23 to MP 35.54 (Shady Cove Peyton Bridge) Effective May 5, 2026, this section of OR62 eastbound and westbound will be restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle - Weight Table 3, for all loads at all hours. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE62: MP 35.41
ORE62, 15 miles East of Shady Cove
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane traffic controlled by an automated flagging system. Most delays will be less than 5-10 minutes. Crews working Monday – Friday, with closures in place 24/7 until Fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22629)
- Last Updated
- 4/29/2026 5:17 PM
ORE7: MP 50 to 34
ORE7, Baker City
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/12/2026 9:46 AM
ORE74: MP 46 to 82
ORE74, Heppner
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/04/2026 4:03 PM
ORE74: MP 72 to 82
ORE74, 11 miles North of Intersection with Pendleton - John Day Highway US395
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/06/2026 2:44 PM
ORE74: MP 83 to 73
ORE74, Intersection with Pendleton - John Day Highway US395
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/05/2026 3:11 PM
ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
- Last Updated
- 12/09/2025 8:27 AM
ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Nighttime lane closures (8:00 p.m. to 5:30 a.m.) on Canyon Road, Monday through Friday. • Travelers can expect nighttime flagging at Rose Biggi Avenue and Cedar Hills Thursday and Friday nights. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
- Last Updated
- 4/19/2026 8:44 AM
ORE8: WB MP 13.82 to 17.67
ORE8, Hillsboro
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No traffic impacts. Project Description: This safety improvement project in three locations on OR 8 in Hillsboro and Forest Grove includes new sidewalks, an enhanced pedestrian crosswalk, new lighting and upgraded traffic signals. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21608)
- Last Updated
- 5/10/2026 6:17 AM
ORE8: MP 17.6 to 17.7
ORE47, Forest Grove
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 5/26/2026 12:00:00 AM
- Details
- Alert: OR8 EB and WB MP 17.6 to MP 17.7 (Cornelius) Effective May 26, 2026, this section of OR8 eastbound and westbound will be restricted to 14 feet 00 inches in width Monday through Thursday between the hours of 8 AM and 3 PM and Friday between the hours of 9 AM and 2 PM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 30, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE82: MP 2.29 to 2.41
ORE82, La Grande
Commercial Vehicle Information
Informational only
- Details
- Alert: OR82 MP 2.29 to MP 2.41 (Island City) Effective May 15, 2026, this section of OR82 eastbound and westbound will be closed from D Street (mile point 2.29) to McAlister Road (mile point 2.41) from 6:00 PM to 9:00 PM in the city of Island City for the Ag and Timber Parade. The estimated completion date is May 15, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE86: MP 3 to 70
ORE86, Intersection with Old Oregon Trail Highway I-84
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/11/2026 4:48 PM
ORE86: MP 34.01 to 70.58
ORE86, 7 miles West of Richland
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite replacing guardrail at various locations. Expect daytime lane closures with flagging.
- Last Updated
- 5/11/2026 1:57 AM
ORE86: MP 40.64
ORE86, Richland
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal control. Use caution, prepare to slow.
- Last Updated
- 4/21/2026 1:05 AM
ORE86: MP 42.01 to 42.4
ORE86, Richland
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 3/24/2026 1:11 PM
ORE86: MP 56.47
ORE86, 14 miles West of Oregon - Idaho Border
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal controls. Use caution, prepare to slow.
- Last Updated
- 4/21/2026 1:15 AM
ORE99: MP 10.2 to 11.25
ORE99, 1 mile North of Phoenix
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. The week of April 26, expect single lane traffic through the construction area as the contractor begins paving. Expect intermittent lane closures through the work zone on OR 99, Monday through Friday.
- Last Updated
- 4/28/2026 5:50 PM
ORE99: MP 14.42 to 16.09
ORE99, Cottage Grove
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-cottagegrove)
- Last Updated
- 5/01/2026 8:35 PM
ORE99E: MP 3 to 4.4
ORE99E, Portland
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 6/1/2026 12:00:00 AM
- Details
- Alert: OR99E NB & SB MP 3.00 to MP 4.40 (Portland) Effective June 1, 2026, this section of OR99E northbound and southbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 9:00 AM & 5:00 PM for northbound and 9:00 AM & 2:00 PM for southbound. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 23, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE99E: MP 11.63
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- Alert: OR99E SB off-ramp to I-205 SB (Oregon City) Effective March 2, 2026, the OR99E southbound off-ramp to I-205 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is May 22, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE99E: MP 40.75 to 40.81
ORE99E, Brooks
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/01/2026 8:37 PM
ORE99EB: MP 2 to 5
99EBus, Salem, Intersection with Hyacinth St NE (East)/Verda Ln (West)
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 5/07/2026 3:28 PM
ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 5/01/2026 8:40 PM
ORE99W: MP 31
ORE99W, 1 mile North of Lafayette
Crash/Hazard
Estimated delay under 20 minutes
- Comments
- Hazardous debris on the road. Prepare to slow.
- Last Updated
- 5/16/2026 2:28 PM
ORE99W: NB MP 38.07 to 37.8
ORE99W, McMinnville
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/05/2026 5:37 PM
ORE99W: MP 44 to 45
ORE99W, Amity
Commercial Vehicle Information
Informational only
- Details
- Alert: OR99W NB & SB MP 44 to MP 45 (Amity) Effective January 5, 2026, this section of OR99W northbound and southbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and on Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
- Last Updated
- 5/16/2026 1:00 PM
ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
- Last Updated
- 5/05/2026 6:56 AM
ORE99W: NB MP 84.17 to 86.31
ORE99W, Intersection with Corvallis - Newport Highway US20
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Work on the project has now begun. Expect night time lane closures Monday through Thursday nights from 7:00 PM to 6:00 AM. Expect some noise and short delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22785)
- Last Updated
- 5/14/2026 10:36 AM
HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park
Construction Work
No to Minimum Delay
- Comments
- The east viaduct is opened. Periodic single-lane closures on the East Viaduct until 9 a.m. starting May 18. Use caution and watch for workers. I-84 is open; expect delays. Use I-84 Exit 31 or take transit to visit Multnomah Falls. The Historic Columbia River Highway viaducts, east and west of Multnomah Falls, are open to vehicles less than 35 feet long and bicycle travel only. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roads that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roads– called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct is open. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. Over the summer, travelers using the east viaduct can expect to see flaggers directing traffic while crews clean up the site, complete finishing touches on the railings and install permanent striping. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
- Last Updated
- 5/16/2026 8:50 AM
HWY372: MP 4.64 to 21.98
HWY372, 3 miles East of Intersection with Dillon Falls Road
Information
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) 1 Lane (Westbound) 1 Lane
- Comments
- A special event is taking place. Prepare to slow. Bikes will be on the roadway.
- Last Updated
- 5/16/2026 8:59 AM