Statewide Oregon Local Events
Current Events By Agency
Road Closed and Hewitt Park Closed
Construction - Closed
- Direction Impacted
- Both
- Comments
Hewitt Park is getting stream bank restoration and will be closed until mid-November.
Sorry for the inconvenience.
- Public Contact
- Doni Bruland
- Baker County Parks Department
- Phone: (541) 519-1719
- Email: parks@bakercountyor.gov
- Event Id
- 4417
- Updated
- 8/13/2024 3:01 PM
MP 10.7, Lobster Valley Road, Alsea
Construction - High Impact
- Comments
One Lane traffic only. Truck traffic through the corridor is discouraged and over-dimensional loads are prohibited until such time as the road is repaired.
- Public Contact
- Gordon Kurtz
- Benton County Public Works
- Phone: (541) 766-6006
- Email: amelia.miller@bentoncountyor.gov
- Event Id
- 3102
- Updated
- 5/16/2024 1:21 PM
South Steens Campground to Big Indian Gorge -
Hazard - Closed
- Comments
Access on the Steens Mountain Loop Road, from South Steens Campground to Big Indian Gorge Overlook, is closed while stabilization work is done on a rockfall that happened in the area in 2023. This work could take several weeks. South Steens Campground is still open and accessible.
- Public Contact
- Tara Thissell
- Bureau of Land Management - Burns District
- Phone: (541) 573-4519
- Email: tthissell@blm.gov
- Event Id
- 4471
- Updated
- 9/10/2024 1:51 PM
Big Indian Gorge + 1-2 miles
Hazard - Closed
- Comments
***STABILIZATION WORK BEGAN SEPTEMBER 9! The work could take several weeks. Also note that Big Indian Trail, at the base of Big Indian Gorge, will be closed for the duration.
This section of road, from Big Indian Gorge Overlook + 1-2 miles, WILL REMAIN CLOSED UNTIL FURTHER NOTICE. This closure prevents continuous travel around the entire Steens Mountain Loop Road. You can still access all the major points of interest, but some destinations will require and "out and back" trip. In 2023, there was a rockfall on this area of the road. This section of the road was closed for the entire visitor season in 2023 and remains closed at this time. Once it is stabilized, that section of the road will open to motorized travel.
- Public Contact
- Tara Thissell
- Bureau of Land Management - Burns District
- Phone: (541) 573-4519
- Email: tthissell@blm.gov
- Event Id
- 4224
- Updated
- 9/10/2024 1:47 PM
8th Avenue Streetscape Project
Construction - High Impact
- Comments
The project will repave sections of 8th Avenue from Lincoln Street to Mill Street, convert the section to a two-way street, construct protected bike lanes from High Street to Lincoln Street, add 4-way stops at key intersections, and widen sidewalks and reconstruct sidewalk access ramps.
Motor vehicle parking on the south side of 8th Avenue will be removed and parking on the north side will be relocated away from the curb, to allow for the protected bike lanes. The project aims to create a safe travel option for community members of all ages and abilities to access Downtown Eugene.
Expect periodic closures and equipment and workers in the roadway. Follow signed detours.
- Public Contact
- Rachael Love
- City of Eugene
- Phone: (541) 501-0379
- Email: RLove@eugene-or.gov
- Event Id
- 4091
- Updated
- 4/16/2024 8:54 AM
Shute Road from Cornell Rd to Brookwood Parkway
Construction - Low Impact
- Comments
Construction for a multi-use path on the west side of Shute Road will include lane closures and delays for utilities work and widening. Traffic control includes flaggers.
Shute Road Multi-Use Path | Engage Hillsboro (hillsboro-oregon.gov)
- Public Contact
- Ryan Godsey
- City of Hillsboro
- Phone: (503) 681-6480
- Email: Ryan.Godsey@hillsboro-oregon.gov
- Event Id
- 4466
- Updated
- 9/10/2024 9:36 AM
SE Francis Street from Imlay to SE 65th Ave
Construction - Low Impact
- Comments
Paving
- Public Contact
- Sheri Markwardt
- City of Hillsboro
- Phone: (503) 681-5219
- Email: sheri.markwardt@hillsboro-oregon.gov
- Event Id
- 4468
- Updated
- 9/09/2024 10:30 PM
Centennial Blvd. paving inlay
Construction - Low Impact
- Comments
Thursday, September 12, from 7 a.m. until approximately 5 p.m., Centennial Boulevard at Market Street will be reduced to one travel lane with flaggers directing traffic through the one-lane work zone. Market Street will also be closed to through traffic between L Street and Parker Street with no turns from Centennial Blvd.
- Public Contact
- Ben Gibson
- City of Springfield
- Phone: (541) 726-3761
- Email: bgibson@springfield-or.gov
- Event Id
- 4478
- Updated
- 9/12/2024 8:06 AM
Centennial Blvd. paving inlay
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Thursday, September 12, from 7 a.m. until approximately 5 p.m., Centennial Boulevard at Market Street will be reduced to one travel lane with flaggers directing traffic through the one-lane work zone. Market Street will also be closed to through traffic between L Street and Parker Street with no turns from Centennial Blvd.
- Public Contact
- Ben Gibson
- City of Springfield
- Phone: (541) 726-3761
- Email: bgibson@springfield-or.gov
- Event Id
- 4477
- Updated
- 9/12/2024 8:05 AM
Mill Street Reconstruction
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Mill Street is restricted to one-way northbound traffic between Main Street and Centennial Boulevard for the Mill Street Reconstruction project. Detours are in place with signs and flaggers directing traffic.
https://bit.ly/MillStreetreconstruction
- Public Contact
- Kristi Krueger
- City of Springfield
- Phone: (541) 726-4584
- Email: kkrueger@springfield-or.gov
- Event Id
- 4464
- Updated
- 9/09/2024 10:05 AM
42nd Street Overlay from International Paper to Marcola Road
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Expect minor delays during construction with flaggers controlling traffic as needed. This information will be updated as the project progresses.
A paving grind and inlay is being applied to 42nd St. between International Paper and Marcola Rd. Work is ongoing and includes new striping and signing. In addition, to meet current standards, existing Americans with Disabilities Act (ADA) sidewalk ramps are being updated. https://bit.ly/42overlay
- Public Contact
- Kristi Krueger
- City of Springfield
- Phone: (541) 726-4584
- Email: kkrueger@springfield-or.gov
- Event Id
- 4463
- Updated
- 9/09/2024 9:57 AM
SW Boeckman Rd between SW Stafford Rd and SW Canyon Creek Rd
Construction - Closed
- Direction Impacted
- Both
- Comments
Ongoing construction on SW Boeckman Rd between SW Stafford Rd and SW Canyon Creek Rd. Full closure in both directions until April 2025.
- Public Contact
- Zach Weigel
- City of Wilsonville
- Phone: (503) 570-1565
- Email: weigel@ci.wilsonville.or.us
- Event Id
- 3786
- Updated
- 1/22/2024 7:46 AM
SW 65th Ave and SW Stafford Rd
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
A construction signal has been installed at the intersection of SW 65th Ave and SW Stafford Road starting in November 2023. Expect intermittent delays.
- Public Contact
- Zach Weigel
- City of Wilsonville
- Phone: (503) 570-1565
- Email: weigel@ci.wilsonville.or.us
- Event Id
- 3673
- Updated
- 11/07/2023 3:15 PM
Beginning July 15th Ziak-Gnat Creek Lane will be closed to all through traffic at the Supply Creek Bridge
Construction - Closed
- Comments
Upcoming Closures
Beginning July 15th Ziak-Gnat Creek Lane will be closed to all through traffic at the Supply Creek bridge (between HWY 30 and Aldrich Point Road) for a bridge repair project. Utilize Valley Creek Lane and Brownsmead Hill Road as an alternative route. Detour signs will be in place during the closure. Ziak-Gnat Creek Lane will be closed at the bridge for approximately 8 weeks.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 4193
- Updated
- 6/11/2024 10:48 AM
Dolphin Road Bridge
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type 3 Truck - 10 Ton Max GVW
Type 3S2 Truck - 20 Ton Max GVW
Type 3-3 Truck - 35 Ton Max GVW
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 626
- Updated
- 2/15/2024 8:01 AM
Rippett Road Milepost 0.12 at Circle Creek Bridge
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type EV3 truck - 32 tons
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 4025
- Updated
- 2/01/2024 11:55 AM
North Fork Klaskanine River Bridge, Olney Cutoff Road
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type 3 Truck - 25 Tons
Type 3S2 Truck - 31 Tons
Type 3-3 Truck - 30 Tons
SHVs
SU4 - 22 Tons
SU5 & SU6 - 21 Tons
SU7 - 22 Tons
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 3730
- Updated
- 9/19/2023 1:45 PM
Youngs River Road -- Miles Crossing to Tucker Creek Lane Closed to All Trucks Over 26,000 LBS
Vehicle Restriction - Low Impact
- Comments
Youngs River Road is closed (North & Southbound Lanes) to all truck traffic over 26,000 LBS from Miles Crossing through Tucker Creek Lane.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 2811
- Updated
- 4/17/2023 12:22 PM
Lewis and Clark Road milepost 3.43 at McEwan Slough Bridge Load Restriction
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Specialized Hauling Vehicles (SHVs)
SU6 Vehicles (6 Axles) 31 Ton Max GVW
SU7 Vehicles (7 Axles) 32 Ton Max GVW
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 1990
- Updated
- 4/17/2023 12:21 PM
Youngs River Road -- Miles Crossing to Tucker Creek Lane
Vehicle Restriction - Low Impact
- Comments
Youngs River Road is closed to all truck traffic over 26,000 LBS from Miles Crossing to Tucker Creek Lane.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@co.clatsop.or.us
- Event Id
- 2810
- Updated
- 11/14/2022 7:55 AM
East Rim Drive from Skell Head to Phantom Ship Overlook
Construction - Closed
- Direction Impacted
- Both
- Comments
Road is closed due to a major construction project.
- Public Contact
- Marsha McCabe
- Crater Lake National Park
- Phone: (541) 594-3100
- Email: CRLA_Information_Requests@nps.gov
- Event Id
- 4392
- Updated
- 8/14/2024 11:25 AM
RIVER SUMMIT DR (45 RD)
Special Event - Closed
- Direction Impacted
- Both
- Comments
Fire activity in the area, road closed until further notice.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: road@deschutes.org
- Event Id
- 4469
- Updated
- 9/11/2024 10:35 AM
POWELL BUTTE HWY/BUTLER MKT RD ROUNDABOUT
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Road work occurring at Powell Butte Hwy/Butler Market Rd intersection. Expect intermittent delays. Use caution for construction vehicles & equipment entering/exiting the roadway.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: road@deschutes.org
- Event Id
- 4418
- Updated
- 8/14/2024 6:39 AM
HUNNELL RD
Construction - Closed
- Direction Impacted
- Both
- Comments
Hunnell Rd closed to traffic between Loco Rd and Bowery Ln. Use alternate route.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: road@deschutes.org
- Event Id
- 4177
- Updated
- 6/03/2024 8:54 AM
Quines Creek Rd / BLM Road 33-5-1.1
Hazard - Closed
- Direction Impacted
- Both
- Comments
Road Closed. Large berm of debris blocking access from both directions of travel.
- Public Contact
- Larissa May
- Douglas County
- Phone: (541) 464-6307
- Email: lrmay@co.douglas.or.us
- Event Id
- 2882
- Updated
- 12/17/2022 7:29 AM
County Road 63, Izee-Paulina Lane:WILDFIRE
Hazard - Closed
- Comments
Road closed to through traffic.
Residential and emergency personnel only!!!
- Public Contact
- Alan Hickerson
- Grant County Road Department
- Phone: (541) 575-0138
- Email: hickersona@grantcounty-or.gov
- Event Id
- 4461
- Updated
- 9/12/2024 12:09 PM
Grant County Road # 40 Antone Hwy Rd.;WILDFIRE!!
Hazard - Closed
- Comments
Closed to through traffic.
Residential and emergency vehicles only!!!
- Public Contact
- Alan Hickerson
- Grant County Road Department
- Phone: (541) 575-0138
- Email: hickersona@grantcounty-or.gov
- Event Id
- 4470
- Updated
- 9/10/2024 8:33 AM
County Road # 42; Southfork Road -WILDFIRE!
Hazard - Closed
- Comments
Road closed to through traffic.
Emergency vehicles and local residents only.
- Public Contact
- Alan Hickerson
- Grant County Road Department
- Phone: (541) 575-0138
- Email: hickersona@grantcounty-or.gov
- Event Id
- 4457
- Updated
- 9/07/2024 7:07 AM
Tiller Trail Highway approximately milepost 45
Hazard - High Impact
- Comments
A portion of this road to the north in Douglas County is impacted due to a fire hazard. Expected delays and use alternate routes if possible to avoid the fire area.
- Public Contact
- J Domis
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 4411
- Updated
- 8/14/2024 11:26 AM
Foothill Road - Corey Road to East Vilas Road
Construction - High Impact
- Direction Impacted
- Both
- Comments
Beginning 7/29/24 a temporary closure will impact travel between Corey Road and areas to the south. Multiple closures will be in place. Local traffic only will be allowed. No thru traffic will be allowed between Corey Road and Coker Butte Road. This particular closure is to improve culvert and irrigation facilities to allow future widening of the roadway.
A major, multi-year construction project is occurring on Foothill Road between Hillcrest Road and Dry Creek Road which impacts both City of Medford and Jackson County roadways. Detailed information and impacts can be found at the Foothill Road Improvement Project Page.
Expect delays as well as temporary closures with detours. Please use caution and obey all traffic control devices and personnel for safety.
- Public Contact
- Colton Minton
- Jackson County Roads
- Phone: (541) 774-6201
- Email: mintoncd@jacksoncountyor.gov
- Event Id
- 4321
- Updated
- 7/24/2024 3:30 PM
Foothill Road - Hillcrest Road to Dry Creek Road
Construction - High Impact
- Direction Impacted
- Both
- Comments
A major, multi-year construction project is occurring on Foothill Road between Hillcrest Road and Dry Creek Road which impacts both City of Medford and Jackson County roadways. Detailed information and impacts can be found at the Foothill Road Improvement Project Page.
Expect delays as well as temporary closures with detours. Please use caution and obey all traffic control devices and personnel for safety.
- Public Contact
- Mary Dillinger
- ODOT
- Phone: (541) 621-3074
- Email: mary.dillinger@odot.oregon.gov
- Event Id
- 4186
- Updated
- 6/06/2024 2:08 PM
Foothill Road - Hillcrest Road to Dry Creek Road
Construction - High Impact
- Direction Impacted
- Both
- Comments
A major, multi-year construction project is occurring on Foothill Road between Hillcrest Road and Dry Creek Road which impacts both City of Medford and Jackson County roadways. Detailed information and impacts can be found at the Foothill Road Improvement Project Page.
Expect delays as well as temporary closures with detours. Please use caution and obey all traffic control devices and personnel for safety.
- Public Contact
- Mary Dillinger
- ODOT
- Phone: (541) 621-3074
- Email: mary.dillinger@odot.oregon.gov
- Event Id
- 4185
- Updated
- 6/06/2024 2:08 PM
Foothill Road - Hillcrest Road to Dry Creek Road
Construction - High Impact
- Direction Impacted
- Both
- Comments
A major, multi-year construction project is occurring on Foothill Road between Hillcrest Road and Dry Creek Road which impacts both City of Medford and Jackson County roadways. Detailed information and impacts can be found at the Foothill Road Improvement Project Page.
Expect delays as well as temporary closures with detours. Please use caution and obey all traffic control devices and personnel for safety.
- Public Contact
- Mary Dillinger
- ODOT
- Phone: (541) 621-3074
- Email: mary.dillinger@odot.oregon.gov
- Event Id
- 4184
- Updated
- 6/06/2024 2:08 PM
Foothill Road - Hillcrest Road to Dry Creek Road
Construction - High Impact
- Direction Impacted
- Both
- Comments
A major, multi-year construction project is occurring on Foothill Road between Hillcrest Road and Dry Creek Road which impacts both City of Medford and Jackson County roadways. Detailed information and impacts can be found at the Foothill Road Improvement Project Page.
Expect delays as well as temporary closures with detours. Please use caution and obey all traffic control devices and personnel for safety.
- Public Contact
- Mary Dillinger
- ODOT
- Phone: (541) 621-3074
- Email: mary.dillinger@odot.oregon.gov
- Event Id
- 4183
- Updated
- 6/06/2024 2:07 PM
Foothill Road - Hillcrest Road to Dry Creek Road
Construction - High Impact
- Direction Impacted
- Both
- Comments
A major, multi-year construction project is occurring on Foothill Road between Hillcrest Road and Dry Creek Road which impacts both City of Medford and Jackson County roadways. Detailed information and impacts can be found at the Foothill Road Improvement Project Page.
Expect delays as well as temporary closures with detours. Please use caution and obey all traffic control devices and personnel for safety.
- Public Contact
- Mary Dillinger
- ODOT
- Phone: (541) 621-3074
- Email: mary.dillinger@odot.oregon.gov
- Event Id
- 4182
- Updated
- 6/06/2024 2:07 PM
Table Rock Road - Water Line Project
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
NOTE: Please watch for reduced speed zones (such as 35 MPH) in portions of this construction zone.
Medford Water Commission is installing a new 42" water line along Table Rock Road from near the Rogue River south to Vilas Road. The project will begin in February 2024 and will extend through January 2025. More information and details can be found at MedfordWater.org/TableRock.
Watch for construction, slow down in work areas throughout this extended project area, obey all signs and traffic control workers. Expect delays and use alternate routes if possible.
- Public Contact
- Lester McFall
- Medford Water Commission
- Phone: (541) 774-2675
- Email: lester.mcfall@medfordwater.org
- Event Id
- 4020
- Updated
- 3/27/2024 8:47 AM
NE Brown Dr Between Loucks Rd and End of Pavement
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4435
- Updated
- 8/19/2024 11:37 AM
Loucks Rd Between Bean Dr and NUID Canal
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction on the roads indicated in orange ink on the attached maps. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4434
- Updated
- 8/19/2024 11:35 AM
James Dr
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4432
- Updated
- 8/19/2024 11:11 AM
Teresa Dr, Jason Dr & James Dr
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4431
- Updated
- 8/19/2024 11:10 AM
SE Dover Ln Between S Adams Dr & SE Baldwin Dr
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4430
- Updated
- 8/19/2024 11:08 AM
Roberta Dr Between Burns Ln and Madras City Limits
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4427
- Updated
- 8/19/2024 11:06 AM
Ashwood Rd between SW Bear Dr & NW Deschutes Dr
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4429
- Updated
- 8/19/2024 11:05 AM
Burns Ln
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4428
- Updated
- 8/19/2024 11:00 AM
Rimrock Dr
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4426
- Updated
- 8/19/2024 10:48 AM
Belmont Ln between Elk Dr & Madras City Limits
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4425
- Updated
- 8/19/2024 10:44 AM
Ramms Rd Between Hwy 26 and Grizzly Rd
Construction - Low Impact
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4423
- Updated
- 8/19/2024 10:35 AM
Bear Dr Between Eureka Ln and Belmont Ln
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Beginning August 28, 2024, Jefferson County Public Works will begin road construction in the form of Chip Seal, which is a multi-phase process beginning with the application of chip rock which is compacted into the surface and allowed time to embed and cure for about 2 weeks. The crew will return after that process to fog seal and then paint stripe the roads. The process should be completed mid to late September, please expect delays and drive slowly during construction. Weather, equipment breakdowns and resource availability may cause adjustments to the time schedule.
- Public Contact
- Jefferson County Public Works
- Jefferson County Public Works
- Phone: (541) 475-4459
- Email: cbridges@jeffco.net
- Event Id
- 4424
- Updated
- 8/19/2024 10:35 AM
Aurther Street form Shasta way to S. 6th Street.
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Road closure with possible detours. 7 am. to 7 pm. Please use an alternate route.
- Public Contact
- Jeremy Morris
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 4458
- Updated
- 9/04/2024 2:40 PM
Sprague River Road
Hazard - Low Impact
- Direction Impacted
- Both
- Comments
Fire recovery in vicinity of Sprague River Road. Road is open, please slow down and use caution as private contractors, utility workers, fire fighters, etc. will be working on cleanup activities.
- Public Contact
- Jeremy Morris
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 4456
- Updated
- 9/04/2024 8:05 AM
Laverne Avenue from Altamont to Crest Street.
Construction - High Impact
- Direction Impacted
- Both
- Comments
Road construction is taking place. The road will be closed at times throughout the day. Please use an alternate route.
- Public Contact
- Jeremy Morris
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 4443
- Updated
- 8/26/2024 1:13 PM
Shasta Way (Homedale to Patterson)
Construction - High Impact
- Direction Impacted
- Both
- Comments
Daytime/weekday lane closures with flaggers to facilitate construction of sidewalks. Please use alternative routes to reduce congestion in construction zone.
- Public Contact
- Klamath County Public Works
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 4380
- Updated
- 8/05/2024 10:18 AM
Brice Creek Road
Hazard - Closed
- Comments
Brice Creek Road is closed starting at milepost 0 (at Layng Creek Road) due to wildfire.
The closure will remain in effect until further notice.
- Public Contact
- Public Works
- Lane County Government
- Phone: (541) 682-6900
- Email: publicinformation@lanecountyor.gov
- Event Id
- 4300
- Updated
- 9/09/2024 9:17 AM
Sharps Creek Road
Hazard - Closed
- Direction Impacted
- Both
- Comments
Sharps Creek Road is closed until further notice due to wildfire.
MP 0.00 (Row River Rd) to MP 4.50 (Pony Creek Rd) - The road is closed for all recreational purposes. It remains open to residents in the area and light commercial use.
MP 4.50 (Pony Creek Rd) to MP 17.745 – IS CLOSED TO ALL TRAFFIC
- Public Contact
- Public Works
- Lane County Government
- Phone: (541) 682-6900
- Email: publicinformation@lanecountyor.gov
- Event Id
- 4301
- Updated
- 9/09/2024 9:17 AM
Row River Rd at M.P. 8.72
Construction - Low Impact
- Comments
Lane County will be performing construction work to replace failing culvert under Row River Road to mitigate the risk of future landslides. The work will take place at four different locations between May 20, 2024 and Fall of 2024. Each culvert replacement will require a full road closure of 4-6 weeks.
Park Access -
West End of Row River Road
M.P. 6.10 Army Corps Roundabout
M.P. 6.40 Row Point
M.P. 7.40 Harms Park Boat Ramp
East End of Row River Road
M.P. 9.50 Bake Stewart Park
This notice is for the fourth and final road closure, which is expected to be complete around September 30, 2024.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 4446
- Updated
- 8/28/2024 2:59 PM
South 28th St., Springfield, OR
Construction - Low Impact
- Comments
Lane County in partnership with City of Springfield will be installing storm sewer facilities, grading, and paving along S 28th St, from F St. heading south for approximately 1500 ft. Construction work starts on January 17th, 2024 and the project contract end date is December 31, 2024. Please obey the traffic control signs and flaggers. Please use caution and slow down through work zones to improve safety and efficiency.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 3937
- Updated
- 6/20/2024 7:07 AM
N Game Farm Rd M.P. 0.59 to M.P. 1.69
Construction - Low Impact
- Comments
Lane County will be upgrading ADA curb ramps, paving, signing and doing traffic signal modifications on N Game Farm Rd, starting February 20, 2024. The project contract end date is December 31, 2024. Please obey the traffic control signs and flaggers. Please use caution and slow down through work zones to improve safety and efficiency.
- Public Contact
- Derek Jensen
- Lane County Government
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 4029
- Updated
- 6/20/2024 7:02 AM
South Beaver Creek Road
Construction - Moderate Impact
- Comments
South Beaver Creek Road is closed to traffic in both directions approximately 1 mile south of North Beaver Creek Road.
- Public Contact
- Mikel Diwan
- Lincoln County Public Works
- Phone: (541) 265-5747
- Email: mdiwan@co.lincoln.or.us
- Event Id
- 4270
- Updated
- 7/17/2024 7:13 AM
South Beaver Creek Road at Bayview Road
Detour - Moderate Impact
- Direction Impacted
- Both
- Comments
South Beaver Creek Road is closed from North Beaver Creek Road to North Bayview Road due to construction. Local access only.
- Public Contact
- Mikel Diwan
- Lincoln County Public Works
- Phone: (541) 265-5747
- Email: mdiwan@co.lincoln.or.us
- Event Id
- 4269
- Updated
- 7/17/2024 7:12 AM
South Beaver Creek Road at North Beaver Creek Road
Detour - Low Impact
- Direction Impacted
- Both
- Comments
South Beaver Creek Road is closed from North Beaver Creek Road to North Bayview Road due to construction. Local access only.
- Public Contact
- Mikel Diwan
- Lincoln County Public Works
- Phone: (541) 265-5747
- Email: mdiwan@co.lincoln.or.us
- Event Id
- 4268
- Updated
- 7/17/2024 7:09 AM
Cascade Highway Resurfacing
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Planned work for this project includes isolated pavement repairs, milling and replacing the top 3” of existing asphalt pavement, installing centerline rumble strips, striping, and shoulder rock.
This work is planned to be completed between June 10, 2024 and August 31, 2024. Please note that due to a contract change, a section of striping work between Riches Rd and State St will be completed in September. Construction hours for this project are 7:00am to 5:00pm.
Please note that the paving contractor, Roy Houck Construction, will be responsible for establishing the construction schedule for each section of road.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4114
- Updated
- 8/26/2024 4:36 PM
Torvend Rd Realignment
Construction - Closed
- Direction Impacted
- Both
- Comments
Marion County Public Works will be closing Torvend Road on Monday, May 13th, 2024 for a Construction Project. The road will remain closed until October 31, 2024. Emergency and Local traffic will not be allowed through the closure area.
Please note that a portion of Hazelgreen Road will also be closed for the duration of the Torvend Road closure.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4117
- Updated
- 6/28/2024 10:47 AM
Meridian Bridge Repair
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Scour repairs and foundation strengthening at the abutments and piers, and to install new approach guardrails to County Bridge #2504A.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4122
- Updated
- 6/06/2024 1:29 PM
River Rd
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Marion County's contractor, Mid Valley Excavation, will install updated curve warning signs.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4147
- Updated
- 5/13/2024 10:46 AM
Vitae Springs/Orville Rd
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Marion County's contractor, Mid Valley Excavation, will install updated curve warning signs.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4146
- Updated
- 5/13/2024 10:43 AM
Abiqua Rd Curve Signing
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Marion County's contractor, Mid Valley Excavation, will install updated curve warning signs.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4145
- Updated
- 5/13/2024 10:41 AM
Hazelgreen Bridge Replacement
Construction - Closed
- Direction Impacted
- Both
- Comments
Marion County Public Works will be closing Hazelgreen Road on Monday, May 13th, 2024 for a Construction Project and the replacement of Bridge #05387.The road will remain closed until October 31st, 2024. A detour will be in place during construction. Emergency and Local traffic will not be allowed through the closure area.
Please note that Torvend Road will also be closed for some time during the Hazelgreen Road closure. Construction will be by Farline Bridge.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4116
- Updated
- 5/13/2024 9:33 AM
Rambler Bridge Rehabilitation
Construction - Low Impact
- Direction Impacted
- Both
- Comments
The rehabilitation will include replacing the rotting timber decking system and installing a new deck membrane and deck joints to protect the timber girders and pile caps, installing new bridge rails to improve roadway safety and installing new guardrail and guardrail transitions at the bridge approaches.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4124
- Updated
- 4/24/2024 4:43 PM
Connecticut Av Sidewalks
Construction - Low Impact
- Direction Impacted
- Both
- Comments
The project involves the completion of urban bicycle and ADA compliant pedestrian facilities along Connecticut Avenue SE between Macleay Road/Pennsylvania Avenue and Rickey Street/Macleay Road.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4123
- Updated
- 4/24/2024 4:35 PM
Elma Av Safe Routes to Schools
Construction - Low Impact
- Direction Impacted
- Both
- Comments
A new walkway and sidewalk infill will be constructed on the east side of Elma Av. Enhanced safety measures such as high-visibility signing and striping will also be installed at Elma and Mahrt. Traffic calming measures will be constructed at the intersections near the school- at Elma & Beck and Elma & Durbin.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4121
- Updated
- 4/24/2024 4:26 PM
Elma Av Safe Routes to Schools
Construction - Low Impact
- Direction Impacted
- Both
- Comments
A new walkway and sidewalk infill will be constructed on the east side of Elma Av. Enhanced safety measures such as high-visibility signing and striping will also be installed at Elma and Mahrt. Traffic calming measures will be constructed at the intersections near the school- at Elma & Beck and Elma & Durbin.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4120
- Updated
- 4/24/2024 4:25 PM
Brown's Island Bridge
Construction - No Impact
- Direction Impacted
- Both
- Comments
A large culvert at the public entrance to Brown's Island Landfill is failing. This project will construct a new bridge over the existing culvert to ensure continued public access.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4119
- Updated
- 4/24/2024 4:17 PM
Hazelgreen Bridge detour
Detour - Low Impact
- Direction Impacted
- Both
- Comments
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4118
- Updated
- 4/24/2024 4:03 PM
Salmon Falls Park Closed Due to Wildfire Damage
Hazard - Closed
- Comments
Marion County anticipates it will take two to three years to fully rebuild county parks following the Beachie Creek and Lionshead fires. We appreciate the public's partnership as we make the park safe for visitors.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 588-5036
- Email: jogden@co.marion.or.us
- Event Id
- 1500
- Updated
- 4/24/2024 11:28 AM
Minto Park Closed Due to Wildfire Damage
Hazard - Closed
- Comments
Marion County anticipates it will take two to three years to fully rebuild county parks following the Beachie Creek and Lionshead fires. We appreciate the public's partnership as we make the park safe for visitors.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 588-5036
- Email: jogden@co.marion.or.us
- Event Id
- 1501
- Updated
- 4/24/2024 11:27 AM
Niagara Park Closed Due to Wildfire Damage
Hazard - Closed
- Comments
Marion County anticipates it will take two to three years to fully rebuild county parks following the Beachie Creek and Lionshead fires. We appreciate the public's partnership as we make the park safe for visitors.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 588-5036
- Email: jogden@co.marion.or.us
- Event Id
- 1503
- Updated
- 4/24/2024 11:26 AM
Hayesville Dr Improvements
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Carter and Company construction has been contracted to complete bicycle and pedestrian improvements on Hayesville Drive between Portland Road and Fuhrer Street.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 2778
- Updated
- 10/26/2022 10:45 AM
Altman from Lusted to County Line
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Temporary lane closures for striping and installing shoulder gravel
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 4462
- Updated
- 9/07/2024 5:31 PM
Dodge Park Blvd/ Cottrell intersection, Cottrell Road (between Dodge Park Boulevard and Carpenter Lane), & Carpenter Lane (east of Cottrell Road)
Construction - Low Impact
- Comments
Work to improve the Carpenter Lane access to the filtration facility site is ongoing, including paving the road and the temporary pedestrian path on Carpenter Lane and installing retaining wall and right turn lane at Dodge Park Boulevard and Cottrell Road.
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 4239
- Updated
- 9/07/2024 5:13 PM
416, Clark Street, Wasco 406, Vista Drive, Rufus
Vehicle Restriction - Low Impact
- Direction Impacted
- Both
- Comments
Length restrictions permits required
- Public Contact
- Mark Coles
- sherman county road department
- Phone: (541) 565-3271
- Email: markc@co.sherman.or.us
- Event Id
- 2869
- Updated
- 12/06/2022 1:52 PM
Cape Kiwanda Parking Lot under construction.
Construction - High Impact
- Direction Impacted
- Both
- Comments
A portion of the parking lot is open, but construction is still going on.
Alternate parking locations include the Lightwave lot, County boat launch off of Sunset Drive, Bob Straub State Park.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 3480
- Updated
- 8/22/2024 4:17 PM
Big Trout Bridge CLOSED
Vehicle Restriction - Closed
- Direction Impacted
- Both
- Comments
Big Trout Bridge is closed.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 662
- Updated
- 8/22/2024 4:16 PM
Savage Road - Active Slide Zone
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Savage Road is an active slide area and is load limited to 22.5 Tons
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 4200
- Updated
- 6/17/2024 12:28 PM
Sandlake Road
Hazard - Low Impact
- Comments
Sandlake Road (between Pacific City and Tierra Del Mar) is now open to one lane with automatic signal device for traffic control.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 3875
- Updated
- 3/06/2024 3:01 PM
Cape Meares Loop
Vehicle Restriction - Low Impact
- Direction Impacted
- Both
- Comments
The new alignment of Cape Meares Loop is OPEN.
There are sections of steep 12 percent grades, plan your trip accordingly.
Tillamook County Public Works will close the road during snow/ice events.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 3479
- Updated
- 11/21/2023 8:57 AM
Old Wheeler Mohler Road, Nehalem
Hazard - Closed
- Direction Impacted
- Both
- Comments
Slide area. Repairs are being designed.
After slide repairs, road to remain gated for emergency access only.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 2424
- Updated
- 6/07/2022 7:57 AM
Browning Bridge Weight Restriction
Vehicle Restriction - High Impact
- Comments
Weight Limit: 6 Axle = 32 Ton, 7 Axle = 32 Ton
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 2418
- Updated
- 6/02/2022 3:25 PM
Prince Bridge
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Prince Bridge located at 0.48 mile on Blum Lane is Load Rated for 3 Tons.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 2030
- Updated
- 11/24/2021 9:51 AM
Salmonberry Bridge Weight Restriction
Vehicle Restriction - Moderate Impact
- Comments
Salmonberry Bridge is load rated at 14 tons for all vehicles.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 751
- Updated
- 10/20/2021 12:35 PM
South Road bridge over Upper Tualatin River
Construction - Closed
- Direction Impacted
- Both
- Comments
Use alternate route; bridge replacement.
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7822
- Email: heather_sturgill@washingtoncountyor.gov
- Event Id
- 4438
- Updated
- 8/20/2024 4:50 PM
Springville Road, between PCC Rock Creek and Court Yards at Springville
Construction - Closed
- Direction Impacted
- Both
- Comments
Use alternate route
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7822
- Email: Heather_Sturgill@washingtoncountyor.gov
- Event Id
- 4333
- Updated
- 7/25/2024 5:20 PM
Stringtown Road, between Sylvia Lane and Prickett Creek
Construction - Closed
- Direction Impacted
- Both
- Comments
Use alternate route.
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7822
- Email: heather_sturgill@washingtoncountyor.gov
- Event Id
- 4332
- Updated
- 7/25/2024 5:15 PM
River Road south of Farmington Road
Construction - Closed
- Direction Impacted
- Both
- Comments
Use alternate route.
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7822
- Email: heather_sturgill@washingtoncountyor.gov
- Event Id
- 4331
- Updated
- 7/25/2024 5:12 PM
Timber Road
Hazard - Closed
- Comments
Timber Road closed indefinitely between Strassel and Cochran roads due to landslide activity.
- Public Contact
- Chris Lueneburg
- Washington County
- Phone: (971) 330-8276
- Email: chris_lueneburg@washingtoncountyor.gov
- Event Id
- 3572
- Updated
- 7/05/2024 1:23 PM
Timber Road
Hazard - Closed
- Comments
Timber Road closed indefinitely between Strassel and Cochran roads due to landslide activity.
- Public Contact
- Chris Lueneburg
- Washington County
- Phone: (971) 330-8276
- Email: chris_lueneburg@washingtoncountyor.gov
- Event Id
- 3571
- Updated
- 7/05/2024 1:23 PM
Scholls Ferry Rd, Roy Rogers to Murray
Construction - Moderate Impact
- Comments
Expect lane restrictions for drinking water pipeline construction. 6:30 am to 5:30 pm Monday through Friday, with the exception of work at most intersections and other potential activities scheduled for nighttime work.
- Public Contact
- David Marciniak
- Willamette Water Supply Program
- Phone: (503) 941-4570
- Email: info@ourreliablewater.org
- Event Id
- 4024
- Updated
- 4/12/2024 10:49 AM