Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

HWY100, 6 miles West of Ainsworth State Park MP 16 - 22

Historic Columbia River Highway, US 30, is closed EB & WB from Angels Rest near MP 16 to Dodson Park near MP 22.
Updated
4/14/2018 7:43:00 PM

I-205: MP 3.55 to 7.95

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 3.40 to MP 8.00 (West Linn) Effective May 18, 2018 this section of I-205 northbound and southbound will be restricted to 19 feet 00 inches in width between the hours of 9 PM & 5 AM. Estimated date of completion is May 19, 2018.
Last Updated
4/20/2018 7:02 PM

I-205: MP 3.55 to 7.95

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 3.40 to MP 8.00 (West Linn) Effective May 18, 2018 this section of I-205 northbound and southbound will be restricted to 17 feet 11 inches in height. Estimated date of completion is May 19, 2018.
Last Updated
4/20/2018 7:02 PM

I-205: MP 3.55 to 7.95

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 3.40 to MP 8.00 (West Linn) Effective May 18, 2018 this section of I-205 northbound and southbound will be restricted to 19 feet 00 inches in width between the hours of 9 PM & 5 AM. Estimated date of completion is May 19, 2018.
Last Updated
4/20/2018 7:02 PM

I-205: MP 3.55 to 7.95

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 3.40 to MP 8.00 (West Linn) Effective May 18, 2018 this section of I-205 northbound and southbound will be restricted to 17 feet 11 inches in height. Estimated date of completion is May 19, 2018.
Last Updated
4/20/2018 7:02 PM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.
Last Updated
4/20/2018 7:02 PM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 19 feet 00 inches in width from 1/2 hour before sunrise to 1/2 hour after sunset. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.
Last Updated
4/20/2018 7:02 PM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 5 inches in height. Loads higher than 16 feet 5 inches in height may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.
Last Updated
4/20/2018 7:02 PM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.
Last Updated
4/20/2018 7:02 PM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 19 feet 00 inches in width from 1/2 hour before sunrise to 1/2 hour after sunset. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.
Last Updated
4/20/2018 7:02 PM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 5 inches in height. Loads higher than 16 feet 5 inches in height may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.
Last Updated
4/20/2018 7:02 PM

I-205: SB MP 16.3 to 25.6

Construction Work
No to Minimum Delay
Comments
Nighttime single and double lane closures from 8 p.m. to 5:30 a.m. Sunday through Thursday nights and from 8 p.m. to 7 a.m. Friday night.
Last Updated
4/15/2018 12:22 PM

I-405: MP 2.25 to 4.21

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.25 to MP 4.21 (Portland) Effective April 15, 2018, this section of I-405 northbound will be restricted to 19 feet 00 inches in width between the hours of 6 AM & 12 noon for one day only.
Last Updated
4/20/2018 7:02 PM

I-5: MP 48.51 to 57.55

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 48.50 to MP 57.50 (Grants Pass) Effective May 16, 2018, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM to 1/2 hour after sunset and from 1/2 hour before sunrise to 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is September 7, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 48.51 to 57.5

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 48.50 to MP 57.50 (Grants Pass) Effective May 16, 2018, this section of I-5 northbound and southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is September 7, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: NB MP 82 to 119

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) Median , 1 Lane (Northbound) Median , 1 Lane
Comments
Road construction is occurring, for cable barrier installation, use caution. Expect intermittent fast lane and median closures. This part of the project is between Glendale and south Roseburg.
Last Updated
4/17/2018 12:39 AM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
4/20/2018 7:02 PM

I-5: NB MP 119 to 120

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane (Northbound) 2 Lanes
Comments
Road construction is occurring causing no to minimum delays, use caution. Ramps Affected.
Last Updated
4/17/2018 12:41 AM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

I-5: MP 155.27 to 156.65

Commercial Vehicle Information
Informational only
Details
I-5 MP 158 to MP 155 SB & NB (Curtin) Effective April 23, 2018, this section of I-5 northbound and southbound will be restricted to 16 feet 00 inches in width. Estimated date of completion is April 27, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 155.27 to 156.65

Commercial Vehicle Information
Informational only
Details
I-5 MP 158 to MP 155 SB (Curtin) Effective April 23, 2018, this section of I-5 southbound will be restricted to 17 feet 11 inches in height. Estimated date of completion is April 27, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: NB MP 156

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 2 Lanes (Northbound) 2 Lanes
Comments
Road construction is occurring. Watch for 24 hour lane closures in both directions at milepost 156. Use caution. Motorists should watch for shifting traffic configurations, constructions equipment, workers and signage. The speed limit in this area will be reduced to 55 mph during construction.
Last Updated
4/17/2018 12:34 AM

I-5: MP 163.17 to 163.67

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 163.00 to MP 164.00 (Curtin) Effective April 18, 2018, this section of I-5 northbound and southbound will be restricted to 12 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is May 2, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 163.17 to 163.67

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 163.00 to MP 164.00 (Curtin) Effective April 18, 2018, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width from 1/2 hour before sunrise to 11 AM and from 7 PM to 1/2 hour after sunset. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for more information. Estimated date of completion is May 2, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 164.44

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 164.00 to MP 165.00 (Curtin) Effective April 18, 2018, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width from 1/2 hour before sunrise to 11 AM and from 7 PM to 1/2 hour after sunset. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for more information. Estimated date of completion is May 2, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 164.44

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 164.00 to MP 165.00 (Curtin) Effective April 18, 2018, this section of I-5 northbound and southbound will be restricted to 12 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is May 2, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 174.755 to 175.03

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 174 to/from OR99/Row River Rd (Cottage Grove) Effective May 14, 2018, the I-5 southbound on/off ramps at Exit 174 will be closed between the hours of 7 PM & 6 AM. Estimated date of completion is May 17, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 175.08

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from OR99/Row River Rd (Cottage Grove) Effective May 13, 2018, the ramp from OR99/Row River Road to I-5 northbound will be closed between the hours of 7 PM & 6 AM. Estimated date of completion of May 14, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: NB MP 238

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring, use caution. Construction is anticipated through approximately the end of April. Lane closures on OR164 can be expected Monday – Friday with the exception of commute hours. No closures between 6 a.m. – 9 a.m. and 4 p.m. – 7 p.m. and Fridays after noon.
Last Updated
4/21/2018 7:02 AM

I-5: MP 260.2 to 260.22

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 260.10 to MP 260.25 (Keizer) Effective April 29, 2018, this section of I-5 southbound will be restricted to 18 feet 00 inches in width between the hours of 3 AM & 10 AM. Estimated date of completion is April 29, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 260.2 to 260.22

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 260.10 to MP 260.25 (Keizer) Effective April 29, 2018, this section of I-5 southbound will be restricted to 16 feet 1 inch in height between the hours of 3 AM & 10 AM. Estimated date of completion is April 29, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 260.2 to 260.22

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 260.10 to MP 260.25 (Keizer) Effective April 29, 2018, this section of I-5 southbound will be restricted to 18 feet 00 inches in width between the hours of 3 AM & 10 AM. Estimated date of completion is April 29, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 260.2 to 260.22

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 260.10 to MP 260.25 (Keizer) Effective April 29, 2018, this section of I-5 southbound will be restricted to 16 feet 1 inch in height between the hours of 3 AM & 10 AM. Estimated date of completion is April 29, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: NB MP 270.5

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
4/22/2018 7:00:00 AM
Lanes Affected
(Northbound) Median
Comments
Road maintenance operations are occurring causing no to minimum delays, use caution.
Last Updated
4/18/2018 1:53 PM

I-5: NB MP 280.67

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
4/24/2018 7:30:00 AM
Comments
Road maintenance operations are occurring on Arndt rd under I-5, causing no to minimum delays, use caution.
Last Updated
4/18/2018 2:03 PM

I-5: MP 282.04 to 283.88

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 282.00 to MP 284.00 (Wilsonville) Effective April 19, 2018, this section of I-5 southbound will be restricted to 19 feet 00 inches in width between the hours of 10 PM & 5 AM. Estimated date of completion is April 20, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 282.04 to 283.88

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 282.00 to MP 284.00 (Wilsonville) Effective April 19, 2018, this section of I-5 southbound will be restricted to 17 feet 1 inch in height between the hours of 10 PM & 5 AM. Estimated date of completion is April 20, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: NB MP 283.5

Construction Work
Estimated delay under 20 minutes
Comments
Day and night lane closures on the southbound Exit 283 on-ramp from Wilsonville Road from 8 a.m. to 2 p.m. and shoulder closures weekdays. Wednesday night lane closures from 7 p.m. to 6 a.m.
Last Updated
4/18/2018 1:22 PM

I-5: MP 288.48 to 289.92

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 288.00 to MP 290.00 (Tualatin) Effective February 21, 2018 this section of I-5 southbound will be restricted to 16 feet 9 inches in height Sunday through Thursday nights 8 PM to 5:30 AM; Friday nights 8 PM to 8 AM; and Saturday nights 8 PM to 9 AM. Estimated date of completion is August 30, 2019.
Last Updated
4/20/2018 7:02 PM

I-5: MP 290.25

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Lower Boones Ferry Rd (Tualatin) Effective March 6, 2018, the I-5 southbound on-ramp from Lower Boones Ferry Rd will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 15, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: NB MP 292.5 to 297.26

Construction Work
Estimated delay under 20 minutes
Comments
Expect nighttime on-and off-ramp closures from 10 p.m. to 5 a.m. and lane closures on I-5 from 8 p.m. to 5:30 a.m. weekdays. Use signed detours. Monday night, the northbound Exit 297 off-ramp to Terwilliger Boulevard will be closed. Tuesday night, the southbound Exit 296B off-ramp to Multnomah Boulevard will be closed.
Last Updated
4/15/2018 12:20 PM

I-5: MP 293.28

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 293 to Haines St (Portland) Effective May 7, 2018, the I-5 southbound off-ramp (Exit 293) will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM and Friday night between the hours of 11 PM & 7 AM. Estimated date of completion is May 12, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: SB MP 294.21 to 288.55

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single and double lane closures of I-5 in both directions from 8 p.m. to 5:30 a.m. Periodic shoulder closures.
Last Updated
4/15/2018 12:19 PM

I-5: MP 295.19

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 295 to Capitol Hwy (Portland) Effective May 7, 2018, the I-5 southbound off-ramp (Exit 295) will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM and Friday night between the hours of 11 PM & 7 AM. Estimated date of completion is May 12, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 296.6

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 297 to Terwilliger Blvd (Portland) Effective April 16, 2018, I-5 northbound Exit 297 to Terwilliger Blvd will be intermittently closed Monday through Thursday nights between the hours of 10 PM to 5 AM and Friday nights between the hours of 11 PM to 7 AM. Estimated date of completion is April 21, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 296.68

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 296B to Multnomah Blvd (Portland) Effective April 16, 2018, I-5 southbound Exit 296B will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM and Friday night between the hours of 11 PM & 7 AM. Estimated date of completion is April 21, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 297.311

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 297 to Terwilliger Blvd (Portland) Effective April 23, 2018, I-5 southbound Exit 297 to Terwilliger Blvd will be intermittently closed Monday through Thursday nights between the hours of 10 PM to 5 AM and Friday nights between the hours of 11 PM to 7 AM. Estimated date of completion is April 28, 2018 .
Last Updated
4/20/2018 7:02 PM

I-5: MP 298.78 to 299.991

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 298.00 to MP 300.00 (Portland) Effective April 20, 2018 this section of I-5 northbound will be restricted to 15 feet 11 inches in height and 17 feet 6 inches in height southbound between the hours of 9 PM & 5 AM. Estimated date of completion is April 21, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 307.18 to 308.38

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.00 to MP 308.38 (Portland) Effective May 5, 2018, this section of I-5 northbound will be restricted to 12 feet 00 inches in width between the hours of 10 PM & 7 AM. Estimated date of completion is May 6, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 307.18 to 308.38

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.00 to MP 308.38 (Portland) Effective May 5, 2018, this section of I-5 northbound will be restricted to 15 feet 3 inches in height between the hours of 10 PM & 7 AM. Estimated date of completion is May 6, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 307.18 to 308.38

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.00 to MP 308.38 (Portland) Effective May 5, 2018, this section of I-5 northbound will be restricted to 12 feet 00 inches in width between the hours of 10 PM & 7 AM. Estimated date of completion is May 6, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 307.18 to 308.38

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.00 to MP 308.38 (Portland) Effective May 5, 2018, this section of I-5 northbound will be restricted to 15 feet 3 inches in height between the hours of 10 PM & 7 AM. Estimated date of completion is May 6, 2018.
Last Updated
4/20/2018 7:02 PM

I-5: MP 307.97

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Jantzen Beach (Portland) Effective May 5, 2018, the on-ramp from Jantzen Beach will be closed between the hours of 10 PM & 7 AM. Estimated date of completion is May 6, 2018.
Last Updated
4/20/2018 7:02 PM

I-82: MP 0.48 to 1

Commercial Vehicle Information
Informational only
Details
I-82 SB MP 0.50 to MP 1.00 (Umatilla) Effective March 12, 2018, this section of I-82 southbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-82: MP 0.61 to 1

Commercial Vehicle Information
Informational only
Details
I-82 NB MP 0.50 to MP 1.00 (Umatilla) Effective March 12, 2018, this section of I-82 northbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-82: MP 0.761 to 1.28

Commercial Vehicle Information
Informational only
Details
I-82 NB & SB Exit 1 on/off ramps to/from US730 (Umatilla) Effective April 23, 2018, I-82 Exit 1 on/off ramps to/from US730 will be intermittently closed between the hours of 8 PM & 6 AM. Estimated date of completion is April 27, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 1.19 to 4.95

Commercial Vehicle Information
Informational only
Details
I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is April 24, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 1.19 to 4.95

Commercial Vehicle Information
Informational only
Details
I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is April 24, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 1.19 to 4.95

Commercial Vehicle Information
Informational only
Details
I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is April 24, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 1.19 to 4.95

Commercial Vehicle Information
Informational only
Details
I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is April 24, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 1.19 to 4.95

Commercial Vehicle Information
Informational only
Details
I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is April 24, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 1.19 to 4.95

Commercial Vehicle Information
Informational only
Details
I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is April 24, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 6.55

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 9 to 102nd Ave (Portland) Effective April 30, 2018, the I-84 eastbound off-ramp (Exit 9) will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 4, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 6.55 to MP 6.74 (Portland) Effective April 30, 2018, this section of I-84 eastbound will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 4, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 6.55 to MP 6.74 (Portland) Effective April 30, 2018, this section of I-84 eastbound will be restricted to 18 feet 3 inches in height Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 4, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 6.55

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 9 to 102nd Ave (Portland) Effective April 30, 2018, the I-84 eastbound off-ramp (Exit 9) will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 4, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 6.55 to MP 6.74 (Portland) Effective April 30, 2018, this section of I-84 eastbound will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 4, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 6.55 to MP 6.74 (Portland) Effective April 30, 2018, this section of I-84 eastbound will be restricted to 18 feet 3 inches in height Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 4, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: WB MP 6.74 to 11.49

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closure of westbound I-84 from 8 p.m. to 5:30 a.m. Friday.
Last Updated
4/15/2018 12:21 PM

I-84: WB MP 28

Information
Closure
Off Ramp
Comments
I-84 Exit 28, Bridal Veil: Closed, resident access only. Ramps Affected.
Last Updated
4/14/2018 7:44 PM

I-84: EB MP 35

Information
Closure
Off Ramp
Comments
I-84 Exit 35, Historic Columbia River Highway, Ainsworth interchange open but access to US-30 closed. Ramps Affected.
Last Updated
4/14/2018 7:44 PM

I-84: EB MP 35.71

Information
Closure
Off Ramp
Comments
Frontage Road, Dodson Road east from Warrendale interchange to John B Yeon State Park: closed, resident access only. Ramps Affected.
Last Updated
4/14/2018 7:43 PM

I-84: EB MP 40

Information
Closure
Off Ramp
Comments
I-84 Exit 40, Bonneville south of interchange: closed. Ramps Affected.
Last Updated
4/14/2018 7:43 PM

I-84: EB MP 41

Information
Closure
Off Ramp
Comments
I-84 Exit 41, Eagle Creek: closed. Ramps Affected.
Last Updated
4/14/2018 7:43 PM

I-84: MP 47.31 to 47.62

Commercial Vehicle Information
Informational only
Details
I-84 MP 47.22 to MP 48.21 EB & WB (Cascade Locks) Effective February 19, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width per the following schedule: Monday through Friday from 1/2 hour before sunrise to 12 (noon); Friday nights from 8 PM to 1/2 hour after sunset; Saturday mornings from 1/2 hour before sunrise to 9 AM; Saturday nights from 8 PM to 1/2 hour after sunset; Sunday mornings from 1/2 hour before sunrise to 10 AM. Estimated date of completion is November 15, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 47.31 to 47.62

Commercial Vehicle Information
Informational only
Details
I-84 MP 47.22 to MP 48.21 EB & WB (Cascade Locks) Effective February 19, 2018, this section of I-84 eastbound and westbound will be restricted to 13 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Estimated date of completion is November 15, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 47.31 to 47.62

Commercial Vehicle Information
Informational only
Details
I-84 MP 47.22 to MP 48.21 EB & WB (Cascade Locks) Effective February 19, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width per the following schedule: Monday through Friday from 1/2 hour before sunrise to 12 (noon); Friday nights from 8 PM to 1/2 hour after sunset; Saturday mornings from 1/2 hour before sunrise to 9 AM; Saturday nights from 8 PM to 1/2 hour after sunset; Sunday mornings from 1/2 hour before sunrise to 10 AM. Estimated date of completion is November 15, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 47.31 to 47.62

Commercial Vehicle Information
Informational only
Details
I-84 MP 47.22 to MP 48.21 EB & WB (Cascade Locks) Effective February 19, 2018, this section of I-84 eastbound and westbound will be restricted to 13 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Estimated date of completion is November 15, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: WB MP 48

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts.
Last Updated
4/15/2018 12:21 PM

I-84: WB MP 51 to 53

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Expect an around-the-clock single lane closure for eastbound I-84 from milepost 51-53 until mid-May. Periodic shoulder closures.
Last Updated
4/15/2018 12:21 PM

I-84: MP 51.22

Commercial Vehicle Information
Informational only
Details
I-84 MP 51.25 to MP 53.15 EB (Wyeth) Effective February 16, 2018, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width. Estimated date of completion is May 11, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: EB MP 56

Information
Closure
Off Ramp
Comments
I-84 Exit 56, Viento interchange: open; north and south access closed. Ramps Affected.
Last Updated
4/14/2018 7:43 PM

I-84: MP 64.1 to 75

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64.00 to MP 76.00 (Hood River - Rowena) Effective March 1, 2018, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM to 7 AM. Estimated date of completion is May 31, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 64.1 to 75

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64.00 to MP 76.00 (Hood River - Rowena) Effective April 9, 2018, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width Monday through Thursday 7 AM to 7 PM. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is May 31, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 64.28 to 64.69

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 64 (Hood River) Effective May 10, 2018, the I-84 eastbound and westbound on/off ramps (Exit 64) will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 18, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 64.44 to 75

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64.44 to MP 76.45 (Hood River - Rowena) Effective March 1, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Thursday 7 AM to 7 PM. Estimated date of completion is April 13, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 65.58 to 65.88

Commercial Vehicle Information
Informational only
Details
I-84 WB to Koberg State Park (Hood River) Effective May 10, 2018, the I-84 westbound ramps to/from Koberg State Park (Rest Area) will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 18, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 69.62 to 69.93

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 69.50 to MP 70.50 (Moiser Creek) Effective August 27, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 4 PM. Loads wider than 16 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 30, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 69.62 to 69.93

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 69.50 to MP 70.50 (Moiser Creek) Effective August 27, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 06 inches in height between the hours of 6 AM and 4 PM. Estimated date of completion is August 30, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 69.63 to 69.93

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 69 (Mosier) Effective May 10, 2018, the I-84 eastbound and westbound on/off ramps (Exit 69) will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 18, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 69.79

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64.44 to MP 76.45 (Hood River - Rowena) Effective March 1, 2018, this section of I-84 eastbound and westbound will be restriction to 16 feet 6 inches in height. Estimated date of completion is April 13, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 72.71 to 73.18

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB to Memaloose Rest Area (Rowena) Effective May 10, 2018, the I-84 eastbound and westbound the ramps to/from the Memaloose Rest Area will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 18, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: WB MP 76.5 to 64

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Single lane closures may be in place at night both EB and WB for construction work. Use caution. No to minimum delay.
Last Updated
4/17/2018 6:19 AM

I-84: MP 83.45 to 83.96

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 83.00 to MP 84.00 (The Dalles) Effective July 30, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 5 PM. Loads wider than 16 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 2, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 88.04 to 88.83

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 88.00 to MP 89.00 (The Dalles) Effective July 16, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 5 PM. Loads wider than 16 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 19, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 97.37

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays, use caution. Flaggers may control traffic at the railroad crossing. The Celilo Park Safe Access Project includes widening of the railroad crossing and repaving of the entrance to Celilo Park. The Tribal fishing site and Celilo Park will be open and accessible; flaggers may control traffic access to the park during construction.
Last Updated
4/17/2018 6:14 AM

I-84: MP 179.02 to 179.9

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 179.00 to MP 180.00 (Umatilla) Effective March 12, 2018, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 179.02 to 179.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 179.00 to MP 180.00 (Umatilla) Effective March 12, 2018, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 179.4

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 179.40 (Umatilla) Effective March 12, 2018 this section of I-84 eastbound will be restricted to 18 feet 00 inches in height. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: EB MP 179.42

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Single lane closures may be in place during daytime hours for construction work. No to minimum delay.
Last Updated
4/16/2018 9:13 PM

I-84: MP 179.43

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 179.43 (Umatilla) Effective March 12, 2018 this section of I-84 westbound will be restricted to 17 feet 06 inches in height. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: EB MP 179.45

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Single lane closures may be in place during daytime hours for construction work. No to minimum delay.
Last Updated
4/16/2018 9:19 PM

I-84: MP 209.17 to 209.54

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 209.00 to MP 210.00 (Pendleton) Effective March 12, 2018, this section of I-84 westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 209.36 to 209.81

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 209.00 to MP 210.00 (Pendleton) Effective March 12, 2018, this section of I-84 eastbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: EB MP 209.54

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Single lane closures may be in place during daytime hours for construction work. No to minimum delay.
Last Updated
4/16/2018 9:20 PM

I-84: EB MP 238

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
There is a pothole in the lane of travel. Use caution.
Last Updated
3/22/2018 10:03 AM

I-84: MP 238.38 to 248.47

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 238.00 to MP 248.50 (Meacham) Effective April 23, 2018, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width Monday through Thursday between the hours of 8 AM and 4 PM. Estimated date of completion is April 26, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: EB MP 242 to 249

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Due to heavy rains, there are multiple potholes and rough patches in the eastbound lanes of travel. Use caution.
Last Updated
3/22/2018 8:34 AM

I-84: MP 243.54 to 243.99

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 243.30 to MP 244.30 (Meacham) Effective March 26, 2018, this section of I-84 eastbound will be restricted to 16 feet 09 inches in height and westbound will be restricted to 16 feet 07 inches in height. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 243.54 to 243.99

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 243.30 to MP 244.30 (Meacham) Effective March 26, 2018, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: EB MP 243.82

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Single lane closures may be in place during daytime hours for construction work. No to minimum delay.
Last Updated
4/16/2018 9:22 PM

I-84: MP 243.82

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 238.00 to MP 248.50 (Meacham) Effective April 23, 2018, this section of I-84 eastbound will be restricted to 16 feet 09 inches in height and westbound will be restricted to 16 feet 07 inches in height. Estimated date of completion is April 26, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 256.4

Commercial Vehicle Information
Informational only
Details
I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
4/20/2018 7:02 PM

I-84: MP 283.64 to 284.38

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 283.50 to MP 285.50 (North Powder) Effective April 3, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width. Estimated date of completion is July 31, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 283.64 to 284.38

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 283.50 to MP 285.50 (North Powder) Effective April 3, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 3 inches in height. Estimated date of completion is July 31, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: WB MP 284

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring, use caution. The east bound lanes are closed. The west bound lanes are being used for two way traffic until further notice.
Last Updated
4/06/2018 5:58 PM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
4/20/2018 7:02 PM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
4/20/2018 7:02 PM

I-84: MP 303.8 to 304.43

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 303.50 to MP 304.50 (Baker City) Effective March 26, 2018, this section of I-84 westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 303.88 to 304.14

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 303.50 to MP 304.50 (Baker City) Effective March 26, 2018, this section of I-84 eastbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: EB MP 304.13

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Single lane closures may be in place during daytime hours for construction work. No to minimum delay.
Last Updated
4/16/2018 9:23 PM

I-84: EB MP 313.12 to 318.53

Construction Work
Informational only
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Construction is scheduled to begin 04/30/2018. Lane width restrictions will be in place during nighttime operations.
Last Updated
4/17/2018 6:35 AM

I-84: MP 313.29 to 317.77

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 313.12 to MP 318.53 (Pleasant Valley) Effective April 30, 2018, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width between 7 PM to 1/2 hour after sunset; and from 1/2 hour before sunrise to 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is May 14, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 313.29 to 317.77

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 313.12 to MP 318.53 (Pleasant Valley) Effective April 30, 2018, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is May 14, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 313.29 to 317.77

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 313.12 to MP 318.53 (Pleasant Valley) Effective April 30, 2018, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width between 7 PM to 1/2 hour after sunset; and from 1/2 hour before sunrise to 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is May 14, 2018.
Last Updated
4/20/2018 7:02 PM

I-84: MP 313.29 to 317.77

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 313.12 to MP 318.53 (Pleasant Valley) Effective April 30, 2018, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is May 14, 2018.
Last Updated
4/20/2018 7:02 PM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
4/20/2018 7:02 PM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Last Updated
4/20/2018 7:02 PM

US101: MP 40.71

Commercial Vehicle Information
Informational only
Details
US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita) Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.
Last Updated
4/20/2018 7:02 PM

US101: SB MP 65.7

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
U.S. 101/OR6 Traffic Improvement Project in Tillamook Ramps Affected. U.S. 101/OR6 Traffic Improvement Project in Tillamook This project improves traffic operations and performance, and increases safety on U.S. 101 and OR 6 through downtown Tillamook and across Hoquarton Slough. The project will lengthen the U.S. 101 couplet to the Hoquarton Slough by extending Pacific Avenue north beyond 1st Street and replacing the existing slough bridge with a new four-lane bridge. The new bridge will be up to 5 feet higher than the existing bridge. The project will also widen the travel lanes on Main and Pacific Avenues from 1st to 4th Streets. Turn lanes will be added at key intersections through town. The project also improves the Hoquarton Interpretive Area, and adds gateway elements and downtown beautification. Construction will be occurring adjacent to the highway. Expect shoulder closures and night time work. Look for construction vehicles entering and leaving the highway. The project is expected to be completed in the fall of 2018.
Last Updated
4/07/2018 8:42 AM

US101: MP 70.78

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
4/23/2018 10:00:00 AM
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays, use caution.
Last Updated
4/20/2018 10:49 AM

US101: MP 139.32 to 140.73

Commercial Vehicle Information
Informational only
Details
US101 MP 139.32 to MP 140.73 NB & SB (Newport) Effective May 5, 2018, this section of US101 northbound and southbound will be closed between the hours of 12 (noon) & 2 PM for one day only.
Last Updated
4/20/2018 7:02 PM

US101: MP 141.44 to 141.83

Maintenance Work
Future Event: Informational only
Expected Start Date
4/23/2018 8:00:00 AM
Comments
Yaquina Bay Bridge will be inspected Monday thru Friday. Watch out for workes in and around the bridge. Use caution.
Last Updated
4/21/2018 6:54 AM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
4/20/2018 7:02 PM

US101: MP 190.87 to 191.21

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Expect single lane closures with flagger control and possible 20 minute delay. Project Summary: This project will make repairs to the existing concrete and reinforcement and replace the cathodic protection system on the Siuslaw River Bridge Seismic restraints to help maintain the integrity of the bridge in an earthquake will also be added. Sidewalk closure on one side of bridge. A new ornamental bridge rail will replace the existing rail along with improved pedestrian access to the bridge. Work is to be completed by the end of March in 2019.
Last Updated
4/07/2018 8:46 AM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

US101: MP 221

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring, use caution. Traffic will be reduced to one lane and will be under 24 hour flagging while a temporary bridge is constructed.
Last Updated
4/17/2018 12:36 AM

US101: MP 221.14

Commercial Vehicle Information
Informational only
Details
US101 MP 221.05 to MP 221.20 NB & SB (Lakeside) Effective February 19, 2018, this section of US101 northbound and southbound will be restricted to 17 feet 00 inches in width. Estimated date of completion is April 15, 2018.
Last Updated
4/20/2018 7:02 PM

US101: MP 233.4 to 234.5

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays, use caution. Watch for flaggers and workers on the bridge. Both sidewalks on the bridge are open, pedestrians are advised to use caution.
Last Updated
4/17/2018 12:43 AM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 MP 233.99 (McCullough Bridge - Coos Bay) Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.
Last Updated
4/20/2018 7:02 PM

US101: NB MP 244 to 244.56

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring, use caution. This project will replace a failing culvert and tide-gate that conveys water underneath U.S 101 near the Oregon 42 junction, with two bridges.
Last Updated
4/17/2018 12:37 AM

US101: MP 244.01

Commercial Vehicle Information
Informational only
Details
US101 MP 244.00 to MP 244.09 NB & SB (Coos Bay) Effective February 21, 2018, this section of US101 northbound and southbound will be restricted to 17 feet 00 inches in width. Estimated date of completion is June 12, 2018.
Last Updated
4/20/2018 7:02 PM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic. Effective May 5, 2017, during construction, on-site certified flaggers may be provided to the carrier at no cost on a case-by-case basis during construction hours. Contact the Over-Dimension Permit Unit for information.
Last Updated
4/20/2018 7:02 PM

US101: MP 335.8

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
The road surface has collapsed, use caution.
Last Updated
4/20/2018 7:36 PM

US101: MP 343.7

Crash/Hazard
No to Minimum Delay
Comments
Rough road, use caution.
Last Updated
4/19/2018 12:03 PM

US101: MP 347.78

Commercial Vehicle Information
Informational only
Details
US101 MP 347.78 NB & SB (north of Brookings) Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. Estimated date of completion is August 31, 2019.
Last Updated
4/20/2018 7:02 PM

US101: MP 348

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is reduced to a single lane, and controlled with a temporary traffic signal. Expect delays and use caution. This is for painting the Thomas Creek Bridge; Which is reduced to a single lane of traffic until summer 2019.
Last Updated
4/17/2018 12:40 AM

US20: MP 5.94 to 12.6

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 5.00 to MP 12.50 (Bend) Effective March 26, 2018 this section of US20 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Friday between the hours of 7 AM & 8 PM. Estimated date of completion is April 26, 2018.
Last Updated
4/20/2018 7:02 PM

US20: MP 13 to 17

Maintenance Work
No to Minimum Delay
Frontage Road
Comments
Road maintenance operations are occurring causing no to minimum delays, use caution.
Last Updated
4/19/2018 7:20 AM

US20: MP 15.78 to 31.48

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. The majority of the work on the new roadway alignment at the West end of the project is now complete. Work continues on minor cleanup, planting, and drainage improvements. Periodic lane closures may be necessary. Expect delays of up to 20 minutes.
Last Updated
4/21/2018 6:47 AM

US20: MP 80.88 to 87.22

Construction Work
Future Event: Estimated delay of 20 minutes - 2 hours
Expected Start Date
4/23/2018 7:00:00 AM
Lanes Affected
(Westbound) Median , 2 Lanes (Eastbound) Median , 2 Lanes
Comments
Road construction is occurring, use caution. Contractor will be closing alternating lanes. Traffic controlled by flaggers and pilot car. Work will be done Monday thru Thursday, 7:00 am to 7:00 pm. Friday work will be done 7:00 am to 12:00 pm.
Last Updated
4/20/2018 9:47 AM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 is restricted to 14 feet 00 inches in width and/or 154 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
4/20/2018 7:02 PM

US26: WB MP 1.76

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Day and night single lane closures from 9 a.m. to 3 p.m. and from 8 p.m. to 6 a.m. weekdays. Flagging at intersections. Flaggers will direct traffic at intersections of SE 21st, 26th and 33rd Avenues during night work.
Last Updated
4/20/2018 10:49 AM

US26: MP 58.42 to 59.14

Commercial Vehicle Information
Informational only
Details
US26 EB & WB on/off ramps to/from Jackson School Rd (North Plains) Effective May 12, 2018, the US26 eastbound and westbound Exit 59 on/off ramps to/from Jackson School Rd will be closed between the hours of 6 AM to 2 PM for one day only.
Last Updated
4/20/2018 7:02 PM

US26: WB MP 62 to 65

Construction Work
No to Minimum Delay
Comments
Nighttime single and double lane closures on U.S. 26 from 8 p.m. to 5:30 a.m.
Last Updated
4/15/2018 12:22 PM

US26: MP 62.12

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 62 ramp to Cornelius Pass Rd (Hillsboro) Effective May 12, 2018, the US26 eastbound Exit 62 ramp to Cornelius Pass Rd will be closed between the hours of 6 AM & 8:30 AM for one day only.
Last Updated
4/20/2018 7:02 PM

US26: EB MP 69 to 73

Construction Work
No to Minimum Delay
Comments
Night and day shoulder closures on U.S. 26. Single lane closure for eastbound U.S. 26 from 8 p.m. to 5:30 a.m. weekdays.
Last Updated
4/15/2018 12:22 PM

US26: MP 73.53 to 73.7

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 73.53 (Vista Ridge Tunnel - Portland) Effective May 4, 2018, this section of US26 will be restricted to 8 foot 6 inches in width (LEGAL WIDTH) between the hours of 9 PM & 5 AM. In addition, the height will be restricted to 17 feet 10 inches in height eastbound, and 18 feet 00 inches in height westbound, during the same time. Estimated date of completed is May 5, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.46

Commercial Vehicle Information
Informational only
Details
US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.87 to 1.33

Commercial Vehicle Information
Informational only
Details
US30 EB Exit to I-405 SB (Portland) Effective April 27, 2018, US30 eastbound exit to I-405 southbound will be closed between the hours of 9 PM & 6 AM. Estimated date of completed is April 28, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.87 to 1.33

Commercial Vehicle Information
Informational only
Details
US30 EB Exit to I-405 SB (Portland) Effective May 4, 2018, US30 eastbound exit to I-405 southbound will be closed between the hours of 9 PM & 6 AM. Estimated date of completed is May 5, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.87 to 1.33

Commercial Vehicle Information
Informational only
Details
US30 EB Exit to I-405 SB (Portland) Effective April 27, 2018, US30 eastbound exit to I-405 southbound will be closed between the hours of 9 PM & 6 AM. Estimated date of completed is April 28, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.87 to 1.33

Commercial Vehicle Information
Informational only
Details
US30 EB Exit to I-405 SB (Portland) Effective May 4, 2018, US30 eastbound exit to I-405 southbound will be closed between the hours of 9 PM & 6 AM. Estimated date of completed is May 5, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.87 to 1.33

Commercial Vehicle Information
Informational only
Details
US30 EB Exit to I-405 SB (Portland) Effective April 27, 2018, US30 eastbound exit to I-405 southbound will be closed between the hours of 9 PM & 6 AM. Estimated date of completed is April 28, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 0.87 to 1.33

Commercial Vehicle Information
Informational only
Details
US30 EB Exit to I-405 SB (Portland) Effective May 4, 2018, US30 eastbound exit to I-405 southbound will be closed between the hours of 9 PM & 6 AM. Estimated date of completed is May 5, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 1.32 to 1.85

Commercial Vehicle Information
Informational only
Details
US30 Bypass WB MP 1.32 to MP 1.85 (Portland) Effective May 7, 2018, this section of US30 Bypass westbound will be restricted to 11 feet 00 inches in width between the hours of 8 PM & 6 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is May 11, 2018.
Last Updated
4/20/2018 7:02 PM

US30: MP 1.65 to 2.1

Commercial Vehicle Information
Informational only
Details
US30 EB & WB MP 1.65 to MP 2.10 (La Grande) Effective May 5, 2018, this section of US30 will be closed between the hours of 8 AM & 10 AM for one day only.
Last Updated
4/20/2018 7:02 PM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
4/20/2018 7:02 PM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Last Updated
4/20/2018 7:02 PM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
4/20/2018 7:02 PM

US30: WB MP 30.33 to 30.46

Information
Closure
Off Ramp
Comments
State Parks Trail at Cascade Locks to Eagle Creek: closed Ramps Affected.
Last Updated
4/14/2018 7:43 PM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Last Updated
4/20/2018 7:02 PM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
4/20/2018 7:02 PM

US30: EB MP 63.03 to 63.12

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays, use caution. U.S. 30: Clatskanie Bluffs Rockfall Repair and Screening (Columbia County) (Lower Columbia River Highway, mileposts 63.03 to 63.12) This project consists of performing work as follows: Scale slopes and remove debris; clear trees from top of slopes; install wire mesh slope protection; repair road surface; and install permanent pavement markings. Flaggers will control single lane of traffic during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. One or more lanes may be closed when allowed shown or directed during the following periods and times: Monday through Friday, 9 a.m. to 4 p.m., except those times as indicated in 00220.40(e-2). The project is scheduled to be completed by July 31, 2018.
Last Updated
4/07/2018 8:42 AM

US97: MP 75.04

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 74.04 (Madras) Effective April 16, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 31, 2018.
Last Updated
4/20/2018 7:02 PM

US97: MP 75.04

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 75.04 (Madras) Effective April 16, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 08 inches in height. Estimated date of completion is October 31, 2018.
Last Updated
4/20/2018 7:02 PM

US97: MP 75.04

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 74.04 (Madras) Effective April 16, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 31, 2018.
Last Updated
4/20/2018 7:02 PM

US97: MP 75.04

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 75.04 (Madras) Effective April 16, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 08 inches in height. Estimated date of completion is October 31, 2018.
Last Updated
4/20/2018 7:02 PM

US97: MP 134.6

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing no to minimum delays, use caution. Ramps Affected.
Last Updated
4/20/2018 10:18 AM

US97: MP 275.251

Commercial Vehicle Information
Informational only
Details
US97 Exit to US97 Business/Klamath Falls/City Center Effective March 5, 2018, the ramp from US97 northbound to US97 Business will be closed. Estimated date of completion is May 31, 2018.
Last Updated
4/20/2018 7:02 PM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
4/20/2018 7:02 PM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/20/2018 7:02 PM

ORE126: MP 3.07

Weather Impact
Informational only
Comments
Watch out for rising water near Cushman. ODOT has posted signs on the roadway near the high water location. No restrictions are in place at this time.
Last Updated
4/13/2018 12:37 PM

ORE126: MP 15.39 to 16.01

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring on the roads adjoining the roundabout, causing no to minimum delay on the state highway. Use caution. Grinding and paving will be done at night on Airport Way and a new section of Tom McCall Rd. There may be flagging operations with brief delays to traffic on Airport Way and Aviation Blvd.
Last Updated
4/20/2018 10:10 AM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/20/2018 7:02 PM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/20/2018 7:02 PM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/20/2018 7:02 PM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/20/2018 7:02 PM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
4/20/2018 7:02 PM

ORE138: MP 0.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring, use caution. Ramps Affected. Several traffic signals are being replaced, flaggers will provide traffic control as needed. Motorists may want to use alternate routes. Pedestrians should watch for sidewalk and crosswalk closures throughout the work zone, and look for pedestrian detour signs. This project will help improve safety in the downtown area and the flow of traffic between Diamond Lake Blvd and I-5.
Last Updated
4/17/2018 12:43 AM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

ORE207: MP 7.98 to 8.46

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Intermittent lane closures may be in place for construction work. Flaggers may control traffic, expect delays up to 20 minutes.
Last Updated
4/17/2018 6:46 AM

ORE207: MP 30.1

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Rock fall has occurred causing no to minimum delays, use caution.
Last Updated
4/02/2018 10:04 AM

ORE212: MP 7 to 8.5

Construction Work
No to Minimum Delay
Comments
Beginning Wednesday, April 18 expect 20 minute delays and lane closures on OR 212 from 9 a.m. to 9 p.m. weekdays.
Last Updated
4/17/2018 3:16 PM

ORE212: MP 7.36 to 8.37

Commercial Vehicle Information
Informational only
Details
OR212 EB & WB MP 7.09 to MP 8.42 (Boring) Effective April 16, 2018, this section of OR212 eastbound and westbound will be restricted to 8 feet 06 inches in width Monday through Friday 9 AM to 7 PM. Estimated date of completion is April 25, 2018.
Last Updated
4/20/2018 7:02 PM

ORE213: MP 3.45 to 5.24

Commercial Vehicle Information
Informational only
Details
OR213 NB MP 3.45 to MP 5.24 (Portland) Effective April 29, 2018, this section of OR213 (82nd Ave) northbound will be closed between the hours of 9 AM & 12 noon for one day only.
Last Updated
4/20/2018 7:02 PM

ORE213: MP 5.7 to 6.8

Construction Work
Estimated delay under 20 minutes
Comments
Daytime single lane closures from 6 a.m. to 3 p.m. weekdays and pedestrian detours at Foster, Woodstock and Flavel. Project description: This project will upgrade traffic signals and install sidewalk curb ramps on SE 82nd Avenue at the intersections of SE Foster Road, SE Woodstock Boulevard and SE Flavel Street. Construction is expected through 2018.
Last Updated
4/20/2018 8:36 AM

ORE213: MP 7.4 to 8.32

Construction Work
Estimated delay under 20 minutes
Comments
Daytime lane closures from 5 a.m. to 3 p.m. weekdays on SE 82nd Avenue. Pedestrian and cyclist detours.
Last Updated
4/15/2018 12:36 PM

ORE213: MP 9 to 11

Construction Work
Estimated delay under 20 minutes
Comments
One lane in each direction is open. Speed is reduced to 45 mph.
Last Updated
4/15/2018 12:37 PM

ORE213: MP 9.14 to 10.9

Commercial Vehicle Information
Informational only
Details
OR213 MP 9.14 to MP 10.90 SB (Mulino) Effective July 3, 2017, this section of OR213 southbound will be restricted to 9 feet 00 in. in width. Estimated date of completion is December 31, 2017.
Last Updated
4/20/2018 7:02 PM

ORE213: MP 9.14 to 10.9

Commercial Vehicle Information
Informational only
Details
OR213 MP 10.90 to MP 9.14 NB (Mulino) Effective July 3, 2017, this section of OR213 northbound will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2017.
Last Updated
4/20/2018 7:02 PM

ORE213: MP 9.14 to 10.9

Commercial Vehicle Information
Informational only
Details
OR213 MP 9.14 to MP 10.97 NB & SB (Mulino) Effective March 20, 2017, this section of OR213 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Estimated date of completion is December 31, 2018.
Last Updated
4/20/2018 7:02 PM

ORE213: MP 12.16 to 12.4

Construction Work
Estimated delay under 20 minutes
Comments
Daytime lane closures with flaggers directing traffic from 7 a.m. to 5 p.m. weekdays on South Union Mills Road. Expect 20 minute delays.
Last Updated
4/15/2018 12:36 PM

ORE213: MP 12.35

Commercial Vehicle Information
Informational only
Details
OR213 MP 12.16 to MP 12.40 NB & SB (Mulino) Effective March 1, 2018, this section of OR213 northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday between the hours of 7 PM & 6 AM. Estimated date of completion is June 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE214: MP 49.62 to 50.35

Commercial Vehicle Information
Informational only
Details
OR214 NB & SB MP 49.50 to MP 50.40 (Silverton) Effective May 19, 2018, this section of OR214 northbound and southbound will be closed between the hours of 10 AM & 11:30 AM for one day only.
Last Updated
4/20/2018 7:02 PM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

ORE22: MP 8.26

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays, use caution.
Last Updated
4/21/2018 6:22 AM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
4/20/2018 7:02 PM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
4/20/2018 7:02 PM

ORE22: MP 30.03

Commercial Vehicle Information
Informational only
Details
Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Last Updated
4/20/2018 7:02 PM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

ORE241: MP 0.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. Watch for intermittent weeknight lane closures on Isthmus Slough Bridge from 8PM to 6AM. Traffic will be controlled by flaggers as needed.
Last Updated
4/17/2018 12:35 AM

ORE241: MP 0.51

Commercial Vehicle Information
Informational only
Details
OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Last Updated
4/20/2018 7:02 PM

ORE242: MP 61.91 to 83.7

Information
Seasonal Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Old McKenzie highway 242 is closed for the season from MP 61-83 in both directions. Use alternate route.
Last Updated
4/07/2018 8:46 AM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/20/2018 7:02 PM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/20/2018 7:02 PM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/20/2018 7:02 PM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Last Updated
4/20/2018 7:02 PM

ORE339: MP 2.76

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/20/2018 7:02 PM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/20/2018 7:02 PM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
4/20/2018 7:02 PM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Last Updated
4/20/2018 7:02 PM

ORE34: MP 2.55 to 15.67

Commercial Vehicle Information
Informational only
Details
OR34 MP 2.55 to MP 15.78 EB & WB (Corvallis) Effective January 29, 2018, this section of OR34 eastbound and westbound will be restricted to 17 feet 00 inches in width, between the hours of 7 PM to 6 AM. Estimated date of completion is June 30, 2018.
Last Updated
4/20/2018 7:02 PM

ORE34: MP 6.2 to 15.65

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays, use caution. Daytime shoulder work that does not require lane closures will continue with electrical work near Denny School Road and installation of new sign footings throughout the project. Night work with lane closures will be intermittent. Work is weather dependent. Expect minor delays.
Last Updated
4/21/2018 6:58 AM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Last Updated
4/20/2018 7:02 PM

ORE351: MP 0.77 to 1.62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Intermittent lane closures may be in place for construction work. Flaggers may control traffic, expect delays up to 20 minutes. Temporary Pedestrian/Bike routes will be in place during construction.
Last Updated
4/17/2018 6:52 AM

ORE38: MP 1 to 42

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. This project will build two bridges and replace more than 30 culverts, throughout the project area. Construction will continue until September 2018.
Last Updated
3/19/2018 6:40 PM

ORE38: MP 22.75 to 22.84

Commercial Vehicle Information
Informational only
Details
OR38 MP 21 to MP 26 EB & WB (east of Scottsburg) Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE38: MP 41.98

Commercial Vehicle Information
Informational only
Details
OR38 MP 41 to MP 42 EB & WB (west of Drain) Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE42: MP 0.57 to 0.68

Commercial Vehicle Information
Informational only
Details
OR42 MP 0.20 to MP 0.80 EB (Coos Bay) Effective January 3, 2018 this section of OR42 eastbound will be restricted to 18 feet 00 in. in width. Estimated date of completion is April 30, 2018 .
Last Updated
4/20/2018 7:02 PM

ORE42: EB MP 0.6

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Expect intermittent lane closures, beginning Jan 2nd, for a bridge rail replacement project. Use caution, and expect minor delays. This is one of the 3 bridges on HWY 42, that are part of this project.
Last Updated
4/17/2018 12:38 AM

ORE42: MP 25.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Expect traffic control with flaggers, beginning Jan 2nd, as a temporary traffic signal is installed. Use caution, and expect minor delays. This is one of three bridges on Hwy 42, to repair bridge rails.
Last Updated
4/17/2018 12:37 AM

ORE42: MP 25.52 to 25.67

Commercial Vehicle Information
Informational only
Details
OR42 MP 25 to MP 26 EB & EB (Myrtle Point) Effective January 29, 2018 this section of OR42 eastbound and westbound will be restricted to 18 feet 00 in. in width. Estimated date of completion is July 31, 2018.
Last Updated
4/20/2018 7:02 PM

ORE42: MP 30.05 to 30.69

Commercial Vehicle Information
Informational only
Details
OR42 MP 29.50 to MP 30.75 EB & WB (Bridge) Effective February 26, 2018, this section of OR42 eastbound and westbound will be restricted to 18 feet 00 inches in width. Loads wider than 18 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 30, 2018.
Last Updated
4/20/2018 7:02 PM

ORE42: MP 30.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Expect intermittent lane closures for a bridge rail replacement project. Use caution, and expect minor delays. This is one of the 3 bridges on HWY 42, that are part of this project.
Last Updated
3/05/2018 5:20 PM

ORE42: MP 45 to 45.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring Traffic will be controlled by flaggers as needed, use caution.
Last Updated
4/17/2018 12:35 AM

ORE42: MP 75.72

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Traffic will be controlled by flaggers between 7:00PM-7:00am, use caution.
Last Updated
4/17/2018 12:36 AM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
4/20/2018 7:02 PM

ORE47: MP 69.03 to 69.79

Commercial Vehicle Information
Informational only
Details
OR47 NB & SB MP 69.72 to MP 69.87 (Beaver Creek Bridge - Vernonia) Effective July 9, 2018 this section of OR47 northbound and southbound will be closed. The estimated date of completion is September 6, 2018.
Last Updated
4/20/2018 7:02 PM

ORE47: MP 69.03 to 69.79

Commercial Vehicle Information
Informational only
Details
OR47 NB & SB MP 69.72 to MP 69.87 (Beaver Creek Bridge - Vernonia) Effective May 14, 2018, this section of OR47 northbound and southbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 9 AM & 6 PM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 29, 2018.
Last Updated
4/20/2018 7:02 PM

ORE47: MP 69.72 to 69.87

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring, use caution. OR 47 Beaver Creek Bridge Replacement Project (Washington County) (Nehalem Highway, mileposts 69.72 to 69.87) This project consists of performing work as follows: construct work area isolation and remove existing bridge; construct pile foundations, abutments and bridge superstructure; install drainage and storm water facilities and roadway paving; install cast in place retaining wall; and perform additional and incidental work as called for by specifications and plans. Flaggers will control single lane of traffic along with single lane closures during tree removal. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Single lane closures are anticipated to begin mid-May, 2018. A full road closure is not anticipated until early July, 2018 and is expected to last approximately 2 months. Traffic will be detoured using Timber Junction Road. There will also be a pedestrian and bicycle detour along the Banks-Vernonia trail.
Last Updated
4/16/2018 1:20 PM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
4/20/2018 7:02 PM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Last Updated
4/20/2018 7:02 PM

ORE569: WB MP 11.38 to 11.67

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Watch for construction equipment and workers in roadway. Use caution. Minimal delays during the day are expected. Travelers should expect distractions from off-road work in the area and be prepared for trucks entering and exiting the roadway. Crews will be working on median barrier work and paving activities on Beltline. Oregon State Police are enforcing the speed limit through the work zone area.
Last Updated
4/07/2018 8:46 AM

ORE58: MP 62.17

Weather Warning - WILLAMETTE PASS
Informational only
Weather Condition
Intermittent Showers
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
33 F
New Snow
0 in.
Last Updated
4/21/2018 7:27 AM

ORE6: MP 38.95

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
4/23/2018 6:00:00 AM
Comments
Road maintenance operations will be paving on Timber Road. There will be no to minimum delays, use caution. Washington County Project, Inspector is Trey Senator
Last Updated
4/20/2018 9:13 AM

ORE62: MP 0.7 to 5.7

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 3 Lanes , Shoulder (Eastbound) Median , 3 Lanes , Shoulder
Comments
Road construction is occurring, use caution. The new access to Crater Lake Avenue at Fowler Lane is open and the existing access at Corey Road is closed. North/Middle: Daytime, watch for truck traffic in the Vilas / Hwy 62 intersection. South: Agate Road at Hwy 62 is permanently closed. During the day, workers and equipment will be working off the roadway. Use caution, and watch for workers throughout the project.
Last Updated
4/17/2018 12:42 AM

ORE62: MP 20 to 20.76

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. Expect traffic control with flaggers for road improvement work in Shady Cove.
Last Updated
4/17/2018 12:39 AM

ORE8: MP 3.18 to 10

Construction Work
Estimated delay under 20 minutes
Comments
Single lane closures and shoulder closures on 185th Avenue, Cornelius Pass, Murray Road and Scholls Ferry Road from 9 a.m. to 3 p.m. weekdays.
Last Updated
4/15/2018 12:24 PM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
4/20/2018 7:02 PM

ORE99: MP -5.502

Commercial Vehicle Information
Informational only
Details
OR99W MP -5.5 (Crossing over Victory Blvd - Portland) Effective March 6, 2018, OR99W crossing Victory Blvd. is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
4/20/2018 7:02 PM

ORE99: SB MP -0.19 to -0.09

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring, use caution. There are no impacts to traffic, during the day. This project will rehabilitate the Caveman Bridge, in Grants Pass. This is scheduled for completion by March, 2019, any traffic impacts will occur at night.
Last Updated
3/19/2018 6:41 PM

ORE99: MP 3.07 to 3.72

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E southbound will be restricted to 14 feet 00 inches in width, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.72

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E southbound will be restricted to 17 feet 06 inches in height, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.7

Commercial Vehicle Information
Informational only
Details
OR99E NB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E northbound will be restricted to 14 feet 00 inches in width, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.72

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E southbound will be restricted to 14 feet 00 inches in width, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.72

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E southbound will be restricted to 17 feet 06 inches in height, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.7

Commercial Vehicle Information
Informational only
Details
OR99E NB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E northbound will be restricted to 14 feet 00 inches in width, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.72

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E southbound will be restricted to 14 feet 00 inches in width, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.72

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E southbound will be restricted to 17 feet 06 inches in height, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 3.07 to 3.7

Commercial Vehicle Information
Informational only
Details
OR99E NB MP 3.07 to MP 3.75 (Milwaukie) Effective April 1, 2018 this section of OR99E northbound will be restricted to 14 feet 00 inches in width, Monday through Friday between the hours of 7 PM and 5 AM. The estimated date of completion is May 15, 2018.
Last Updated
4/20/2018 7:02 PM

ORE99: MP 14.6 to 17.8

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing no to minimum delays, use caution. This is daytime work in preparation for highway upgrades.
Last Updated
4/17/2018 12:40 AM

ORE99W: MP -5.5

Construction Work
Estimated delay under 20 minutes
Comments
Periodic single lane closures.
Last Updated
4/16/2018 12:26 PM

HWY100: MP 16 to 22

Information
Closure
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Historic Columbia River Highway, US 30, is closed EB & WB from Angels Rest near MP 16 to Dodson Park near MP 22.
Last Updated
4/14/2018 7:43 PM

HWY372: MP 21.98

Information
Seasonal Closure
Lanes Affected
(Westbound) 1 Lane
Comments
The snow gate at Mt. Bachelor on the Cascade Lakes Highway is closed for the season.
Last Updated
11/15/2017 9:43 PM

99: MP 128.99

Commercial Vehicle Information
Informational only
Details
Old OR99 (DC388) Old Winchester Bridge (Roseburg) Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.
Last Updated
4/20/2018 7:02 PM