Southwest Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure with Detour

I-5, Intersection with Pacific Highway ORE99 MP 45

Road maintenance operations has closed the road; a detour is in place. Use an alternate route. Ramps Affected.
Updated
8/12/2020 10:00:00 PM

Closure

I-405, Interstate 5 MP 4

Roadwork has the ramp from I-405 Northbound to I-5 Southbound closed, use alternate route.
Updated
8/12/2020 8:46:00 PM

I-5: MP 4.63 to 5.71

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 4.5 to MP 6.5 (Ashland) Effective April 3, 2020, this section of I-5 northbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is August 25, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 5.37 to 5.71

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 6 on- and off-ramp to/from OR273 (Ashland) Effective April 16, 2020, the I-5 northbound Exit 6 on- and off-ramp to/from OR273 will be closed at all hours. The estimated completion date for this project is August 25, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 5.39

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 5.39 (Ashland) Effective April 3, 2020, this section of I-5 northbound will be restricted to 18 feet 8 inches in height at all hours. The estimated completion date for this project is August 25, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: SB MP 45

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. This week, Sunday through Thursday nights (July 26-30), southbound I-5 traffic will detour from Exit 48 (Rogue River) to Exit 43a between 10 p.m. and 5 a.m. Expect single-lane traffic an hour before and after the closure and detour. The contractor is currently finishing the deck work and will transition to the bridge joints.
Last Updated
8/10/2020 1:05 AM

I-5: NB MP 45

Maintenance Work
Closure with Detour
Lanes Affected
(Northbound) 2 Lanes
Comments
Road maintenance operations has closed the road; a detour is in place. Use an alternate route. Ramps Affected.
Last Updated
8/12/2020 10:00 PM

I-5: MP 45.45 to 45.72

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 45.44 to MP 45.72 (Rogue River) Effective June 7, 2020, this section of I-5 northbound will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is August 28, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 45.45 to 45.72

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 45.44 to MP 45.72 (Rogue River) Effective May 31, 2020, this section of I-5 northbound will be restricted to 13 feet 00 inches in width Sunday nights between the hours of 9 PM & 6 AM; and Monday through Thursday nights between the hours of 7 PM & 6 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is August 28, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 45.66 to 45.47

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 45.72 to MP 45.44 (Rogue River) Effective July 12, 2020, this section of I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is August 28, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 45.66 to 45.47

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 45.72 to MP 45.44 (Rogue River) Effective May 17, 2020, this section of I-5 southbound will be restricted to 13 feet 00 inches in width Sunday nights between the hours of 9 PM & 6 AM; and Monday through Thursday nights between the hours of 7 PM & 6 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is August 28, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 45.82

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Valley of the Rogue State Park (Rogue River) Effective July 12, 2020, the I-5 southbound on-ramp from Valley of the Rogue State Park will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is August 28, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 45.95

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Valley of the Rogue State Park (Rogue River) Effective June 7, 2020, the I-5 northbound on-ramp from Valley of the Rogue State Park will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is August 28, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 58.34

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 58 off-ramp to OR99/US199 (Grants Pass) Effective July 6, 2020, the I-5 southbound Exit 58 off-ramp to OR99/US199 will be restricted to 10 feet 00 inches in width at all hours. The estimated completion date for this project is August 14, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: NB MP 71.9

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Construction is taking place under the I-5 bridges on Leland Road and does not impact I-5 traffic. On Leland Road, watch for intermittent lane closures. Traffic control will be provided by flaggers or a portable traffic signal.
Last Updated
8/10/2020 1:04 AM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
8/12/2020 7:02 PM

I-5: MP 116.43 to 112.66

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 117.74 to MP 112.64 (Roseburg) Effective May 16, 2020, this section of I-5 southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 1, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: SB MP 118 to 113

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane , Shoulder (Northbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project (www.RobertsMountain.com) will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction will continue until summer 2021. On Roberts Mountain (MP 118-116), the speed limit has been reduced to 55 mph in the southbound direction. The southbound shoulder is closed in this area. Trucks should use the right lane in both northbound and southbound directions. Roberts Mountain Road is limited to a single lane at milepost 3, at the south foot of the mountain, for construction of a retaining wall. Traffic control is provided by a temporary signal. Motorists can expect brief delays. Throughout the work zone, watch for intermittent lane and shoulder closures, and for construction vehicles entering and exiting the travel lanes.
Last Updated
8/10/2020 1:02 AM

US101: MP 297 to 297.5

Information
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays. Use caution.
Last Updated
7/29/2020 7:29 AM

US101: MP 304 to 333

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will level and pave portions of U.S. 101 that have sunk during last winter’s storms. Watch for intermittent lane closures and expect delays under 20 minutes. Flaggers and pilot cars will provide traffic control as needed.
Last Updated
8/10/2020 12:57 AM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
8/12/2020 7:02 PM

US101: MP 312.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will rebuild the shoulder and stabilize the slope along the southbound lane using soil nails, long metal rods that are installed in the ground under the road to improve ground stability. Construction will require lane and shoulder closures. Watch for traffic control devices. Speed advisories will be in place during construction.
Last Updated
8/10/2020 12:57 AM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

US101: MP 327 to 328

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will provide several repairs to the U.S. 101 Rogue River Bridge at the north end of Gold Beach. Construction is scheduled to be completed in November. Watch for intermittent weeknight single-lane closures on the bridge (7 p.m. to 7 a.m., Sunday night to Friday morning). Motorists should expect nighttime delays up to 20 minutes. Flaggers will provide traffic control as needed. Nearby residents and businesses should expect noise due to saw-cutting and other construction.
Last Updated
8/10/2020 12:58 AM

US199: MP 3.07 to 1.24

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Traffic will be controlled by flaggers.
Last Updated
8/10/2020 1:04 AM

US97: MP 273 to 273.89

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 273.00 to MP 274.00 (Klamath Falls) Effective August 31, 2020, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width Monday through Thursday between the hours of 6 AM & 5 PM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is September 3, 2020.
Last Updated
8/12/2020 4:22 PM

US97: MP 274.69 to 275.93

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 274.00 to MP 276.00 (Klamath Falls) Effective August 24, 2020, this section of US97 northbound and southbound will be intermittently restricted to 11 feet 00 inches in width Monday through Thursday between the hours of 6 AM & 5 PM. Loads over 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is September 3, 2020.
Last Updated
8/12/2020 4:22 PM

US97: MP 275.931

Commercial Vehicle Information
Informational only
Details
US97 NB MP 275.931 (Klamath Falls) Effective August 24, 2020, this section of US97 northbound will be intermittently restricted to 16 feet 7 inches in height Monday through Thursday between the hours of 6 AM & 5 PM. Loads over 16 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is September 3, 2020.
Last Updated
8/12/2020 4:22 PM

US97: MP 278.42 to 279.96

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 278 to MP 280 (Klamath Falls) Effective August 17, 2020, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width Monday through Thursday between the hours of 6 AM & 5 PM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2020.
Last Updated
8/12/2020 4:22 PM

US97: MP 280.51 to 291.71

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Shoulder, paving and delineator work is scheduled during the night Sunday thru Thursday morning expect 20 minute delays.
Last Updated
8/10/2020 12:55 AM

ORE140: MP 1.6

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures and flagger control on Oregon 140 as trucks enter and exit the work zone. The work zone speed limit is 45 mph. Completion is scheduled for the end of October.
Last Updated
8/10/2020 1:06 AM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
8/12/2020 7:02 PM

ORE255: MP 350 to 362

Construction Work
Informational only
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is or will be occurring. Use caution. Motorists on Oregon 255 (Carpenterville Highway) should expect 20 minute delays the weeks of August 17-21 and August 24-28 due to a chip seal project.The project, a joint effort by ODOT and Curry County, will resurface the final 12 miles at the south end of the highway (milepost 350-362). Construction is scheduled Monday to Friday each week, from 7 a.m. to 7 p.m. Flaggers and pilot cars will be used to provide traffic control. Motorists are advised to slow down and drive with caution to avoid kicking up loose rock during construction.
Last Updated
8/10/2020 1:10 AM

ORE39: MP 0.12 to 6.28

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Shoulder, guardrail, and clean up work is scheduled during the day Monday thru Friday - expect expect minor delays.
Last Updated
8/10/2020 12:54 AM

ORE42: MP 55 to 60

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will seal cracks in all travel lanes between Camas Valley and Tenmile. All work is expected to be completed by the end of August. Motorists should watch for intermittent lane closures in both directions. Watch for construction equipment entering and exiting the work zone.
Last Updated
8/10/2020 12:59 AM

ORE542: MP 1.8

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will replace the existing Rhoda Creek culvert with a 17-foot diameter pipe that will provide better drainage and fish passage. The highway is limited to a single lane of travel. A temporary traffic signal has been installed. Flaggers may provide traffic control at times.
Last Updated
8/10/2020 12:56 AM

ORE542: MP 1.81 to 1.97

Commercial Vehicle Information
Informational only
Details
OR542 NB & SB MP 1.74 to MP 1.98 (Broadbent) Effective June 1, 2020, this section of OR542 northbound and southbound will be intermittently restricted to 15 feet 00 inches in width at all hours. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is September 18, 2020.
Last Updated
8/12/2020 7:02 PM