Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure with Detour

ORE42, Winston MP 73

Road construction has closed the road; a brief, signed detour is in place. Use an alternate route.

This project is for repairs to the Lookingglass Bridge. During the closure, Oregon 42 traffic will detour through Dillard on Old Hwy 99 and Brockway Rd. Pedestrian access across the bridge will be maintained, with possible delays.

Updated
6/21/2019 12:14:00 PM

I-105: MP 0.18

Commercial Vehicle Information
Informational only
Details
I-105 WB off-ramp to W 6th Ave (Eugene) Effective June 24, 2019, the I-105 westbound off-ramp to West 6th Avenue will be closed at all hours. The estimated completion date for this project is July 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-105: WB MP 0.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) , Shoulder
Comments
Eastbound, there is a shoulder closure in place. Ramps Affected. Westbound, traffic is reduced to a single lane from the Willamette River Bridge to the 6th Ave. off-ramp for bridge joint and bridge rail replacement. Monday morning, June 24th, the 6th Ave. off-ramp will close for about 4 weeks. A signed detour will be in place. In a two year project, I-105 bridges and ramps between the Delta Highway interchange and downtown Eugene are being repaired, repaved, and receiving seismic upgrades.
Last Updated
6/24/2019 7:14 AM

I-105: MP 0.44

Commercial Vehicle Information
Informational only
Details
I-105 EB MP 0.44 (Eugene) Effective June 17, 2019, this section of I-105 eastbound will be restricted to 18 feet 7 inches in height at all hours. The estimated completion date for this project is August 2, 2019.
Last Updated
6/24/2019 10:00 AM

I-105: MP 0.44 to 0.08

Commercial Vehicle Information
Informational only
Details
I-105 WB MP 0.44 to MP 0.08 (Eugene) Effective June 10, 2019, this section of I-105 westbound will be restricted to 18 feet 00 inches in height at all hours. The estimated completion date for this project is July 6, 2019.
Last Updated
6/24/2019 10:00 AM

I-105: MP 0.44

Commercial Vehicle Information
Informational only
Details
I-105 EB MP 0.44 (Eugene) Effective June 17, 2019, this section of I-105 eastbound will be restricted to 18 feet 7 inches in height at all hours. The estimated completion date for this project is August 2, 2019.
Last Updated
6/24/2019 10:00 AM

I-105: MP 0.44 to 0.08

Commercial Vehicle Information
Informational only
Details
I-105 WB MP 0.44 to MP 0.08 (Eugene) Effective June 10, 2019, this section of I-105 westbound will be restricted to 18 feet 00 inches in height at all hours. The estimated completion date for this project is July 6, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 12.94

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR212/OR224 (Estacada) Effective February 11, 2019, the I-205 northbound on-ramp from OR212/OR224 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: SB MP 13.45 to 14.17

Construction Work
No to Minimum Delay
Comments
Nighttime lane and ramp closures. Expect traffic shifts on northbound I-205. Nighttime lane closures from 8 p.m. to 5 a.m. and closures of the on-ramp to OR 224 and the Exit 14 off-ramp to Sunnybrook Sunday through Thursday nights. Follow signed detours.
Last Updated
6/21/2019 1:22 PM

I-205: MP 13.6

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR224/Sunrise Expressway (Milwaukie) Effective February 11, 2019, the I-205 northbound on-ramp from OR224/Sunrise Expressway will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 13.95

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 14 to Sunnybrook Blvd (Milwaukie) Effective February 11, 2019, the I-205 northbound Exit 14 to Sunnybrook Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 14.32 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 14.17 to MP 13.45 (Clackamas) Effective February 11, 2019, this section of I-205 southbound crossing under SE 82nd Dr will be restricted to 17 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 16 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound will be restricted to 16 feet 7 inches in height and 16 feet 5 inches in height southbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads higher than 16 feet 7 inches northbound or 16 feet 5 inches southbound may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 16.2

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from Johnson Creek Blvd (Portland) Effective May 21, 2019, the I-205 NB on-ramp from Johnson Creek Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 16 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound will be restricted to 16 feet 7 inches in height and 16 feet 5 inches in height southbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads higher than 16 feet 7 inches northbound or 16 feet 5 inches southbound may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: SB MP 16.3 to 25.6

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane and ramp closures. Periodic nighttime single and double lane closures in both directions and periodic ramp closures. Periodic nighttime ramp closures at the northbound Exit 20 toward Washington and Stark Streets, the southbound Washington Street on-ramp, and northbound Exit 23B to Killingsworth Street/U.S. 30 Bypass. Periodic daytime single lane closures in both directions on Glisan Street and on Washington and Stark. Pedestrian detours at Washington, Stark and Glisan Streets.
Last Updated
6/21/2019 1:22 PM

I-205: MP 16.8 to 16.23

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 17 to MP 16 (Portland) Effective July 16, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 4, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 18.1 to 17.49

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 17 on- and off-ramps to/from Foster Rd (Portland) Effective May 21, 2019, the I-205 northbound Exit 17 off- and on-ramps to/from Foster Rd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 19.58 to 18.89

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from US26 (Portland) Effective June 3, 2019, I-205 NB and SB Exit 19 on- and off-ramps to/from US26 EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: NB MP 19.61

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road work has the right lanes closed NB from Powell to Glisan, use caution.
Last Updated
6/24/2019 11:37 PM

I-205: MP 19.82 to 19.12

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 20 to MP 19 (Portland) Effective July 11, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 28, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 19.87 to 18.89

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St (Portland) Effective August 2, 2019, the I-205 northbound Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 20.02

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 19 (US26/Powell Blvd/Division St - Portland) Effective April 1, 2019, the I-205 southbound Exit 19 off-ramp to US26/Division St/Powell Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 20.31

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from Stark St/Washington St (Portland) Effective May 21, 2019, the I-205 SB on-ramp from Stark St/Washington St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective May 21, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective August 2, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective May 21, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective August 2, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 20.63

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 21A off-ramp to Glisan St (Portland) Effective August 2, 2019, the I-205 northbound Exit 21A off-ramp to Glisan St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 21.49 to 20.63

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 21A on- and off-ramps to/from Glisan St (Portland) Effective May 21, 2019, the I-205 northbound Exit 17 off- and on-ramps to/from Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 21.66 to 17.12

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 17 to MP 22 (Portland) Effective August 2, 2019, this section of I-205 northbound will be closed at all hours beginning at 10 PM. The estimated completion date for this project is 5 AM on August 5, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: SB MP 22 to 20

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 2 Lanes
Comments
Road work has the right lanes closed SB from the I-84 interchange to Burnside, use caution and expect delays.
Last Updated
6/24/2019 11:26 PM

I-205: MP 22.63

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 EB (Portland) Effective June 18, 2018, the I-205 northbound on-ramp from I-84 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 22.86

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 WB (Portland) Effective June 19, 2018, the I-205 northbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 22.86 to 20.99

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from I-84 (Portland) Effective June 3, 2019, I-205 NB and SB Exits 21/22 on- and off-ramps to/from I-84 EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 22.86

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 WB (Portland) Effective June 19, 2018, the I-205 northbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 22.86 to 20.99

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from I-84 (Portland) Effective June 3, 2019, I-205 NB and SB Exits 21/22 on- and off-ramps to/from I-84 EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 22.93 to 20.02

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 23 to MP 20 (Portland) Effective July 19, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 11, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23A to US30 Bypass EB (Portland) Effective June 19, 2018, I-205 northbound Exit 23A ramp to US30 Bypass eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective June 20, 2018, the I-205 northbound Exit 23B ramp to US30 Bypass westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective July 8, 2019, the I-205 northbound Exit 23B to US30 Bypass westbound will be closed at all hours beginning at 9 PM. The estimated date of completion for this project is July 19, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective June 20, 2018, the I-205 northbound Exit 23B ramp to US30 Bypass westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective July 8, 2019, the I-205 northbound Exit 23B to US30 Bypass westbound will be closed at all hours beginning at 9 PM. The estimated date of completion for this project is July 19, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.98 to 20.05

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 20 to MP 24 (Portland) Effective August 2, 2019, this section of I-205 northbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 18, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.98 to 23.02

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 23 to MP 24 (Portland) Effective June 25, 2019, this section of I-205 northbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 14, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.98 to 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from US30 Bypass (Portland) Effective June 3, 2019, I-205 NB and SB Exit 23 on- and off-ramps to/from US30 Bypass EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.98 to 20.05

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 20 to MP 24 (Portland) Effective August 2, 2019, this section of I-205 northbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 18, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.98 to 23.02

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 23 to MP 24 (Portland) Effective June 25, 2019, this section of I-205 northbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 14, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 23.98 to 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from US30 Bypass (Portland) Effective June 3, 2019, I-205 NB and SB Exit 23 on- and off-ramps to/from US30 Bypass EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 24.31

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from Airport Way EB (Portland) Effective May 21, 2019, the I-205 SB on-ramp from Airport Way EB will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 24.97 to 24.18

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 25 to MP 24 (Portland) Effective June 18, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 7, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 25 to MP 26 (Portland) Effective July 8, 2019 this section of I-205 northbound and southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 28, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18th, 2019, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18, 2019, this section of I-205 northbound will be restricted to 16 feet 10 inches in height and 16 feet 05 inches southbound Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads higher than 16 feet 10 inches northbound or higher than 16 feet 05 inches southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 25 to MP 26 (Portland) Effective July 8, 2019 this section of I-205 northbound and southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 28, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18th, 2019, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
6/24/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18, 2019, this section of I-205 northbound will be restricted to 16 feet 10 inches in height and 16 feet 05 inches southbound Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads higher than 16 feet 10 inches northbound or higher than 16 feet 05 inches southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 0.951

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1C off-ramp to 6th Ave (Portland) Effective July 25, 2019, the I-405 northbound exit 1C off-ramp to 6th Ave will be closed Thursday, Friday, Monday, and Tuesday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is July 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 1.03

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Broadway/6th Ave (Portland) Effective April 8, 2019, the I-405 northbound on-ramp from Broadway/6th Ave will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 1.24

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1D to US26 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 1D off-ramp to US26 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: SB MP 1.46 to 3.98

Construction Work
No to Minimum Delay
Comments
24/7 weekend ramp closure on I-405 north off-ramp to North Kerby from Friday, June 28 at 8 p.m. to Monday, July 1 at 10 a.m. Nighttime ramp closures of U.S. 30 east to I-405 south weeknights beginning at 8 p.m. I-405 north right lane closed across the Fremont Bridge from Friday, June 24 at 8 p.m. to Monday, July 1 at 10 a.m. Single lane closures on the I-405 north off-ramp to North Kerby 24/7. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020.
Last Updated
6/21/2019 3:29 PM

I-405: MP 1.551

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from SW 13th Ave (Portland) Effective July 8, 2019, the I-405 southbound on-ramp from SW 13th Ave will be closed Monday through Tuesday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is July 10, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.451 to 2.12

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.12 to MP 2.45 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height and 15 feet 11 inches in height southbound Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.62

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from NW Glisan St (Portland) Effective March 27, 2019, the I-405 northbound on-ramp from NW Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective May 3, 2019 , the I-405 northbound Exit 3 off-ramp to US30 westbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective May 3, 2019 , the I-405 northbound Exit 3 off-ramp to US30 westbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: NB MP 2.9

Construction Work
No to Minimum Delay
Comments
24/7 weekend ramp closure on I-405 north off-ramp to North Kerby from Friday, June 28 at 8 p.m. to Monday, July 1 at 10 a.m. Nighttime ramp closures of U.S. 30 east to I-405 south weeknights beginning at 8 p.m. I-405 north right lane closed across the Fremont Bridge from Friday, June 24 at 8 p.m. to Monday, July 1 at 10 a.m. Single lane closures on the I-405 north off-ramp to North Kerby 24/7. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020.
Last Updated
6/21/2019 3:32 PM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: NB MP 3.7

Construction Work
No to Minimum Delay
Comments
24/7 weekend ramp closure on I-405 north off-ramp to North Kerby from Friday, June 28 at 8 p.m. to Monday, July 1 at 10 a.m. Nighttime ramp closures of U.S. 30 east to I-405 south weeknights beginning at 8 p.m. I-405 north right lane closed across the Fremont Bridge from Friday, June 24 at 8 p.m. to Monday, July 1 at 10 a.m. Single lane closures on the I-405 north off-ramp to North Kerby 24/7. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020.
Last Updated
6/21/2019 3:32 PM

I-405: NB MP 3.79 to 3.57

Maintenance Work
Estimated delay under 20 minutes
Off Ramp
Comments
Road work has the NB exit to Kerby Avenue closed, use an alternate route. Ramps Affected.
Last Updated
6/24/2019 10:21 PM

I-405: MP 4.14 to 3.2

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 4.14 to MP 3.20 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 16 feet 03 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 9.42

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 9.42 (Ashland) Effective July 8, 2019, this section of I-5 northbound will be restricted to 17 feet 1 inch in height at all hours. The estimated date of completion is October 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 10 to 12.5

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
6/22/2019 2:34 PM

I-5: MP 10.33

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 9 to MP 11.40 (Ashland) Effective July 8, 2019, this section of I-5 northbound will be restricted to 19 feet 00 inches in width and southbound will be restricted to 17 feet 00 inches in width at all hours. The estimated date of completion is October 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 28.19 to 28.93

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 28 to MP 29 (Medford) Effective July 8, 2019, this section of I-5 northbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 6 AM. Loads wider than 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 33

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Project is in final stages. Watch for night work on installing pedestrian signals and guardrail, final striping and landscaping. Project should be wrapped up by end of June. This project will widen the existing northbound off-ramp to allow for dual right turn lanes. No traffic delays expected, but there may be some queueing in the peak hour. Watch for workers and equipment off the shoulder.
Last Updated
6/22/2019 2:33 PM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
6/24/2019 10:00 AM

I-5: SB MP 118 to 113

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane , Shoulder (Northbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction will continue until summer 2021. On Roberts Mountain (MP 118-116), the speed limit has been reduced to 55 mph in the southbound direction. The southbound shoulder is closed in this area. Elsewhere, watch for intermittent lane and shoulder closures. For more information, visit: www.RobertsMountain.com.
Last Updated
6/22/2019 2:24 PM

I-5: NB MP 123 to 127

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. From Thursday to Saturday, June 20-22, watch for intermittent nighttime (7 p.m. to 7 a.m.) ramp closures involving Exit 123 (Fairgrounds), Exit 125 (Garden Valley) and Exit 127 (Edenbower). Motorists are advised to watch for construction signs and use alternate I-5 interchanges when ramps are closed.
Last Updated
6/22/2019 2:22 PM

I-5: MP 123.8

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 124 off-ramp to OR138 (Roseburg) Effective June 16, 2019, the I-5 northbound exit 124 off-ramp to OR138 will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this project is June 29, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 123.91

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from OR138/Harvard Ave (Roseburg) Effective June 11, 2019, the I-5 southbound on-ramp from OR138/Harvard Ave will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 124

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Pedestrians should watch for construction activity north of the bridge, from Gaddis Park to the pedestrian bridge.
Last Updated
6/22/2019 2:23 PM

I-5: NB MP 124

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Road construction is occurring. Use caution. Ramps Affected. This project will replace the traffic signals at both sides of the Harvard interchange (Exit 124), realign the southbound ramps and Bellows Street, add turn lanes, replace sidewalks and make other improvements. Watch for intermittent nighttime lane closures on Bellows Street and Harvard Avenue. Pedestrians should watch for intermittent sidewalk closures throughout the work area.
Last Updated
6/22/2019 2:26 PM

I-5: MP 124.16

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 124 on- and off-ramps to/from OR138 (Roseburg) Effective July 15, 2019, the I-5 southbound exit 124 on- and off-ramps to/from OR138 will be closed at all hours. The estimated completion date for this project is July 28, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 124.16

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 124 off-ramp to OR138 (Roseburg) Effective May 30, 2019, the I-5 southbound exit 124 off-ramp to OR138 will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 7 PM. The estimated completion date for this project is July 14, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 129.46

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 129.49 (Roseburg) Effective July 17, 2019, this section of I-5 northbound will be restricted to 17 feet 5 inches in height Wednesday through Thursday nights between the hours of 8 PM & 5 AM. Loads higher than 17 feet 5 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 19, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 135 to 169

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Tree & slide removal work will require intermittent lane and shoulder closures, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
6/22/2019 2:39 PM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

I-5: MP 227.66

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 228 on-ramp from OR34 EB (Tangent) Effective June 24, 2019, the I-5 southbound on-ramp from OR34 eastbound will be closed between the hours of 8 PM & 5 AM. The estimated date of completion is June 26, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 227.8

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 228 off-ramp (Tangent) Effective June 23, 2019, the I-5 northbound Exit 228 off-ramp to OR34 will be closed between the hours of 8 PM & 5 AM. The estimated date of completion is June 25, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 228

Maintenance Work
Closure
On Ramp
Comments
Road maintenance operations are occurring. Use an alternate route. Ramps Affected.
Last Updated
6/24/2019 9:02 PM

I-5: MP 228.52

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 228 on-ramp from OR34 WB (Tangent) Effective June 23, 2019, the I-5 northbound on-ramp from OR34 westbound will be closed between the hours of 8 PM & 5 AM. The estimated date of completion is June 25, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 233.14

Commercial Vehicle Information
Informational only
Details
I-5 NB off-ramp Exit 233 to US20 (Albany) Effective June 20, 2019, the I-5 northbound Exit 233 off-ramp will be closed starting Thursday night at 9 PM at all hours until Friday morning at 3 AM. The estimated completion date is June 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 233.23

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 233.23 (Albany) Effective June 20, 2019, this section of I-5 northbound crossing under Exit 233 will be restricted to 16 feet 05 inches in height starting Thursday night at 9 PM at all hours until Friday morning at 3 AM. The estimated completion date is June 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 233.3 to 232.94

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 232.50 to MP 233.50 (Albany) Effective June 20, 2019, this section of I-5 northbound will be restricted to 19 feet 0 inches in width starting Thursday night at 9 PM at all hours until Friday morning at 3 AM. The estimated completion date is June 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 253 to 261

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 3 Lanes (Northbound) 3 Lanes
Comments
Road construction is occurring. Use caution. Ramps Affected. Motorist should expect single and double lane closures, including some off and on Ramps with detours, nightly Sunday through Friday, 9:00 p.m. to 5:00 a.m
Last Updated
5/21/2019 8:03 PM

I-5: MP 254.74 to 257.53

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 254.74 to MP 257.53 (Salem) Effective May 13, 2019, this section of I-5 northbound will be restricted to 17 feet 3 inches in height between the hours of 9 PM & 5 AM. Loads higher than 17 feet 3 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 255.95

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 256 on- and off-ramps to/from Market St (Salem) Effective March 4, 2019, the I-5 NB & SB Exit 256 on- and off-ramps to/from Market St will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is May 24, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 256.62

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 256 on- and off-ramps to/from Market St (Salem) Effective May 13, 2019, the I-5 NB & SB Exit 256 on- and off-ramps to/from Market St will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is August 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 258.4

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 258 on- and off-ramps to/from OR99E (Salem) Effective March 18, 2019, the I-5 NB & SB Exit 258 on- and off-ramps to/from OR99E will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is May 24, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 259 to 271

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 3 Lanes (Northbound) 3 Lanes
Comments
Road construction is occurring. Use caution. Motorist should anticipate nightly lane closures, Sunday night through Friday morning, 7:00 p.m. to 9:00 a.m. In addition, the ramps at the Chemawa Rd. Interchange, Brooks Interchange and the southbound Woodburn onramp to I-5 will be closed on various dates throughout the life of the project
Last Updated
6/24/2019 6:58 PM

I-5: MP 259.03 to 272

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 259.03 to MP 272 (Woodburn) Effective May 13, 2019, this section of I-5 northbound will be intermittently restricted to 16 feet 04 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 04 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 northbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B off-ramp to Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B on-ramp from Chemawa Rd (Salem) Effective May 16, 2019, the I-5 southbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 263.23

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 263 on-ramp from Brooklake Rd (Salem) Effective May 16, 2019, the I-5 southbound Exit 263 on-ramp from Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 263.28

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 263 off-ramp to Brooklake Rd (Salem) Effective May 16, 2019, the I-5 northbound Exit 263 off-ramp to Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 263.49 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 263.49 to MP 259.1 (Woodburn) Effective May 13, 2019, this section of I-5 southbound will be intermittently restricted to 16 feet 02 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 02 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 263.69

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 263 off-ramp to Brooklake Rd (Salem) Effective May 16, 2019, the I-5 southbound Exit 263 off-ramp to Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 263.76

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 263 on-ramp from Brooklake Rd (Salem) Effective May 16, 2019, the I-5 northbound Exit 263 on-ramp from Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is June 20, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 271.6

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 271 on-ramp from OR219 (Woodburn) Effective July 7, 2019, the I-5 southbound on-ramp from OR219 eastbound will be closed Sunday through Thursday nights between the hours of 7 PM & 9 AM. The estimated date of completion is July 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 271.85 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 259 to MP 272 (Woodburn) Effective May 13, 2019, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 271.85 to 263.69

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 271.85 to MP 263.69 (Woodburn) Effective May 13, 2019, this section of I-5 southbound will be intermittently restricted to 16 feet 04 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 04 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 282.6 to 288.98

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 282.50 to MP 289 (Tualatin) Effective June 16, 2019, this section of I-5 northbound and southbound will be restricted to 16 feet 11 inches in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads higher than 16 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is June 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: SB MP 294.21 to 288.55

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane and ramp closures in both directions. Periodic shoulder closures. The southbound on- and off-ramps at Lower Boones Ferry (exit 290) will be closed at night between 10 p.m. and 5 a.m. Shoulder closures.
Last Updated
6/21/2019 1:21 PM

I-5: SB MP 301.45 to 301.92

Construction Work
Informational only
Comments
No traffic impacts.
Last Updated
5/31/2019 10:50 AM

I-5: MP 301.89 to 299.57

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 301.89 to MP 299.57 (Portland) Effective July 13, 2019, this section of I-5 southbound will be closed between the hours of 9 PM & 6 AM. The estimated date of completion in July 14, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 302.74 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 302.70 to MP 304.00 (Portland) Effective March 7, 2019, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 303.08 off-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound off-ramp from Greeley Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 303.08 off-ramp from Greeley Ave (Portland) Effective May 10, 2019 , the I-5 southbound off-ramp from Greeley Ave will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 303.08 off-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound off-ramp from Greeley Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 303.08 off-ramp from Greeley Ave (Portland) Effective May 10, 2019 , the I-5 southbound off-ramp from Greeley Ave will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 303.08 off-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound off-ramp from Greeley Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 303.08 off-ramp from Greeley Ave (Portland) Effective May 10, 2019 , the I-5 southbound off-ramp from Greeley Ave will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.15 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 303.15 to MP 303.98 (Portland) Effective March 7, 2019, I-5 northbound will be restricted to 15 feet 06 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.47

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 302B to I-405 SB (Portland) Effective April 8, 2019, the I-5 southbound exit 302B off-ramp to I-405 southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.76 to 304.07

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 303 (Swan Island/N Going St - Portland) Effective July 23, 2018, the I-5 northbound and southbound on/off ramps (Exit 303) will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.81

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from N Going St (Portland) Effective March 27, 2019, the I-5 southbound on-ramp from N Going St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: MP 303.98 to 303.16

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 303.98 to MP 303.16 (Portland) Effective March 7, 2019, this section of I-5 southbound will be restricted to 15 feet 05 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
6/24/2019 10:00 AM

I-5: MP 304.75 to 305.12

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 304 (Rosa Parks - Portland) Effective August 13, 2018, the I-5 northbound and southbound on and off ramps to Rosa Parks Way will be will be intermittently closed through Saturday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is April 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-5: NB MP 305 to 307.97

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane closures from 8 p.m. to 5:30 a.m. Friday through Monday nights in both directions between the Fremont Bridge and Lombard Boulevard. Nighttime ramp closures at Broadway/Weidler, Going Street, Rosa Parks Way, Lombard Boulevard, Victory Boulevard, Marine Drive and Jantzen Beach from 9 p.m. to 5 a.m.
Last Updated
6/21/2019 1:20 PM

I-82: MP 0.61 to 1.81

Commercial Vehicle Information
Informational only
Details
I-82 NB & SB MP 0.50 to MP 3.00 (Umatilla) Effective March 25, 2019, this section of I-82 northbound and southbound will be restricted to 18 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-82: EB MP 1.77 to 10.27

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 2 Lanes (Eastbound) Median , 2 Lanes
Comments
Road construction is occurring causing no to minimum delay. Speed limits may be reduced in the work zone. This project includes replacement of bridge end panels and paving.
Last Updated
6/24/2019 2:35 PM

I-84: WB MP 17 to 17.6

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane closures from 10 p.m. to 5:30 a.m. Daytime and nighttime single lane closures on I-84 and daytime lane closures on Graham Road.
Last Updated
6/21/2019 1:21 PM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM &5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is August 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM &5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is August 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: WB MP 51 to 53

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Single lane closure for eastbound I-84 and shoulder closures from 6:30 a.m. to 5 p.m. Monday through Thursday.
Last Updated
6/21/2019 1:22 PM

I-84: MP 85.3

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 85 on- and off-ramps to City Center (The Dalles) Effective July 15, 2019 , the I-84 eastbound and westbound Exit 85 on- and off-ramps to/from City Center will be closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is August 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 85.3

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 85 on- and off-ramps to City Center (The Dalles) Effective May 6, 2019, the I-84 eastbound and westbound Exit 85 on- and off-ramps to/from City Center will be closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is June 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: EB MP 85.51

Construction Work
No to Minimum Delay
Off Ramp
Comments
Intermittent on and off ramp closures will be in place for construction operations Sunday-Friday from 7PM-7AM at the Exit 85 Interchange. Ramps Affected.
Last Updated
6/24/2019 7:09 PM

I-84: MP 85.51

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 85.51 (The Dalles) Effective May 23, 2019, this section of I-84 eastbound crossing under Exit 85 will be restricted to 16 feet 09 inches in height between the hours of 7 PM & 10 AM. Loads higher than 16 feet 09 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 85.72 to 85.3

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 85 to MP 86 (The Dalles) Effective May 23, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 7 PM & 10 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 85.75

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 85.75 (The Dalles) Effective May 23, 2019, this section of I-84 westbound crossing under Exit 85 will be restricted to 17 feet 02 inches in height between the hours of 7 PM & 10 AM. Loads higher than 17 feet 02 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: EB MP 100.61 to 103.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
6/23/2019 9:11 AM

I-84: MP 104.56

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 104.56 (Biggs Junction) Effective May 1, 2019, this section of I-84 crossing under Exit 104 eastbound is restricted to 19 feet 06 inches in height and 17 feet 10 inches in height westbound. The estimated date of completion for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 104.78

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 104 off-ramp to US97 (Biggs Junction) Effective May 1, 2019, the westbound I-84 off-ramp to US97 (Exit 104) will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 104.83

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 104 on-ramp from US97 (Biggs Junction) Effective May 1, 2019, the eastbound I-84 on-ramp from US97 (Exit 104) will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 108 to 103.75

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 104.20 to MP 105.30 (Biggs Junction) Effective May 1, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: EB MP 109.17 to 110.77

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
6/23/2019 9:11 AM

I-84: MP 114.13 to 109.02

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 109.25 to MP 110.50 (Rufus) Effective May 1, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 123.31

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 123.31 (Arlington) Effective June 24, 2019, this section of I-84 eastbound will be restricted to 17 feet 00 inches in height at all hours. Loads higher than 17 feet 00 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 8, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 123.48

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 123.48 (Arlington) Effective June 24, 2019, this section of I-84 westbound will be restricted to 16 feet 07 inches in height at all hours. Loads higher than 16 feet 07 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 8, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 123.56 to 123.09

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 122.75 to MP 124.00 (Arlington) Effective June 24, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. Loads wider that 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 8, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: EB MP 125.5 to 137.78

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Lane closures are in place both EB and WB in the construction zone. No to minimum delay.
Last Updated
6/23/2019 9:12 AM

I-84: MP 129.22

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 129 on- and off-ramps to from Blalock Canyon Rd (Arlington) Effective May 29, 2019, the I-84 eastbound exit 129 on- and off-ramps to/from Blalock Canyon will be closed at all hours. The estimated completion date for this project is July 2, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 129.22 to 137.59

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 125.5 to MP 137.78 (Arlington) Effective May 28, 2019, this section of I-84 eastbound and westbound will be restricted to 15 feet 6 inches in width at all hours. The estimated completion date for this project is July 2, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: EB MP 131.61 to 136.9

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
6/23/2019 9:11 AM

I-84: EB MP 146.46 to 148.18

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
6/23/2019 9:10 AM

I-84: MP 147.35

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 147.35 (Arlington) Effective June 17, 2019, this section of I-84 eastbound will be restricted to 16 feet 07 inches in height at all hours. Loads higher than 16 feet 07 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 147.36

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 147.36 (Arlington) Effective June 17, 2019, this section of I-84 westbound will be restricted to 15 feet 10 inches in height at all hours. Loads higher than 15 feet 10 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 147.7 to 147.12

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 146.50 to MP 148 (Arlington) Effective June 17, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width at all hours. Loads wider that 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 1, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: EB MP 152 to 64

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Intermittent single lane closures are in place both EB and WB in the construction zone. No to minimum delay. This construction project includes installation of new guardrail end treatments, bridge screening, and bridge rail replacement.
Last Updated
6/23/2019 9:13 AM

I-84: MP 152.002 to 151.49

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 151 to MP 152 (Boardman) Effective June 11, 2019, this section of I-84 eastbound will be restricted to 20 feet 00 inches in width at all hours. The estimated completion date for this project is July 19, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 159.3

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 159.30 (Boardman) Effective March 18, 2019, this section of I-84 westbound crossing under Exit 159 is restricted to 16 feet 01 inch in height Monday through Friday between the hours of 5 AM & 10 PM. The estimated completion date for this project is June 28, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: WB MP 162

Information
Informational only
Rest Area
Comments
Watch for crews working in the rest area. Use caution.
Last Updated
6/12/2019 10:30 AM

I-84: MP 167.94 to 156.32

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 154 to MP 174 (Boardman) Effective March 18, 2019 this section of I-84 eastbound and westbound will be restricted to 20 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 28, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective May 31, 2019, this section of I-84 westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: WB MP 195.16

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Road construction is occurring. Use caution.
Last Updated
6/23/2019 3:01 PM

I-84: EB MP 206.75 to 209.91

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median (Eastbound) Median
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
6/23/2019 9:07 AM

I-84: MP 207.47

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 207.47 (Pendleton) Effective April 12, 2019, this section of I-84 eastbound will be restricted to 18 feet 01 inches in height between the hours of 5 AM & 10 PM. The estimated completion date for this project is June 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 210.96 to 207.1

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 205 to MP 211 (Pendleton) Effective April 12, 2019, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width between the hours of 5 AM & 10 PM. The estimated completion date for this project is June 21, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: EB MP 214 to 259.97

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures may be in place both EB and WB in the construction zone. Expect delays. This safety improvement project includes installation of new variable message signs, road/weather sensors, improved lighting and reflectors, and additional cable barrier. Work also includes trenching, grading, and signing.
Last Updated
6/24/2019 8:03 AM

I-84: MP 214.001 to 259.35

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 214 to MP 259.97 (Pendleton) Effective April 1, 2019 , this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 214.001 to 259.35

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 214 to MP 259.97 (Pendleton) Effective April 1, 2019 , this section of I-84 eastbound and westbound will be restricted to 15 feet 11 inches in height at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: WB MP 226

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures may be in place both EB and WB in the construction zone. Expect delays. This safety improvement project includes installation of new variable message signs, road/weather sensors, improved lighting and reflectors, and additional cable barrier. Work also includes trenching, grading, and signing.
Last Updated
6/24/2019 8:03 AM

I-84: EB MP 238

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of hazardous debris has been received. Use caution.
Last Updated
6/24/2019 2:00 PM

I-84: MP 256.4

Commercial Vehicle Information
Informational only
Details
I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

I-84: WB MP 259.97

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures may be in place both EB and WB in the construction zone. Expect delays. This safety improvement project includes installation of new variable message signs, road/weather sensors, improved lighting and reflectors, and additional cable barrier. Work also includes trenching, grading, and signing.
Last Updated
6/24/2019 8:02 AM

I-84: EB MP 260.32 to 272.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Intermittent lane closures may be in place EB and WB for construction operations. The Exit 270 WB on ramp is closed Mon-Fri from 7A-12P and 1P-6P. Ramps Affected. This project includes grading, drainage, structures, paving, illumination, and roadside development.
Last Updated
6/23/2019 3:02 PM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width Sunday through Saturday nights from 1/2 before sunrise to 1/2 after sunset. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound will be restricted to 16 feet 08 inches in height at all hours. Loads higher than 16 feet 08 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 260.93 to 268.5

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Saturday nights from 1/2 after sunset to 1/2 before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound and westbound will be restricted to 17 feet 00 inches in width Sunday through Saturday nights from 1/2 before sunrise to 1/2 after sunset. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 260.93 to 269.22

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound will be restricted to 16 feet 08 inches in height at all hours. Loads higher than 16 feet 08 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 260.93 to 268.5

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Saturday nights from 1/2 after sunset to 1/2 before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 269.27 to 260.93

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 260.32 to MP 269.65 (La Grande) Effective April 22, 2019, this section of I-84 westbound will be restricted to 16 feet 06 inches in height at all hours. Loads higher than 16 feet 06 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 270.74 to 270.87

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 270.39 to MP 272.71 (La Grande) Effective April 8, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is July 15, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
6/24/2019 10:00 AM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
6/24/2019 10:00 AM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
6/24/2019 10:00 AM

I-84: MP 369.99 to 376.98

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 373.08

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 eastbound will be restricted to 16 feet 10 inches in height Monday through Friday between the hours of 5 AM & 10 PM. Loads higher than 16 feet 10 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 373.08

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 westbound will be restricted to 16 feet 4 inches in height Monday through Friday between the hours of 5 AM & 10 PM. Loads higher than 16 feet 4 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: WB MP 376 to 378

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 2 Lanes (Eastbound) Median , 2 Lanes
Comments
Lane closures are in place EB and WB in the construction zone for bridge work. No to minimal delays. A detour is in place for oversize loads.
Last Updated
6/23/2019 9:09 AM

I-84: MP 377.9

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 377.9 (Ontario) Effective April 15, 2019, this section of I-84 westbound will be restricted to 18 feet 6 inches in height at all hours. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

I-84: MP 378.01

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 377.75 to MP 378.25 (Ontario) Effective April 15, 2019, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

US101: MP 4.53 to 5.33

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring. Use caution. US 101: Young’s Bay (New Youngs Bay) Bridge Repair Project (Oregon Coast Highway, mileposts 4.53 to 5.33) This project consists of the following: • Raising the left span tower bracing above the high route clearance requirement; • replacing rocker bearings; • repairing the damaged concrete with cathodic protection; and • replacing compression joint seals. Initially in mid March, the traveling public will notice the contractor building the containment structure which will be attached to the sides of the bridge, and a barge in the water with support boats bringing crew and materials to and from the barge. Once the containment structure is in place, actual construction will begin. Most of the construction will be performed below the bridge from the barge. The traveling public can expect periodic single lane closures at night to allow the contractor to move equipment. The lane closures will be Sunday night through Friday morning, 9 p.m. to 5:30 a.m. A complete two week night time closure of the bridge is scheduled in 2021 toward the end of the project. An alternative route during periods of lane closures and the full night time closure is U.S. 101B over the Old Youngs Bay and Lewis and Clark River Bridges. The public is encouraged to sign up for project updates to be delivered via email by copying an pasting the following link into your web browser and following the steps to enroll: https://public.govdelivery.com/accounts/ORDOT/subscriber/new?topic_id=ORDOT_126
Last Updated
5/05/2019 2:05 AM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
6/24/2019 10:00 AM

US101: MP 4.91

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 4.53 to MP 5.33 (New Young's Bay Bridge - Astoria) Effective February 15, 2019, this section of US101 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is November 30, 2021.
Last Updated
6/24/2019 10:00 AM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Last Updated
6/24/2019 10:00 AM

US101: MP 19 to 21

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
6/20/2019 10:02 AM

US101: MP 22.04 to 25.27

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 22 to MP 25.50 (Seaside) Effective May 5, 2019, this section of US101 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM until June 31, 2019. Starting July 1, 2019 this width restriction will be Sunday through Thursday nights between the hours of 8 PM & 6 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is October 30, 2019.
Last Updated
6/24/2019 10:00 AM

US101: MP 22.52 to 24.95

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Night road work is occuring Sunday though Friday, 7:00 PM to 7:00 AM. Traffic controlled by flaggers. Use caution. US 101: Dooley Bridge – JCT US 26 SEC. (Clatsop County) (Oregon Coast Highway, mileposts 22.52 to 24.95) This project includes work as follows: • Soft spot repairs; • asphalt grinding/inlay; • installing centerline rumble strips north of Beerman Creek; and • New permanent striping. The traveling public can expect single lane closures at night to allow the contractor to perform work. The lane closures will be Sunday night through Friday morning, 7:00 p.m. to 7:00 a.m. During the summer months of July and August the lane closures will be Sunday night through Friday morning, 8:00 p.m. to 6:00 am. A pedestrian transport vehicle will be available during working hours to accommodate pedestrian and bicycle traffic.
Last Updated
6/19/2019 10:57 AM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

US101: SB MP 82.8

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
6/24/2019 9:14 AM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. U.S. 101: Devil’s Lake Outlet, Schooner Cr & Siltcoos River Bridges At D River Outlet Night work is complete for the season and work will continue during the day underneath the bridge. Short duration lane closures are allowed from 7 p.m. to 9:30 p.m. but will only be needed on occasion. Work is expected to last until the spring of 2020. Work at Schooner Creek Bridge is expected to start in August 2019. Expect minor delays. This project includes the following improvements at each of the three bridges: • Repair damaged concrete • Install zinc anodes to the structures to protect them from the harsh coastal climate • Replace bridge railings to meet current crash standards • Install steel and titanium rebar to strengthen bridges
Last Updated
6/24/2019 6:52 AM

US101: MP 141.44 to 141.83

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. U.S. 101: Yaquina Bay Bridge painting The eastern sidewalk is closed for the duration of the project. A temporary pedestrian crossing at the south end of the bridge will allow pedestrians to cross U.S. 101. At the north end, pedestrians can use the existing sidewalks under the bridge, which will be signed as the pedestrian detour route. This project is expected to last until October 2019. Expect minor delays. Most of the work is under the bridge with no impact to traffic. There will be occasional nighttime lane closures to set up containment under the bridge and move equipment. Intermittent night work will continue with lane closures allowed from 8 p.m. to 6 a.m. This project is painting the steel bridge members under the roadway deck in two spans of the steel structure. These members are in need of additional protection from the harsh coastal environment.
Last Updated
6/24/2019 6:55 AM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
6/24/2019 10:00 AM

US101: MP 166.48

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Cape Perpetua Half Viaduct (South of Yachats): A new cathodic protection system is being installed, including installing a wind turbine generator under the bridge to power the system. Crews are fabricating the walkway platform underneath the bridge. Bridge work is expected to be completed by the end of December 2020.
Last Updated
6/02/2019 2:19 PM

US101: MP 178.33

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Cape Creek Bridge (North of Florence): Installation of a new cathodic protection system and bridge repairs are underway. Crews are dismantling scaffolding and moving it forward to the next section of bridge. Single lane closures for some of the work. Bridge work is expected to be completed by the end of December 2020.
Last Updated
6/02/2019 2:18 PM

US101: MP 190.17 to 190.89

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Night work (8 p.m. to 6 a.m.) is scheduled the week of June 3 on U.S. 101 between U.S. 101/OR126 Jct and the Siuslaw River Bridge. Crews finishing up sidewalk and ADA improvements on U.S. 101 southbound, near Rhododendron Drive. Expect single lane closures on U.S. 101 southbound and side street closures. This project is a partnership with the City of Florence to improve the streetscape and pave. ADA facilities along U.S.101 will also be improved. The project includes: • Work along U.S.101 –south from the U.S.101/OR 126 Junction to the Siuslaw River Bridge & OR 126 –east from the U.S. 101/OR 126 Junction to Spruce Street • ADA ramps, colored concrete plazas, art plinths, street lighting, underground overhead utilities, bike lanes, parking spaces along U.S. 101, and landscaping and irrigation improvements. • U.S. 101 paving from the U.S.101/OR 126 Junction south to the Siuslaw River Bridge. The project is to be completed by the end of October.
Last Updated
6/02/2019 11:37 AM

US101: MP 190.87 to 191.21

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. US 101: Siuslaw River Bridge (Florence) (MP 190.8 -191.2). Crews are completing final touch up work. The Siuslaw River Bridge is located at the south end of Florence on U.S. 101. Repairs have been made to the bridge and its protective coating, seismic upgrades added, the railing upgraded, and pedestrian access improved. The project is completed except for final cleanup work. All final clean up work is expected to be finished by the end of June 2019.
Last Updated
6/07/2019 8:08 AM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

US101: MP 233.4 to 234.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. This project will paint the steel truss section of McCullough Bridge, replace rivets, remove rust and repair damaged steel. Construction is scheduled for completion in fall 2021. For more information, visit: www.McCulloughBridge.com. Watch for intermittent nighttime (7 p.m. to 7 a.m.) lane closures each Sunday night to Friday morning. Pedestrians should watch for intermittent sidewalk closures. At all times, at least one of the bridge’s sidewalks will remain open.
Last Updated
6/22/2019 2:17 PM

US101: MP 233.48 to 234.48

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Bridge work is occurring. Use caution. Expect minor delays.
Last Updated
6/24/2019 11:39 PM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 233.48 to MP 233.49 (North Bend) Effective April 15, 2019, this section of US101 northbound and southbound will be restricted to 16 feet 00 inches in height Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads higher than 16 feet 00 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
6/24/2019 10:00 AM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 233.48 to MP 233.49 (North Bend) Effective April 15, 2019, this section of US101 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
6/24/2019 10:00 AM

US101: MP 234 to 235

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures on both sides of U.S. 101 (Sherman Ave.) at the Union, Michigan and Colorado Ave. intersections in North Bend. Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone. Construction is scheduled for completion June 30.
Last Updated
6/22/2019 2:18 PM

US101: MP 250.8

Information
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
5/31/2019 8:17 PM

US101: MP 251

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
5/30/2019 6:50 AM

US101: MP 295 to 300

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will pave five miles of U.S. 101 and repair four bridges between the Sixes area and the north end of Port Orford. The speed limit has been reduced to 40 mph at milepost 295, the one-mile section of highway between Crystal Creek and Sixes River. Watch for intermittent weekday lane closures and brief delays throughout the project area as the contractor continues with road work. Flaggers will provide traffic control as needed. Paving will begin on Monday, June 17, and continue for approximately two weeks. Expect brief delays.
Last Updated
6/22/2019 2:22 PM

US101: SB MP 304

Information
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays. Use caution.
Last Updated
6/17/2019 6:56 PM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
6/24/2019 10:00 AM

US101: MP 312

Information
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
5/31/2019 8:17 PM

US101: MP 316

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
5/30/2019 10:57 PM

US101: MP 316

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
6/06/2019 9:07 PM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

US101: MP 332.2

Information
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
6/09/2019 8:33 PM

US101: MP 333.75

Information
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
6/22/2019 12:10 PM

US101: MP 335.7

Information
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
5/28/2019 9:22 AM

US101: MP 347.78

Commercial Vehicle Information
Informational only
Details
US101 MP 347.78 NB & SB (north of Brookings) Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. The estimated completion date for this project is August 31, 2019.
Last Updated
6/24/2019 10:00 AM

US101: MP 348

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is reduced to a single lane, and controlled with a temporary traffic signal. Expect delays and use caution. The bridge is limited to a single lane of traffic until summer 2019. A temporary signal is in place to provide traffic control. Expect brief delays.
Last Updated
6/22/2019 2:43 PM

US20: MP 13.14 to 13.45

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 13.14 to MP 13.45 (Lebanon) Effective December 1, 2019, this section of US20 eastbound and westbound between Vine St and Oak St will be closed for one day only between the hours of 5 PM & 6 PM for a parade.
Last Updated
6/24/2019 10:00 AM

US20: MP 13.27 to 13.45

Commercial Vehicle Information
Informational only
Details
US20 EB MP 13.27 to MP 13.45 (Lebanon) On Saturday, September 7, 2019, this section of US20 eastbound between Sherman Street and Oak Street in Lebanon will be closed between the hours of 10 AM and 10 PM for the annual Lebanon Community Block Party Event.
Last Updated
6/24/2019 10:00 AM

US20: MP 20.27 to 19.66

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
6/24/2019 8:35 PM

US20: WB MP 50.79

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. U.S. 20 / OR 34: Philomath Blvd Apartments highway improvements. A left turn lane, a right turn lane and a pedestrian crossing are being constructed as part of the new apartment complex development between Corvallis and Philomath. Work not impacting travel lanes can be expected during the day. Lane closures may occur between 7 p.m. and 6 a.m. Watch for flaggers controlling traffic.
Last Updated
6/24/2019 6:40 AM

US20: MP 51.4 to 52.2

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays, use caution. US 20 / Philomath Blvd: Boulevard Apartment in Philomath Water/Sewer Line Work Water and sewer line work along and across the highway will be occurring June 2018 to TBD. This work is for a proposed apartment complex. After the water and sewer line work is completed, the contractor is expected to begin work on highway improvements which will likely include a left turn lane and a pedestrian crossing. Lane closures, when needed, on US20 can be expected: Sunday night through Thursday night from 7:00 PM to 6:00 AM. No holiday weekend closures will be permitted/allowed.
Last Updated
5/05/2019 2:07 AM

US20: MP 96 to 128

Construction Work
No to Minimum Delay
Comments
A chip seal is scheduled to begin mid-July. Traffic will be controlled by flaggers during construction operations with delays up to 20 minutes.
Last Updated
6/24/2019 2:38 PM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 is restricted to 14 feet 00 inches in width and/or 154 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/24/2019 10:00 AM

US20: MP 245.77 to 246.36

Commercial Vehicle Information
Informational only
Details
US20 EB MP 245.77 to MP 246.36 (Vale) Effective July 4, 2019, this section of US20 will be closed for one evening only between the hours of 5 PM & 6 PM for the 4th of July Parade.
Last Updated
6/24/2019 10:00 AM

US26: MP 0.34

Commercial Vehicle Information
Informational only
Details
US26 WB (Ross Island Bridge) off-ramp to OR10/Barbur Blvd (Portland) Effective June 30, 2019, the off-ramp from US26 westbound to OR10/Barbur Blvd will be closed between the hours of 5 AM & 8 PM. The estimated completion date for this project is June 30, 2019.
Last Updated
6/24/2019 10:00 AM

US26: WB MP 1.76

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime single lane closures from 7 a.m. to 3:30 p.m. and nighttime single lane closures from 8 p.m. to 5 a.m. in both directions. Traffic signal turned off at Powell Blvd & E 26th Ave at night. Intersection will be under control of flaggers in all four directions.
Last Updated
6/21/2019 1:39 PM

US26: MP 7.1 to 7.3

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments
Road work on Powell from 121st to 126th Avenues has two way traffic controlled by flagger. Use caution.
Last Updated
6/24/2019 8:20 PM

US26: MP 7.5 to 7.95

Construction Work
No to Minimum Delay
Comments
Weekday shoulder closures. Watch for crews and equipment. Nighttime single lane closures from 8 p.m. to 6 a.m. Monday through Thursday. The Oregon Department of Transportation (ODOT) will construct roadway improvements on Powell Boulevard(US Highway 26) from SE 122nd Avenue to SE 136th Avenue. This project will address the high rate of collisions on Outer Powell for the past several years. The purpose of this project is to increase safety for people who walk, drive, take the bus and ride bikes, making Outer Powell a safer place for everyone.
Last Updated
6/21/2019 1:39 PM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective January 4, 2019, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 30 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

US26: MP 21 to 23

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
6/24/2019 8:03 AM

US26: MP 23.87 to 24.61

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 23.87 to MP 24.61 (Sandy) Effective July 11, 2019, this section of US26 eastbound and westbound will be restricted to 8 feet 6 inches in width between the hours of 6:30 PM & 9:30 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

US26: MP 32.47 to 30.43

Commercial Vehicle Information
Informational only
Details
US26 WB MP 32.47 to MP 30.43 (Cherryville) (Hood to Coast) Effective August 23, 2019 this section of US26 will be restricted to 12 feet 00 inches in width between the hours of 6 AM & 7:45 PM. The estimated completion date for this project is August 24, 2019.
Last Updated
6/24/2019 10:00 AM

US26: MP 34.97 to 32.68

Commercial Vehicle Information
Informational only
Details
US26 WB MP 32.68 to MP 34.97 (Government Camp) Effective June 29, 2019, this section of US26 westbound will be restricted to 12 feet 00 inches in width between the hours of 4 AM & 1 PM for one day only. The estimated completion date for this project is June 29, 2019.
Last Updated
6/24/2019 10:00 AM

US26: WB MP 62 to 65

Construction Work
No to Minimum Delay
Comments
No traffic impacts. This project is complete.
Last Updated
6/21/2019 1:40 PM

US26: MP 91.12 to 103.09

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project includes rock fall mitigation and the installation of drainage, guardrail, pavement markings, and permanent signing.
Last Updated
6/24/2019 2:27 PM

US26: MP 97.2 to 101.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Flaggers will control traffic during nighttime construction operations Sunday - Wednesday. Expect delays up to 20 minutes.
Last Updated
6/24/2019 2:39 PM

US26: MP 115.58

Commercial Vehicle Information
Informational only
Details
US26 MP 115.58 (North Unit Canal Bridge - Madras) Effective February 5, 2019, US26 crossing North Unit Canal Bridge at MP 115.58 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

US26: MP 125 to 124.5

Information
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder
Comments
There are no to minimum delays due to erosion of the highway. Use caution.
Last Updated
6/17/2019 11:39 AM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
6/24/2019 10:00 AM

US30: MP 0.46

Commercial Vehicle Information
Informational only
Details
US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

US30: MP 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective July 19, 2019, the off-ramp from US30 eastbound to I-405 southbound will be closed Friday through Thursday between the hours of 8 PM & 5 AM. The estimated completion date for this project is July 19, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 12.59 to 12.69

Commercial Vehicle Information
Informational only
Details
US30 WB MP 12.5 to MP 12.7 (Burlington) (Hood to Coast) Effective August 23, 2019 this section of US30 will be restricted to 14 feet 00 inches in width between the hours of 4:30 AM & 5:00 AM. The estimated completion date for this project is August 24, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
6/24/2019 10:00 AM

US30: MP 13.19 to 13.18

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures from 8 p.m. to 4:30 a.m. Monday through Friday and until 7 a.m. Saturday.
Last Updated
6/07/2019 2:35 PM

US30: MP 13.22

Commercial Vehicle Information
Informational only
Details
US30 EB & WB Exits to Cornelius Pass Rd (Portland) Effective July 8, 2019, US30 eastbound and westbound exits to Cornelius Pass Rd will be closed at all hours. Estimated date of completion is September 21, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Last Updated
6/24/2019 10:00 AM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
6/24/2019 10:00 AM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Last Updated
6/24/2019 10:00 AM

US30: MP 40.44 to 40.73

Commercial Vehicle Information
Informational only
Details
US30 EB & WB MP 40.44 to MP 40.73 (Haines) Effective July 4, 2019, this section of US30 will be closed between the hours of 5 AM & noon, for one day only.
Last Updated
6/24/2019 10:00 AM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
6/24/2019 10:00 AM

US30: MP 49.29 to 49.95

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 49.29 to MP 49.95 (Baker City) Effective June 29, 2019, this section of US30 will be closed between the hours of 8 AM & noon, for one day only.
Last Updated
6/24/2019 10:00 AM

US30: MP 51.56 to 51.67

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.56 to MP 51.67 (Baker City) Effective July 20, 2019, this section of US30 northbound and southbound will be closed between the hours of 8 AM & 3 PM for one day only.
Last Updated
6/24/2019 10:00 AM

US30: MP 51.79 to 51.73

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.73 to MP 51.79 (Baker City) Effective July 10, 2019, this section of US30 (Broadway St) between 1st St and Main St will be closed starting Wednesday morning at 7 AM at all hours until Sunday night at 9 PM for the Hells Canyon Motor Cycle Rally. The estimated completion date is July 14, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 51.79 to 52.04

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.79 to MP 52.04 (Baker City) Effective June 29, 2019, this section of US30 will be closed between the hours of 9 AM & 8 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

US30: MP 51.79 to 51.98

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.79 to MP 51.98 (Baker City) Effective July 20, 2019, this section of US30 northbound and southbound will be closed between the hours of 8 AM & 3 PM for one day only.
Last Updated
6/24/2019 10:00 AM

US30: MP 52.04 to 51.79

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.79 to MP 52.04 (Baker City) Effective July 11, 2019, this section of US30 (Main St) between Broadway St and Auburn Ave will be closed starting Thursday morning at 10 AM at all hours until Sunday night at 9 PM for the Hells Canyon Motor Cycle Rally. The estimated completion date is July 14, 2019.
Last Updated
6/24/2019 10:00 AM

US30: MP 79.2

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
5/20/2019 2:17 PM

US30: WB MP 98.13 to 98.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. 6th Through 11th Street: Waterfront Bridges (Astoria) Project (Clatsop County) (Various Streets) This project consists of performing work as follows: - Install and remove temporary traffic control and pedestrian routes (TPAR) - Install and remove temporary potable water and sanitary sewer systems - Perform earthwork - Install storm sewer systems and water quality structures - Remove and reconstruct six bridges and trolley crossings (Including tracks) - Construct roadway, sidewalks and ADA ramps - Install permanent signs and illumination systems - Perform additional and incidental work and called for by the Plans and Specifications This Project replaces six aging bridges at the Astoria Waterfront, at 6th through 11th Streets and to install drainage and water quality facilities at the intersection of Highway 30 and 30th Street in Astoria. Streets will be closed while construction is occurring except for Highway 30. Flaggers will control single lane traffic while construction is occurring at 30th St. The odd numbered streets (7th, 9th and 11th) are scheduled to begin bridge demolition mid-October 2018, and are to be completed by June 15, 2019. The remaining work is to be completed no later than June 30, 2020. Temporary Pedestrian Access Routes (TPAR) will be maintained throughout the work zones and will be ADA compliant.
Last Updated
5/05/2019 2:06 AM

US395: MP 3 to 65

Information
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
There are no to minimum delays due to erosion of the highway. Use caution.
Last Updated
6/03/2019 7:34 AM

US395: MP 36.9

Crash/Hazard
No to Minimum Delay
Comments
A landslide has occurred causing no to minimum delays. Southbound has abrupt edge, shoulder closed. Use caution.
Last Updated
4/04/2019 1:36 PM

US95: MP 7

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
The southbound shoulder is closed due to a landslide. Use caution.
Last Updated
6/11/2019 12:22 PM

US97: MP 0.27 to 6.98

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Intermittent single lane closures may be in place for construction operations. No to minimal delay. This project includes bridge upgrades and structure replacement on Highway 97 over Spanish Hollow Creek and Trout Creek.
Last Updated
6/23/2019 9:12 AM

US97: MP 56.72 to 74.9

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Flaggers will control traffic Sunday-Friday from 7PM-7AM for night paving operations. Expect delays up to 20 minutes.
Last Updated
6/23/2019 9:11 AM

US97: MP 58.13 to 68.66

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 56.72 to MP 74.90 (Shaniko) Effective May 5, 2019, this section of US97 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
6/24/2019 10:00 AM

US97: MP 141.09

Commercial Vehicle Information
Informational only
Details
US97 NB Exit 141 off-ramp to 3rd St (Bend) Effective August 25, 2019, the US97 northbound exit 141 off-ramp to 3rd St will be closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is October 18, 2019.
Last Updated
6/24/2019 10:00 AM

US97: MP 265.65 to 280.51

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Paving, bridge, concrete curb, and striping work. Work zone controlled with flagging and pilot car, expect 20 minute delays.
Last Updated
6/22/2019 2:41 PM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
6/24/2019 10:00 AM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) Effective February 12, 2019, OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to the following weights: 18 tons Type 3, 18 tons SU4, SU5, SU6, & SU7, 28 tons Type 3S2, 35 tons Type 3-3.
Last Updated
6/24/2019 10:00 AM

ORE126: MP 15.84

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective June 21, 2018, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width and 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet or 135 feet in overall length may be accommodated on a case by case basis. Contact the OD Permit Unit for information.
Last Updated
6/24/2019 10:00 AM

ORE126: MP 20.4

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. OR 126E: Slope stabilization (MP 20.4). About 300 feet of failing slope on the eastbound shoulder will be stabilized. There will be daytime single lane closures with flaggers, Monday through Saturday, 7 a.m. – 5 p.m. Scheduled to begin Tuesday, June 4. Work will be completed in three weeks from start.
Last Updated
6/04/2019 7:00 AM

ORE126: MP 31.56 to 32.36

Construction Work
Informational only
Comments
Road construction has been postponed until late August 2019. OR 126: Walker Creek – Chickahominy Creek Passing Lane. Crews are building up the road base on both sides of the road and extending existing culverts. A westbound passing lane is being installed from mp 32.36 to mp 31.56, just west of Walton. The road is being widened on both sides to make room for the additional lane. The project also includes new pavement, signs, striping, guardrail, and water quality features.
Last Updated
6/24/2019 9:32 AM

ORE126: MP 32.4 to 31.56

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 31.56 to MP 32.36 (Walton) Effective February 6, 2019, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 11 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2019.
Last Updated
6/24/2019 10:00 AM

ORE126: MP 48.43

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. OR126: Cornerstone Dr. to Terry St. Paving Project. 24-hour flagging near Fisher Road is now complete. Crews will begin work on the two bus pullouts near Ellmaker starting the week of June 3. This work will all be completed at night. One lane will be closed at night Sunday through Thursday nights from 7 p.m. to 6 a.m. Crews are repairing and repaving the roadway, adding two bus pullouts and a westbound right turn lane at Ellmaker Road, widening the north shoulder between Shady Rest Dr. and Lake Side Dr., replacing bridge rail at MP 51.7, installing new guardrail, and installing centerline and edge line rumble strips. This project is scheduled to be complete by September 16.
Last Updated
6/03/2019 10:07 AM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/24/2019 10:00 AM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/24/2019 10:00 AM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/24/2019 10:00 AM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/24/2019 10:00 AM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/24/2019 10:00 AM

ORE138: MP 0.6 to 1.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures in both directions of Diamond Lake Blvd. between NE Bogard Street and NE Patterson Street. Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone. Construction is scheduled for completion June 30.
Last Updated
6/22/2019 2:27 PM

ORE138: MP 5

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
6/07/2019 10:18 PM

ORE140: EB MP 5.6 to 9.3

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Survey and cleanup work. Work zone controlled by flagging and pilot car, expect 20 minute delays.
Last Updated
6/22/2019 2:41 PM

ORE140: MP 7.75

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Watch for traffic control for striping this week on OR 140 Little Butte Creek Bridge.
Last Updated
6/22/2019 2:42 PM

ORE153: MP 4.57 to 4.55

Commercial Vehicle Information
Informational only
Details
OR153 EB & WB MP 4.46 to MP 4.58 (Amity) Effective June 14, 2019, this section of OR153 eastbound and westbound will be closed at all hours. The estimated completion date for this project is July 5, 2019.
Last Updated
6/24/2019 10:00 AM

ORE155: MP 8.58 to 9.19

Commercial Vehicle Information
Informational only
Details
OR155 EB & WB MP 8.58 to MP 9.19 (Dayton) Effective July 26, 2019, this section of OR155 will be closed between the hours of 5:45 PM & 7 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE164: MP 6.12 to 5.49

Commercial Vehicle Information
Informational only
Details
OR164 NB MP 5.49 to MP 6.12 (Jefferson) On Saturday, July 20, 2019, this section of OR164 between Main Street and North Avenue will be closed between 11 AM and 12 noon. The closure is necessary for the annual Mint Festival Parade.
Last Updated
6/24/2019 10:00 AM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

ORE18: MP 2.18 to 2.67

Commercial Vehicle Information
Informational only
Details
OR18 Business EB & WB MP 2.18 to MP 2.67 (Willamina) Effective Thursday, July 4, 2019, this section of OR18 Business eastbound & westbound between Oaken Hills Dr and Baker St will be closed between the hours of 6 PM & 7 PM for the annual Fourth of July Parade.
Last Updated
6/24/2019 10:00 AM

ORE18: MP 50 to 52.6

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
6/03/2019 7:01 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

ORE18: MP 52.59 to 50.1

Commercial Vehicle Information
Informational only
Details
OR18 EB & WB MP 50 to MP 52.6 (Dayton) Effective March 11, 2019, this section of OR18 eastbound and westbound will be restricted to 14 feet 00 inches in width Mondays between the hours of 12 midnight & 5 AM; and Monday through Thursday nights between the hours of 7 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

ORE19: MP 115.8

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
A landslide has occurred causing no to minimum delays. Use caution.
Last Updated
6/05/2019 9:18 AM

ORE194: MP 7.56 to 7.5

Commercial Vehicle Information
Informational only
Details
OR194 EB & WB MP 7.5 to MP 7.56 (Monmouth) Effective August 5, 2019, this section of OR194 (Main Street West) eastbound and westbound between Catron Street and OR99W will be closed at all hours. The estimated date of completion is August 12, 2019.
Last Updated
6/24/2019 10:00 AM

ORE202: MP 4.24 to 4.36

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
6/25/2019 8:00:00 AM
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/21/2019 12:33 PM

ORE204: MP 40.73 to 40.53

Commercial Vehicle Information
Informational only
Details
OR204 EB & WB MP 40.38 to MP 40.73 (Elgin) Effective July 13, 2019, this section of OR204 (Divison St) eastbound and westbound between 17th Ave and 10th Ave will be closed for one day only between the hours of 3:30 PM & 5:30 PM for the Elgin Stampede Grand Parade.
Last Updated
6/24/2019 10:00 AM

ORE207: MP 24

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
The road surface has collapsed. Use caution. Expect delays.
Last Updated
6/24/2019 9:04 AM

ORE213: MP 26.9

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
6/26/2019 8:00:00 AM
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Bridge Repair work on the Abiqua Creek Bridge with flagging and no to minimal delay traffic control. Use Caution.
Last Updated
6/24/2019 11:31 AM

ORE217: MP 2.78

Commercial Vehicle Information
Informational only
Details
OR217 NB & SB Exit 3 on- and off-ramps to/from Denney Rd (Beaverton) Effective September 22, 2019 the OR217 northbound and southbound exit 3 on-and off-ramps to/from Denney Rd will be closed between the hours of 6:30 AM & 1 PM for one day only.
Last Updated
6/24/2019 10:00 AM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 NB & SB MP 23.45 (Newberg) Effective September 15, 2019, this section of OR219 northbound and southbound will be restricted to 16 feet 00 inches in width Monday through Thursday nights between the hours of 7 PM & 5 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 26, 2019.
Last Updated
6/24/2019 10:00 AM

ORE219: MP 28.04 to 28.29

Commercial Vehicle Information
Informational only
Details
OR219 MP 28.04 to MP 28.29 NB & SB (St Paul) Effective July 4, 2019, this section of OR219 will be closed between the hours of 9:45 AM & 12 noon for one day only.
Last Updated
6/24/2019 10:00 AM

ORE22: MP 1.07 to 1.31

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
5/20/2019 6:00 PM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
6/24/2019 10:00 AM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
6/24/2019 10:00 AM

ORE22: MP 10.96 to 11.88

Commercial Vehicle Information
Informational only
Details
OR22 EB & WB MP 11.33 (Dolph) Effective May 29, 2019, this section of OR22 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
6/24/2019 10:00 AM

ORE22: MP 11.3

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. A failing culvert is being replaced with a new structure at MP 11.3. The new structure will be constructed one half at a time. Due to limited working space one lane of traffic will be closed for the duration of the project. Traffic will be controlled using flaggers 24 hours/day. There will be several full weekend road closures. Closures are currently scheduled to take place 5/31-6/2, 6/7- 6/9, and 6/15 -6/16. These closures will be from Friday at 7PM to Monday at 6AM. During closures a signed detour will be in place along US 101 and OR 18. More information can be found at https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19935
Last Updated
6/14/2019 12:47 PM

ORE22: MP 49.84

Commercial Vehicle Information
Informational only
Details
OR22 EB & WB MP 49.84 (Detroit) Effective August 8, 2019, this section of OR22 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 9 AM & 2 PM for one day only. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is August 8, 2019.
Last Updated
6/24/2019 10:00 AM

ORE221: MP 0.34 to 0.48

Commercial Vehicle Information
Informational only
Details
OR221 NB & SB MP 0.34 to MP 0.48 (Dayton) Effective July 26, 2019, this section of OR221 will be closed between the hours of 5:45 PM to 7 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE223: MP 2.91 to 3.56

Commercial Vehicle Information
Informational only
Details
OR223 NB & SB MP 2.91 to MP 3.56 (Dallas) Effective July 27, 2019, this section of OR223 will be closed between the hours of 8 AM & 2 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/24/2019 10:00 AM

ORE229: MP 24.13 to 31.24

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. OR 229 Paving Project The Siletz Highway is being paved from the south end of the town of Siletz to the U.S. 20 Junction (mp 24.13 to mp 32.14). Work is done during the day, Monday through Thursday. Expect lane closures and up to 20 minute delays. Work is scheduled to be completed by June 30, 2019.
Last Updated
6/24/2019 6:57 AM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
6/24/2019 10:00 AM

ORE241: MP 0.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. Watch for intermittent lane closures and brief delays. Flaggers will provide traffic control as needed. For more information, visit: www.IsthmusSloughBridge.com.
Last Updated
6/22/2019 2:20 PM

ORE241: MP 0.51

Commercial Vehicle Information
Informational only
Details
OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Last Updated
6/24/2019 10:00 AM

ORE244: MP 31.03

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/24/2019 2:33 PM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/24/2019 10:00 AM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/24/2019 10:00 AM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/24/2019 10:00 AM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Last Updated
6/24/2019 10:00 AM

ORE281: MP 2.75

Construction Work
Estimated delay under 20 minutes
Comments
Periodic lane closures at both intersections (Tucker Road at Guignard and Country Club at Barrett). ODOT and Hood River County are constructing intersection improvements, including widening the roadway at the intersections to better accommodate truck turning movements at two locations in Hood River County: OR 281, also known as Tucker Road, at Guignard Drive and Country Club Road at Barrett Drive.
Last Updated
6/21/2019 1:53 PM

ORE339: MP 2.76

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/24/2019 10:00 AM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/24/2019 10:00 AM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/24/2019 10:00 AM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Last Updated
6/24/2019 10:00 AM

ORE34: MP 1.62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. OR 34: McKinney Slough Bridge replacement - Traffic is controlled by flaggers 24/7. Crews are raising the grade of the roadway as it approaches the new structure. Traffic will be driving on gravel for up to 14 days. Expect minor delays. An existing bridge near milepost 1.5 is being replaced with a new structure. This new structure is being constructed one half at a time. Due to limited working space one lane of traffic is closed for the duration of the project. The south half of the new structure is complete.
Last Updated
6/24/2019 6:49 AM

ORE34: MP 9.94 to 16.83

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. OR 34: I-5 to Lebanon. Northbound and southbound I-5 on and off-ramps will be paved this week. Striping and recessed markers are scheduled to be placed on OR 34. Crews are scheduled to work between 8 p.m. and 5 a.m. each night. OR 34 is being repaved and shoulder rumble strips added between Seven Mile Lane and Sunset Drive, east of Interstate 5 and west of Lebanon. Work will be completed by June 30, 2019.
Last Updated
6/24/2019 6:26 AM

ORE35: MP 64 to 66

Construction Work
Estimated delay under 20 minutes
Comments
Single lane closures in both directions of OR 35 from 6 a.m. to 6 p.m. weekdays. Project Description: This project is constructing safety improvements with lane widening and dedicated right and left turn lanes accessing the ski area. This project will also construct a box culvert under OR 35. Construction will occur through summer 2019.
Last Updated
6/21/2019 1:41 PM

ORE35: MP 64.99

Commercial Vehicle Information
Informational only
Details
OR35 EB & WB MP 64.81 to MP 65.08 (Government Camp) Effective July 5, 2019 this section of OR35 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated date of completion is September 1, 2019.
Last Updated
6/24/2019 10:00 AM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Last Updated
6/24/2019 10:00 AM

ORE38: MP 1 to 57.13

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures and expect brief delays due to paving work. Flaggers will provide traffic control as needed.
Last Updated
6/22/2019 2:43 PM

ORE38: MP 6.4 to 16.3

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
6/22/2019 2:37 PM

ORE38: MP 16.5 to 36

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
6/22/2019 2:38 PM

ORE38: MP 36.4 to 43

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
6/22/2019 2:38 PM

ORE38: MP 43 to 57

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
6/22/2019 2:39 PM

ORE402: MP 22

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane
Comments
A landslide has occurred causing no to minimum delays. Use caution.
Last Updated
6/24/2019 8:02 AM

ORE42: MP 21

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures on both sides of Oregon 42 between Stover Lane and Oak Street in Myrtle Point. Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone. Construction is scheduled for completion June 30.
Last Updated
6/22/2019 2:19 PM

ORE42: MP 44.95

Commercial Vehicle Information
Informational only
Details
OR42 EB & WB MP 44.90 to MP 45 (Remote) Effective July 1, 2019, this section of OR42 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Friday at all hours. The estimated completion date for this project is July 14, 2019.
Last Updated
6/24/2019 10:00 AM

ORE42: MP 45

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution.
Last Updated
6/22/2019 2:40 PM

ORE42: MP 72.52

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures at the Lower Lookingglass Creek Bridge, located near Douglas High School at the west end of Winston. Flaggers will provide traffic control as needed.
Last Updated
6/22/2019 2:29 PM

ORE42: MP 72.52

Construction Work
Closure with Detour
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction has closed the road; a brief, signed detour is in place. Use an alternate route. This project is for repairs to the Lookingglass Bridge. During the closure, Oregon 42 traffic will detour through Dillard on Old Hwy 99 and Brockway Rd. Pedestrian access across the bridge will be maintained, with possible delays.
Last Updated
6/21/2019 12:14 PM

ORE42: MP 72.52

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures at the Lower Lookingglass Creek Bridge, located near Douglas High School at the west end of Winston. Flaggers will provide traffic control as needed.
Last Updated
6/22/2019 2:29 PM

ORE42: MP 72.52

Construction Work
Closure with Detour
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction has closed the road; a brief, signed detour is in place. Use an alternate route. This project is for repairs to the Lookingglass Bridge. During the closure, Oregon 42 traffic will detour through Dillard on Old Hwy 99 and Brockway Rd. Pedestrian access across the bridge will be maintained, with possible delays.
Last Updated
6/21/2019 12:14 PM

ORE42: MP 72.52

Commercial Vehicle Information
Informational only
Details
OR42 EB & WB MP 72.49 to MP 72.58 (Winston) Effective June 13, 2019, this section of OR42 eastbound and westbound will be closed at all hours. The estimated completion date for this project is July 3, 2019.
Last Updated
6/24/2019 10:00 AM

ORE42: MP 72.7 to 72.4

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures in both directions of Oregon 42 (Douglas Blvd.) in Winston between Brantley Drive and Old Highway 99 (Cheetah intersection). Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone. Construction is scheduled for completion June 30.
Last Updated
6/22/2019 2:30 PM

ORE43: SB MP 0.58

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closure Monday through Thursday nights.
Last Updated
6/21/2019 1:42 PM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
6/24/2019 10:00 AM

ORE47: MP 22.31 to 25.48

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
6/25/2019 7:00:00 AM
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
6/20/2019 3:41 PM

ORE47: MP 34.41 to 34.71

Commercial Vehicle Information
Informational only
Details
OR47 NB & SB MP 34 to MP 35 (Yamhill) Effective July 20, 2019, this section of OR47 will be closed between the hours of 10 AM & 11 AM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE47: MP 37 to 38.1

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
6/25/2019 8:00:00 AM
Lanes Affected
(Eastbound) 1 Lane (Westbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
6/11/2019 11:01 AM

ORE47: MP 62.9 to 74

Construction Work
Estimated delay under 20 minutes
Comments
Tree trimming around power lines will result in alternating lane closures, Mon-Fri 8:00am - 3:30pm. Expect delays.
Last Updated
5/30/2019 3:31 PM

ORE47: MP 69.72 to 69.87

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. OR 47 Beaver Creek Bridge Replacement Project (Washington County) (Nehalem Highway, mileposts 69.72 to 69.87) This project consists of performing work as follows: construct work area isolation and remove existing bridge; construct pile foundations, abutments and bridge superstructure; install drainage and storm water facilities and roadway paving; install cast in place retaining wall; and perform additional and incidental work as called for by specifications and plans. Work has commenced for this season. Final wearing course paving and striping will continue next spring and will be completed by May 30, 2019.
Last Updated
5/05/2019 2:06 AM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/24/2019 10:00 AM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Last Updated
6/24/2019 10:00 AM

ORE62: MP 0.7 to 5.7

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Expressway is open to traffic. Workers will be off the shoulder for 'punch list' items.
Last Updated
6/22/2019 2:42 PM

ORE62: MP 22.5 to 29

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. This Monday and Tuesday, June 24, 25, 3 a.m. - 6 p.m. expect single lane traffic controlled by flagger and up to 20 minute delays as the highway will be ‘fog sealed’, a liquid asphalt sealant which turns the road black. This weather proofs the new chip seal. Striping planned for Thursday, which will complete the project. Expect delays and slow moving traffic through the work zone, depending on location. This project was planned last summer but was delayed due to wildfire safety concerns.
Last Updated
6/22/2019 2:31 PM

ORE8: MP 3.18 to 10

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts.
Last Updated
6/21/2019 1:40 PM

ORE82: MP 12.06 to 12.4

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 12.06 to MP 12.40 (Imbler) Effective July 4, 2018, this section of OR82 will be closed between the hours of 11:30 AM & 1 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE82: MP 20.3 to 20.07

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 20.07 to MP 20.30 (Elgin) Effective July 13, 2019, this section of OR82 (8th Ave) eastbound and westbound between Cedar St and Albany St will be closed for one day only between the hours of 9:30 AM & 11 AM for the Elgin Stampede Kiddie Parade.
Last Updated
6/24/2019 10:00 AM

ORE82: MP 20.3 to 19.62

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 19.62 to MP 20.30 (Elgin) Effective July 13, 2019, this section of OR82 (8th Ave) eastbound and westbound between Hemlock St and Albany St will be closed for one day only between the hours of 3:30 PM & 5:30 PM for the Elgin Stampede Grand Parade.
Last Updated
6/24/2019 10:00 AM

ORE82: MP 30.02 to 32.58

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Flaggers will control traffic during construction operations. Expect delays up to 20 minutes. This project includes grading, paving, and bank stabilization.
Last Updated
6/23/2019 3:02 PM

ORE82: MP 46.78 to 47.31

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 46.78 to MP 47.31 (Wallowa) Effective July 4, 2019, this section of OR82 will be closed between the hours of 10:30 AM & 12:30 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
6/24/2019 10:00 AM

ORE99: SB MP -0.87

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
6/24/2019 8:36 PM

ORE99: SB MP 2 to 2.74

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Expect single lane traffic on Oregon 99 through end of the year for project that builds new signal and highway connection across railroad tracks into Twin Creek development.
Last Updated
6/22/2019 2:35 PM

ORE99: MP 24.67

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 24.67 (Aurora) Effective August 7, 2019, this section of OR99E northbound and southbound will be restricted to 14 feet 00 inches in width between the hours of 9 AM & 3 PM for one day only. Mobile homes with eaves over 14 feet 00 inches in width are not allowed. The estimated completion date for this project is August 7, 2019.
Last Updated
6/24/2019 10:00 AM

ORE99: MP 24.67

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 24.67 (Aurora) Effective August 7, 2019, this section of OR99E northbound and southbound will be restricted to 15 feet 03 inches in height between the hours of 9 AM & 3 PM for one day only. The estimated completion date for this project is August 7, 2019.
Last Updated
6/24/2019 10:00 AM

ORE99: MP 28.59 to 28.89

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 28.59 to MP 28.89 (Harrisburg) Effective July 4, 2019, this section of OR99E will be closed between the hours of 11 AM & 12:30 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE99: MP 49.72 to 50.63

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 49.69 to MP 51.23 (Amity) Effective September 23, 2019, this section of OR99W northbound and southbound will be restricted to 17 feet 00 inches in width at all hours. The estimated date of completion is September 30, 2019.
Last Updated
6/24/2019 10:00 AM

ORE99: MP 62.31 to 63.79

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 62.03 to MP 63.90 (Monmouth) Effective August 1, 2018, this section of OR99W northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is December 31, 2019.
Last Updated
6/24/2019 10:00 AM

ORE99: MP 63.49 to 63.35

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB left turn lanes to Main St (OR51 & OR194) (Monmouth) Effective July 8, 2019, the OR99W northbound and southbound left turn lanes to Main Street (OR51 and OR194) will be closed at all hours. The estimated date of completion is August 29, 2019.
Last Updated
6/24/2019 10:00 AM

ORE99: MP 108.76 to 109.76

Commercial Vehicle Information
Informational only
Details
OR99 NB & SB MP 108.76 to MP 109.76 (Junction City) Effective July 13, 2019, this section of OR99 northbound and southbound will be closed between the hours of 4 PM & 11 PM, for one day only.
Last Updated
6/24/2019 10:00 AM

ORE99E: MP -4.01 to -4.08

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder
Comments
Road maintenance operations has the right lane closed NB from Columbia Blvd to Kilpatrick St. Use caution.
Last Updated
6/24/2019 8:12 AM

ORE99E: MP 12.56 to 12.73

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 1 Lane
Comments
Road work has NB lanes closed from 2nd Street to Main Street. Traffic is being controlled by flaggers, use caution and expect delays.
Last Updated
6/24/2019 9:21 PM

ORE99E: MP 12.73

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Single and double lane closures with flaggers directing traffic from 7 p.m. to 5 a.m. weekdays.
Last Updated
6/21/2019 1:43 PM

ORE99W: SB MP 11 to 11.22

Construction Work
No to Minimum Delay
Comments
No traffic impacts. This project is complete.
Last Updated
6/21/2019 1:43 PM

ORE99W: MP 49.7 to 51.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Motorist should expect intermittent delays between 9:00 a.m. and 4:00 p.m., Monday through Thursday; and possibly nights between 6:00 p.m. and 6:00 a.m., Monday through Friday morning.
Last Updated
5/06/2019 10:10 AM

ORE99W: MP 62 to 64

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Motorist should expect intermittent lane closures nightly Sunday through Friday, 7:00 p.m. to 6:00 a.m
Last Updated
5/05/2019 2:07 AM