Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

I-105: MP 0.21

Commercial Vehicle Information
Informational only
Details
I-105 EB on-ramp from W 6th Ave (Eugene) Effective March 18, 2019, the I-105 eastbound on-ramp from West 6th Avenue will be closed at all hours. The estimated completion date for this project is May 24, 2019.
Last Updated
4/25/2019 10:00 AM

I-105: EB MP 0.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Two westbound lanes are available south of the Willamette River Bridge during the day, and one lane at night between 10:00 pm and 6:00 am. Two lanes are also open in the eastbound lanes. Travelers should expect this traffic configuration to remain for several weeks. The 6th Avenue on-ramp to eastbound I-105 remains open at this time. Work continues around the 6th and 7th Avenue ramps. Travelers should expect lane closures and changes in traffic patterns in the work zone.
Last Updated
4/02/2019 6:31 PM

I-205: MP 12.94

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR212/OR224 (Estacada) Effective February 11, 2019, the I-205 northbound on-ramp from OR212/OR224 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is May 12, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: SB MP 13.45 to 14.17

Construction Work
No to Minimum Delay
Comments
Periodic shoulder closures.
Last Updated
4/22/2019 2:31 AM

I-205: MP 13.6

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR224/Sunrise Expressway (Milwaukie) Effective February 11, 2019, the I-205 northbound on-ramp from OR224/Sunrise Expressway will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is May 12, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 13.95

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 14 to Sunnybrook Blvd (Milwaukie) Effective February 11, 2019, the I-205 northbound Exit 14 to Sunnybrook Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is May 12, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 14.32 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 14.17 to MP 13.45 (Clackamas) Effective February 11, 2019, this section of I-205 southbound crossing under SE 82nd Dr will be restricted to 17 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 southbound will be restricted to 16 feet 5 inches in height and 16 feet 7 inches in height northbound. Loads higher may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 1, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 16 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 1, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 southbound will be restricted to 16 feet 5 inches in height and 16 feet 7 inches in height northbound. Loads higher may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 1, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: SB MP 16.3 to 25.6

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane and ramp closures. Division Street on-ramp to northbound I-205 and auxiliary lane closed 24/7. Periodic nighttime single and double lane closures in both directions and periodic ramp closures. Periodic nighttime ramp closures at the I-205 northbound Division Street on-ramp, northbound Exit 20 toward Washington and Stark Streets, the southbound Washington Street on-ramp, and northbound Exit 23B to Killingsworth Street/U.S. 30 Bypass. Periodic daytime single lane closures in both directions on Glisan Street and on Washington and Stark. Pedestrian detours at Washington, Stark and Glisan Streets.
Last Updated
4/22/2019 2:31 AM

I-205: MP 19.68

Construction Work
Closure
On Ramp
Comments
The Division on-ramp to I-205 north is closed 24/7. Use SE 82nd Avenue to Washington Street. Ramps Affected.
Last Updated
4/22/2019 2:31 AM

I-205: MP 19.87 to 18.89

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St (Portland) Effective August 2, 2019, the I-205 northbound Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 19.87

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from Division St (Portland) Effective March 11, 2019, the I-205 northbound on-ramp from Division St will be intermittently closed at all hours. The estimated completion date for this project is May 10, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 19.87 to 18.89

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St (Portland) Effective August 2, 2019, the I-205 northbound Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 19.87

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from Division St (Portland) Effective March 11, 2019, the I-205 northbound on-ramp from Division St will be intermittently closed at all hours. The estimated completion date for this project is May 10, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 20.02

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 19 (US26/Powell Blvd/Division St - Portland) Effective April 1, 2019, the I-205 southbound Exit 19 off-ramp to US26/Division St/Powell Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective August 2, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 20.63

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 21A off-ramp to Glisan St (Portland) Effective August 2, 2019, the I-205 northbound Exit 21A off-ramp to Glisan St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 21.66 to 17.12

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 17 to MP 22 (Portland) Effective August 2, 2019, this section of I-205 northbound will be closed at all hours beginning at 10 PM. The estimated completion date for this project is 5 AM on August 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 21.71

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 21B off-ramp to I-84 WB (Portland) Effective May 17, 2019, the I-205 southbound Exit 21B off-ramp to I-84 westbound will be closed Friday night between the hours of 10 PM to 5 AM. The estimated date of completion for this project is May 18, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 22.63

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 EB (Portland) Effective June 18, 2018, the I-205 northbound on-ramp from I-84 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 22.86

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 WB (Portland) Effective June 19, 2018, the I-205 northbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23A to US30 Bypass EB (Portland) Effective June 19, 2018, I-205 northbound Exit 23A ramp to US30 Bypass eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective May 10, 2019, the I-205 northbound Exit 23B to US30 Bypass westbound will be closed at all hours beginning at 9 PM. The estimated date of completion for this project is May 24, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective June 20, 2018, the I-205 northbound Exit 23B ramp to US30 Bypass westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective May 10, 2019, the I-205 northbound Exit 23B to US30 Bypass westbound will be closed at all hours beginning at 9 PM. The estimated date of completion for this project is May 24, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18th, 2019, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 18, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18, 2019, this section of I-205 northbound will be restricted to 16 feet 10 inches in height and 16 feet 05 inches southbound Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads higher than 16 feet 10 inches northbound or higher than 16 feet 05 inches southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 18, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18th, 2019, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 18, 2019.
Last Updated
4/25/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18, 2019, this section of I-205 northbound will be restricted to 16 feet 10 inches in height and 16 feet 05 inches southbound Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads higher than 16 feet 10 inches northbound or higher than 16 feet 05 inches southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 18, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 0.951

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1C off-ramp to 6th Ave (Portland) Effective May 13, 2019, the I-405 northbound exit 1C off-ramp to 6th Ave will be closed Monday through Wednesday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 1.03

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Broadway/6th Ave (Portland) Effective April 8, 2019, the I-405 northbound on-ramp from Broadway/6th Ave will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 22, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 1.24

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1D to US26 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 1D off-ramp to US26 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 22, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: SB MP 1.46 to 3.98

Construction Work
No to Minimum Delay
Comments
Daytime lane closures with flaggers directing traffic on Mississippi Avenue and Interstate Avenue for overhead work on I-405. Periodic shoulder closures. Delays for people walking and biking.
Last Updated
4/22/2019 2:32 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.451 to 2.12

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.12 to MP 2.45 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height and 15 feet 11 inches in height southbound Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.62

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from NW Glisan St (Portland) Effective March 27, 2019, the I-405 northbound on-ramp from NW Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 22, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective May 3, 2019 , the I-405 northbound Exit 3 off-ramp to US30 westbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 22, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective May 3, 2019 , the I-405 northbound Exit 3 off-ramp to US30 westbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 22, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: NB MP 2.9

Construction Work
No to Minimum Delay
Comments
Daytime lane closures with flaggers directing traffic on Mississippi Avenue and Interstate Avenue for overhead work on I-405. Periodic shoulder closures. Delays for people walking and biking.
Last Updated
4/22/2019 2:32 AM

I-405: MP 3.32 to 3.11

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 3.5 to MP 3.1 (Portland) Effective June 16, 2019, this section of I-405 southbound will be restricted to 22 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads wider than 22 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.32 to 3.11

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 3.5 to MP 3.1 (Portland) Effective June 16, 2019, this section of I-405 southbound will be restricted to 17 feet 05 inches in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads higher than 17 feet 05 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.32 to 3.11

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 3.5 to MP 3.1 (Portland) Effective June 16, 2019, this section of I-405 southbound will be restricted to 22 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads wider than 22 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.32 to 3.11

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 3.5 to MP 3.1 (Portland) Effective June 16, 2019, this section of I-405 southbound will be restricted to 17 feet 05 inches in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads higher than 17 feet 05 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.32 to 3.11

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 3.5 to MP 3.1 (Portland) Effective June 16, 2019, this section of I-405 southbound will be restricted to 22 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads wider than 22 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.32 to 3.11

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 3.5 to MP 3.1 (Portland) Effective June 16, 2019, this section of I-405 southbound will be restricted to 17 feet 05 inches in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads higher than 17 feet 05 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective May 1, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective May 3, 2019 , the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective May 1, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective May 3, 2019 , the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective May 1, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective May 1, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective May 3, 2019 , the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective May 1, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective May 1, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: SB MP 3.7

Construction Work
No to Minimum Delay
Comments
Daytime lane closures with flaggers directing traffic on Mississippi Avenue and Interstate Avenue for overhead work on I-405. Periodic shoulder closures. Delays for people walking and biking.
Last Updated
4/22/2019 2:32 AM

I-405: MP 4.14 to 3.2

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 4.14 to MP 3.20 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 16 feet 03 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: NB MP 10 to 12.5

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
4/23/2019 12:00 AM

I-5: NB MP 33

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Monday night, guard rails will be placed and traffic shifted as project nears final stages. Watch for workers and equipment in the off-ramp area. This project will widen the existing northbound off-ramp to allow for dual right turn lanes. No traffic delays expected, but there may be some queueing in the peak hour. Watch for workers and equipment off the shoulder. OREGON 62 (Crater Lake Highway), MP .7 -1.73 / 5.38 - 5.77, Rogue Valley Expressway Project Phases I & II ($120 million) Some punch list items and awaiting signal turn on and final striping which is weather dependent. Weather permitting, look for the opening sometime after May 1.
Last Updated
4/22/2019 11:59 PM

I-5: SB MP 48

Maintenance Work
No to Minimum Delay
Off Ramp
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution. Ramps Affected.
Last Updated
4/26/2019 1:38 AM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
4/25/2019 10:00 AM

I-5: SB MP 118 to 113

Construction Work
Informational only
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is or will be occurring. Use caution. This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction will continue until summer 2021. On Roberts Mountain (MP 118-116), the speed limit has been reduced to 55 mph in the southbound direction. The southbound shoulder is closed in this area. Elsewhere, watch for intermittent lane and shoulder closures. For more information, visit: www.RobertsMountain.com.
Last Updated
4/22/2019 11:57 PM

I-5: NB MP 124

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Pedestrians should watch for construction activity north of the bridge, from Gaddis Park to the pedestrian bridge.
Last Updated
4/22/2019 11:57 PM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

I-5: MP 254.25

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 253 on- and off-ramps to/from OR22 (Salem) Effective April 17, 2019, the I-5 SB Exit 253 on- and off-ramps to/from OR22 will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is May 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 254.74 to 257.53

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 254.74 to MP 257.53 (Salem) Effective May 13, 2019, this section of I-5 northbound will be restricted to 17 feet 3 inches in height between the hours of 9 PM & 5 AM. Loads higher than 17 feet 3 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 255.95

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 256 on- and off-ramps to/from Market St (Salem) Effective March 4, 2019, the I-5 NB & SB Exit 256 on- and off-ramps to/from Market St will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is May 19, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 256.62

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 256 on- and off-ramps to/from Market St (Salem) Effective May 13, 2019, the I-5 NB & SB Exit 256 on- and off-ramps to/from Market St will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is August 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 258.4

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 258 on- and off-ramps to/from OR99E (Salem) Effective March 18, 2019, the I-5 NB & SB Exit 258 on- and off-ramps to/from OR99E will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 26, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 259.03 to 272

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 259.03 to MP 272 (Woodburn) Effective May 13, 2019, this section of I-5 northbound will be restricted to 16 feet 04 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 04 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 263.23

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 263 on-ramp from Brooklake Rd (Salem) Effective May 16, 2019, the I-5 southbound Exit 263 on-ramp from Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 263.28

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 263 off-ramp to Brooklake Rd (Salem) Effective May 16, 2019, the I-5 northbound Exit 263 off-ramp to Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 263.49 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 263.49 to MP 259.1 (Woodburn) Effective May 13, 2019, this section of I-5 southbound will be restricted to 16 feet 02 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 02 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 263.69

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 263 off-ramp to Brooklake Rd (Salem) Effective May 16, 2019, the I-5 southbound Exit 263 off-ramp to Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 263.76

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 263 on-ramp from Brooklake Rd (Salem) Effective May 16, 2019, the I-5 northbound Exit 263 on-ramp from Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 271.85 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 259 to MP 272 (Woodburn) Effective May 13, 2019, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 271.85 to 263.69

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 271.85 to MP 263.69 (Woodburn) Effective May 13, 2019, this section of I-5 southbound will be restricted to 16 feet 04 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 04 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: SB MP 294.21 to 288.55

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane and ramp closures in both directions. The southbound on- and off-ramps to Lower Boones Ferry (exit 290) and Nyberg Street (exit 289) will be closed at night between 10 p.m. and 5 a.m. Shoulder closures.
Last Updated
4/22/2019 2:30 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective April 11, 2019, the I-5 northbound off-ramp to I-84 eastbound will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 15 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 15 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective April 11, 2019, the I-5 northbound off-ramp to I-84 eastbound will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 15 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 301.36

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Morrison Bridge (Portland) Effective May 28, 2019 the I-5 northbound on-ramp from Morrison Bridge will be closed between the hours of 9 PM & 5 AM. The estimated completion date for this project is June 1, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: SB MP 301.45 to 301.92

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Full closures of the ramps from I-84 west to I-5 north and I-5 south to I-84 east from 10pm April 26 to 5am April 29. Weekend full closures of the ramps from I-84 west to I-5 north and I-5 south to I-84 east. The ramp from I-84 west to I-5 north will be closed from 10 p.m. Friday 4/26 through Saturday night/Sunday morning. The ramp from I-5 south to I-84 east will be closed Saturday night/Sunday morning through 5 a.m. Monday, April 29. Nighttime lane closures on the ramp from I-5 north to I-84 west Thursday, April 25.
Last Updated
4/23/2019 3:31 PM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB exit 300B to US26/OR99E/OMSI/Belmont St/Morrison St (Portland) Effective May 28, 2019 the I-5 southbound Exit 300B off-ramp to US26/OR99E/OMSI/Belmont St/Morrison St will be closed between the hours of 9 PM & 5 AM. The estimated completion date for this project is June 1, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 301.911

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 301 to I-84 EB (Portland) Effective September 20, 2018, the I-5 southbound off-ramp to I-84 eastbound will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM. In addition, starting Friday nights at 10 PM, this ramp will be closed at all hours, until 5 AM Monday mornings. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 302.74 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 302.70 to MP 304.00 (Portland) Effective March 7, 2019, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-5: MP 303.15 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 303.15 to MP 303.98 (Portland) Effective March 7, 2019, I-5 northbound will be restricted to 15 feet 06 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-5: MP 303.47

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 302B to I-405 SB (Portland) Effective April 8, 2019, the I-5 southbound exit 302B off-ramp to I-405 southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 1/2 hour before sunrise. The estimated completion date for this project is April 22, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 303.76 to 304.07

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 303 (Swan Island/N Going St - Portland) Effective July 23, 2018, the I-5 northbound and southbound on/off ramps (Exit 303) will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 303.81

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from N Going St (Portland) Effective March 27, 2019, the I-5 southbound on-ramp from N Going St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 303.95

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Alberta St (Portland) Effective July 27, 2018, the I-5 southbound on-ramp from Alberta St will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 20, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 303.98 to 303.16

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 303.98 to MP 303.16 (Portland) Effective March 7, 2019, this section of I-5 southbound will be restricted to 15 feet 05 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
4/25/2019 10:00 AM

I-5: MP 304.5

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Alberta St (Portland) Effective July 27, 2018, the I-5 northbound on-ramp from Alberta St will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 304.75 to 305.12

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 304 (Rosa Parks - Portland) Effective August 13, 2018, the I-5 northbound and southbound on and off ramps to Rosa Parks Way will be will be intermittently closed through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: NB MP 305 to 307.97

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane and ramp closures weekdays and daytime lane closures on ramps for paving. Nighttime lane closures with flagging at the intersections of Victory Boulevard and Marine Drive. Nighttime ramp closures on Broadway/Weidler, Going Street, Rosa Parks Way, Lombard Boulevard, Victory Boulevard, Marine Drive and Jantzen Beach from 9 p.m. to 5 a.m. Daytime single lane closures on the ramps from 9 a.m. to 3 p.m.
Last Updated
4/22/2019 2:30 AM

I-5: MP 305.24 to 305.4

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB on/off ramps to US30 Bypass (Portland) Effective July 17, 2018, the I-5 northbound and southbound on/off ramps to/from US30 Bypass will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 306.97 to 306.51

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 306.50 to MP 307.50 (Victory Blvd/Hwy 091 Portland) Effective August 3, 2018, the I-5 northbound and southbound on/off ramps to/from Victory Blvd/Hwy 091 will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-5: MP 307.14 to 307.471

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 307 (Marine Dr/OR99E - Portland) Effective March 4, 2019, the I-5 northbound and southbound on/off ramps to/from Marine Dr/OR99E will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-82: MP 0.61 to 1.81

Commercial Vehicle Information
Informational only
Details
I-82 NB & SB MP 0.50 to MP 3.00 (Umatilla) Effective March 25, 2019, this section of I-82 northbound and southbound will be restricted to 18 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-82: EB MP 1.77 to 10.27

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Lane closures and speed reductions are in place in the construction zone EB and WB. No to minimum delay. This project includes replacement of bridge end panels and paving.
Last Updated
4/22/2019 7:01 PM

I-82: MP 10.01 to 10.41

Commercial Vehicle Information
Informational only
Details
I-82 NB & SB MP 10.00 to MP 10.50 (Umatilla) Effective March 25, 2019, this section of I-82 northbound and southbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this project is August 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-82: MP 10.01 to 10.41

Commercial Vehicle Information
Informational only
Details
I-82 NB & SB MP 10.00 to MP 10.50 (Umatilla) Effective September 1, 2019 this section of I-82 northbound and southbound will be restricted to 18 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-82: MP 10.41

Commercial Vehicle Information
Informational only
Details
I-82 SB MP 10.41 (Umatilla) Effective September 1, 2019 this section of I-82 southbound will be restricted to 17 feet 09 inches in height at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-82: MP 10.41

Commercial Vehicle Information
Informational only
Details
I-82 SB MP 10.41 (Umatilla) Effective March 25, 2019, this section of I-82 southbound will be restricted to 17 feet 09 inches in height at all hours. The estimated completion date for this project is August 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 0.37

Commercial Vehicle Information
Informational only
Details
I-84 WB to I-5 SB (Portland) Effective November 26, 2018, the I-84 westbound off-ramp to I-5 southbound will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM. Starting Friday night at 10 PM, this ramp will be closed at all hours until Monday morning at 5 AM. The estimated completion date for this project is May 6, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 0.66

Commercial Vehicle Information
Informational only
Details
I-84 EB on-ramp from Grand Ave (Portland) Effective May 5, 2019, the I-84 eastbound on-ramp from Grand Ave will be closed on Sundays between the hours of 6 AM & 3 PM. The estimated completion date for this project is May 19, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: WB MP 17 to 17.6

Construction Work
Estimated delay under 20 minutes
Comments
Daytime and nighttime single lane closures on I-84 and daytime lane closures on Graham Road. Expect flaggers directing traffic with short-term traffic holds on Graham Road Monday from 10 a.m. to noon. Daytime lane closures on I-84 between 8 a.m. and 6 p.m., and shoulder closures. Nighttime lane closures from 10 p.m. to 5:30 a.m.
Last Updated
4/22/2019 2:30 AM

I-84: MP 17.56

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 17.56 (Troutdale) Effective March 12, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height Monday through Thursday between the hours of 7 AM to 6 PM, and Friday 7 AM to 3 PM. The estimated completion date for this project is April 26, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 17.571 to 17.37

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 17.60 to MP 17.09 (Troutdale) Effective May 2, 2019, this section of I-84 westbound will be closed between the hours of 10 PM & 5 AM. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 22.1 to 22.36

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 22 to MP 24 (Corbett) Effective June 3, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Wednesday between the hours of 6 AM & 6 PM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 22.1

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 22.10 (Corbett) Effective June 3, 2019, this section of I-84 westbound will be restricted to 15 feet 5 inches in height Monday through Wednesday between the hours of 6 AM & 6 PM. Loads higher than 16 feet 00 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 5, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 27.86

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 27.8 (Corbett) Effective April 26, 2019, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width between the hours of 9 PM & 6 AM. The estimated completion date for this project is April 27, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 27.86

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 28 off-ramp to Historic Columbia River Hwy (Corbett) Effective April 26, 2019, the I-84 eastbound exit 28 off-ramp to Historic Columbia River Hwy will be closed between the hours of 9 PM & 6 AM. The estimated completion date for this project is April 27, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 37.83

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 37.83 (Cascade Locks) Effective April 29, 2019, this section of I-84 eastbound will be intermittently restricted to 14 feet 00 inches in width Monday through Friday between the hours of 7 AM & 6 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: WB MP 51 to 53

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Single lane closure for eastbound I-84 and shoulder closures from 7 a.m. to 5 p.m. Monday through Thursday.
Last Updated
4/22/2019 2:30 AM

I-84: MP 63.4

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 63.41 (Hood River) Effective April 29, 2019, this section of I-84 westbound will be intermittently restricted to 14 feet 00 inches in width Monday through Friday between the hours of 7 AM & 6 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 85.3

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 85 on- and off-ramps to City Center (The Dalles) Effective April 22, 2019, the I-84 eastbound and westbound Exit 85 on- and off-ramps to/from City Center will be closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 87.01 to 64.26

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64.22 to MP 87.01 Effective March 11, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 05 inches in height Monday through Thursday between the hours of 7 AM & 7 PM. Loads higher than 16 feet 05 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 1, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 99.85 to 63.92

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64 to MP 100 Effective March 11, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width Monday through Thursday between the hours of 7 AM & 7 PM. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 1, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 99.85 to 63.92

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64.00 to MP 100.00 Effective January 16, 2019 this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 7 PM & 10 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is March 27, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 100.61 to 103.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:01 PM

I-84: MP 101.68

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 104 to MP 100 (Biggs Junction) Effective April 29, 2019, this section of I-84 westbound will be restricted to 16 feet 00 inches in width at all hours. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 104.56

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 104.56 (Biggs Junction) Effective February 25, 2019, this section of I-84 westbound crossing under US97 at Exit 104, will be restricted to 17 feet 10 inches in height Monday through Friday between the hours of 5 AM & 10 PM. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 104.78

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 104 off-ramp to US97 (Biggs Junction) Effective January 16, 2019, the westbound I-84 off-ramp to US97 (Exit 104) will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is April 4, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 104.83

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 104 on-ramp from US97 (Biggs Junction) Effective January 16, 2019, the eastbound I-84 on-ramp from US97 (Exit 104) will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is April 4, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 108 to 103.75

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 104.20 to MP 105.30 (Biggs Junction) Effective January 16, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is April 4, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 109.02

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 109.02 (Rufus) Effective April 29, 2019, this section of I-84 westbound will be intermittently restricted to 14 feet 00 inches in width Monday through Friday between the hours of 7 AM & 6 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 109.17 to 110.77

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:00 PM

I-84: MP 109.68

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 109 on-ramp from John Day Dam (Rufus) Effective January 16, 2019, the I-84 westbound on-ramp from John Day Dam (Exit 109) will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is June 10, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 109.76

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 109 off-ramp to John Day Dam (Rufus) Effective January 16, 2019, the I-84 eastbound off-ramp to John Day Dam (Exit 109) will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is June 10, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 114.13 to 99.85

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 100.00 to MP 112.00 (Biggs Junction) Effective February 25, 2019, this section of I-84 eastbound and westbound will be restricted to 20 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 114.13 to 109.02

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 109.25 to MP 110.50 (Rufus) Effective January 16, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is June 10, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 123.31

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 123.31 (Arlington) Effective April 12, 2019, this section of I-84 eastbound will be restricted to 17 feet 00 inches in height Sunday through Saturday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is April 24, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 123.31

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 123.31 (Arlington) Effective May 1, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 07 inches in height at all hours. The estimated completion date for this project is May 23, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 123.31

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 123.31 (Arlington) Effective April 12, 2019, this section of I-84 eastbound will be restricted to 17 feet 00 inches in height Sunday through Saturday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is April 24, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 123.31

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 123.31 (Arlington) Effective May 1, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 07 inches in height at all hours. The estimated completion date for this project is May 23, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 125.5 to 137.78

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Intermittent single lane closures will be in place both EB and WB in the construction zone. No to minimum delay.
Last Updated
4/21/2019 6:36 PM

I-84: MP 129.22 to 137.59

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 125.50 to MP 137.78 (Arlington) Effective May 1, 2019, this section of I-84 eastbound and westbound will be restricted to 15 feet 06 inches in width at all hours. The estimated completion date for this project is May 23, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 129.22 to 137.78

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 125.50 to MP 137.78 (Arlington) Effective April 12, 2019, this section of I-84 eastbound will be restricted to 12 feet 00 inches in width Sunday through Saturday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is April 24, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 129.22 to 137.59

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 125.5 to MP 137.78 (Arlington) Effective June 6, 2019, this section of I-84 eastbound and westbound will be restricted to 15 feet 6 inches in width at all hours. The estimated completion date for this project is June 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 129.22

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 129 on- and off-ramps to from Blalock Canyon Rd (Arlington) Effective June 6, 2019, the I-84 eastbound exit 129 on- and off-ramps to/from Blalock Canyon will be closed at all hours. The estimated completion date for this project is June 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 129.72

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 129 on- and off-ramps to Blalock Canyon (Arlington) Effective April 24, 2019, the I-84 westbound exit 129 on- and off-ramps to/from Blalock Canyon will be closed at all hours. The estimated completion date for this project is May 23, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 131.61 to 136.9

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:00 PM

I-84: MP 137.92

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 137.92 (Arlington) Effective April 29, 2019, this section of I-84 eastbound and westbound will be intermittently restricted to 14 feet 6 inches in width Monday through Friday between the hours of 7 AM & 6 PM. Loads wider than 14 feet 06 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 146.46 to 148.18

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:00 PM

I-84: MP 147.36

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 147.36 (Arlington) Effective March 15, 2019, this section of I-84 westbound crossing under Exit 147 is restricted to 15 feet 10 inches in height Monday through Friday between the hours of 5 AM & 10 PM. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 148.59 to 131.03

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 131 to MP 149 (Arlington) Effective March 15, 2019 this section of I-84 eastbound and westbound will be restricted to 20 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 152 to 64

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Intermittent single lane closures will be in place both EB and WB in the construction zone. No to minimum delay. This construction project includes installation of new guardrail end treatments, bridge screening, and bridge rail replacement.
Last Updated
4/21/2019 6:34 PM

I-84: MP 152.002 to 151.49

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 151 to MP 152 (Boardman) Effective June 17, 2019, this section of I-84 eastbound will be restricted to 20 feet 00 inches in width at all hours. The estimated completion date for this project is July 26, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 159.3

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 159.30 (Boardman) Effective March 18, 2019, this section of I-84 westbound crossing under Exit 159 is restricted to 16 feet 01 inch in height Monday through Friday between the hours of 5 AM & 10 PM. The estimated completion date for this project is June 28, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 167.94 to 156.32

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 154 to MP 174 (Boardman) Effective March 18, 2019 this section of I-84 eastbound and westbound will be restricted to 20 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 28, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective May 13, 2019, this section of I-84 westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is July 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective May 6, 2019, this section of I-84 westbound will be restricted to 17 feet 00 inches in width Monday through Friday between the hours of 6 AM & 7 PM. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective May 13, 2019, this section of I-84 westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is July 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective May 6, 2019, this section of I-84 westbound will be restricted to 17 feet 00 inches in width Monday through Friday between the hours of 6 AM & 7 PM. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 207.47

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 207.47 (Pendleton) Effective April 12, 2019, this section of I-84 eastbound will be restricted to 18 feet 01 inches in height between the hours of 5 AM & 10 PM. The estimated completion date for this project is June 21, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 210.96 to 207.1

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 205 to MP 211 (Pendleton) Effective April 12, 2019, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width between the hours of 5 AM & 10 PM. The estimated completion date for this project is June 21, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 214 to 259.97

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures are in place both EB and WB in the construction zone. No to minimum delay. This project includes grading, structures, signing, illumination, and signals.
Last Updated
4/22/2019 5:06 PM

I-84: MP 214.001 to 259.35

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 214 to MP 259.97 (Pendleton) Effective April 1, 2019 , this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 214.001 to 259.35

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 214 to MP 259.97 (Pendleton) Effective April 1, 2019 , this section of I-84 eastbound and westbound will be restricted to 15 feet 11 inches in height at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 256.4

Commercial Vehicle Information
Informational only
Details
I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 260.32 to 272.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Intermittent lane closures may be in place EB and WB in the construction zone. No to minimum delay expected. This project includes grading, drainage, structures, paving, illumination, and roadside development.
Last Updated
4/22/2019 9:01 PM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width Sunday through Saturday nights from 1/2 before sunrise to 1/2 after sunset. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound will be restricted to 16 feet 08 inches in height at all hours. Loads higher than 16 feet 08 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 260.93 to 268.5

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Saturday nights from 1/2 after sunset to 1/2 before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width Sunday through Saturday nights from 1/2 before sunrise to 1/2 after sunset. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound will be restricted to 16 feet 08 inches in height at all hours. Loads higher than 16 feet 08 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 269.27 to 260.93

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 westbound will be restricted to 16 feet 06 inches in height at all hours. Loads higher than 16 feet 06 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 270.74 to 270.87

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 270.39 to MP 272.71 (La Grande) Effective April 8, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is July 15, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
4/25/2019 10:00 AM

I-84: MP 285.68

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 285.68 (North Powder) Effective April 29, 2019, this section of I-84 eastbound and westbound will be intermittently restricted to 15 feet 00 inches in width Monday through Friday between the hours of 7 AM & 6 PM. Loads wider than 15 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 3, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
4/25/2019 10:00 AM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
4/25/2019 10:00 AM

I-84: MP 325.34

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 325.46 (Durkee) Effective June 3, 2019, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width 1/2 hour before sunrise and half hour after sunset and restricted to 12 feet 00 inches in width 1/2 hour after sunset and half hour before sunrise. Loads wider than 16 feet 00 inches during the day or 12 feet 00 inches in width at night may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 9, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: EB MP 353.2

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder
Comments
Roadwork is occuring on the shoulder causing no to minimal delays . Use caution. The westbound Port of Entry scale is closed.
Last Updated
4/22/2019 5:09 PM

I-84: MP 369.99 to 376.98

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 373.08

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 eastbound will be restricted to 16 feet 10 inches in height Monday through Friday between the hours of 5 AM & 10 PM. Loads higher than 16 feet 10 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 373.08

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 westbound will be restricted to 16 feet 4 inches in height Monday through Friday between the hours of 5 AM & 10 PM. Loads higher than 16 feet 4 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: WB MP 376 to 378

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments
Single lane closures will be in place in the construction zone. No to minimal delays.
Last Updated
4/22/2019 5:07 PM

I-84: MP 377.9

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 377.9 (Ontario) Effective April 15, 2019, this section of I-84 westbound will be restricted to 18 feet 6 inches in height at all hours. The estimated completion date for this project is September 30, 2019.
Last Updated
4/25/2019 10:00 AM

I-84: MP 378.01

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 377.75 to MP 378.25 (Ontario) Effective April 15, 2019, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is September 30, 2019.
Last Updated
4/25/2019 10:00 AM

US101: MP 4.53 to 5.33

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring. Use caution. US 101: Young’s Bay (New Youngs Bay) Bridge Repair Project (Clatsop County) (Oregon Coast Highway, mileposts 4.53 to 5.33) This project includes work as follows: • Raising the left span tower bracing above the high route clearance requirement; • replacing rocker bearings; • repairing the damaged concrete with cathodic protection; and • replacing compression joint seals. Initially in mid March, the traveling public will notice the contractor building the containment structure which will be attached to the sides of the bridge, and a barge in the water with support boats bringing crew and materials to and from the barge. Once the containment structure is in place, actual construction will begin. Most of the construction will be performed below the bridge from the barge. The traveling public can expect periodic single lane closures at night to allow the contractor to move equipment. The lane closures will be Sunday night through Friday morning, 9 p.m. to 5:30 a.m. A complete two week night time closure of the bridge is scheduled in 2021 toward the end of the project. This closure will be for 14 consecutive nights. Pedestrian traffic will also not be allowed during the complete closures. An alternative route during periods of lane closures and the full night time closure is U.S. 101B over the Old Youngs Bay and Lewis and Clark River Bridges. The public is encouraged to sign up for project updates to be delivered via email by copying an pasting the following link into your web browser and following the steps to enroll: https://public.govdelivery.com/accounts/ORDOT/subscriber/new?topic_id=ORDOT_126
Last Updated
3/27/2019 9:24 AM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
4/25/2019 10:00 AM

US101: MP 4.91

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 4.53 to MP 5.33 (New Young's Bay Bridge - Astoria) Effective February 15, 2019, this section of US101 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is November 30, 2021.
Last Updated
4/25/2019 10:00 AM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Last Updated
4/25/2019 10:00 AM

US101: MP 22.04 to 25.27

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 22 to MP 25.50 (Seaside) Effective May 5, 2019, this section of US101 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM until June 31, 2019. Starting July 1, 2019 this width restriction will be Sunday through Thursday nights between the hours of 8 PM & 6 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is October 30, 2019.
Last Updated
4/25/2019 10:00 AM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Night work continues until Memorial Day, but will be intermittent depending on weather. Lane closures are in effect from 7 p.m. to 6 a.m. Monday night through Thursday night. Flaggers are directing traffic at the signal at SE 1st St during lane closures. Crews are installing steel and titanium reinforcement to the bridge deck. Work at the Devil’s Lake Outlet bridge is expected to last until the spring of 2020. Work at Schooner Creek bridge is expected to start in summer of 2019. Expect minor delays.
Last Updated
4/14/2019 11:56 AM

US101: MP 139.32 to 140.73

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 139.32 to MP 140.73 (Newport) Effective May 4, 2018, this section of US101 northbound and southbound will be closed between the hours of 11:30 & 2:30 PM for one day only. The estimated completion date for this project is May 4, 2019.
Last Updated
4/25/2019 10:00 AM

US101: MP 141.44 to 141.83

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project will paint the steel bridge members under the roadway deck in two spans of the steel structure. These members are in need of additional protection from the harsh coastal environment. Most of the work will be done under the bridge with no impact to traffic. There will be occasional nighttime lane closures to set up containment under the bridge and move equipment. Intermittent night work will continue with lane closures allowed from 8 p.m. to 6 a.m. The eastern sidewalk is closed for the duration of the project. A temporary pedestrian crossing at the south end of the bridge will allow pedestrians to cross U.S. 101. At the north end, pedestrians can use the existing sidewalks under the bridge, which will be signed as the pedestrian detour route. This project is expected to last until October 2019. Expect minor delays.
Last Updated
4/14/2019 9:20 AM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
4/25/2019 10:00 AM

US101: MP 190.1 to 190.84

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
4/12/2019 9:07 PM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

US101: MP 233.4 to 234.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. This project will paint the steel truss section of McCullough Bridge, replace rivets, remove rust and repair damaged steel. Construction is scheduled for completion in fall 2021. For more information, visit: www.McCulloughBridge.com. Watch for intermittent nighttime (7 p.m. to 7 a.m.) lane closures each Sunday night to Friday morning. During daylight hours, watch for intermittent shoulder closures and/or northbound and southbound traffic lane shifting to accommodate sidewalk work at the corner of Ferry Road & U.S. 101. Pedestrians should watch for intermittent sidewalk closures. At all times, at least one of the bridge’s sidewalks will remain open.
Last Updated
4/22/2019 11:54 PM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 233.48 to MP 233.49 (North Bend) Effective April 15, 2019, this section of US101 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
4/25/2019 10:00 AM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 233.48 to MP 233.49 (North Bend) Effective April 15, 2019, this section of US101 northbound and southbound will be restricted to 16 feet 00 inches in height Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads higher than 16 feet 00 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
4/25/2019 10:00 AM

US101: MP 250.8

Information
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
4/14/2019 6:12 AM

US101: MP 251

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
4/14/2019 6:12 AM

US101: MP 295 to 300

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will pave five miles of U.S. 101 and repair four bridges between the Sixes area and the north end of Port Orford. The speed limit has been reduced to 40 mph at milepost 295, the one-mile section of highway between Crystal Creek and Sixes River. Watch for intermittent weekday lane closures and brief delays throughout the project area as the contractor continues with bridge work. Flaggers will provide traffic control as needed.
Last Updated
4/22/2019 11:55 PM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
4/25/2019 10:00 AM

US101: MP 312

Information
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
4/14/2019 6:13 AM

US101: MP 316

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
4/14/2019 6:12 AM

US101: MP 316

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
4/14/2019 6:11 AM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

US101: MP 332.2

Information
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
4/23/2019 8:33 AM

US101: MP 333.75

Information
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
4/20/2019 10:09 PM

US101: MP 335.7

Information
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
4/23/2019 8:34 AM

US101: MP 344

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Hwy 101 is open to a single lane of traffic. Expect delays.
Last Updated
4/22/2019 6:15 AM

US101: MP 347.78

Commercial Vehicle Information
Informational only
Details
US101 MP 347.78 NB & SB (north of Brookings) Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. The estimated completion date for this project is August 31, 2019.
Last Updated
4/25/2019 10:00 AM

US101: MP 348

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is reduced to a single lane, and controlled with a temporary traffic signal. Expect delays and use caution. The bridge is limited to a single lane of traffic until summer 2019. A temporary signal is in place to provide traffic control. Expect brief delays.
Last Updated
4/22/2019 11:56 PM

US197: MP 46.22 to 46.75

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic may be controlled by flagger in the construction zone. Expect delays of up to 20 minutes. Use caution.
Last Updated
4/21/2019 7:55 PM

US20: MP 13.08 to 13.39

Commercial Vehicle Information
Informational only
Details
US20 EB MP 13.08 to MP 13.39 (Lebanon) Effective Friday, May 31, 2019, this section of US20 eastbound between Rose Street and Maple Street in Lebanon will be closed between the hours of 11:30 AM & 4:30 PM for the annual Strawberry Festival Junior Parade. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

US20: MP 13.08 to 15.1

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 13.08 to MP 15.10 (Lebanon) On Saturday, June 1, 2019, US20 eastbound and westbound between Rose Street and Burdell Boulevard in Lebanon will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7 AM and 5 PM for the annual Strawberry Festival Grand Parade.
Last Updated
4/25/2019 10:00 AM

US20: MP 13.27 to 13.45

Commercial Vehicle Information
Informational only
Details
US20 EB MP 13.27 to MP 13.45 (Lebanon) On Saturday, September 7, 2019, this section of US20 eastbound between Sherman Street and Oak Street in Lebanon will be closed between the hours of 10 AM and 10 PM for the annual Lebanon Community Block Party Event.
Last Updated
4/25/2019 10:00 AM

US20: MP 19.93 to 19.9

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Intermittent lane closures may be in place during night construction operations. No to minimum delay.
Last Updated
4/25/2019 1:04 PM

US20: MP 51.4 to 52.2

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays, use caution. US 20 / Philomath Blvd: Boulevard Apartment in Philomath Water/Sewer Line Work Water and sewer line work along and across the highway will be occurring June 2018 to TBD. This work is for a proposed apartment complex. After the water and sewer line work is completed, the contractor is expected to begin work on highway improvements which will likely include a left turn lane and a pedestrian crossing. Lane closures, when needed, on US20 can be expected: Sunday night through Thursday night from 7:00 PM to 6:00 AM. No holiday weekend closures will be permitted/allowed.
Last Updated
4/12/2019 8:39 PM

US20: MP 98 to 88.2

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/15/2019 7:01 AM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 is restricted to 14 feet 00 inches in width and/or 154 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
4/25/2019 10:00 AM

US26: MP 0.42 to 1.12

Construction Work
No to Minimum Delay
Comments
Westbound single lane closures at night Monday through Friday from 8 p.m. to 6 a.m.
Last Updated
4/22/2019 9:02 AM

US26: MP 0.75

Commercial Vehicle Information
Informational only
Details
US26 WB MP 0.75 on the Ross Island Bridge (Portland) Effective April 22, 2019, this section of US26 westbound on the Ross Island Bridge will be restricted to 17 feet 08 inches in height between the hours of 8 PM & 6 AM Monday through Friday. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

US26: MP 0.95

Commercial Vehicle Information
Informational only
Details
US26 EB (Ross Island Bridge) off-ramp to OR99E SB (Portland) Effective May 3, 2019, the off-ramp from US26 eastbound to OR99E southbound will be closed between the hours of 10 PM & 5 AM. The estimated completion date for this project is May 5, 2019.
Last Updated
4/25/2019 10:00 AM

US26: WB MP 1.76

Construction Work
Estimated delay under 20 minutes
Comments
Periodic single lane closures from 7 a.m. to 3:30 p.m. in both directions and Saturday beginning at 6 a.m. for eastbound.
Last Updated
4/22/2019 2:44 AM

US26: MP 7.5 to 7.95

Construction Work
No to Minimum Delay
Comments
No traffic impacts. The Oregon Department of Transportation (ODOT) will construct roadway improvements on Powell Boulevard(US Highway 26) from SE 122nd Avenue to SE 136th Avenue. This project will address the high rate of collisions on Outer Powell for the past several years. The purpose of this project is to increase safety for people who walk, drive, take the bus and ride bikes, making Outer Powell a safer place for everyone.
Last Updated
4/05/2019 1:21 PM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective January 4, 2019, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 30 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

US26: MP 32.47 to 30.43

Commercial Vehicle Information
Informational only
Details
US26 WB MP 32.47 to MP 30.43 (Cherryville) (Hood to Coast) Effective August 23, 2019 this section of US26 will be restricted to 12 feet 00 inches in width between the hours of 6 AM & 7:45 PM. The estimated completion date for this project is August 24, 2019.
Last Updated
4/25/2019 10:00 AM

US26: MP 34.97 to 32.68

Commercial Vehicle Information
Informational only
Details
US26 WB MP 32.68 to MP 34.97 (Government Camp) Effective June 29, 2019, this section of US26 westbound will be restricted to 12 feet 00 inches in width between the hours of 4 AM & 1 PM for one day only. The estimated completion date for this project is June 29, 2019.
Last Updated
4/25/2019 10:00 AM

US26: MP 58.42

Commercial Vehicle Information
Informational only
Details
US26 EB & WB Exit 59 on- and off-ramps to/from Jackson School Rd (Hillsboro) Effective May 11, 2019, the US26 eastbound and westbound Exit 59 on- and off-ramps to/from Jackson School Rd will be closed between the hours of 6:30 AM & 2 PM for one day only.
Last Updated
4/25/2019 10:00 AM

US26: MP 60.86

Commercial Vehicle Information
Informational only
Details
US26 EB & WB Exit 61 on- and off-ramps to/from Helvetia Rd/Brookwood Pkwy (Hillsboro) Effective June 8, 2019, the US26 eastbound and westbound Exit 61 on- and off-ramps to/from Helvetia Rd/Brookwood Pkwy will be closed between the hours of 7:30 AM & 1 PM for one day only.
Last Updated
4/25/2019 10:00 AM

US26: MP 62.12

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 62 off-ramp to Cornelius Pass Rd (Hillsboro) Effective June 8, 2019, the US26 eastbound Exit 62 off-ramp to Cornelius Pass Rd will be closed between the hours of 6:30 AM & 8:30 AM for one day only.
Last Updated
4/25/2019 10:00 AM

US26: MP 62.12

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 62 off-ramp to Cornelius Pass Rd (Hillsboro) Effective May 11, 2019, the US26 eastbound Exit 62 off-ramp to Cornelius Pass Rd will be closed between the hours of 6:30 AM & 8:30 AM for one day only.
Last Updated
4/25/2019 10:00 AM

US26: MP 62.12

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 62 off-ramp to Cornelius Pass Rd (Hillsboro) Effective June 8, 2019, the US26 eastbound Exit 62 off-ramp to Cornelius Pass Rd will be closed between the hours of 6:30 AM & 8:30 AM for one day only.
Last Updated
4/25/2019 10:00 AM

US26: MP 62.12

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 62 off-ramp to Cornelius Pass Rd (Hillsboro) Effective May 11, 2019, the US26 eastbound Exit 62 off-ramp to Cornelius Pass Rd will be closed between the hours of 6:30 AM & 8:30 AM for one day only.
Last Updated
4/25/2019 10:00 AM

US26: MP 67

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Rock fall has occurred causing no to minimum delays. Use caution watch for rocks in the roadway.
Last Updated
4/25/2019 4:24 PM

US26: MP 91.12 to 103.09

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Flaggers will control traffic during construction operations. Expect delays up to 20 minutes between 8AM and 5PM. The WB slow lane is closed. This project includes rock fall mitigation and the installation of drainage, guardrail, pavement markings, and permanent signing.
Last Updated
4/21/2019 6:44 PM

US26: MP 115.58

Commercial Vehicle Information
Informational only
Details
US26 MP 115.58 (North Unit Canal Bridge - Madras) Effective February 5, 2019, US26 crossing North Unit Canal Bridge at MP 115.58 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

US26: MP 125 to 124.5

Information
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder
Comments
There are no to minimum delays due to erosion of the highway. Use caution.
Last Updated
4/25/2019 11:35 AM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
4/25/2019 10:00 AM

US30: MP 0.46

Commercial Vehicle Information
Informational only
Details
US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

US30: MP 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective July 19, 2019, the off-ramp from US30 eastbound to I-405 southbound will be closed Friday through Thursday between the hours of 8 PM & 5 AM. The estimated completion date for this project is July 19, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is April 15, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 1.65 to 2.1

Commercial Vehicle Information
Informational only
Details
US30 EB & WB MP 1.65 to MP 2.10 (La Grande) Effective April 27, 2019, US30 EB & WB will be closed for one morning only from 8 AM to 10 AM for the La Grande Little League Opening Day Parade. The estimated completion date for this project is April 27, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 12.59 to 12.69

Commercial Vehicle Information
Informational only
Details
US30 WB MP 12.5 to MP 12.7 (Burlington) (Hood to Coast) Effective August 23, 2019 this section of US30 will be restricted to 14 feet 00 inches in width between the hours of 4:30 AM & 5:00 AM. The estimated completion date for this project is August 24, 2019.
Last Updated
4/25/2019 10:00 AM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
4/25/2019 10:00 AM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Last Updated
4/25/2019 10:00 AM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
4/25/2019 10:00 AM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Last Updated
4/25/2019 10:00 AM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
4/25/2019 10:00 AM

US30: WB MP 98.13 to 98.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. 6th Through 11th Street: Waterfront Bridges (Astoria) Project (Clatsop County) (Various Streets) This project consists of performing work as follows: - Install and remove temporary traffic control and pedestrian routes (TPAR) - Install and remove temporary potable water and sanitary sewer systems - Perform earthwork - Install storm sewer systems and water quality structures - Remove and reconstruct six bridges and trolley crossings (Including tracks) - Construct roadway, sidewalks and ADA ramps - Install permanent signs and illumination systems - Perform additional and incidental work and called for by the Plans and Specifications This Project replaces six aging bridges at the Astoria Waterfront, at 6th through 11th Streets and to install drainage and water quality facilities at the intersection of Highway 30 and 30th Street in Astoria. Streets will be closed while construction is occurring except for Highway 30. Flaggers will control single lane traffic while construction is occurring at 30th St. The odd numbered streets (7th, 9th and 11th) are scheduled to begin bridge demolition mid-October 2018, and are to be completed by June 15, 2019. The remaining work is to be completed no later than June 30, 2020. Temporary Pedestrian Access Routes (TPAR) will be maintained throughout the work zones and will be ADA compliant.
Last Updated
4/12/2019 9:03 PM

US395: MP 0.78 to 0.99

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes
Comments
Intermittent lane closures will be in place SB in the construction zone on Emigrant Avenue. No to minimum delay. This project includes grading, drainage, paving, signing, and roadside development on Emigrant Avenue.
Last Updated
4/22/2019 9:01 PM

US395: MP 3 to 65

Information
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
There are no to minimum delays due to erosion of the highway. Use caution.
Last Updated
4/15/2019 6:32 AM

US395: MP 36.9

Crash/Hazard
No to Minimum Delay
Comments
A landslide has occurred causing no to minimum delays. Southbound has abrupt edge, shoulder closed. Use caution.
Last Updated
4/04/2019 1:36 PM

US395: MP 97

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
High water is causing no to minimum delays. Use caution.
Last Updated
4/22/2019 3:04 PM

US395: MP 115.59

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
A landslide has occurred causing no to minimum delays. Use caution.
Last Updated
4/25/2019 11:16 AM

US95: MP 7

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
The southbound shoulder is closed due to a landslide. Use caution.
Last Updated
4/25/2019 3:06 PM

US97: MP 0.27 to 6.98

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is controlled by a temporary signal in the construction zone. Flaggers may occasionally control traffic, expect minor delays. This project includes bridge upgrades and structure replacement on Highway 97 over Spanish Hollow Creek and Trout Creek.
Last Updated
4/21/2019 6:38 PM

US97: MP 0.39

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 0.28 to MP 0.52 (Biggs Junction) Effective January 1, 2019, this section of US97 northbound and southbound will be restricted to 18 feet 00 inches in width. The estimated completion date for this project is May 23, 2019.
Last Updated
4/25/2019 10:00 AM

US97: MP 57 to 75

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
No work is planned for the week of April 22nd.
Last Updated
4/21/2019 6:41 PM

US97: MP 58.13 to 68.66

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 56.72 to MP 74.90 (Shaniko) Effective April 8, 2019 this section of US97 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 30, 2019.
Last Updated
4/25/2019 10:00 AM

US97: MP 74.9 to 75.18

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is controlled by a temporary signal in the construction zone. Flaggers may occasionally control traffic, expect minor delays. This project includes bridge upgrades and structure replacement on Highway 97 over Trout Creek.
Last Updated
4/21/2019 6:42 PM

US97: MP 75.04 to 74.26

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 74.09 to MP 75.18 (Madras) Effective October 22, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width. The estimated completion date for this project is May 31, 2019.
Last Updated
4/25/2019 10:00 AM

US97: MP 136.9 to 137.17

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Intermittent lane closures may be in place during night construction operations. No to minimum delay.
Last Updated
4/25/2019 1:38 PM

US97: NB MP 140.1 to 139.9

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Intermittent lane closures may be in place during night construction operations. No to minimum delay.
Last Updated
4/25/2019 1:05 PM

US97: MP 240.55 to 257.77

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Bump grinding, work zone controlled with flagging and pilot car, expect minor delays.
Last Updated
4/23/2019 2:42 AM

US97: MP 252.52 to 252.36

Commercial Vehicle Information
Informational only
Details
US97 SB MP 252.23 to MP 252.65 (Chiloquin) Effective April 23, 2019, this section of US97 will be restricted to 20 feet 00 inches in width between the hours of 8 AM & 5 PM. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 1, 2019.
Last Updated
4/25/2019 10:00 AM

US97: MP 265.65 to 280.51

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Guardrail, sign and grading work. Work zone controlled with flagging and pilot car, expect 20 minute delays.
Last Updated
4/23/2019 2:48 AM

US97: MP 278.7

Commercial Vehicle Information
Informational only
Details
US97 SB MP 278.60 to MP 278.90 (Klamath Falls) Effective April 25, 2019, this section of US97 will be restricted to 20 feet 00 inches in width between the hours of 8 AM & 5 PM. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 1, 2019.
Last Updated
4/25/2019 10:00 AM

ORE104: MP 1 to 4

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/25/2019 6:16 PM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
4/25/2019 10:00 AM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) Effective February 12, 2019, OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to the following weights: 18 tons Type 3, 18 tons SU4, SU5, SU6, & SU7, 28 tons Type 3S2, 35 tons Type 3-3.
Last Updated
4/25/2019 10:00 AM

ORE126: MP 2

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
4/18/2019 7:04 PM

ORE126: MP 15.84

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective June 21, 2018, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width and 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet or 135 feet in overall length may be accommodated on a case by case basis. Contact the OD Permit Unit for information.
Last Updated
4/25/2019 10:00 AM

ORE126: MP 31.56 to 32.4

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. 24-hour flagging beginning tomorrow at 6 a.m. through May 10 at noon. A westbound passing lane is being added. Flaggers will direct traffic 24-hours a day beginning April 24 through May 10, including weekends.
Last Updated
4/23/2019 12:43 PM

ORE126: MP 32.4 to 31.56

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 31.56 to MP 32.36 (Walton) Effective February 6, 2019, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 11 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2019.
Last Updated
4/25/2019 10:00 AM

ORE126: MP 107

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
4/26/2019 3:27 AM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/25/2019 10:00 AM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/25/2019 10:00 AM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/25/2019 10:00 AM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/25/2019 10:00 AM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/25/2019 10:00 AM

ORE138: MP 5

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
4/20/2019 10:11 AM

ORE140: MP 7.75

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Watch for traffic control barrier on Little Butte Creek Bridge near Brownsboro. Two-lane traffic will be maintained through the OR 140 work zone. This project upgrades the bridge and culvert rails for safety. In addition, the Little Butte Creek Bridge will receive a deck overlay. Work on the Oregon 238 bridge rail is rescheduled to June 2-7. Expect detour due to one week full closure between West Main Street and Rossanley Drive.
Last Updated
4/23/2019 12:01 AM

ORE140: MP 49.62 to 50.35

Commercial Vehicle Information
Informational only
Details
OR214 NB & SB MP 49.50 to MP 50.40 (Silverton) Effective May 18, 2019, this section of OR214 northbound and southbound will be closed between the hours of 9:45 AM & 11:30 AM for one day only.
Last Updated
4/25/2019 10:00 AM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

ORE18: MP 50 to 52.6

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Motorists should expect intermittent delays Monday between 12:00 a.m. and 5:00 a.m. and Monday – Friday between 7:00 p.m. and 5:00 a.m. OR18 EB & WB MP 50 to MP 52.6 (Dayton) Effective May 6, 2019, this section of OR18 eastbound and westbound will be closed at 9 a.m. Monday – 6 a.m. Friday. A signed detour will be in place along with flaggers to help control intersection traffic on the detour. Open for Weekend Traffic. The estimated completion date for this project is May 24, 2019.
Last Updated
4/17/2019 10:33 AM

ORE18: MP 50.8 to 52.472

Commercial Vehicle Information
Informational only
Details
OR18 EB & WB MP 50.11 to MP 52.52 (Dayton) Effective May 6, 2019, this section of OR18 eastbound and westbound will be closed Mondays at 9 AM to Fridays at 6 AM. The estimated completion date for this project is May 24, 2019.
Last Updated
4/25/2019 10:00 AM

ORE18: MP 51

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/25/2019 10:44 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

ORE18: MP 52.59 to 50.1

Commercial Vehicle Information
Informational only
Details
OR18 EB & WB MP 50 to MP 52.6 (Dayton) Effective March 11, 2019, this section of OR18 eastbound and westbound will be restricted to 14 feet 00 inches in width Mondays between the hours of 12 midnight & 5 AM; and Monday through Thursday nights between the hours of 7 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2019.
Last Updated
4/25/2019 10:00 AM

ORE19: MP 117

Information
No to Minimum Delay
Comments
Burning is taking place along the highway causing no to minimum delays. Use caution.
Last Updated
4/25/2019 5:10 PM

ORE204: EB MP 2.1 to 2.4

Crash/Hazard
No to Minimum Delay
Comments
A landslide has occurred causing no to minimum delays. Use caution.
Last Updated
4/24/2019 2:24 PM

ORE207: MP 7 to 26

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
4/25/2019 8:05 AM

ORE207: MP 24

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
The road surface has collapsed. Use caution. Expect delays.
Last Updated
4/25/2019 4:23 PM

ORE217: MP 2.78

Commercial Vehicle Information
Informational only
Details
OR217 NB & SB Exit 3 on- and off-ramps to/from Denney Rd (Beaverton) Effective September 22, 2019 the OR217 northbound and southbound exit 3 on-and off-ramps to/from Denney Rd will be closed between the hours of 6:30 AM & 1 PM for one day only.
Last Updated
4/25/2019 10:00 AM

ORE217: MP 4.44

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 4 off-ramp (Tigard) Effective May 6, 2019, OR217 northbound Exit 4 off-ramp to Scholls Ferry Rd will be restricted to 17 feet 00 inches in width Monday through Tuesday between the hours of 9 PM & 5 AM. The estimated completion date for this project is May 7, 2019.
Last Updated
4/25/2019 10:00 AM

ORE217: MP 5.13

Commercial Vehicle Information
Informational only
Details
OR217 NB on-ramp from Greenburg Rd (Tigard) Effective May 6, 2019, OR217 northbound on-ramp from Greenburg Rd will be restricted to 17 feet 00 inches in width Monday through Wednesday between the hours of 9 PM & 5 AM. The estimated completion date for this project is May 8, 2019.
Last Updated
4/25/2019 10:00 AM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
4/25/2019 10:00 AM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
4/25/2019 10:00 AM

ORE22: MP 30.03

Commercial Vehicle Information
Informational only
Details
Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Last Updated
4/25/2019 10:00 AM

ORE22: MP 39 to 35

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 2 Lanes
Comments
Road construction is occurring. Use caution.
Last Updated
4/12/2019 9:06 PM

ORE22: MP 47.57 to 47.77

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. The Contractor will be performing work on the bridge deck, installing guardrail, and shoulder work. Single ane closures controlled by flaggers will be in place 24 hours a day Sunday night until Friday at noon.Traffic should expect delays of 20 minutes or less.
Last Updated
4/24/2019 1:19 PM

ORE22: MP 49.84

Commercial Vehicle Information
Informational only
Details
OR22 EB & WB MP 49.84 (Detroit) Effective August 6, 2019, this section of OR22 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 9 AM & 2 PM for one day only. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is August 6, 2019.
Last Updated
4/25/2019 10:00 AM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
4/25/2019 10:00 AM

ORE223: MP 18.9

Commercial Vehicle Information
Informational only
Details
OR223 NB & SB MP 18.90 to MP 18.95 (Pedee) Effective April 15, 2019, this section of OR223 northbound and southbound will be restricted to 15 feet 00 inches in width between the hours of 7 AM & 7 PM. Loads wider than 15 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is May 10, 2019.
Last Updated
4/25/2019 10:00 AM

ORE228: MP 11.8

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Conducting bridge strengthening project on McKercher bridge, the first phase should be done about the 12th of April. The second phase will begin about 6 weeks later. We will be able to accommaodate oversize loads. 10:50 with flaggers / emerg contact Doug Rogerson 541-936-0221 10:50 ODOT Insp. Del Webb 541-206-3881
Last Updated
4/15/2019 5:19 PM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
4/25/2019 10:00 AM

ORE238: MP 36.2 to 34.87

Commercial Vehicle Information
Informational only
Details
OR238 EB & WB MP 34.87 to MP 36.20 (Jacksonville) Effective June 2, 2019, this section of OR238 eastbound and westbound will be closed at all hours beginning at 8 PM. The estimated date of completion for this project is June 7, 2019.
Last Updated
4/25/2019 10:00 AM

ORE241: MP 0.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. Watch for intermittent lane closures and delays of less than 20 minutes. Flaggers will provide traffic control as needed. For more information, visit: www.IsthmusSloughBridge.com.
Last Updated
4/22/2019 11:54 PM

ORE241: MP 0.51

Commercial Vehicle Information
Informational only
Details
OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Last Updated
4/25/2019 10:00 AM

ORE242: MP 61.91 to 83.7

Information
Seasonal Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Old McKenzie Highway 242 is closed for the season from Milepost 61.91-83.7. Use an alternate route.
Last Updated
11/07/2018 10:38 PM

ORE255: MP 345

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
The road surface has collapsed. Use caution.
Last Updated
4/22/2019 6:15 AM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/25/2019 10:00 AM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/25/2019 10:00 AM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/25/2019 10:00 AM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Last Updated
4/25/2019 10:00 AM

ORE281: MP 2.75

Construction Work
Estimated delay under 20 minutes
Comments
Daytime lane closures with flaggers directing traffic at both intersections.
Last Updated
4/22/2019 2:45 AM

ORE320: MP 35.36

Commercial Vehicle Information
Informational only
Details
OR320 EB & WB MP 35.47 to MP 35.56 (Echo) Effective May 25, 2019, this section of OR320/W Main St eastbound and westbound will be closed between the hours of 7 AM & 1 AM for one day only.
Last Updated
4/25/2019 10:00 AM

ORE339: MP 2.76

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/25/2019 10:00 AM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/25/2019 10:00 AM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/25/2019 10:00 AM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Last Updated
4/25/2019 10:00 AM

ORE34: MP 1.62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. An existing bridge near milepost 1.5 is being replaced with a new structure. This new structure will be constructed one half at a time. Due to limited working space one lane of traffic will be closed for the duration of the project. Crews will continue working on driving pile for another week. Once pile driving is complete crews will work on removing the closed portion of the old structure. One lane, two way traffic will be controlled by a temporary signal or flaggers at all times. Expect minor delays.
Last Updated
4/14/2019 9:15 AM

ORE34: MP 15.67

Commercial Vehicle Information
Informational only
Details
OR34 EB & WB MP 15.67 Exit to Denny School Rd (Lebanon) Effective May 19, 2019, OR34 eastbound and westbound exits to Denny School Rd will be closed Sunday through Wednesday nights between the hours of 7 PM & 6 AM. The estimated date of completion of this project is May 23, 2019.
Last Updated
4/25/2019 10:00 AM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Last Updated
4/25/2019 10:00 AM

ORE38: MP 1 to 57.13

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures and expect brief delays due to paving work. Flaggers will provide traffic control as needed.
Last Updated
4/22/2019 11:58 PM

ORE42: MP 4.5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/19/2019 12:06 PM

ORE42: MP 72.52

Commercial Vehicle Information
Informational only
Details
OR42 EB & WB MP 72.49 to MP 72.58 (Winston) Effective June 13, 2019, this section of OR42 eastbound and westbound will be closed at all hours. The estimated completion date for this project is July 3, 2019.
Last Updated
4/25/2019 10:00 AM

ORE42: WB MP 75

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/26/2019 4:35 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective April 29, 2019 this section of OR43 southbound will be restricted to 13 feet 00 inches in width between the hours of 10 PM & 5 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 26, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective April 29, 2019 this section of OR43 southbound will be restricted to 16 feet 07 inches in height between the hours of 10 PM & 5 AM. Loads higher than 16 feet 07 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 26, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective May 11, 2019, this section of OR43 southbound will be closed Saturday and Sunday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective April 29, 2019 this section of OR43 southbound will be restricted to 13 feet 00 inches in width between the hours of 10 PM & 5 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 26, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective April 29, 2019 this section of OR43 southbound will be restricted to 16 feet 07 inches in height between the hours of 10 PM & 5 AM. Loads higher than 16 feet 07 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 26, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective May 11, 2019, this section of OR43 southbound will be closed Saturday and Sunday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective April 29, 2019 this section of OR43 southbound will be restricted to 13 feet 00 inches in width between the hours of 10 PM & 5 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 26, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective April 29, 2019 this section of OR43 southbound will be restricted to 16 feet 07 inches in height between the hours of 10 PM & 5 AM. Loads higher than 16 feet 07 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 26, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 0.59

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.59 (Portland) Effective May 11, 2019, this section of OR43 southbound will be closed Saturday and Sunday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
4/25/2019 10:00 AM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
4/25/2019 10:00 AM

ORE47: MP 62.9 to 74

Construction Work
Estimated delay under 20 minutes
Comments
Tree trimming around power lines will result in alternating lane closures, Mon-Fri 8:00am - 3:30pm. Expect delays.
Last Updated
2/04/2019 8:00 AM

ORE47: MP 69.72 to 69.87

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. OR 47 Beaver Creek Bridge Replacement Project (Washington County) (Nehalem Highway, mileposts 69.72 to 69.87) This project consists of performing work as follows: construct work area isolation and remove existing bridge; construct pile foundations, abutments and bridge superstructure; install drainage and storm water facilities and roadway paving; install cast in place retaining wall; and perform additional and incidental work as called for by specifications and plans. Work has commenced for this season. Final wearing course paving and striping will continue next spring and will be completed by May 30, 2019.
Last Updated
2/06/2019 1:48 PM

ORE47: MP 69.79

Commercial Vehicle Information
Informational only
Details
OR47 NB & SB MP 69.72 to MP 69.87 (Vernonia) Effective April 1, 2019, this section of OR47 northbound and southbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 9 AM & 6 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is May 30, 2019.
Last Updated
4/25/2019 10:00 AM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
4/25/2019 10:00 AM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Last Updated
4/25/2019 10:00 AM

ORE58: MP 13 to 46

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/25/2019 8:11 AM

ORE58: MP 28 to 29

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/24/2019 2:21 PM

ORE58: MP 37 to 46

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments
Road construction is occurring. Work will be done Monday thru Thrusday, 8am to 4pm. Use caution.
Last Updated
4/23/2019 9:33 AM

ORE58: MP 54.5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/24/2019 1:08 PM

ORE62: MP 0.7 to 5.7

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Contractor is waiting for good weather window for final striping, along with working on various end-of-project – punch list - items, such as signs, signal/electrical work and corrective work on erosion control. No opening date yet, but weather-permitting, it may be end of this month or early May.
Last Updated
4/22/2019 11:22 PM

ORE8: MP 3.18 to 10

Construction Work
Estimated delay under 20 minutes
Comments
Lane closures and pedestrian detours on 185th Avenue.
Last Updated
4/22/2019 2:44 AM

ORE8: EB MP 14.07

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane closures with flagging on the bridge over Dairy Creek. Nighttime lane closures with flagging are from 7:30 p.m. to 6 a.m., 7 p.m. Friday until 9 a.m. Saturday and 8 p.m. Saturday until 10 a.m. Sunday. Project description: ODOT is resurfacing the TV Highway bridge over Dairy Creek in Washington County, between Cornelius and Hillsboro.
Last Updated
4/22/2019 2:45 AM

ORE82: MP 30.02 to 32.58

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Flaggers will control traffic during construction operations. Expect delays up to 20 minutes. This project includes grading, paving, and bank stabilization.
Last Updated
4/22/2019 7:01 PM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
4/25/2019 10:00 AM

ORE99: SB MP 2 to 2.74

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Expect single lane traffic on Oregon 99 through end of the year for project that builds new signal and highway connection across railroad tracks into Twin Creek development.
Last Updated
4/23/2019 12:00 AM

ORE99: MP 24.67

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 24.67 (Aurora) Effective August 5, 2019, this section of OR99E northbound and southbound will be restricted to 14 feet 00 inches in width between the hours of 9 AM & 3 PM for one day only. Mobile homes with eaves over 14 feet 00 inches in width are not allowed. The estimated completion date for this project is August 5, 2019.
Last Updated
4/25/2019 10:00 AM

ORE99: MP 24.67

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 24.67 (Aurora) Effective August 5, 2019, this section of OR99E northbound and southbound will be restricted to 15 feet 03 inches in height between the hours of 9 AM & 3 PM for one day only. The estimated completion date for this project is August 5, 2019.
Last Updated
4/25/2019 10:00 AM

ORE99: MP 62.31 to 63.79

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 62.03 to MP 63.90 (Monmouth) Effective August 1, 2018, this section of OR99W northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is December 31, 2019.
Last Updated
4/25/2019 10:00 AM

ORE99: MP 108.76 to 109.76

Commercial Vehicle Information
Informational only
Details
OR99 NB & SB MP 108.76 to MP 109.76 (Junction City) Effective May 31, 2019, this section of OR99 northbound and southbound will be closed Friday through Saturday nights between the hours of 5 PM & 9:30 PM. The estimated completion date for this project is June 1, 2019.
Last Updated
4/25/2019 10:00 AM

ORE99E: MP 12.73

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane closures at 7 p.m., with flagging at 9 p.m., until 5 a.m. Monday through Friday near the tunnel. Daytime lane closures 9 a.m. to 3 p.m.
Last Updated
4/22/2019 2:25 PM

ORE99W: SB MP 11 to 11.22

Construction Work
No to Minimum Delay
Comments
Daytime bike lane closure and shoulder closures.
Last Updated
4/22/2019 2:45 AM

ORE99W: MP 62 to 64

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Motorist should expect intermittent lane closures nightly Sunday through Friday, 7:00 p.m. to 6:00 a.m
Last Updated
4/12/2019 8:40 PM

ORE99W: MP 63

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/26/2019 1:04 AM

HWY372: MP 21.9

Information
Seasonal Closure
Comments
The snow gate at Mt. Bachelor on the Cascade Lakes Highway is closed for the season.
Last Updated
12/05/2018 5:37 PM

99: MP 128.99

Commercial Vehicle Information
Informational only
Details
Old OR99 (DC388) Old Winchester Bridge (Roseburg) Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.
Last Updated
4/25/2019 10:00 AM