Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

ORE224, 8 miles East of Estacada MP 31 - 50

OR-224 is closed from Promontory Park to Ripplebrook Rd at mile post 31. FS Road 46 is closed as well. Use alternate route.
Updated
4/27/2021 9:49:00 AM

Weather Alert

Harney Co., Baker Co., Malheur Co., Lower Treasure Valley

Excessive Heat Warning

NOAA Issue Date: 7/25/2021 01:10:00 PM What Dangerously hot conditions with temperatures of 98 to 106 in the lower valleys, and 90 to 102 in the mountain valleys expected. Where Portions of northeast and southeast Oregon and south central, southwest and west central Idaho. When Until midnight MDT /11 PM PDT/ Monday night. Impacts Extreme heat will significantly increase the potential for heat related illnesses, particularly for those working or participating in outdoor activities. Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

I-205: MP 0.58

Commercial Vehicle Information
Informational only
Details
I-205 SB off-ramp to I-5 SB (Tualatin) Effective July 28, 2021, the I-205 southbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM, Friday nights between the hours of 11 PM & 7 AM, and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is July 30, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: NB MP 9.31 to 13.46

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/25/2021 8:25 AM

I-205: MP 9.99

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 10 off-ramp to OR213 SB (Oregon City) Effective July 30, 2021, the I-205 northbound Exit 10 off-ramp to OR213 southbound will be intermittently closed between the hours of 9 PM & 7 AM. The estimated completion date for this work is July 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: NB MP 11.08

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Northbound) Median
Comments
A crash has occurred NB at Gladstone. Use caution.
Last Updated
7/05/2021 10:57 AM

I-205: MP 14.31 to 14.94

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 14.00 to MP 15.00 (Harmony) Effective January 20, 2020, this section of I-205 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width between the hours of 11 PM & 5 AM nightly. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: MP 14.31 to 14.94

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 14.00 to MP 15.00 (Harmony) Effective January 20, 2020, this section of I-205 northbound and southbound will be intermittently restricted to 17 feet 1 inch in height between the hours of 11 PM & 5 AM nightly. Loads over 17 feet 1 inch in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: MP 14.31 to 14.94

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 14.00 to MP 15.00 (Harmony) Effective January 20, 2020, this section of I-205 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width between the hours of 11 PM & 5 AM nightly. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: MP 14.31 to 14.94

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 14.00 to MP 15.00 (Harmony) Effective January 20, 2020, this section of I-205 northbound and southbound will be intermittently restricted to 17 feet 1 inch in height between the hours of 11 PM & 5 AM nightly. Loads over 17 feet 1 inch in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: MP 18.89 to 19.87

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB Exit 19 on- and off-ramps to/from Division St (Portland) Effective May 3, 2021, the I-205 northbound and southbound Exit 19 on- and off-ramps to/from Division Street will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this project is September 15, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: MP 19.27

Crash/Hazard
Closure
Off Ramp
Comments
Roadwork has the ramp from Powell North to Division closed, use alternate route. Ramps Affected. Closure is expected to be in place until Thursday July 29th.
Last Updated
7/24/2021 3:26 AM

I-205: NB MP 19.61 to 19.77

Construction Work
No to Minimum Delay
Comments
24/7 closure of the I-205 north off-ramp to Division Street from 10 p.m. Friday, July 23 to 5 a.m. Thursday, July 29. Nighttime short-term closures of the intersection at SE Division Street and SE 96th Avenue on Wednesday, July 28. Daytime lane closures on Division Street. Pedestrian detours.
Last Updated
7/25/2021 8:24 AM

I-205: MP 20.99

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB Exit 21B off-ramps to I-84 WB (Portland) Effective July 9, 2021, the I-205 northbound and southbound Exit 21B off-ramps to I-84 westbound will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is July 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: MP 21.49

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from NE Glisan St (Portland) Effective August 2, 2021, the I-205 northbound on-ramp from NE Glisan Street will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday through Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this work is August 5, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: MP 21.55

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 21A off-ramp to NE Glisan Street (Portland) Effective August 2, 2021, the I-205 southbound Exit 21A off-ramp to NE Glisan Street will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday through Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this work is August 5, 2021.
Last Updated
7/25/2021 10:00 AM

I-205: SB MP 23.28

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/28/2021 12:16 PM

I-405: MP 1.41

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from US26 EB (Montgomery Tunnel - Portland) Effective July 26, 2021, the I-405 southbound on-ramp from US26 eastbound will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this work is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Taylor & SW 13th Ave (Portland) Effective August 9, 2021, the I-405 southbound on-ramp from Taylor and SW 13th Avenue will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 MP 1.97 SW Taylor St crossing over I-405 (Portland) Effective June 18, 2020, SW Taylor Street crossing over I-405 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 GVW, Weight Table 2.
Last Updated
7/25/2021 10:00 AM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Taylor & SW 13th Ave (Portland) Effective August 9, 2021, the I-405 southbound on-ramp from Taylor and SW 13th Avenue will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 MP 1.97 SW Taylor St crossing over I-405 (Portland) Effective June 18, 2020, SW Taylor Street crossing over I-405 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 GVW, Weight Table 2.
Last Updated
7/25/2021 10:00 AM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Taylor & SW 13th Ave (Portland) Effective August 9, 2021, the I-405 southbound on-ramp from Taylor and SW 13th Avenue will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 0.69

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from OR273 SB (Ashland) Effective July 22, 2021, the I-5 southbound on-ramp from OR273 southbound will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: NB MP 4 to 7

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane , Shoulder
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
6/13/2021 8:56 PM

I-5: MP 4.63 to 5.71

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 4.50 to MP 6.50 (Ashland) Effective June 3, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in width at all hours. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 5.28

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from OR273 at Exit 6 (Ashland) Effective April 21, 2021, the I-5 southbound on-ramp from OR273 at Exit 6 will be intermittently closed at all hours. The estimated completion date for this project is October 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 5.39

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 5.39 (Ashland) Effective May 20, 2021, this section of I-5 northbound will be intermittently restricted to 18 feet 8 inches in height at all hours. Loads over 18 feet 8 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 5.58 to 4.32

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 5.58 to MP 4.00 (Ashland) Effective May 20, 2021, this section of I-5 southbound will be intermittently restricted to 12 feet 00 inches in width at all hours. Loads over 12 feet 00 inches in width must use the temporary ramp detour. The estimated completion date for this project is October 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 8 to 2

Maintenance Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane , Shoulder
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
6/21/2021 7:46 AM

I-5: MP 57.93

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 58 off-ramp crossing under I-5 to OR99/Scoville Rd (Grants Pass) Effective August 23, 2021, OR99/Scoville Road/6th Street southbound MP -2.6 (Grants Pass) will be intermittently restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is May 23, 2022. This restriction is NOT on the I-5 mainline.
Last Updated
7/25/2021 10:00 AM

I-5: MP 78.11

Commercial Vehicle Information
Informational only
Details
I-5 MP 78.11 Speaker Rd crossing over I-5 (Canyonville) Effective March 12, 2021, Speaker Rd crossing over I-5 is restricted 21,500 lbs. single axle; 43,000 lbs. tandem axle; Weight Table 3.
Last Updated
7/25/2021 10:00 AM

I-5: NB MP 80

Construction Work
No to Minimum Delay
Off Ramp
Comments
Road construction is occurring causing no to minimum delays. Use caution. Ramps Affected. Watch for intermittent lane closures on the local road under the I-5 bridges.
Last Updated
7/18/2021 8:46 PM

I-5: MP 80.791 to 80.79

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 80.76 to MP 80.80 (Glendale) Effective April 5, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 6 PM & 9 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: NB MP 85.9

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. I-5 motorists should watch for construction activity near the Quines Creek Road interchange (Exit 86) due to a culvert repair project. Watch for construction vehicles entering and exiting the median. All work is scheduled to be completed by the end of July.
Last Updated
7/18/2021 8:33 PM

I-5: MP 88.12

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 88.12 (Azalea) Effective September 9, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 9 inches in height Sunday through Thursday nights between the hours of 6 PM & 7 AM. Loads over 16 feet 9 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 88.28 to 87.82

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 88 on- and off-ramps to/from Azalea-Glen Rd (Azalea) Effective September 13, 2021, the I-5 southbound Exit 88 on- and off-ramps to/from Azalea-Glen Road will be intermittently closed Sunday through Thursday nights between the hours of 6 PM & 7 AM. The estimated completion date for this work is September 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 90.2 to 87.82

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 87.50 to MP 91.00 (Azalea) Effective September 9, 2021, this section of I-5 southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 6 PM & 7 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 98

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/19/2021 6:20 AM

I-5: NB MP 103

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
6/28/2021 8:59 AM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
7/25/2021 10:00 AM

I-5: MP 107.99

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 108 off-ramp to Old Hwy 99/Myrtle Creek (Myrtle Creek) Effective July 28, 2021, the I-5 northbound Exit 108 off-ramp to Old Hwy 99/Myrtle Creek will be intermittently closed between the hours of 8 AM & 8 PM. The estimated completion date for this work is July 28, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: NB MP 108

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/25/2021 1:55 PM

I-5: MP 112.57

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 112.57 (S Umpqua River Bridge - Roseburg) Effective August 8, 2021, this section of I-5 southbound will be restricted to 11 feet 00 inches in width at night between the hours of 7 PM & 7 AM. Loads over 11 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 10, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 113.25 to 113.59

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 113.25 to MP 113.69 (Myrtle Creek) Effective August 8, 2021, this section of I-5 northbound will be closed at night between the hours of 9 PM & 6 AM. When closed use the up and over detour at Exit 113. The estimated completion date for this project is August 14, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 113.66

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 113 on- and off-ramps to/from Clarks Branch Rd (Roseburg) Effective August 16, 2021, the I-5 northbound and southbound on- and off-ramps to/from Clarks Branch Road will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 113.66 to 113.44

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 113.21 to MP 113.66 (Myrtle Creek) Effective August 1, 2021, this section of I-5 southbound will be closed at night between the hours of 9 PM & 6 AM. When closed use the up and over detour at Exit 113. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 113.66

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 113 on- and off-ramps to/from Clarks Branch Rd (Roseburg) Effective August 16, 2021, the I-5 northbound and southbound on- and off-ramps to/from Clarks Branch Road will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 113.66 to 113.44

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 113.21 to MP 113.66 (Myrtle Creek) Effective August 1, 2021, this section of I-5 southbound will be closed at night between the hours of 9 PM & 6 AM. When closed use the up and over detour at Exit 113. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 116.43 to 112.66

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 117.74 to MP 112.64 (Roseburg) Effective May 16, 2020, this section of I-5 southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 117.74

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 117.5 to MP 119 (Roseburg) Effective May 27, 2021, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 118 to 113

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane , Shoulder (Northbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project (www.RobertsMountain.com) will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction will continue until summer 2021. A 55-mph speed limit is in effect for southbound I-5 on Roberts Mountain. Southbound traffic is on a temporary alignment, with both lanes shifted to the right side of the roadway. Passenger vehicles are allowed to use either available southbound lane, but trucks are required to use the right lane. Construction at Exit 113 (Clarks Branch), originally scheduled for late July, has been postponed until August. Throughout July, most work will take place outside the travel lanes. Watch for intermittent lane closures in both direction for striping and guardrail work. Motorists are advised to drive with caution and watch for construction vehicles. On Roberts Mountain Road, watch for intermittent lane closures with flaggers.
Last Updated
7/18/2021 8:32 PM

I-5: NB MP 118 to 126

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project will pave eight miles of I-5 between the Garden Valley interchange and Roberts Creek and install or replace sidewalk ADA ramps. Watch for intermittent weeknight (Sunday night to Friday morning, 7:00 PM TO 6:00 AM) lane and shoulder closures. Watch for intermittent ramp closures and use alternate routes.
Last Updated
7/18/2021 8:30 PM

I-5: SB MP 118 to 113

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane , Shoulder (Northbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project (www.RobertsMountain.com) will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction will continue until summer 2021. A 55-mph speed limit is in effect for southbound I-5 on Roberts Mountain. Southbound traffic is on a temporary alignment, with both lanes shifted to the right side of the roadway. Passenger vehicles are allowed to use either available southbound lane, but trucks are required to use the right lane. Construction at Exit 113 (Clarks Branch), originally scheduled for late July, has been postponed until August. Throughout July, most work will take place outside the travel lanes. Watch for intermittent lane closures in both direction for striping and guardrail work. Motorists are advised to drive with caution and watch for construction vehicles. On Roberts Mountain Road, watch for intermittent lane closures with flaggers.
Last Updated
7/18/2021 8:32 PM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective May 16, 2021, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective May 16, 2021, this section of I-5 northbound will be restricted to 16 feet 00 inches in height and southbound will be restricted to 16 feet 05 inches in height Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 16 feet 00 inches in height northbound or over 16 feet 05 inches in height southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 119.65 to 119.99

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 119 on- and off-ramps to/from OR42 (Roseburg) Effective August 8, 2021, the I-5 northbound Exit 119 on- and off-ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 9, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 119.75 to 119.3

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 119 on- and off-ramps to/from OR42 (Roseburg) Effective August 8, 2021, the I-5 southbound Exit 119 on- and off-ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 9, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 120.34

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 120 on- and off-ramps to/from Old Hwy 99 (Roseburg) Effective August 8, 2021, the I-5 northbound Exit 120 on- and off-ramps to/from Old Hwy 99 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 13, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 120.34

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 120 off-ramp to Old Hwy 99 (Roseburg) Effective September 7, 2021, the I-5 northbound Exit 120 off-ramp to Old Hwy 99 will be intermittently closed at night between the hours of 7 AM & 5:30 PM. The estimated completion date for this work is September 8, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 120.51 to 120.13

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 120 on- and off-ramps to/from Old Hwy 99 (Roseburg) Effective August 9, 2021, the I-5 southbound Exit 120 on- and off-ramps to/from Old Hwy 99 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 13, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 121.09 to 121.9

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 121 on- and off-ramps to/from Mclain Ave (Roseburg) Effective August 8, 2021, the I-5 northbound Exit 121 on- and off-ramps to/from Mclain Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 13, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 121.87 to 121.63

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 121 on- and off-ramps to/from Mclain Ave (Roseburg) Effective August 8, 2021, the I-5 southbound Exit 121 on- and off-ramps to/from Mclain Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 13, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 122.76 to 123.23

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 123 on- and off-ramps to/from Portland Ave (Roseburg) Effective July 25, 2021, the I-5 northbound Exit 123 on- and off-ramps to/from Portland Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is July 30, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 123.2 to 122.81

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 123 on- and off-ramps to/from Portland Ave (Roseburg) Effective July 29, 2021, the I-5 southbound Exit 123 on- and off-ramps to/from Portland Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 123.8 to 124.2

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 124 on- and off-ramps to/from OR138 (Roseburg) Effective August 8, 2021, the I-5 northbound Exit 124 on- and off-ramps to/from OR138 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 9, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 124.16 to 123.91

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 124 on- and off-ramps to/from OR138 (Roseburg) Effective July 26, 2021, the I-5 southbound Exit 124 on- and off-ramps to/from OR138 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is July 30, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 124.8 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 125 on- and off-ramps to/from Garden Valley Blvd (Roseburg) Effective August 8, 2021, the I-5 northbound Exit 125 on- and off-ramps to/from Garden Valley Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 13, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 125.36 to 124.87

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 125 on- and off-ramps to/from Garden Valley Blvd (Roseburg) Effective July 25, 2021, the I-5 southbound Exit 125 on- and off-ramps to/from Garden Valley Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is July 28, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 139.09

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 140.50 to MP 138.50 (Oakland) Effective August 5, 2021, this section of I-5 southbound will be intermittently restricted to 14 feet 00 inches in width between the hours of 6 PM & 8:30 PM and restricted to 12 feet 00 inches in width at night between the hours of 8:30 PM & 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 140.27 to 142.36

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 139.50 to MP 142.50 (Oakland) Effective August 3, 2021, this section of I-5 northbound will be intermittently restricted to 15 feet 00 inches in width at night between the hours of 6 PM & 7 AM. Loads over 15 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 4, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 140.48

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Oakland (DC388) (Oakland) Effective August 3, 2021, the I-5 northbound on-ramp from Oakland (DC388) will be intermittently closed at night between the hours of 6 PM & 7 AM. The estimated completion date for this work is August 4, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 142.02 to 142.36

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 142 off-ramp to Metz Hill Rd (Oakland) Effective August 3, 2021, the I-5 northbound Exit 142 off-ramp to Metz Hill Road will be intermittently closed at night between the hours of 6 PM & 7 AM. The estimated completion date for this work is August 4, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 151

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
6/28/2021 11:40 AM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 162

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
7/16/2021 2:18 PM

I-5: NB MP 212 to 230

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Expect daytime inside and outside shoulder closures Monday through Thursday, 7 a.m. to 5 p.m. Occasional nighttime lane closures. Work is expected to be completed in July 2021.
Last Updated
7/14/2021 9:16 PM

I-5: SB MP 216 to 235

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Lane closures will typically run Sunday through Thursday nights from 7:30 p.m. to 5:30 a.m.
Last Updated
7/16/2021 5:27 AM

I-5: MP 216.34 to 234.69

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 215.25 to MP 235.25 (Albany) Effective March 14, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 3 inches in height Sunday through Thursday nights 1/2 hour after sunset to 1/2 hour before sunrise. Loads over 16 feet 3 inches in height may be accommodated on a case-by-case basis. The estimated completion date for this project is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 234.39 to 216.3

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 215.25 to MP 235.25 (Albany) Effective March 14, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 15 feet 00 inches in width Sunday through Thursday nights 1/2 hour after sunset to 1/2 hour before sunrise. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 234.39 to 216.3

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 235.25 to MP 215.25 (Albany) Effective March 14, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 5 inches in height Sunday through Thursday nights 1/2 hour after sunset to 1/2 hour before sunrise. Loads over 16 feet 5 inches in height may be accommodated on a case-by-case basis. The estimated completion date for this project is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 248.62

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 248 off-ramp to Delaney Rd SE (Salem) Effective August 1, 2021, the I-5 southbound Exit 248 off-ramp to Delaney Road SE will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is August 4, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 249.35

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 249.35 (Salem) Effective July 26, 2021, this section of I-5 northbound will be intermittently restricted to 19 feet 00 inches in width at night between the hours of 9 PM and 5 AM. Loads over 19 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this emergency work is July 27, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 249.37

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 249.84 to MP 249.36 (Salem) Effective July 14, 2021, this section of I-5 southbound will be intermittently restricted to 17 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads over 17 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 27, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: NB MP 264.8 to 267.3

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Culvert cleaning and construction work will resume Wednesday June 2nd. Expect shoulder closures daytime M-Th 7AM-5PM between MP 264.8-267.3.
Last Updated
6/30/2021 5:08 PM

I-5: NB MP 282

Crash/Hazard
Estimated delay under 20 minutes
Comments
A crash has occurred, use caution.
Last Updated
7/25/2021 2:40 PM

I-5: MP 283.11 to 285.57

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 283.00 to MP 286.00 (Wilsonville) Effective April 11, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 283.15

Crash/Hazard
Estimated delay of 20 minutes - 2 hours
Lanes Affected
(Southbound) Median , 2 Lanes
Comments
A crash has the SB left lanes closed near Wilsonville. Use caution.
Last Updated
7/25/2021 2:46 PM

I-5: SB MP 283.2 to 288.6

Construction Work
Estimated delay under 20 minutes
Comments
Periodic nighttime lane closures on I-5 north and south between Wilsonville Road and the I-205 interchange weekdays. Nighttime single and double lane closures on I-5 north Monday through Wednesday nights and on I-5 south Thursday through Saturday nights. Lane closures time are 7 p.m. and 6 a.m. Sunday through Thursday nights and between 8 p.m. and 9 a.m. Friday and Saturday nights. Nighttime closures of the following ramps between 10 p.m. and 5 a.m. if weather allows: The Wilsonville Road on-ramp to I-5 south Thursday through Saturday and the I-5 south off-ramp to Wilsonville Road Thursday through Saturday nights.
Last Updated
7/25/2021 8:23 AM

I-5: MP 284.06

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 283 off-ramp to Wilsonville Rd (Wilsonville) Effective July 25, 2021, the I-5 southbound Exit 283 off-ramp to Wilsonville Road will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is July 28, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 284.08

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Wilsonville Rd (Wilsonville) Effective July 25, 2021, the I-5 northbound on-ramp from Wilsonville Road will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is July 28, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 284.88

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 284.88 (Wilsonville) Effective April 11, 2021, this section of I-5 northbound will be intermittently restricted to 17 feet 3 inches in height at night between the hours of 9 PM & 5 AM. Loads over 17 feet 3 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 285.82 to 283.11

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 286.00 to MP 283.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 286.15 to 285.82

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramps from Boones Ferry Rd/OR141/Elligsen Rd (Wilsonville) Effective July 25, 2021, the I-5 southbound on-ramps from Boones Ferry Road/OR141/Elligsen Road will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this project is July 26, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 286.18 to 288.98

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 286.00 to MP 289.00 (Wilsonville) Effective April 12, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 286.45

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 286 off-ramps to Boones Ferry Rd/OR141/Elligsen Rd (Wilsonville) Effective July 25, 2021, the I-5 southbound Exit 286 off-ramp to Boones Ferry Road/OR141/Elligsen Road will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this project is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 286.52 to 286.2

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramps from Elligsen Rd EB & WB (Wilsonville) Effective July 25, 2021, the I-5 northbound on-ramps from Elligsen Road eastbound and westbound will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 288.21

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 288 off-ramp to I-205 NB (Tualatin) Effective July 25, 2021, the I-5 northbound Exit 288 off-ramp to I-205 northbound will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM, Friday nights between the hours of 11 PM & 7 AM, and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is July 30, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 17 feet 00 inches in height at night between the hours of 10 PM & 6 AM. Loads over 17 feet 00 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 17 feet 00 inches in height at night between the hours of 10 PM & 6 AM. Loads over 17 feet 00 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: NB MP 289

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of a crash has been received. Use caution.
Last Updated
7/06/2021 12:40 PM

I-5: MP 291.58 to 292.91

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 291.50 to MP 293.00 (Tigard) Effective July 5, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 2 inches in height at night between the hours of 10 PM & 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 292.12

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 292B off-ramp to Kruse Way (Tigard) Effective July 5, 2021, the I-5 northbound Exit 292B off-ramp to Kruse Way will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is September 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 292.2

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 292.20 (Tigard) Effective July 5, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 5 inches in height at night between the hours of 10 PM & 5 AM. Loads over 16 feet 5 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 292.86 to 291.5

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 291.50 to MP 293.00 (Tigard) Effective July 5, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 18 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: NB MP 296.54

Construction Work
No to Minimum Delay
Comments
Nighttime single or double lane closures on I-5 in both directions between SW Multnomah Boulevard and SW Barbur Boulevard. Expect daytime and nighttime lane closures at the Multnomah Boulevard on-ramp to I-5 north.
Last Updated
7/25/2021 8:23 AM

I-5: NB MP 298.75

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
7/13/2021 3:36 PM

I-5: MP 299.83

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 299A off-ramp to OR43 (Portland) Effective August 2, 2021, the I-5 southbound Exit 299A off-ramp to OR43 will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 299.30 to MP 300.30 (Portland) Effective August 2, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights from half an hour after sunset to 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 299.30 to MP 300.30 (Portland) Effective August 2, 2021, this section of I-5 northbound will be intermittently restricted to 15 feet 7 inches in height and I-5 southbound will be intermittently restricted to 16 feet 6 inches in height Sunday through Thursday nights from half an hour after sunset to 5 AM. Loads over 15 feet 7 inches northbound and 16 feet 6 inches southbound in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 299.30 to MP 300.30 (Portland) Effective August 2, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights from half an hour after sunset to 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 299.30 to MP 300.30 (Portland) Effective August 2, 2021, this section of I-5 northbound will be intermittently restricted to 15 feet 7 inches in height and I-5 southbound will be intermittently restricted to 16 feet 6 inches in height Sunday through Thursday nights from half an hour after sunset to 5 AM. Loads over 15 feet 7 inches northbound and 16 feet 6 inches southbound in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 299.30 to MP 300.30 (Portland) Effective August 2, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights from half an hour after sunset to 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 299.30 to MP 300.30 (Portland) Effective August 2, 2021, this section of I-5 northbound will be intermittently restricted to 15 feet 7 inches in height and I-5 southbound will be intermittently restricted to 16 feet 6 inches in height Sunday through Thursday nights from half an hour after sunset to 5 AM. Loads over 15 feet 7 inches northbound and 16 feet 6 inches southbound in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 301.62 to 300.38

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 301.65 to MP 300.38 (Portland) Effective July 30, 2021, this section of I-5 southbound will be intermittently closed at night between the hours of 10 PM & 6 AM. The estimated completion date for this work is August 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 301.911

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 300 & 301 off-ramps to I-84 EB (Portland) Effective August 13, 2021, the I-5 northbound Exit 300 and southbound Exit 301 off-ramps to I-84 eastbound will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 302.09

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 302A off-ramp to Moda Center/Weidler St (Portland) Effective August 15, 2021, the I-5 northbound Exit 302A off-ramp to Weidler Street will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is August 18, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 302.99 to 301.66

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 303.00 to MP 301.65 (Portland) Effective July 30, 2021, this section of I-5 southbound will be intermittently restricted to 13 feet 00 inches in width at night between the hours of 10 PM & 6 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 304.69

Construction Work
No to Minimum Delay
Comments
Nighttime lane closures on I-5 north and south at Ainsworth Street and on the Ainsworth Street bridge Monday to Thursday nights starting July 12. ODOT is installing new bridge screening on the Ainsworth Street bridge over I-5. Work begins as soon as Monday, July 12 and is expected to last for several weeks.
Last Updated
7/25/2021 8:29 AM

I-5: MP 305.14 to 308.38

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 305.00 to MP 308.38 (Portland) Effective August 14, 2021, this section of I-5 northbound will be intermittently closed at night between the hours of 10 PM & 7 AM. The estimated completion date for this work is August 15, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective June 14, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective June 14, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 15 feet 9 inches in height Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 15 feet 9 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective June 14, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective June 14, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 15 feet 9 inches in height Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 15 feet 9 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 307.19

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from OR99W/Interstate Ave/Denver Ave (Portland) Effective August 23, 2021, the I-5 northbound on-ramp from OR99W/Interstate Avenue/Denver Avenue will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is August 24, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: SB MP 307.98 to 308.38

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
A crash has the sb right lane blocked on the Interstate Bridge, use caution.
Last Updated
7/25/2021 2:56 PM

I-5: MP 307.99

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 308 off-ramp to Jantzen Beach (Portland) Effective August 4, 2021, the I-5 southbound Exit 308 off-ramp to Jantzen Beach will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is August 5, 2021.
Last Updated
7/25/2021 10:00 AM

I-5: MP 308.38 to 308

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 308.38 to MP 308.00 (Portland) Effective July 31, 2021, this section of I-5 southbound will be intermittently closed at night between the hours of 10 PM & 7 AM. The estimated completion date for this work is August 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 0.37

Commercial Vehicle Information
Informational only
Details
I-84 WB off-ramp to I-5 SB (Portland) Effective July 30, 2021, the I-84 westbound off-ramp to I-5 southbound will be intermittently closed at night between the hours of 8 PM & 6 AM. The estimated completion date for this work is August 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 0.44

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 0.40 to MP 0.49 (Portland) Effective August 9, 2021, this section of I-84 westbound will be intermittently restricted to 12 feet 00 inches in width at night between the hours of 9 PM & 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 10, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 0.54

Commercial Vehicle Information
Informational only
Details
I-84 EB on-ramp from the Morrison St Bridge (Portland) Effective August 13, 2021, the I-84 eastbound on-ramp from the Morrison Street Bridge will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 0.66

Commercial Vehicle Information
Informational only
Details
I-84 EB on-ramp from Grande Ave/OR99E (Portland) Effective August 13, 2021, the I-84 eastbound on-ramp from Grande Avenue/OR99E will be closed all weekend, Thursday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 2.05 to 2.14

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramps from NE 33rd Ave & Sandy Blvd (Portland) Effective August 13, 2021, the I-84 westbound on-ramps from NE 33rd Avenue and Sandy Boulevard will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: WB MP 2.06

Crash/Hazard
No to Minimum Delay
Comments
A disabled vehicle is creating a hazard causing no to minimum delays. Use caution.
Last Updated
6/28/2021 5:20 PM

I-84: MP 3.38

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from NE Glisan St (NE Glisan Tunnel - Portland) Effective July 26, 2021, the I-84 westbound on-ramp from NE Glisan Street will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this work is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 3.38

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramps from NE Glisan St/NE 58th Ave (Portland) Effective August 13, 2021, the I-84 westbound on-ramps from NE Glisan Street/NE 58th Avenue will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 3.38

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from NE Glisan St (NE Glisan Tunnel - Portland) Effective July 26, 2021, the I-84 westbound on-ramp from NE Glisan Street will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this work is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 3.38

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramps from NE Glisan St/NE 58th Ave (Portland) Effective August 13, 2021, the I-84 westbound on-ramps from NE Glisan Street/NE 58th Avenue will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 3.38

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from NE Glisan St (NE Glisan Tunnel - Portland) Effective July 26, 2021, the I-84 westbound on-ramp from NE Glisan Street will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this work is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 3.38

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramps from NE Glisan St/NE 58th Ave (Portland) Effective August 13, 2021, the I-84 westbound on-ramps from NE Glisan Street/NE 58th Avenue will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 4.8

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from NE Halsey St/NE 82nd Ave/OR213 (Portland) Effective August 13, 2021, the I-84 westbound on-ramp from NE Halsey Street/NE 82nd Avenue/OR213 will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.29

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 8 off-ramp to I-205 NB (Portland) Effective July 5, 2021, the I-84 eastbound Exit 8 off-ramp to I-205 northbound will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this work is July 27, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.39

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from 102nd Ave (Portland) Effective August 13, 2021, the I-84 westbound on-ramp from 102nd Avenue will be closed all weekend, Friday at 10 PM through Monday at 5 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 6.50 to MP 7.00 (Portland) Effective July 6, 2021, this section of I-84 eastbound and westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights from half an hour after sunset to 5 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.55

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 9 off-ramp to 102nd Ave (Portland) Effective July 6, 2021, the I-84 eastbound Exit 9 off-ramp to 102nd Avenue will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 6.50 to MP 7.00 (Portland) Effective July 6, 2021, this section of I-84 eastbound and westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights from half an hour after sunset to 5 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.55

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 9 off-ramp to 102nd Ave (Portland) Effective July 6, 2021, the I-84 eastbound Exit 9 off-ramp to 102nd Avenue will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.74

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.74 (Portland) Effective August 9, 2021, this section of I-84 westbound will be intermittently restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 18 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.74

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.74 (Portland) Effective August 9, 2021, this section of I-84 westbound will be intermittently restricted to 15 feet 1 inch in height Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 15 feet 1 inch in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 6.74 (Portland) Effective July 6, 2021, this section of I-84 eastbound will be intermittently restricted to 18 feet 3 inches and westbound will be intermittently restricted to 15 feet 1 inch in height Monday through Thursday nights from half an hour after sunset to 5 AM. Loads over 18 feet 3 inches eastbound and 15 feet 1 inch westbound in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.74

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.74 (Portland) Effective August 9, 2021, this section of I-84 westbound will be intermittently restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 18 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 6.74

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.74 (Portland) Effective August 9, 2021, this section of I-84 westbound will be intermittently restricted to 15 feet 1 inch in height Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 15 feet 1 inch in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: WB MP 13.03

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/28/2021 3:21 PM

I-84: MP 17.37 to 17.84

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.3 to MP 18.0 (Troutdale) Effective July 22, 2021, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM and Friday through Saturday nights between the hours of 9 PM & 8 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 27, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.25 to 41.57

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 41.25 to MP 41.71 (Cascade Locks) Effective August 2, 2021, this section of I-84 eastbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 6 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.25

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 41.25 (Cascade Locks) Effective August 2, 2021, this section of I-84 eastbound will be intermittently restricted to 17 feet 3 inches in height at night between the hours of 9 PM & 6 AM. Loads over 17 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.25 to 41.57

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 41.25 to MP 41.71 (Cascade Locks) Effective August 2, 2021, this section of I-84 eastbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 6 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.25

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 41.25 (Cascade Locks) Effective August 2, 2021, this section of I-84 eastbound will be intermittently restricted to 17 feet 3 inches in height at night between the hours of 9 PM & 6 AM. Loads over 17 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 off-ramp to Fish Hatchery/Eagle Creek Loop (Cascade Locks) Effective August 2, 2021, the I-84 eastbound Exit 41 off-ramp to Fish Hatchery/Eagle Creek Loop will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 to Eagle Creek (Eagle Creek Bridge) Effective June 18, 2020, the I-84 EB Exit 41 ramp over Eagle Creek is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2. This restriction is NOT on the I-84 mainline.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 off-ramp to Fish Hatchery/Eagle Creek Loop (Cascade Locks) Effective August 2, 2021, the I-84 eastbound Exit 41 off-ramp to Fish Hatchery/Eagle Creek Loop will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 to Eagle Creek (Eagle Creek Bridge) Effective June 18, 2020, the I-84 EB Exit 41 ramp over Eagle Creek is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2. This restriction is NOT on the I-84 mainline.
Last Updated
7/25/2021 10:00 AM

I-84: MP 43.11

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from US30/Hwy 100/Wa Na Pa St (Cascade Locks) Effective August 2, 2021, I-84 westbound on-ramp from US30/Hwy 100/Wa Na Pa Street will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 45.24

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 44 off-ramp to US30/Cascade Locks/Wa Na Pa St (Cascade Locks) Effective August 2, 2021, I-84 westbound Exit 44 off-ramp to US30/Cascade Locks/Wa Na Pa Street will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: WB MP 58 to 59

Construction Work
No to Minimum Delay
Comments
I-84 Exit 58 to Mitchell Point Overlook closed around-the-clock. Project Description: The iconic Mitchell Point Tunnel was a highlight of the original Historic Highway, but the construction of Interstate 84 destroyed the tunnel. Now, we are constructing a new tunnel and Historic Highway State Trail segment adjacent to I-84 east near Exit 58.
Last Updated
7/25/2021 8:24 AM

I-84: EB MP 62

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of animals on the roadway has been received. Use caution.
Last Updated
7/18/2021 4:37 PM

I-84: MP 63.72

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 63 on-and off-ramps to/from City Center/2nd St (Hood River) Effective August 2, 2021, the I-84 eastbound and westbound on- and off-ramps to/from City Center/2nd Street will be intermittently closed at night between the hours of 9 PM and 6 AM. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: WB MP 63.9 to 64.4

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
No traffic impacts. This project is complete. Ramps Affected.
Last Updated
7/18/2021 5:19 AM

I-84: WB MP 63.9 to 64.4

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Nighttime ramp closures on I-84 Exit 63 and 64 on- and off-ramps. Lane closures on I-84. Ramps Affected. Ramp closures on the I-84 westbound Exit 63 off-ramp and the Exit 64 on-ramp from 10 p.m. to 5 a.m. Monday through Thursday nights.
Last Updated
9/14/2020 9:24 AM

I-84: WB MP 63.9 to 64.4

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Nighttime lane and ramp closures for Exit 63 and 64 on-and off-ramps. Ramps Affected. Ramp closures on the I-84 westbound Exit 63 off-ramp and the Exit 64 on-ramp from 10 p.m. to 5 a.m. Monday through Thursday nights.
Last Updated
9/18/2020 1:41 PM

I-84: WB MP 63.9 to 64.4

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Rolling slowdowns Wednesday night on I-84 east from 10 p.m. to 5 a.m. One lane of eastbound I-84 is closed 24/7 between Exit 63-64. Ramps Affected.
Last Updated
9/23/2020 3:53 PM

I-84: WB MP 63.9 to 64.4

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
One lane of I-84 east is closed 24/7. Watch for traffic shifts. Ramps Affected. Ramp closures on the I-84 westbound Exit 63 off-ramp and the Exit 64 on-ramp from 10 p.m. to 5 a.m. Monday through Thursday nights.
Last Updated
9/26/2020 7:10 AM

I-84: MP 64.28

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 64 on-and off-ramps to/from White Salmon Bridge/OR35/Button Bridge Rd (Hood River) Effective August 2, 2021, the I-84 eastbound and westbound on-and off-ramps to/from White Salmon Bridge/OR35/Button Bridge Road will be intermittently closed at night between the hours of 9 PM and 6 AM. The estimated completion date for this project is August 3, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: EB MP 100.6 to 102.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Expect delays up to 20 minutes. Use caution. Work is for construction of bridge decking, water quality facilities and illumination.
Last Updated
7/24/2021 6:45 AM

I-84: EB MP 111

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
7/24/2021 7:18 PM

I-84: MP 114.13 to 114.6

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 113.00 to MP 115.00 (Rufus) Effective September 13, 2021, this section of I-84 eastbound and westbound will be intermittently restricted to 14 feet 00 inches in width Monday through Thursday between the hours of 7 AM & 4 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 16, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: EB MP 157.37 to 168

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Expect intermittent closures of travel lanes and shoulders. Use caution. The work performed will be for culvert repairs and replacements.
Last Updated
7/24/2021 6:52 AM

I-84: EB MP 168 to 253.6

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 3 Lanes
Comments
Road construction is occurring causing no to minimum delays. Use caution. The work performed will be for culvert repairs and replacements.
Last Updated
7/24/2021 6:52 AM

I-84: EB MP 214 to 220

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. I-84 NE OR Snow Zone Safety Improvement Project
Last Updated
7/24/2021 6:54 AM

I-84: EB MP 237.6 to 248.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Speed will be reduced to 50 mph through the work zone.
Last Updated
7/24/2021 6:51 AM

I-84: MP 237.93 to 248.94

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 237.00 to MP 249.00 (Meacham) Effective April 1, 2021, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is November 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: EB MP 240 to 246

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes
Comments
Rough roads in the area, WB. Use caution.
Last Updated
7/19/2021 8:31 AM

I-84: MP 243.82

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 243.82 (Meacham) Effective April 1, 2021, this section of I-84 eastbound will be intermittently restricted to 16 feet 9 inches in height at all hours. Loads over 16 feet 9 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2021.
Last Updated
7/25/2021 10:00 AM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
7/25/2021 10:00 AM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
7/25/2021 10:00 AM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
7/25/2021 10:00 AM

US101: MP 4.53 to 5.33

Construction Work
Informational only
Comments
Road construction is occurring. Use caution. Most of the work that impacts the travel lanes will be done at night. There may be times when one-lane closures occur to accommodate equipment needed for the work and activities being done underneath the bridge. A 14 day full night closure will occur in June, 2021 while replacing the lift span bracing. The night closures will detour traffic onto U.S. 101 Business route between the hours of 9:00 pm and 5:30 am.
Last Updated
5/27/2021 9:16 PM

US101: MP 4.53 to 5.33

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution.
Last Updated
7/01/2021 9:59 PM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
7/25/2021 10:00 AM

US101: MP 4.91

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 4.53 to MP 5.33 (New Young's Bay Bridge - Astoria) Effective February 15, 2019, this section of US101 northbound and southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is January 10, 2022.
Last Updated
7/25/2021 10:00 AM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective July 1, 2020, US101 Business crossing the Old Youngs Bay Bridge is restricted to the following weights: 25 tons SU4 & SU5 (4 and 5 axle single unit trucks); 26 tons SU6 & SU7 (6 and 7 axle single-unit trucks); 20,000 single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1 for combinations.
Last Updated
7/25/2021 10:00 AM

US101: MP 46.15 to 46.66

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
7/06/2021 1:09 PM

US101: MP 77.53

Commercial Vehicle Information
Informational only
Details
US101 MP 77.53 (West Beaver Creek Bridge - Beaver) Effective October 23, 2020, US101 crossing West Beaver Creek Bridge at MP 77.53 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US101: MP 80.32

Commercial Vehicle Information
Informational only
Details
US101 MP 80.32 (Beaver Creek Bridge - Beaver) Effective March 12, 2021, US101 crossing Beaver Creek Bridge at MP 80.32 is restricted to the following weights: 26 tons for SU5 & SU6 (5 to 6-axle single-unit trucks); 27 tons SU7 (7 axle-single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Devil’s Lake Outlet: All sidewalks are open. Minor work is taking place under the bridge. No delays are expected.
Last Updated
7/14/2021 9:11 PM

US101: MP 118.17

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Closures and work are weather dependent. Schooner Creek Bridge: The eastern bridge rail and portions of the sidewalk are being removed, and new sidewalk and rail will be installed in several phases. The eastern sidewalk is closed while the bridge rail is replaced. Night work with flaggers controlling traffic.
Last Updated
7/14/2021 9:12 PM

US101: MP 141.44 to 141.83

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Most work will take place under the bridge with little impact to traffic. Occasional night lane closures are needed to set up scaffolding and move equipment. The eastern sidewalk will be closed for the duration of the project in the near future. A pedestrian detour is in place at the south end of the bridge.
Last Updated
7/14/2021 9:14 PM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
7/25/2021 10:00 AM

US101: MP 142.22

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect one lane of travel in each direction, and minor congestion during peak travel hours. Work continues on SE 35th Street as well as work on the new signal and sidewalks at the intersection of SE 35th and U.S. 101. All work on 35th is being done off of the road with minimal impacts to traffic. Expect traffic shifts and minor congestion.
Last Updated
7/14/2021 9:12 PM

US101: MP 150 to 180

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution.
Last Updated
7/21/2021 6:14 PM

US101: MP 178.33 to 179

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Minimal impacts as crews finishing up installing corrosion protection system under the bridge.
Last Updated
7/14/2021 9:06 PM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
7/25/2021 10:00 AM

US101: MP 196.94

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Closures and work are weather dependent. Siltcoos River Bridge: Concrete repair and reinforcement work is underway under the bridge. The east rail is under construction. There will be night work with intermittent lane closures. Flagger will be controlling traffic. Expect minor delays.
Last Updated
7/14/2021 9:07 PM

US101: MP 210 to 244

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will repair or replace 24 culverts along U.S. 101, mostly between the city of Coos Bay and the Oregon 42 junction. Some additional culverts are located in the Gardiner and Hauser area. Watch for weeknight (8 p.m. to 6 a.m.) lane closures south of Coos Bay. Expect delays up to 20 minutes. Flaggers will provide traffic control.
Last Updated
7/18/2021 8:24 PM

US101: MP 212.69 to 215

Traffic Congestion
No to Minimum Delay
Comments
Slow traffic causing no to minimum delays. Use caution.
Last Updated
7/25/2021 3:20 PM

US101: NB MP 214

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/05/2021 1:33 PM

US101: NB MP 214

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/23/2021 8:51 AM

US101: MP 216.2

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/16/2021 6:47 AM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 233.48 to MP 233.49 (North Bend) Effective April 1, 2021, this section of US101 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
7/25/2021 10:00 AM

US101: MP 234

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Motorists should watch for nighttime (7 p.m. to 7 a.m.) lane closures, Sunday night to Friday morning, until September. Expect delays of 20 minutes. Traffic control will be provided by automated flaggers. One sidewalk will remain open at all times during construction. This project will paint the steel truss section of McCullough Bridge, replace rivets, remove rust and repair damaged steel. Construction is scheduled for completion in fall 2021. For more information, visit: www.McCulloughBridge.com.
Last Updated
7/18/2021 8:25 PM

US101: MP 237.6

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road construction is occurring. Use caution. This project, overseen by the City of Coos Bay, will make improvements to the U.S. 101 (Front Street) intersection at Hemlock Avenue. Watch for intermittent lane closures. Watch for traffic control devices and construction vehicles. Expect congestion and possible delays through the work zone.
Last Updated
7/18/2021 8:26 PM

US101: NB MP 238.9

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. This project will make several improvements at the intersections U.S. 101 (northbound and southbound) and Johnson Avenue in south Coos Bay. The U.S. 101 traffic signals between Johnson Avenue and Market Street will be temporarily out of sync until Friday, July 23. As a result, U.S. 101 motorists traveling north or south may be stopped several times by red lights in this nine-block area. Expect delays. Watch for intermittent lane closures in the area of Johnson Avenue and U.S. 101 (northbound and southbound). Flaggers will provide traffic control as needed. Watch for congestion and expect delays. Construction will require some sidewalk closures, but alternate pedestrian routes will be provided.
Last Updated
7/18/2021 8:27 PM

US101: SB MP 241.5

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
7/04/2021 3:08 PM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
7/25/2021 10:00 AM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US197: MP 0.57 to 0.61

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Expect single lane closures at night through the work zone with delays up to 20 minutes. Use caution.
Last Updated
7/24/2021 6:44 AM

US199: MP -0.14

Commercial Vehicle Information
Informational only
Details
US199 SB MP -0.13 (Rogue River Bridge) - Grants Pass Effective March 24, 2021, the Rogue River (Caveman) Bridge is restricted to Weight Table 3 weights. All single-trip permits over Weight Table 3 must stop traffic, straddle centerline, and be the only vehicle on the bridge when crossing.
Last Updated
7/25/2021 10:00 AM

US199: MP 23

Crash/Hazard
No to Minimum Delay
Comments
A wildfire in the area is causing no to minimum delays. Use caution. U.S.199 Redwood Highway MP 23: all lanes open. Watch for crews working fire mop-up in the fire area.
Last Updated
7/25/2021 11:16 AM

US199: MP 41.5

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Watch for shoulder closures as the contractor builds a new “Welcome to Oregon” sign.
Last Updated
7/18/2021 8:42 PM

US20: MP 10

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
A disabled vehicle is creating a hazard causing no to minimum delays. Use caution.
Last Updated
7/25/2021 1:21 PM

US20: MP 56.6

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 55.90 to MP 56.90 (Cascadia) Effective August 4, 2021, this section of US20 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 20, 2021.
Last Updated
7/25/2021 10:00 AM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 eastbound and westbound is restricted to 14 feet 00 inches in width and/or 154 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
7/25/2021 10:00 AM

US20: MP 245.72 to 246.53

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
7/18/2021 8:05 AM

US20: MP 246.15

Commercial Vehicle Information
Informational only
Details
US20 EB MP 246.17 (Vale) Effective July 27, 2021 this section of US20 eastbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 28, 2021.
Last Updated
7/25/2021 10:00 AM

US20: MP 265.17 to 266.52

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
7/18/2021 8:06 AM

US26: MP 0.98

Construction Work
No to Minimum Delay
Comments
Nighttime right lane closures on the east end of the Ross Island Bridge from 8 p.m. to 6 a.m. in both directions beginning as soon as Monday, July 12.
Last Updated
7/25/2021 8:30 AM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective October 23, 2020, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US26: MP 10.17 to 14.14

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 9.85 to MP 15.05 (Elsie) Effective March 21, 2021, this section of US26 eastbound and westbound will be intermittently restricted to 16 feet 00 inches in width Sundays at 7 PM through Fridays at 12 PM (noon). Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 14.8

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane , Shoulder
Comments
Sunken grade, use caution.
Last Updated
7/01/2021 3:30 PM

US26: MP 16.28 to 21.66

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 15.05 to MP 21.67 (Elsie) Effective July 1, 2021, this section of US26 eastbound and westbound will be intermittently restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 8 AM. Loads over 11 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 30, 2021.
Last Updated
7/25/2021 10:00 AM

US26: EB MP 24.51 to 22.89

Construction Work
No to Minimum Delay
Comments
Periodic shoulder closures with pedestrian detours.
Last Updated
7/25/2021 8:25 AM

US26: MP 30.3 to 32.49

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. Signed detours for people walking and biking.
Last Updated
7/25/2021 8:26 AM

US26: MP 30.43 to 32.77

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 30.00 to MP 33.00 (Cherryville) Effective July 6, 2021, this section of US26 eastbound and westbound will be intermittently restricted to 14 feet 00 inches in width at all hours Sundays at 9 PM through Fridays at 9 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 32.47 to 30.43

Commercial Vehicle Information
Informational only
Details
US26 WB MP 32.47 to MP 30.43 (Cherryville) Beginning August 27, 2021 at 5 AM, US26 westbound between MP 32.47 and MP 30.43 (east of Portland, in the Cherryville area), will be restricted to 12 feet 00 in. in width. The restriction is estimated to be lifted on August 27, 2021 at 7:45 PM.
Last Updated
7/25/2021 10:00 AM

US26: MP 41.6 to 44.1

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/18/2021 5:29 AM

US26: MP 41.6 to 44.1

Construction Work
No to Minimum Delay
Comments
Intermittent daytime or nighttime lane closures.
Last Updated
7/25/2021 8:26 AM

US26: MP 41.6 to 44.1

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/18/2021 5:29 AM

US26: MP 41.6 to 44.1

Construction Work
No to Minimum Delay
Comments
Intermittent daytime or nighttime lane closures.
Last Updated
7/25/2021 8:26 AM

US26: MP 49.28 to 49.43

Commercial Vehicle Information
Informational only
Details
US26 EB & WB on- and off-ramps to/from OR47 NB & SB (Manning) Effective August 15, 2021, the US26 eastbound and westbound on- and off-ramps to/from OR47 northbound and southbound will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 50.12 to 52.98

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 50.00 to MP 53.00 (Government Camp) Effective August 2, 2021, this section of US26 eastbound and westbound will be intermittently restricted to 11 feet 00 inches in width Monday through Thursday between the hours of 6 AM & 8 PM and Friday 6 AM to 12 PM. Loads over 11 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 4, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 64.91 to 65.19

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Traffic will be detoured onto a single lane controlled by a signal. Expect delays of up to 20 minutes. Use caution. Work consists of construction of a new bridge, installation of new guardrail, signage and drainage structures.
Last Updated
7/24/2021 6:43 AM

US26: MP 65.03

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 64.60 to MP 65.20 (Mitchell) Effective April 1, 2021, this section of US26 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this project is October 15, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 65.03

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 64.60 to MP 65.20 (Mitchell) Effective April 1, 2021, this section of US26 eastbound and westbound will be restricted to 16 feet 8 inches in height at all hours. Loads over 16 feet 8 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 15, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 66.22

Commercial Vehicle Information
Informational only
Details
US26 WB Exit 65 off-ramp to Cornell Rd/Bethany Blvd (Beaverton) Effective July 6, 2021, the US26 westbound off-ramp to Cornell Road/Bethany Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 66.43 to 112.91

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Expect lane closures with delays up to 20 minutes. Traffic controlled by flaggers. Use caution.
Last Updated
7/24/2021 6:46 AM

US26: MP 66.84

Commercial Vehicle Information
Informational only
Details
US26 WB on-ramp from Murray Blvd (Portland) Effective July 6, 2021, the US26 westbound on-ramp from Murray Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 66.93 to 67.54

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 67 on- and off-ramps to/from Murray Blvd (Portland) Effective July 6, 2021, the US26 eastbound Exit 67 on- and off-ramps to/from Murray Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 67.42

Commercial Vehicle Information
Informational only
Details
US26 WB Exit 67 off-ramp to Murray Blvd (Portland) Effective July 6, 2021, the US26 westbound Exit 67 off-ramp to Murray Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 68.11 to 68.73

Commercial Vehicle Information
Informational only
Details
US26 EB & WB Exit 68 on- and off-ramps to/from Cedar Hills Blvd NB & SB (Beaverton) Effective July 6, 2021, the US26 eastbound and westbound Exit 68 on- and off-ramps to/from Cedar Hills Boulevard northbound and southbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 68.55

Commercial Vehicle Information
Informational only
Details
US26 WB Exit 68 off-ramp to Cedar Hills Blvd (Beaverton) Effective August 9, 2021, the US26 westbound Exit 68 off-ramp to Cedar Hills Boulevard will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 69.01

Commercial Vehicle Information
Informational only
Details
US26 EB & WB Exit 69A off-ramps to OR217 SB (Portland) Effective July 6, 2021, the US26 eastbound and westbound Exit 69A off-ramps to OR217 southbound will be intermittently closed Sunday through Thursday nights between 11 PM & 5 AM, Friday and Saturday nights between the hours of 11 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 20, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 69.25 to 69.53

Commercial Vehicle Information
Informational only
Details
US26 EB & WB Exit 69B on- and off-ramps to/from Barnes Rd/Baltic Ave/Park St (Portland) Effective July 6, 2021, the US26 eastbound and westbound Exit 69B on- and off-ramps to/from Barnes Road/Baltic Avenue/Park Street will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 70.68 to 71.47

Commercial Vehicle Information
Informational only
Details
US26 EB and WB Exit 71 & 71B on- and off-ramps to/from Sylvan/Scholls Ferry Rd/Skyline Blvd (Portland) Effective July 6, 2021, the US26 eastbound and westbound Exit 71 & 71B on- and off-ramps to/from Sylvan/Scholls Ferry Road/Skyline Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 71.19

Commercial Vehicle Information
Informational only
Details
US26 EB on-ramp from OR8 (Portland) Effective July 6, 2021, the US26 eastbound on-ramp from OR8 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: EB MP 71.3 to 66.5

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single and double lane closures from 8:30 p.m. to 5:30 a.m. Sunday through Friday nights. Daytime shoulder closures.
Last Updated
7/25/2021 8:25 AM

US26: MP 71.3

Commercial Vehicle Information
Informational only
Details
US26 WB Exit 71A off-ramp to OR8 SB (Portland Effective July 6, 2021, the US26 westbound Exit 71A off-ramp to OR8 southbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 72.97

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 73 off-ramp to Jefferson St/Providence Park (Portland) Effective August 9, 2021, the US26 eastbound Exit 73 off-ramp to Jefferson Street/Providence Park will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 73.75

Commercial Vehicle Information
Informational only
Details
US26 EB off-ramp to I-405 NB (Portland) Effective August 23, 2021, the US26 eastbound off-ramp to I-405 northbound will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is August 24, 2021.
Last Updated
7/25/2021 10:00 AM

US26: MP 103.02 to 111.16

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Expect up to 20 minute delay. Use caution. Project; Construction of new ADA ramps and an illuminated multi-use path throughout the city of Warm Springs, install pedestrian crossing safety devises across US26, update and replace the guardrail & repave the highway with new pavement marking and signage.
Last Updated
7/24/2021 6:48 AM

US26: MP 115.58

Commercial Vehicle Information
Informational only
Details
US26 MP 115.58 (North Unit Canal Bridge - Madras) Effective February 5, 2019, US26 crossing North Unit Canal Bridge at MP 115.58 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US26: MP 169

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
7/24/2021 9:14 PM

US26: MP 277.71 to 278.21

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
7/18/2021 8:05 AM

US26: MP 278 to 275.5

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Watch for loose gravel on roadway.
Last Updated
7/12/2021 1:20 PM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
7/25/2021 10:00 AM

US30: MP 0.46

Commercial Vehicle Information
Informational only
Details
US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/25/2021 10:00 AM

US30: MP 1.65 to 2.1

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 1.65 to MP 2.10 (La Grande) Effective August 6, 2021, this section of US30 (Adams Ave) northbound and southbound between 4th Street and Hemlock Street will be closed between the hours of 4 PM & 8 PM for the Union County Fair Parade.
Last Updated
7/25/2021 10:00 AM

US30: MP 2.82 to 4.91

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
7/24/2021 2:22 PM

US30: MP 5.25 to 5.38

Commercial Vehicle Information
Informational only
Details
US30 Bypass EB MP 5.20 to MP 5.40 (Portland) Effective July 5, 2021, this section of US30 Bypass eastbound will be restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 3, 2021.
Last Updated
7/25/2021 10:00 AM

US30: MP 11.93

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US30: MP 12.59 to 12.69

Commercial Vehicle Information
Informational only
Details
US30 WB MP 12.5 to MP 12.7 (Scappoose) Beginning August 27, 2021 at 2:45 AM, US30 westbound between MP 12.5 and MP 12.7 (south of Scappoose) will be restricted to 14 feet 00 in. in width. The restriction is estimated to be lifted on August 28, 2021 at 3 AM.
Last Updated
7/25/2021 10:00 AM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) Effective March 12, 2021, US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperd's Dell) Bridge is restricted to the following weights: 18 tons for Type 3 Vehicles (3-axle single-unit trucks); 17 tons for SU4 (4-axle single-unit trucks); 19 tons for SU5, SU6 & SU7 (5 to 7 axle single-unit trucks); 28 tons for Type 3S2 (truck tractor/semitrailer); and 35 tons for Type 3-3 (truck and trailer vehicles).
Last Updated
7/25/2021 10:00 AM

US30: MP 14.6 to 21.97

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy 100) EB & WB MP 14.5 to MP 22 (Bridal Veil) Effective January 22, 2021, this section of US30/Historic Columbia River Hwy 100 eastbound and westbound will be closed at all hours. This restriction is due to the continuing landslide cleanup work involving multiple work zones and lane closures.
Last Updated
7/25/2021 10:00 AM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) Effective March 12, 2021, US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 11 tons for all vehicles.
Last Updated
7/25/2021 10:00 AM

US30: MP 18.21

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 18.21 (East Multnomah Falls Bridge) Effective March 12, 2021 , US30 (Historic Columbia River Hwy) crossing East Multnomah Falls Bridge is restricted to 20,000 lbs. single axle; 34,000 lbs. tandem axle; Weight Table 2.
Last Updated
7/25/2021 10:00 AM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
7/25/2021 10:00 AM

US30: MP 23.15

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
7/25/2021 10:00 AM

US30: MP 26.96 to 25.8

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect delays and lane closures. Traffic on U.S. 30 will not be detoured. The intersections of U.S. 30 and Millard Road and/or U.S. 30 and Bennett Road will be impacted at various times during construction.
Last Updated
7/01/2021 10:04 PM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective October 28, 2019, Bridge of the Gods at US30 MP 30.42 is restricted to the following weights: 25 tons Type 3; 25 tons SU4 (4 axle single-unit trucks); 27 tons SU5 & SU6 (5 and 6 axle single-unit trucks); 28 tons SU7 (7 axle single-unit trucks); 40 tons Type 3S2; 40 tons Type 3-3. This bridge belongs to the Port of Cascade Locks.
Last Updated
7/25/2021 10:00 AM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
7/25/2021 10:00 AM

US30: MP 51.56 to 51.98

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.56 to MP 51.98 (Baker City) On Saturday, August 7, 2021 this section of US30 northbound and southbound will be closed between the hours of 9 AM and 1 PM for the East West Shrine Parade.
Last Updated
7/25/2021 10:00 AM

US30: MP 57.281

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 57.28 (Rock Creek Bridge - Mosier) Effective December 17, 2019, US30 (Historic Columbia River Hwy) crossing Rock Creek Bridge at MP 57.28 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 31 tons for SU6 vehicles (6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US30: MP 57.84

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 57.84 (Mosier Creek Bridge - Mosier) Effective December 17, 2019, US30 (Historic Columbia River Hwy) crossing Mosier Creek Bridge at MP 57.28 is restricted to the following weights: 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

US30BY: MP 3 to 5

Construction Work
No to Minimum Delay
Comments
Turn lane closures at some intersections 24/7. Periodic daytime lane closures. Pedestrian detours. Periodic nighttime lane closures between Peninsular Avenue and Greeley Avenue from 8 p.m. to 6:30 a.m. with flaggers directing traffic from 9 p.m. to 5:30 a.m.
Last Updated
7/25/2021 8:27 AM

US395: MP 6.03 to 12.42

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Night paving will occur beginning at 7pm. Use caution. Work consists of resurfacing the travel lanes, bridge driving surfaces, shoulders, and an update to ADA curb ramps.
Last Updated
7/24/2021 2:20 PM

US395: MP 7.77 to 10.46

Commercial Vehicle Information
Informational only
Details
US395 NB & SB MP 7.50 to MP 10.50 (Stanfield) Effective July 27, 2021, this section of US395 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 8:45 PM and 5:45 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

US395: MP 15.43 to 46.93

Construction Work
Informational only
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is or will be occurring. Use caution. No work is scheduled for the week of July 18, work will resume July 26th.
Last Updated
7/18/2021 8:22 PM

US395: MP 142.62 to 144.06

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Demo, excavation, and sidewalk work is scheduled, flagging operation at times with minimal delays to traffic.
Last Updated
7/18/2021 8:23 PM

US395: MP 154

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/16/2021 7:08 AM

US97: MP 0.87 to 3.69

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Traffic controlled with flaggers. Expect delays up to 20 minutes.
Last Updated
7/24/2021 6:41 AM

US97: MP 133.71 to 133.11

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
7/24/2021 6:49 AM

US97: MP 134.84 to 141.12

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
7/24/2021 6:48 AM

US97: MP 134.93 to 140.84

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 134.84 to MP 141.12 (Bend) Effective August 8, 2021, this section of US97 northbound and southbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 134.93

Commercial Vehicle Information
Informational only
Details
US97 NB & SB Exit 135A on- and off-ramps to/from US20/US97 (Bend) Effective August 8, 2021, the US97 northbound and southbound Exit 135A on- and off-ramps to/from US20/US97 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 134.93 to 140.84

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 134.84 to MP 141.12 (Bend) Effective August 8, 2021, this section of US97 northbound and southbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 135.77

Commercial Vehicle Information
Informational only
Details
US97 NB & SB Exit 135B on- and off-ramps to/from Empire Ave (Bend) Effective August 8, 2021, the US97 northbound and southbound Exit 135B on- and off-ramps to/from Empire Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 136.01

Commercial Vehicle Information
Informational only
Details
US97 NB & SB Exit 136 on- and off-ramps to/from Butler Market Rd (Bend) Effective August 8, 2021, the US97 northbound and southbound Exit 136 on- and off-ramps to/from Butler Market Road will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 136.96 to 137.17

Commercial Vehicle Information
Informational only
Details
US97 NB & SB on- and off-ramps to/from Revere Ave (Bend) Effective August 8, 2021, the US97 northbound and southbound on- and off-ramps to/from Revere Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 138.08 to 138.16

Commercial Vehicle Information
Informational only
Details
US97 NB & SB Exit 138 on- and off-ramps to/from Colorado Ave (Bend) Effective August 8, 2021, the US97 northbound and southbound Exit 138 on- and off-ramps to/from Colorado Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 139.04 to 139.38

Commercial Vehicle Information
Informational only
Details
US97 NB & SB Exit 139 on- and off-ramps to Reed Market Rd (Bend) Effective August 8, 2021, the US97 northbound and southbound Exit 139 on- and off-ramps to/from Reed Market Road will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 140.02 to 140.06

Commercial Vehicle Information
Informational only
Details
US97 NB & SB on- and off-ramps to/from Powers Rd (Bend) Effective August 8, 2021, the US97 northbound and southbound on- and off-ramps to/from Powers Road will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 141.09

Commercial Vehicle Information
Informational only
Details
US97 NB Exit 141 off-ramp to 3rd St/US97 Bus (Bend) Effective August 8, 2021, the US97 northbound Exit 141 off-ramp to 3rd Street/US97 Business will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 148.36 to 149.5

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 148.00 to MP 150.00 (Bend) Effective August 16, 2021, this section of US97 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday between the hours of 6 AM & 5:30 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 19, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 151.3 to 151.57

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 151.00 to MP 152.00 (Bend) Effective August 9, 2021, this section of US97 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday between the hours of 6 AM & 5:30 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

US97: MP 152.33 to 153.67

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 152.00 to MP 154.00 (Bend) Effective August 2, 2021, this section of US97 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday between the hours of 6 AM & 5:30 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 5, 2021.
Last Updated
7/25/2021 10:00 AM

US97: NB MP 153.11 to 156.26

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Project: Construction of 2 lane NB alignment to extend the divided section. Construct 2 wildlife undercrossing bridges. Install wildlife fencing. Construction of new intersection of US97 and Vandevert Rd.
Last Updated
7/24/2021 6:47 AM

US97: MP 169

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/16/2021 7:51 AM

US97: MP 208

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/16/2021 1:24 PM

US97: MP 260

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/17/2021 1:35 PM

US97: MP 274

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/24/2021 10:10 AM

US97: NB MP 276.5

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/19/2021 10:49 AM

US97: NB MP 277

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/25/2021 10:59 AM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
7/25/2021 10:00 AM

ORE11: MP 18

Information
No to Minimum Delay
Comments
A disabled vehicle is creating a hazard causing no to minimum delays. Use caution.
Last Updated
7/15/2021 4:30 PM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) Effective February 12, 2019, OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to the following weights: 18 tons Type 3, 18 tons SU4, SU5, SU6, & SU7, 28 tons Type 3S2, 35 tons Type 3-3.
Last Updated
7/25/2021 10:00 AM

ORE126: EB MP 0.5

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/24/2021 4:24 PM

ORE126: MP 1.34

Commercial Vehicle Information
Informational only
Details
OR126B WB MP 1.34 (Willamette River Bridge - Springfield) Effective June 2, 2021, OR126 Business westbound crossing the Willamette River Bridge at MP 1.34 is restricted to the following weights: 32 tons for SU6 vehicles (6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks). The estimated completion date for this project is September 30, 2021.
Last Updated
7/25/2021 10:00 AM

ORE126: MP 1.34

Commercial Vehicle Information
Informational only
Details
OR126 Bus WB MP 1.34 (Willamette River Bridge - Springfield) Effective July 7, 2021, this section of OR126 Business westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is December 23, 2021.
Last Updated
7/25/2021 10:00 AM

ORE126: MP 1.34

Commercial Vehicle Information
Informational only
Details
OR126B WB MP 1.34 (Willamette River Bridge - Springfield) Effective June 2, 2021, OR126 Business westbound crossing the Willamette River Bridge at MP 1.34 is restricted to the following weights: 32 tons for SU6 vehicles (6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks). The estimated completion date for this project is September 30, 2021.
Last Updated
7/25/2021 10:00 AM

ORE126: MP 1.34

Commercial Vehicle Information
Informational only
Details
OR126 Bus WB MP 1.34 (Willamette River Bridge - Springfield) Effective July 7, 2021, this section of OR126 Business westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is December 23, 2021.
Last Updated
7/25/2021 10:00 AM

ORE126: MP 1.69 to 2.46

Commercial Vehicle Information
Informational only
Details
OR126 Bus MP 1.70 to MP 2.50 (Springfield) Effective August 21, 2021, this section of OR126 Business eastbound and westbound will be closed between the hours of 5 PM & 10 PM for the Annual Car Cruise Event.
Last Updated
7/25/2021 10:00 AM

ORE126: MP 15.19

Commercial Vehicle Information
Informational only
Details
OR126 Right-of-Way MP 15.19 (Knowles Creek Bridge, east of Mapleton) Effective December 1, 2015, all vehicles must be centered on the bridge when crossing. This bridge is NOT on the OR126 mainline.
Last Updated
7/25/2021 10:00 AM

ORE126: MP 15.84

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective August 5, 2020, this section of OR126 eastbound and westbound is restricted to 16 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 16 feet 00 inches in width. Loads wider than 16 feet and/or 135 feet in overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
7/25/2021 10:00 AM

ORE126: MP 25 to 48

Crash/Hazard
Estimated delay of 20 minutes - 2 hours
Comments
Hazardous tree or vegetation. Use caution. Wildfire recovery work zone. Hazardous tree removal, cleanup and maintenance work on-going. Expect numerous work zones and delays.
Last Updated
6/30/2021 6:33 PM

ORE126: MP 27 to 36.7

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Expect brief delays. The westbound passing lane remains closed through the project. Earth work is underway on the uphill side Monday – Friday during the day. Flaggers are controlling traffic. Watch for trucks entering and leaving the project.
Last Updated
7/14/2021 9:05 PM

ORE126B: WB MP 1.3 to 1.4

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Work under the bridge continues with no impacts to traffic.
Last Updated
7/14/2021 9:04 PM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 EB and WB MP 3.23 (Panther Creek Bridge - Pacific City) Effective August 13, 2021, this section of OR130 eastbound and westbound will be closed all weekend starting Friday at 7 AM through Monday at 5 PM. The estimated completion date for this work is August 16, 2021.
Last Updated
7/25/2021 10:00 AM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/25/2021 10:00 AM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) Effective October 23, 2020, OR130 crossing Squaw Creek Bridge at MP 3.60 is restricted to the following weights: 25 tons for SU4 vehicles (4 axle single-unit trucks); 26 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/25/2021 10:00 AM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/25/2021 10:00 AM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/25/2021 10:00 AM

ORE138: EB MP 28 to 83

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. In general, expect delays up to 20 minute at each of several work zones along the North Umpqua corridor as crews remove hazard trees from last summer’s Archie Creek and Thielsen wildfires. Watch for flaggers and pilot cars. In the Thielsen Fire area (milepost 76-80), contractors will remove hazard trees throughout July. Watch for flaggers and expect delays up to 20 minutes. Work is scheduled for Monday-Friday from 6 a.m. to 5 p.m., and Saturday from 6 a.m. to 3 p.m. In the Archie Creek Fire area (milepost 21-38), watch for intermittent lane closures with flaggers and delays. The amount of work in this area is expected to increase throughout July, resulting in numerous work zones and increased delays. When driving through a work zone, stay in your vehicle, do not pull over or stop on the side of the road.
Last Updated
7/18/2021 8:34 PM

ORE138: MP 38 to 55

Crash/Hazard
No to Minimum Delay
Comments
A wildfire in the area is causing no delays. The highway is open however fire conditions can change at any time. Watch for fire vehicles entering the highway.
Last Updated
7/23/2021 7:28 AM

ORE140: MP 3

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/19/2021 10:55 AM

ORE140: MP 3.74 to 4.75

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Survey and excavation work is scheduled, expect minor delays. Homedale is closed south of the intersection of South Klamath Falls Highway and Homedale, use signed detour route.
Last Updated
7/18/2021 8:23 PM

ORE140: MP 58

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/25/2021 8:12 AM

ORE140: MP 81

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
7/18/2021 9:26 AM

ORE153: MP 5.88

Commercial Vehicle Information
Informational only
Details
OR153 (Bellevue-Hopewell Hwy) MP 5.88 (Salt Creek Bridge - west of Amity) Effective June 18, 2020, OR153 crossing Salt Creek (Ash Swale) Bridge at MP 5.88 is restricted to 9 tons for all vehicles.
Last Updated
7/25/2021 10:00 AM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/25/2021 10:00 AM

ORE18: MP 48 to 50

Information
Future Event: Estimated delay under 20 minutes
Expected Start Date
7/30/2021 6:00:00 AM
Comments
A special event is taking place, use caution.
Last Updated
7/15/2021 1:22 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/25/2021 10:00 AM

ORE19: MP 119.5

Crash/Hazard
No to Minimum Delay
Comments
Rock fall has occurred causing damage to the pavement. Possible rough road, use caution.
Last Updated
5/12/2021 10:51 AM

ORE201: SB MP 0.02 to 0.41

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
7/18/2021 8:06 AM

ORE203: MP 15.93 to 17.18

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
7/24/2021 2:29 PM

ORE204: MP 20.78 to 40.25

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
A paving project is occurring. Traffic will be controlled with flaggers and a pilot car from 5am-7pm. Expect 20 min delays. Use caution.
Last Updated
7/19/2021 2:16 PM

ORE204: MP 40.3 to 40.73

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA curb ramps.
Last Updated
7/25/2021 3:20 PM

ORE207: MP 10 to 10.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Chip sealing operations are occurring. Use caution.
Last Updated
7/19/2021 12:34 PM

ORE211: MP 11.47 to 12

Construction Work
Estimated delay under 20 minutes
Comments
Daytime lane closures with flaggers directing traffic from 7 a.m. to 5 p.m. weekdays. Project Description: ODOT, in partnership with the City of Molalla, is making pedestrian and bicycle improvements in Molalla along the north side of Oregon 211 between Oregon 213 and North Hezzie Lane. This project will enhance safety, operations, and efficiency for people walking, biking, driving, rolling, and using transit in the area.
Last Updated
7/25/2021 8:27 AM

ORE211: MP 12.3 to 13.4

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/25/2021 8:27 AM

ORE211: MP 23.2 to 22.8

Construction Work
No to Minimum Delay
Comments
Daytime periodic traffic shifts, shoulder closures and pedestrian detours between 2nd Avenue and SE Acacia Road.
Last Updated
7/25/2021 8:29 AM

ORE212: MP 4.9

Commercial Vehicle Information
Informational only
Details
OR212 WB off-ramp to SE Mckinley Ave (Clackamas) Effective August 2, 2021, the OR212 westbound off-ramp to SE Mckinley Avenue will be intermittently closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 6, 2021.
Last Updated
7/25/2021 10:00 AM

ORE212: MP 8.06 to 5.38

Construction Work
Estimated delay under 20 minutes
Comments
Day and nighttime lane closures on OR 212 between I-205 and U.S. 26. Daytime lane closures with traffic shifts from 8 a.m. to 4 p.m. weekdays. Nighttime lane closures, traffic shifts and flaggers directing traffic from 8 p.m. to 6 a.m.
Last Updated
7/25/2021 8:28 AM

ORE213: MP 2.23

Commercial Vehicle Information
Informational only
Details
OR213 (NE 82nd Ave) MP 2.24 (UPRR Bridge - Portland) Effective November 21, 2019, OR213 crossing UPRR Bridge at MP 2.23 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE213: MP 15.08

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
7/13/2021 11:19 AM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/25/2021 10:00 AM

ORE219: MP 35.19 to 35.77

Commercial Vehicle Information
Informational only
Details
OR219 NB & SB MP 35.59 (Woodburn) Effective, August 9, 2021 this section of OR219 northbound and southbound will be closed at all hours Monday at 6 AM through Tuesday at 11:59 PM. The estimated completion date for this railroad work is August 10, 2021.
Last Updated
7/25/2021 10:00 AM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
7/25/2021 10:00 AM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
7/25/2021 10:00 AM

ORE22: MP 33 to 63

Crash/Hazard
Estimated delay of 20 minutes - 2 hours
Comments
OR22 is open to all traffic. Hazard tree removal, clean-up, and maintenance operations will be on-going. Monday-Friday 6AM to 8PM. Expect delays.
Last Updated
7/20/2021 2:23 PM

ORE221: MP 17.29 to 20.78

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution.
Last Updated
7/22/2021 1:57 PM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE224: MP 31.2 to 49.97

Crash/Hazard
Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
OR-224 is closed from Promontory Park to Ripplebrook Rd at mile post 31. FS Road 46 is closed as well. Use alternate route.
Last Updated
4/27/2021 9:49 AM

ORE224: MP 33.82 to 49.97

Commercial Vehicle Information
Informational only
Details
OR224 EB & WB MP 31.2 to MP 49.97 (Estacada) Effective February 26, 2021, this section of OR224 eastbound and westbound will be closed at all hours. The closure is due to the continuing wildfire cleanup work involving multiple work zones and lane closures.
Last Updated
7/25/2021 10:00 AM

ORE224: MP 33.82 to 38.77

Commercial Vehicle Information
Informational only
Details
OR224 EB & WB MP 35.50 to MP 36.20 (Estacada) Effective April 1, 2021, this section of OR224 eastbound and westbound will be restricted to 13 feet 00 inches in width at all hours. The estimated completion date for this project is August 27, 2021.
Last Updated
7/25/2021 10:00 AM

ORE224: MP 49.911

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
7/25/2021 10:00 AM

ORE237: MP 12.85 to 13.52

Commercial Vehicle Information
Informational only
Details
OR237 EB & WB MP 12.62 to MP 13.72 (Cove) On Saturday August 21, 2021 this section of OR237 eastbound and westbound will be closed between the hours of 9:30 AM & 11:00 AM for the Cove Cherry Festival Parade.
Last Updated
7/25/2021 10:00 AM

ORE237: MP 13.34 to 13.72

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
7/18/2021 8:04 AM

ORE237: MP 16.32 to 16.71

Commercial Vehicle Information
Informational only
Details
OR237 NB & SB MP 16.38 to MP 16.71 (Union) On Saturday, August 14, 2021, this section of OR237 (Main Street) northbound and southbound will be closed between the hours of 7 AM & 11 AM for the Grassroots Festival Parade.
Last Updated
7/25/2021 10:00 AM

ORE237: MP 31.54 to 32.09

Commercial Vehicle Information
Informational only
Details
OR237 NB & SB MP 31.54 to MP 32.09 (North Powder) On Saturday, July 31, 2021 this section of OR237 northbound and southbound will be closed between the hours of 11:30 AM and 1:30 PM for the Huckleberry Festival Parade.
Last Updated
7/25/2021 10:00 AM

ORE238: MP 33.53 to 33.97

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. • Jacksonville: Monday-Friday, 7 a.m. to 3:30 p.m. watch for workers and 7 a.m. lane closures on the above Jacksonville streets due to sidewalk curb ramp construction. The crews are finishing work in Jacksonville prior to the Britt Festival. Eagle Point: Beginning July 18, Crystal Drive at OR 62 will be closed for one week for ramp reconstruction. Other Eagle Point intersections to follow include: • Old Highway 62 intersection: July 25 • Nita Way intersection: Aug. 1 This bundle includes work on Oregon 62 in the Medford, White City and Eagle Point areas.
Last Updated
7/18/2021 8:41 PM

ORE241: MP 4.5 to 6.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures. Most delays in mid-July will be 5-10 minutes, but motorist should expect frequent 20 minute delays through late July and August. Traffic control will be provided by flaggers.
Last Updated
7/18/2021 8:29 PM

ORE244: MP 35.5 to 36.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Traffic is controlled by flaggers and a pilot car 24/7. Expect delays of 10 to 15 minutes at all times. Use caution. Work is for slope repair and rockfall mitigation. Expect delays of up to 15 minutes at all times.
Last Updated
7/24/2021 6:51 AM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/25/2021 10:00 AM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/25/2021 10:00 AM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/25/2021 10:00 AM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) Effective May 27, 2021, OR27 crossing Bear Creek Bridge is restricted to the following weights: 34 tons for SU6 vehicles (6 axle single-unit trucks); 35 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE281: MP 12.9

Commercial Vehicle Information
Informational only
Details
OR281 MP 12.90 (E Fork Hood River Bridge - Dee) Effective March 26, 2021, OR281 crossing E Fork Hood River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 36 tons for SU7 vehicles.
Last Updated
7/25/2021 10:00 AM

ORE3: MP 42.83 to 43.13

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work will consist of upgrades to the ADA ramps.
Last Updated
7/24/2021 2:21 PM

ORE31: MP 2.5

Crash/Hazard
No to Minimum Delay
Comments
A disabled vehicle is creating a hazard causing no to minimum delays. Use caution.
Last Updated
7/11/2021 1:53 PM

ORE31: MP 73 to 86

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
A wildfire is in the area. Fire equipment and activity is taking place near the highway. Watch for fire equipment entering the highway.
Last Updated
7/23/2021 7:25 AM

ORE334: MP 17.34

Commercial Vehicle Information
Informational only
Details
OR334 NB & SB MP 17.34 to MP 17.42 (Athena) On Friday, July 30, 2021, this section of OR334 northbound and southbound will be closed between the hours of 5 PM and 10 PM for the City of Athena Night Out.
Last Updated
7/25/2021 10:00 AM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/25/2021 10:00 AM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/25/2021 10:00 AM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Effective March 24, 2021, Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 12 tons for all vehicles.
Last Updated
7/25/2021 10:00 AM

ORE34: MP 35.62

Construction Work
Future Event: Informational only
Expected Start Date
9/10/2021 7:00:00 AM
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Bridge work has been rescheduled. Work will now occur September 10-12, NOT July 23-26, 2021. This will require a full road closure and detour.
Last Updated
7/15/2021 7:37 PM

ORE34: MP 35.62

Commercial Vehicle Information
Informational only
Details
OR34 EB & WB MP 35.62 (Maltby Creek Bridge - Alsea) Effective September 10, 2021, this section of OR34 eastbound and westbound will be closed all weekend starting Friday at 7 AM through Monday at 10 AM. The estimated completion date for this work is September 13, 2021.
Last Updated
7/25/2021 10:00 AM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Last Updated
7/25/2021 10:00 AM

ORE361: MP 1.38

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
7/19/2021 9:53 AM

ORE38: MP 37.9

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/28/2021 9:53 AM

ORE39: MP -3.9

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/27/2021 5:29 PM

ORE39: MP -3

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
7/25/2021 9:57 AM

ORE39: EB MP 2 to 4.26

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Cleanup work is scheduled during the day, no delays expected.
Last Updated
7/18/2021 8:22 PM

ORE39: MP 3.5

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
7/16/2021 9:06 AM

ORE39: MP 4.77

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/25/2021 9:02 AM

ORE42: MP 0.07

Commercial Vehicle Information
Informational only
Details
OR42 EB MP 0.07 (Coos Bay) Effective July 12, 2021, this section of OR42 eastbound will be restricted to 17 feet 00 inches in width at all hours. Loads over 17 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this emergency work is September 20, 2021.
Last Updated
7/25/2021 10:00 AM

ORE42: WB MP 5.9

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/19/2021 11:12 AM

ORE42: MP 9.6 to 15.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will repave more than 5 miles of Oregon 42 through Coquille, level the roadway between West Central Blvd. and the Oregon 42S junction (milepost 9.9-10.8), replace ADA sidewalk ramps and make other improvements. Watch for intermittent lane closures on Oregon 42.
Last Updated
7/18/2021 8:28 PM

ORE42: MP 25.8

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
7/15/2021 11:28 AM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/08/2021 4:53 PM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/11/2021 8:22 AM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/25/2021 8:30 AM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/08/2021 4:53 PM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/11/2021 8:22 AM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/25/2021 8:30 AM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/08/2021 4:53 PM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/11/2021 8:22 AM

ORE43: NB MP 0.31

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
7/25/2021 8:30 AM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
7/25/2021 10:00 AM

ORE47: MP 64.6

Commercial Vehicle Information
Informational only
Details
OR47 MP 64.60 (Beaver Creek Bridge - south of Vernonia) Effective September 23, 2019, OR47 crossing Beaver Creek Bridge at MP 64.60 is restricted to the following weights: 31 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
7/25/2021 10:00 AM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) Effective September 23, 2019, OR53 crossing Jack Horner Creek Bridge at MP 5.98 is restricted to the following weights: 26 tons for SU4 (4 axle single-unit trucks); 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE53: MP 17.76

Commercial Vehicle Information
Informational only
Details
OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE542: MP 11.55

Commercial Vehicle Information
Informational only
Details
OR542 NB & SB MP 11.94 to MP 12.10 (Powers) Effective July 20, 2021, this section of OR542 northbound and southbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is September 30, 2021.
Last Updated
7/25/2021 10:00 AM

ORE542: MP 12

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will replace the existing culvert at Long Tom Creek with a 130-foot long concrete bridge. Traffic is limited to a single lane through the work zone until September. A temporary signal will provide traffic control. Expect brief delays. There will be pushbuttons on the signal to accommodate bicycles and pedestrians.
Last Updated
7/18/2021 8:30 PM

ORE569: MP 9.53 to 9.89

Commercial Vehicle Information
Informational only
Details
OR569 EB & WB MP 9.50 to MP 10.00 (Eugene) Effective June 27, 2021, this section of OR569 eastbound and westbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 16, 2021.
Last Updated
7/25/2021 10:00 AM

ORE569: MP 9.89

Commercial Vehicle Information
Informational only
Details
OR569 EB off-ramp to OR132/Delta Hwy SB (Eugene) Effective July 25, 2021, the OR569 eastbound off-ramp to OR132/Delta Hwy southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM. The estimated completion date for this project is July 30, 2021.
Last Updated
7/25/2021 10:00 AM

ORE569: MP 10.08

Commercial Vehicle Information
Informational only
Details
OR569 WB on-ramp from OR132/Delta Hwy NB (Eugene) Effective July 18, 2021, the OR569 westbound on-ramp from OR132/Delta Hwy northbound will be intermittently closed. The estimated completion date for this project is July 29, 2021.
Last Updated
7/25/2021 10:00 AM

ORE569: WB MP 10.1

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. The new intersection from eastbound Beltline to north and southbound Delta Highway is open. Traffic is controlled by a new traffic light on Delta Highway. Most work affecting traffic occurs at nights: southbound Delta to eastbound Beltline ramp closures and detours to place barrier and guardrail, and eastbound Beltline lane closures for median barrier work. Daytime crews are building the approach to the new bridge for the off-ramp from northbound Delta to westbound Beltline. Closure of the current northbound Delta ramp to westbound Beltline will begin Sunday night, July 18 and continue to Wednesday, July 28. Traffic will be detoured to turn left at Green Acres onto the ramp to westbound Beltline. This turn will only be in place for the detour period.
Last Updated
7/22/2021 5:09 AM

ORE569: MP 10.26

Commercial Vehicle Information
Informational only
Details
OR569 WB off-ramp to OR132/Delta Hwy (Eugene) Effective July 29, 2021, the OR569 westbound off-ramp to OR132/Delta Hwy will be intermittently closed at night between the hours of 9 PM & 5 AM. The estimated completion date for this work is July 30, 2021.
Last Updated
7/25/2021 10:00 AM

ORE6: MP 35

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays. Use caution.
Last Updated
5/29/2021 8:07 AM

ORE62: MP 99

Crash/Hazard
No to Minimum Delay
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
6/29/2021 7:23 AM

ORE66: MP 8 to 28

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Monday - Thursday, 6 a.m. – 5 p.m., expect flaggers, short delays and single-lane traffic as crews perform maintenance paving.
Last Updated
7/18/2021 8:36 PM

ORE70: MP 6.34 to 6.97

Commercial Vehicle Information
Informational only
Details
OR70 EB & WB MP 6.34 to MP 6.97 (Bonanza) On July 31, 2021 this section of OR70 eastbound and westbound will be closed between the hours of 10:30 AM and 12:00 PM for the Town Parade.
Last Updated
7/25/2021 10:00 AM

ORE8: MP 0.15

Commercial Vehicle Information
Informational only
Details
OR8 NB off-ramp to Sylvan Rd (Portland) Effective July 6, 2021, the OR8 northbound off-ramp to Sylvan Road will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

ORE8: MP 0.15

Commercial Vehicle Information
Informational only
Details
OR8 WB MP 0.06 to MP 0.15 (Portland) Effective August 9, 2021, this section of OR8 westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

ORE8: MP 0.15

Commercial Vehicle Information
Informational only
Details
OR8 NB off-ramp to Sylvan Rd (Portland) Effective July 6, 2021, the OR8 northbound off-ramp to Sylvan Road will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

ORE8: MP 0.15

Commercial Vehicle Information
Informational only
Details
OR8 WB MP 0.06 to MP 0.15 (Portland) Effective August 9, 2021, this section of OR8 westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

ORE8: MP 0.15

Commercial Vehicle Information
Informational only
Details
OR8 NB off-ramp to Sylvan Rd (Portland) Effective July 6, 2021, the OR8 northbound off-ramp to Sylvan Road will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. The estimated completion date for this project is July 25, 2021.
Last Updated
7/25/2021 10:00 AM

ORE8: MP 0.15

Commercial Vehicle Information
Informational only
Details
OR8 WB MP 0.06 to MP 0.15 (Portland) Effective August 9, 2021, this section of OR8 westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 6 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2021.
Last Updated
7/25/2021 10:00 AM

ORE82: MP 1.29

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
7/24/2021 2:24 PM

ORE82: MP 1.74 to 2.49

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
7/24/2021 2:23 PM

ORE82: MP 11.98 to 12.45

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. The project is for upgrades to the ADA ramps.
Last Updated
7/24/2021 2:23 PM

ORE82: MP 19 to 19.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Temporary traffic signal to control traffic 24/7. Expect up to 20 minute delay. Use caution. Bridge work - Removal of existing overlay and old parapet rail. Bridge width reduction to 14 foot wide loads.
Last Updated
7/24/2021 6:56 AM

ORE82: MP 19.2

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 19.00 to MP 19.30 (Elgin) Effective April 1, 2021, this section of OR82 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this project is August 1, 2021.
Last Updated
7/25/2021 10:00 AM

ORE82: MP 19.62 to 20.56

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
7/24/2021 2:22 PM

ORE82: MP 64.49 to 65.74

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work will consist of an upgrade to the ADA ramps.
Last Updated
7/24/2021 2:21 PM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
7/25/2021 10:00 AM

ORE99: MP -0.36

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
Last Updated
7/25/2021 10:00 AM

ORE99: MP 0.48 to 1.33

Commercial Vehicle Information
Informational only
Details
OR99 NB & SB MP 0.48 to MP 1.33 (Grants Pass) Effective April 19, 2021, this section of OR99 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2021.
Last Updated
7/25/2021 10:00 AM

ORE99: MP 1.41

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/25/2021 10:00 AM

ORE99: MP 25.35 to 26.55

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 25.37 to MP 26.54 (Dundee) Effective April 1, 2021, this section of OR99W northbound and southbound will be restricted to 10 feet 00 inches in width between the hours of 4 AM & 7 PM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2022.
Last Updated
7/25/2021 10:00 AM

ORE99: MP 32.18 to 32.97

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 32.00 to MP 33.00 (Lafayette) Effective June 23, 2021, this section of OR99W northbound and southbound will be restricted to 10 feet 00 inches in width at all hours. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 3, 2021.
Last Updated
7/25/2021 10:00 AM

ORE99: MP 111.28 to 114.3

Crash/Hazard
Estimated delay under 20 minutes
Comments
A fire is in the area. Use caution.
Last Updated
7/22/2021 3:10 PM

ORE99E: MP 5.93

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
6/28/2021 1:58 PM

ORE99W: SB MP 25.37 to 26.54

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. On OR99W between MP 25.37 and 26.54 Motorists should expect the following: During the daytime, one lane of traffic, each direction, will be open to traffic. Expect Intermittent, lane closures with flaggers, Pacific Hwy West (OR99W), MP 25.37 to MP 26.58. Nightly, Sunday night through Friday morning, between 7:00 p.m. and 4:00 a.m.
Last Updated
7/01/2021 9:51 PM

ORE99W: MP 29.79 to 36.36

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Motorist should expect narrow lanes and long delays in the City of Lafayette. Additional lane closures may occur intermittently as follows: •MP 29.79 (OR18 Junction) to MP 31.34 (McDougall Road). Daily, Monday through Thursday, between 9:00 a.m. and 11:00 a.m. Nightly, Sunday night through Friday morning, between 6:00 p.m. and 7:00 a.m. •MP 31.34 (McDougall Road) to MP 32.97 (Mineral Springs Road). Daily, any time. •MP 32.97 (Mineral Springs Road) to MP 35.18 (Riverside Drive). Daily, Monday through Thursday, between 9:00 a.m. and 4:00 p.m. Nightly, Sunday night through Friday morning, between 6:00 p.m. and 6:00 a.m. •MP 35.18 (Riverside Drive) to MP 36.36 (McDonald Way). Nightly, Sunday night through Friday morning, between 7:00 p.m. and 10:00 a.m.
Last Updated
7/01/2021 9:50 PM

ORE99W: MP 31 to 33

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Alternating traffic with flaggers and pilot cars. Expect delays.
Last Updated
7/07/2021 6:16 PM

ORE99W: NB MP 84.28 to 86.08

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Outside lane closures may occur as needed on OR 99W between 9 a.m. and 4 p.m. Expect delays Monday through Friday. Early morning work hours and outside lane closures begin July 7 between 5:30 a.m. and 7:00 a.m. northbound and 5:30 a.m. to 7:30 a.m. southbound.
Last Updated
7/15/2021 7:26 AM