Northwest Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

I-405, Interstate 5 MP 4

Roadwork has the ramp from I-405 Northbound to I-5 Southbound closed, use alternate route.
Updated
8/12/2020 8:46:00 PM

Closure

ORE212, 1 mile West of Intersection with Mount Hood Highway US26 MP 8

OR 212 is closed between Boring and U.S. 26 until Aug 22nd. Use an alternate route.
Updated
8/12/2020 9:40:00 AM

Closure

ORE99W, Portland MP 0

Roadwork has the Steel Bridge closed in both directions. Use an alternate route.
Updated
8/3/2020 4:16:00 AM

I-205: MP 6.09

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 6 off-ramp to 10th St (Stafford) Effective September 16, 2020, the I-205 northbound Exit 6 off-ramp to 10th Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 17, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 8.5

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 8 off-ramp to OR43 (West Linn) Effective September 15, 2020, the I-205 northbound Exit 8 off-ramp to OR43 will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 16, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 9.23

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 9 to off-ramp OR99E (Clackamas) Effective July 5, 2020, the I-205 northbound Exit 9 off-ramp to OR99E will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: NB MP 9.31 to 13.46

Construction Work
No to Minimum Delay
Comments
Nighttime double lane closures on I-205 north starting between 9 p.m. and 5:30 a.m. Sunday through Thursday nights. Nighttime ramp closures will occur Sunday night on the I-205 south off-ramp to OR 99E and Monday night on the OR 99E on-ramp to I-205 north.
Last Updated
8/07/2020 11:58 AM

I-205: MP 9.52

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR99E (Clackamas) Effective July 5, 2020, the I-205 northbound on-ramp from OR99E will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 9.56

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 9 off-ramp to OR99E (Clackamas) Effective July 5, 2020, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 9.71 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 9.31 to MP 13.46 (Clackamas) Effective July 5, 2020, this section of I-205 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between 11 PM & 7 AM; and Saturday nights between 11 PM and 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 9.71 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 9.31 to MP 13.46 (Clackamas) Effective July 5, 2020, this section of I-205 northbound and southbound will be intermittently restricted to 16 feet 9 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between 11 PM & 7 AM; and Saturday nights between 11 PM and 8 AM. Loads over 16 feet 9 inches in height may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 9.98

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from OR213 NB (Clackamas) Effective July 5, 2020, the I-205 southbound on-ramp from OR213 northbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 9.99

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 10 off-ramp to OR213 SB (Clackamas) Effective July 5, 2020, the I-205 northbound Exit 10 off-ramp to OR213 southbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: NB MP 10.24 to 11.5

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane
Comments
Roadwork has the Northbound left lane closed, use caution.
Last Updated
8/12/2020 9:35 PM

I-205: MP 10.32

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 10 off-ramp to OR213 SB (Clackamas) Effective July 5, 2020, the I-205 southbound Exit 10 off-ramp to OR213 southbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 10.46

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR213 NB (Clackamas) Effective July 5, 2020, the I-205 northbound on-ramp from OR213 northbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 10.79

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from 82nd Drive (Clackamas) Effective July 5, 2020, the I-205 southbound on-ramp from 82nd Drive will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 10.83

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 11 off-ramp to 82nd Drive (Clackamas) Effective July 5, 2020, the I-205 northbound Exit 11 off-ramp to 82nd Drive will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 11.05

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 11 off-ramp to 82nd Drive (Clackamas) Effective July 5, 2020, the I-205 southbound Exit 11 off-ramp to 82nd Drive will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 11.13

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from 82nd Drive (Clackamas) Effective July 5, 2020, the I-205 northbound on-ramp from 82nd Drive will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 12.29

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from OR212 (Clackamas) Effective July 5, 2020, the I-205 southbound on-ramp from OR212 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 12.47

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 12 off-ramp to OR212 (Clackamas) Effective July 5, 2020, the I-205 northbound Exit 12 off-ramp to OR212 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 12.63

Commercial Vehicle Information
Informational only
Details
I-205 SB off-ramp to OR212 (Clackamas) Effective September 8, 2020, the I-205 southbound off-ramp to OR212 will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 9, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 12.63

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 12A off-ramp to OR212 EB (Clackamas) Effective July 5, 2020, the I-205 southbound Exit 12A off-ramp to OR212 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 12.87

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 12B off-ramp to OR212 WB/Webster Rd (Clackamas) Effective July 5, 2020, the I-205 southbound Exit 12B off-ramp to OR212 WB/Webster Rd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 12.94

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR212/OR224 (Clackamas) Effective July 5, 2020, the I-205 northbond on-ramp from OR212/OR224 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 13.11

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 13 off-ramp to OR213/82nd Ave NB/OR224 WB (Clackamas) Effective July 5, 2020, the I-205 northbound Exit 13 off-ramp to OR213/82nd Ave northbound/OR224 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 13.18

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from OR224 EB (Clackamas) Effective July 5, 2020, the I-205 southbound on-ramp OR224 EB will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM and 8 AM. Loads needing to use the ramp may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: SB MP 13.45 to 14.17

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
No traffic impacts.
Last Updated
7/31/2020 12:50 PM

I-205: SB MP 13.46 to 9.31

Construction Work
No to Minimum Delay
Comments
Nighttime double lane closures on I-205 north starting between 9 p.m. and 5:30 a.m. Sunday through Thursday nights. Daytime shoulder closures on on-ramps and at Exit 11 (toward Gladstone).
Last Updated
7/31/2020 12:51 PM

I-205: NB MP 13.95

Construction Work
Informational only
Comments
The I-205 off-ramp to Sunnybrook Rd will be closed 9 p.m. to 5:30 a.m. Tuesday, August 11 and Wednesday, August 12 for bridge deck seal.
Last Updated
8/07/2020 3:01 PM

I-205: MP 13.95

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 14 off-ramp to Sunnybrook Blvd (Clackamas) Effective August 11, 2020, the I-205 northbound Exit 14 off-ramp to Sunnybrook Boulevard will be closed at night between the hours of 9 PM & 5:30 AM. The estimated completion date for this work is August 14, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 14.31 to 14.94

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 14.00 to MP 15.00 (Harmony) Effective January 20, 2020, this section of I-205 northbound and southbound will be restricted to 12 feet 00 inches in width between the hours of 11 PM & 5 AM nightly. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 14.31 to 14.94

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 14.00 to MP 15.00 (Harmony) Effective January 20, 2020, this section of I-205 northbound and southbound will be restricted to 17 feet 1 inch in height between the hours of 11 PM & 5 AM nightly. Loads over 17 feet 1 inch in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-205: MP 20.02 to 19.24

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 19 on- and off-ramps to/from US26/Divison St (Portland) Effective August 25, 2020, the I-205 southbound Exit 19 off-ramps to US26/Divison Street and the I-205 southbound on-ramp from Division Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this project is August 26, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 20.62

Commercial Vehicle Information
Informational only
Details
I-205 SB off-ramp to Stark St (Portland) Effective August 31, 2020, the I-205 southbound off-ramp to Stark Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 1, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 20.99

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 21B off-ramp to I-84 WB (Portland) Effective September 3, 2020, the I-205 northbound Exit 21B off-ramp to I-84 westbound will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 4, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 21.55

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 21A off-ramp to Glisan St (Portland) Effective September 3, 2020, the I-205 southbound Exit 21A off-ramp to Glisan Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 4, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: MP 21.71

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 21B off-ramp to I-84 WB (Portland) Effective September 3, 2020, the I-205 southbound Exit 21B off-ramp to I-84 westbound will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 4, 2020.
Last Updated
8/12/2020 4:22 PM

I-205: SB MP 24.64

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Roadwork has the Southbound right lane closed, use caution.
Last Updated
8/12/2020 8:59 PM

I-405: MP 1.03

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Broadway/6th Ave (Portland) Effective April 8, 2019, the I-405 northbound on-ramp from Broadway/6th Ave will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 1.24

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1D to US26 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 1D off-ramp to US26 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: SB MP 1.46 to 3.98

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) Median
Comments
Nighttime ramp closures and lane closures. Nighttime ramp closures of the I-405 north ramp to I-5 south, and the N Going Street on-ramp to I-5 south from 8 p.m. to 6 a.m. Monday through Friday nights.
Last Updated
8/07/2020 11:59 AM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 MP 1.97 SW Taylor St crossing over I-405 (Portland) Effective June 18, 2020, SW Taylor Street crossing over I-405 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 GVW, Weight Table 2.
Last Updated
8/12/2020 7:02 PM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: SB MP 2.1 to 2.9

Construction Work
No to Minimum Delay
Comments
The I-405 southbound off ramp at NW Glisan Street will be closed 7/26-8/31 so PBOT can construct a pedestrian bridge over I-405. A full weekend closure of I-405 will be scheduled in November 2020 to erect the new bridge structure.
Last Updated
7/23/2020 5:14 PM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 2.451

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 2.451 (Portland) Effective May 15, 2020, this section of I-405 southbound will be intermittently restricted to 15 feet 11 inches in height starting Friday nights at 9 PM at all hours until Monday mornings at 10 AM. The estimated completion date for this project is August 3, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 2.451 to 2.12

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.12 to MP 2.45 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height and 15 feet 11 inches in height southbound Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 2.451

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2A off-ramp to Couch St/Burnside St (Portland) Effective September 10, 2020, the I-405 southbound Exit 2A off-ramp to Couch Street/Burnside Street will be closed at night between the hours of 9 PM & 1 AM. The estimated completion date for this work is September 11, 2020.
Last Updated
8/12/2020 4:22 PM

I-405: MP 2.62

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from NW Glisan St (Portland) Effective March 27, 2019, the I-405 northbound on-ramp from NW Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St/Everett St (Portland) Effective July 20, 2020, the I-405 southbound Exit 2B off-ramp to Glisan St/Everett St will be closed at all hours. The estimated completion date for this project is August 24, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: NB MP 2.9

Construction Work
No to Minimum Delay
Comments
Nighttime ramp closures and lane closures. Nighttime ramp closures of the I-405 north off-ramp to N Kerby Avenue, the N Cook Street/N Kerby Avenue on-ramp to I-405 south, and the N Going Street on-ramp to I-5 south from 8 p.m. to 6 a.m. Monday through Friday nights. Intermittent nighttime ramp closures of I-5 south to I-405 south, I-405 north to I-5 north, and I-405 north to U.S. 26 west from 8 p.m. from 8 p.m. to 6 a.m. Monday through Friday nights. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020.
Last Updated
7/31/2020 12:54 PM

I-405: MP 3.08 to 2.35

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 3.10 to MP 2.30 (Portland) Effective May 15, 2020, this section of I-405 southbound will be intermittently restricted to 17 feet 00 inches in width starting Friday nights at 9 PM at all hours until Monday mornings at 10 AM. The estimated completion date for this project is August 3, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: NB MP 3.5

Maintenance Work
Closure
Lanes Affected
(Northbound) Median , 1 Lane
Comments
Roadwork has the ramp from I-405 Northbound to I-5 Southbound closed, use alternate route. Ramps Affected.
Last Updated
8/12/2020 8:46 PM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective May 15, 2020, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday nights at 9 PM at all hours until Monday mornings at 10 AM. The estimated completion date for this project is August 3, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: NB MP 3.7

Construction Work
No to Minimum Delay
Comments
Nighttime ramp closures and lane closures. Nighttime ramp closures of the I-405 north off-ramp to N Kerby Avenue, the N Cook Street/N Kerby Avenue on-ramp to I-405 south, and the N Going Street on-ramp to I-5 south from 8 p.m. to 6 a.m. Monday through Friday nights. Intermittent nighttime ramp closures of I-5 south to I-405 south, I-405 north to I-5 north, and I-405 north to U.S. 26 west from 8 p.m. from 8 p.m. to 6 a.m. Monday through Friday nights. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020.
Last Updated
7/31/2020 12:54 PM

I-405: MP 4.14 to 3.2

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 4.14 to MP 3.20 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 16 feet 03 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: NB MP 271.5 to 259.1

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Motorist should expect lane closures at night. Sunday through Friday, between 7:00 p.m. to 9:00 a.m.
Last Updated
8/11/2020 4:24 AM

I-5: MP 271.85 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 259.00 to MP 272.00 (Woodburn) Effective May 24, 2020, this section of I-5 northbound and southbound will be intermittently restricted to 17 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is August 14, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 271.85 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 259.00 to MP 272.00 (Woodburn) Effective May 24, 2020, this section of I-5 northbound will be intermittently restricted to 16 feet 4 inches and I-5 southbound will be intermittently restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads over 16 feet 4 inches northbound and 16 feet 2 inches southbound in height may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is August 14, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 291.89

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 292A off-ramp to OR217 (Tigard) Effective September 24, 2020, the I-5 northbound Exit 292A off-ramp to OR217 will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 25, 2020.
Last Updated
8/12/2020 4:22 PM

I-5: MP 302.74 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 302.70 to MP 304.00 (Portland) Effective March 7, 2019, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound on-ramp from Greeley Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 303.15 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 303.15 to MP 303.98 (Portland) Effective March 7, 2019, I-5 northbound will be restricted to 15 feet 06 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 303.47

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 302B to I-405 SB (Portland) Effective April 8, 2019, the I-5 southbound exit 302B off-ramp to I-405 southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 303.81

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from N Going St (Portland) Effective March 27, 2019, the I-5 southbound on-ramp from N Going St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 303.98 to 303.16

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 303.98 to MP 303.16 (Portland) Effective March 7, 2019, this section of I-5 southbound will be restricted to 15 feet 05 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: SB MP 307.3 to 303.1

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. The closure is scheduled from 11 p.m. Saturday to 6 a.m. Sunday. Travel lanes and entrance and exit ramps on I-5 will close. Only one lane on the bottom deck of the Fremont Bridge (I-405) will remain open to access southbound I-5. Lane closures begin at 7 p.m. The Kerby off-ramp from I-405 north will also be closed. No traffic impacts May 17-23.
Last Updated
7/04/2020 6:43 PM

I-5: MP 307.49

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from OR99E/Marine Dr (Portland) Effective September 12, 2020, the I-5 northbound on-ramp from OR99E/Marine Drive will be closed at all hours. The estimated completion date for this project is September 20, 2020.
Last Updated
8/12/2020 4:22 PM

I-5: MP 307.53 to 308.38

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.50 to MP 308.38 (Portland) Effective August 1, 2020, this section of I-5 northbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5 AM; and Friday and Saturday nights between the hours of 11 PM & 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. The estimated completion date for this project is October 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: NB MP 307.75 to 308.38

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
8/17/2020 9:00:00 AM
Comments
The northbound span of the Interstate Bridge closes September 12–20, 2020. Road construction will occur Aug - Oct 2020. Travelers will experience bridge lifts, nighttime lane closures and intermittent nighttime ramp closures Aug - Oct 2020. Congestion and delays are expected during the closure of the northbound span of the I-5 Interstate Bridge Sept 12-20. Southbound travelers will also experience congestion traveling into Oregon in the 7 days following the closure, as one SB lane closes Sept 21-27.
Last Updated
8/07/2020 10:25 AM

I-5: MP 307.76

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.76 (Portland) Effective August 1, 2020, this section of I-5 northbound will be intermittently restricted to 18 feet 9 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM; and Friday and Saturday nights between the hours of 11 PM & 1/2 hour before sunrise. Loads over 18 feet 9 inches in height may be accommodated on a case-by-case basis. The estimated completion date for this project is October 31, 2020.
Last Updated
8/12/2020 7:02 PM

I-5: MP 307.76 to 308.38

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.75 to MP 308.38 (Portland) Effective September 12, 2020, this section of I-5 northbound will be restricted to 10 feet 00 inches in width between the hours of 2 AM & 1 PM. The estimated completion date for this project is September 20, 2020.
Last Updated
8/12/2020 4:22 PM

I-5: MP 307.97

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Jantzen Beach/Hayden Island Dr (Portland) Effective September 12, 2020, the I-5 northbound on-ramp from Jantzen Beach/Hayden Island Drive will be closed at all hours. The estimated completion date for this project is September 20, 2020.
Last Updated
8/12/2020 4:22 PM

I-5: SB MP 308.38 to 307.75

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
8/17/2020 9:00:00 AM
Comments
The northbound span of the Interstate Bridge closes September 12–20, 2020. NB & SB traffic will use 3 lanes of SB Bridge. Construction Aug-Oct 2020. Travelers will experience bridge lifts, nighttime lane closures and intermittent nighttime ramp closures Aug - Oct 2020. Congestion and delays are expected during the closure of the northbound span of the I-5 Interstate Bridge Sept 12-20. Southbound travelers will also experience congestion traveling into Oregon in the 7 days following the closure, as one SB lane closes Sept 21-27.
Last Updated
8/07/2020 10:24 AM

I-5: MP 308.38 to 307.76

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 308.38 to MP 307.75 (Portland) Effective September 12, 2020, this section of I-5 southbound will be restricted to 10 feet 00 inches in width between the hours of 12 PM (noon) & 3 AM. The estimated completion date for this project is September 20, 2020.
Last Updated
8/12/2020 4:22 PM

I-5: MP 308.38 to 307.76

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 308.38 to MP 307.75 (Portland) Effective September 21, 2020, this section of I-5 southbound will be restricted to 22 feet 6 inches in width at all hours. The estimated completion date for this project is September 27, 2020.
Last Updated
8/12/2020 7:02 PM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St/99th Ave (Portland) Effective September 3, 2020, the I-84 eastbound Exit 7 off-ramp to Halsey Street/99th Avenue will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 4, 2020.
Last Updated
8/12/2020 4:22 PM

I-84: MP 6.55

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 9 off-ramp to 102nd Ave/Fargo St (Portland) Effective August 31, 2020, the I-84 eastbound Exit 9 off-ramp to 102nd Avenue/Fargo Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 1, 2020.
Last Updated
8/12/2020 4:22 PM

I-84: MP 13.38

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 13 off-ramp to 181st Ave (Portland) Effective August 24, 2020, the I-84 westbound Exit 13 off-ramp to 181st Avenue will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is August 25, 2020.
Last Updated
8/12/2020 4:22 PM

I-84: MP 14.17

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 14 off-ramp to Fairview Pkwy (Fairview) Effective August 24, 2020, the I-84 eastbound Exit 14 off-ramp to Fairview Parkway will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is August 25, 2020.
Last Updated
8/12/2020 4:22 PM

I-84: WB MP 17 to 17.6

Construction Work
Estimated delay under 20 minutes
Frontage Road
Comments
Nighttime and daytime lane closures on Graham Road. Nighttime lane closures on I-84 east and west. Periodic daytime lane closures with flagging and shoulder closures on Graham Road weekdays and Nighttime lane closures between 7 p.m. and 6 a.m.
Last Updated
8/07/2020 11:56 AM

I-84: MP 17.56

Commercial Vehicle Information
Informational only
Details
I-84 EB on-ramp from Frontage and Graham Rd (Troutdale) Effective August 10, 2020, the I-84 eastbound on-ramp from Frontage and Graham Road will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5:30 AM. The estimated completion date for this project is August 14, 2020.
Last Updated
8/12/2020 7:02 PM

I-84: MP 17.571

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 17 off-ramp to Frontage Rd/Graham Rd (Troutdale) Effective August 17, 2020, the I-84 westbound Exit 17 off-ramp to Frontage and Graham Road will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5:30 AM. The estimated completion date for this project is August 21, 2020.
Last Updated
8/12/2020 7:03 PM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM &5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2020.
Last Updated
8/12/2020 7:02 PM

I-84: MP 40.14 to 41.9

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 40.00 to MP 42.00 (Cascade Locks) Effective August 9, 2020, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5:30 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 14, 2020.
Last Updated
8/12/2020 7:03 PM

I-84: MP 41.25

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 41.25 (Cascade Locks) Effective August 9, 2020, this section of I-84 eastbound will be restricted to 17 feet 3 inches in height Sunday through Thursday nights between the hours of 8 PM & 5:30 AM. Loads over 17 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 14, 2020.
Last Updated
8/12/2020 7:03 PM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 to Eagle Creek (Eagle Creek Bridge) Effective June 18, 2020, the I-84 EB Exit 41 ramp over Eagle Creek is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2. This restriction is NOT on the I-84 mainline.
Last Updated
8/12/2020 7:02 PM

I-84: MP 42.08 to 41.54

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 43.00 to MP 41.00 (Cascade Locks) Effective August 7, 2020, this section of I-84 westbound will be restricted to 15 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5:30 AM. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is August 14, 2020.
Last Updated
8/12/2020 7:02 PM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
8/12/2020 7:02 PM

US101: MP 4.9

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. US 101: Young’s Bay (New Youngs Bay) Bridge Repair Project Most of the work that impacts the travel lanes will be done at night when there will be one-lane closures during certain periods for the contractor to move equipment. A 14 day full night closure will occur later in the project while replacing the lift span bracing at the end of the project. The night closures will detour traffic onto U.S. 101 Business route.
Last Updated
8/09/2020 10:21 PM

US101: MP 4.91

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 4.53 to MP 5.33 (New Young's Bay Bridge - Astoria) Effective February 15, 2019, this section of US101 northbound and southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is January 10, 2022.
Last Updated
8/12/2020 7:02 PM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective July 1, 2020, US101 Business crossing the Old Youngs Bay Bridge is restricted to the following weights: 25 tons SU4 & SU5 (4 and 5 axle single unit trucks); 26 tons SU6 & SU7 (6 and 7 axle single-unit trucks); 20,000 single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1 for combinations.
Last Updated
8/12/2020 7:02 PM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Bus EB & WB MP 6.73 to MP 7.09 (Old Young's Bay Bridge - Astoria) Effective August 25, 2020, this section of US101 Business eastbound and westbound (Old Young's Bay Bridge) will be closed Tuesday the 25th from 8 AM till Thursday August 27th at 8 PM.
Last Updated
8/12/2020 7:02 PM

US101: MP 7.07

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
8/11/2020 11:08 AM

US101: MP 14 to 15

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
8/13/2020 7:00:00 PM
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
8/11/2020 11:22 AM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

US101: MP 82.74 to 83.08

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Use caution. US 101: Farmer Creek Bridge Sec. (Oregon Coast Highway, mileposts 82.74 to 83.08) There will be lane restrictions and flagging for duration of the project.
Last Updated
8/09/2020 10:21 PM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Devil’s Lake Outlet: The western bridge rail is being replaced and the sidewalk is closed for the next several months. Work continues underneath the bridge and steel plates are being used to protect the work crew. Short-term closures will be needed to move the steel plates as work progresses.
Last Updated
8/09/2020 9:50 PM

US101: MP 118.17

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Schooner Creek Bridge: A platform is being installed under the bridge and damaged concrete sections are being repaired. The western sidewalk is closed for approximately 2 months while the contractor replaces the bridge rail. Intermittent night time lane closures will be needed during that time. Expect minor delays.
Last Updated
8/09/2020 9:50 PM

US101: MP 126.2

Information
Informational only
Comments
The rest area is closed at this time.
Last Updated
7/07/2020 2:05 PM

US101: MP 137.24

Construction Work
No to Minimum Delay
Comments
Road construction is occurring. Use caution. Work during the day, Monday through Thursday, is not expected to cause travel delays. Watch for flaggers controlling traffic. Additional lane closures may occur between 7 p.m. and 6 a.m.
Last Updated
8/09/2020 10:04 PM

US101: MP 141.44 to 141.83

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Bridge work is occurring. Use caution. Expect minor delays.
Last Updated
8/12/2020 7:14 PM

US101: MP 141.44 to 141.83

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Bridge work is occurring. Use caution. Expect minor delays. Travelers should expect delays at night, Monday, Tuesday and Wednesday, Aug. 10, 11, and 12, from 7 p.m. until 6 a.m. each night. Traffic will be controlled by flaggers. Most work will take place under the bridge with little impact to traffic. Occasional night lane closures will be needed to set up scaffolding and move equipment into place. The eastern sidewalk will close soon for the duration of the project. A pedestrian detour will be installed, including a temporary flashing beacon crossing, at the south end of the bridge.
Last Updated
8/09/2020 10:09 PM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
8/12/2020 7:02 PM

US101B: MP 7.1 to 6.74

Maintenance Work
Future Event: Closure with Detour
Expected Start Date
8/25/2020 8:00:00 AM
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work has the highway closed; a detour is in place. Use an alternate route. The Old Youngs Bay Bridge will be closed August 25th at 8am until August 27th at 5pm, use HWY 101.
Last Updated
8/06/2020 1:36 PM

US26: MP 0.95 to 0.37

Commercial Vehicle Information
Informational only
Details
US26 EB MP 0.37 to MP 0.99 (Ross Island Bridge - Portland) Effective July 24, 2020, this section of US26 eastbound will be restricted to 17 feet 08 inches in height between the hours of 9 PM & 6 AM for bridge inspection. The estimated completion date for this work is July 25, 2020.
Last Updated
8/12/2020 7:02 PM

US26: MP 7.5 to 7.95

Construction Work
No to Minimum Delay
Comments
Daytime lane closures from 7 a.m. to 5 p.m. with flaggers intermittently directing traffic.
Last Updated
8/07/2020 11:59 AM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective January 4, 2019, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 30 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

US26: MP 56.98

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 57 off-ramp to NW Glencoe Rd (North Plains) Effective September 28, 2020, the US26 eastbound Exit 57 off-ramp to NW Glencoe Road will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 29, 2020.
Last Updated
8/12/2020 4:22 PM

US26: MP 57.33

Commercial Vehicle Information
Informational only
Details
US26 WB Exit 57 off-ramp to NW Glencoe Rd (North Plains) Effective September 28, 2020, the US26 westbound Exit 57 off-ramp to NW Glencoe Road will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 29, 2020.
Last Updated
8/12/2020 4:22 PM

US26: MP 58.42

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 59 off-ramp to Jackson School Rd (Hillsboro) Effective September 28, 2020, the US26 eastbound Exit 59 off-ramp to Jackson School Road will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 29, 2020.
Last Updated
8/12/2020 4:22 PM

US26: MP 59.02

Commercial Vehicle Information
Informational only
Details
US26 WB Exit 59 off-ramp to Jackson School Rd (Hillsboro) Effective September 28, 2020, the US26 westbound Exit 59 off-ramp to Jackson School Road will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 29, 2020.
Last Updated
8/12/2020 4:22 PM

US26: MP 60.86

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 61 off-ramp to NE Brookwood Pkwy (Hillsboro) Effective September 30, 2020, the US26 eastbound Exit 61 off-ramp to NE Brookwood Parkway will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is October 1, 2020.
Last Updated
8/12/2020 4:22 PM

US26: MP 61.07

Commercial Vehicle Information
Informational only
Details
US26 WB Exit 61A to NE Brookwood pkwy (Hillsboro) Effective September 30, 2020, the US26 westbound Exit 61A off-ramp to NE Brookwood Parkway will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is October 1, 2020.
Last Updated
8/12/2020 4:22 PM

US26: EB MP 62.45 to 64.27

Construction Work
Informational only
Comments
No traffic impacts. Landscaping on U.S. 26/Sunset Highway and the ramps near Cornelius Pass Road and NW 185th Avenue includes weed removal and planting shrubs, trees, grasses and wildflowers.
Last Updated
7/31/2020 12:55 PM

US26: MP 63.99

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 64 off-ramp to 185th Ave/PCC (Beaverton) Effective October 1, 2020, the US26 eastbound Exit 64 off-ramp to 185th Avenue/PCC will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is October 2, 2020.
Last Updated
8/12/2020 4:22 PM

US26: MP 66.93

Commercial Vehicle Information
Informational only
Details
US26 EB Exit 67 off-ramp to Murray Blvd (Beaverton) Effective October 1, 2020, the US26 eastbound Exit 67 off-ramp to Murray Boulevard will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is October 2, 2020.
Last Updated
8/12/2020 4:22 PM

US26: MP 68.96

Commercial Vehicle Information
Informational only
Details
US26 WB on-ramp from Barnes Rd (Beaverton) Effective October 3, 2020, the US26 westbound on-ramp from Barnes Road will be closed between the hours of 6 AM & 5 PM. The estimated completion date for this work is October 3, 2020.
Last Updated
8/12/2020 4:22 PM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
8/12/2020 7:02 PM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
8/12/2020 7:02 PM

US30: MP 11.93

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
8/12/2020 7:02 PM

US30: MP 13.22

Commercial Vehicle Information
Informational only
Details
US30 EB & WB Exits to Cornelius Pass Rd (Portland) Effective July 13, 2020, the US30 eastbound and westbound Exits to Cornelius Pass Road will be closed at all hours. The estimated completion date for this project is September 30, 2020.
Last Updated
8/12/2020 7:02 PM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Last Updated
8/12/2020 7:02 PM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
8/12/2020 7:02 PM

US30: MP 23.15

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
8/12/2020 7:02 PM

US30: MP 25.69 to 25.96

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
8/06/2020 1:28 PM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
8/12/2020 7:02 PM

US30: MP 74.9

Information
Informational only
Comments
The rest area is closed at this time.
Last Updated
7/24/2020 1:46 AM

US30: WB MP 98.13 to 98.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Street ends will be closed while construction is occurring except for U.S. 30. Additional lane restrictions on U.S. 30 and 30th Street may occur. This project replaces six aging bridges at the Astoria Waterfront, at 6th through 11th Streets. We will also install drainage and water quality facilities at the intersection of OR 30 and 30th Street in Astoria.
Last Updated
8/09/2020 10:22 PM

US30BY: MP 13.8 to 14.1

Construction Work
Unconfirmed
Comments
Flaggers directing traffic 24/7 between 148th and 155th Avenues from 8 a.m. Monday to 9 a.m. Saturday. Expect delays or plan alternate route. This project constructs roadway improvements on Sandy Boulevard as part of a development project. Expect delays or plan alternate route.
Last Updated
7/17/2020 5:31 PM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
8/12/2020 7:02 PM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) Effective February 12, 2019, OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to the following weights: 18 tons Type 3, 18 tons SU4, SU5, SU6, & SU7, 28 tons Type 3S2, 35 tons Type 3-3.
Last Updated
8/12/2020 7:02 PM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
8/12/2020 7:02 PM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
8/12/2020 7:02 PM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
8/12/2020 7:02 PM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
8/12/2020 7:02 PM

ORE130: MP 4.15 to 7.55

Commercial Vehicle Information
Informational only
Details
OR130 EB & WB MP 4.15 to MP 7.55 (Little Nestucca Hwy) Effective July 6, 2020, this section of OR130 eastbound and westbound will be closed Mondays through Thursdays between the hours of 8 AM & 5 PM. The estimated completion date for this work is August 14, 2020.
Last Updated
8/12/2020 7:02 PM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
8/12/2020 7:02 PM

ORE130: MP 5 to 8

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. The bridge will be closed Monday through Friday 8am to 5pm. Use alternate route.
Last Updated
7/29/2020 8:02 AM

ORE131: MP 7.49

Commercial Vehicle Information
Informational only
Details
OR131 EB & WB MP 7.49 (Tillamook) Effective September 14, 2020, this section of OR131 eastbound and westbound will be intermittently closed Monday through Friday between the hours of 8 AM & 5 PM. The estimated completion date for this work is September 18, 2020.
Last Updated
8/12/2020 4:22 PM

ORE153: MP 5.88

Commercial Vehicle Information
Informational only
Details
OR153 (Bellevue-Hopewell Hwy) MP 5.88 (Salt Creek Bridge - west of Amity) Effective June 18, 2020, OR153 crossing Salt Creek (Ash Swale) Bridge at MP 5.88 is restricted to 9 tons for all vehicles.
Last Updated
8/12/2020 7:02 PM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
8/12/2020 7:02 PM

ORE18: MP 15 to 17

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
8/12/2020 8:00 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
8/12/2020 7:02 PM

ORE202: MP 5.33 to 4.5

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
8/12/2020 4:12 PM

ORE202: MP 8.43

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
8/11/2020 11:13 AM

ORE212: MP 7.61 to 8.29

Commercial Vehicle Information
Informational only
Details
OR212 EB & WB MP 7.91 to MP 8.00 (Boring) Effective August 10, 2020, this section of OR212 eastbound and westbound will be closed at all hours. The estimated completion date for this project is August 21, 2020.
Last Updated
8/12/2020 7:02 PM

ORE212: MP 7.9 to 8

Construction Work
Informational only
Comments
OR 212 will be closed between Boring and U.S. 26 for 12 days starting Aug 10.
Last Updated
8/06/2020 6:31 PM

ORE212: MP 7.9 to 8

Crash/Hazard
Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
OR 212 is closed between Boring and U.S. 26 until Aug 22nd. Use an alternate route.
Last Updated
8/12/2020 9:40 AM

ORE212: MP 8.06 to 5.38

Construction Work
Estimated delay under 20 minutes
Comments
Beginning at 5 a.m. Monday, OR 212 is closed for 12 days at North Fork Deep Creek (east of Boring). Follow signed detours. Daytime lane closures and nighttime lane closures on OR 212 from 7 p.m. to 8 a.m. Intermittent flagging between 98th and 172nd Avenues at night.
Last Updated
8/07/2020 12:02 PM

ORE213: MP 2.23

Commercial Vehicle Information
Informational only
Details
OR213 (NE 82nd Ave) MP 2.24 (UPRR Bridge - Portland) Effective November 21, 2019, OR213 crossing UPRR Bridge at MP 2.23 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE213: MP 9.78

Commercial Vehicle Information
Informational only
Details
OR213 SB off-ramp to OR224/Milwaukie Expy (Milwaukie) Effective September 9, 2020, the OR213 southbound off-ramp to OR224/Milwaukie Expressway will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 10, 2020.
Last Updated
8/12/2020 4:22 PM

ORE213: MP 10.02

Commercial Vehicle Information
Informational only
Details
OR213 NB MP 10.00 (Clackamas) Effective July 5, 2020, this section of OR213 northbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width will be accommodated with advanced notice. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2020.
Last Updated
8/12/2020 7:02 PM

ORE214: MP 49.62

Construction Work
No to Minimum Delay
Comments
Road construction is occurring. Use caution. Motorist should expect lane closures: Monday through Thursday between 8:00 a.m. to 3:00 p.m. Friday between 8:00 a.m. to 12:00 p.m. Nightly, Sunday through Friday between 6:00 p.m. to 6:00 a.m.
Last Updated
8/09/2020 10:25 PM

ORE217: MP 0.69

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 1 off-ramp to SW Walker St (Beaverton) Effective September 22, 2020, the OR217 southbound Exit 1 off-ramp to SW Walker Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 23, 2020.
Last Updated
8/12/2020 4:22 PM

ORE217: MP 1.11

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 1 off-ramp to SW Walker St (Beaverton) Effective September 22, 2020, the OR217 northbound Exit 1 off-ramp to SW Walker Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 23, 2020.
Last Updated
8/12/2020 4:22 PM

ORE217: MP 6.9

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 7 off-ramp to SW 72nd Street (Tigard) Effective September 21, 2020, the OR217 northbound Exit 7 off-ramp to SW 72nd Street will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is September 22, 2020.
Last Updated
8/12/2020 4:22 PM

ORE219: MP 22.14 to 22.38

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Use caution. Motorists should expect a new traffic pattern. Wilsonville Rd now connects to OR219 south of Wynooski Rd and will no longer be directly accessible from Springbrook Rd. Message boards are installed along Wilsonville Rd, Springbrook Rd, and OR219 to help navigate the change. There will be intermittent flagger controlled lane closures on Wilsonville Road Monday through Friday 9 a.m. and 4 p.m. When we are working on OR 219, expect delays Monday through Friday between 9 a.m. and 4 p.m., and Sunday night through Friday morning between 7 p.m. and 6 a.m. The work will require flagger controlled lane closures.
Last Updated
8/09/2020 10:27 PM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
8/12/2020 7:02 PM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
8/12/2020 7:02 PM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
8/12/2020 7:02 PM

ORE22: EB MP 11.53 to 25.9

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Periodic lane closures, both during the day and at night. Daily, Monday morning through Friday afternoon between 9 a.m. and 4 p.m. Nightly, Sunday night through Friday morning, between 7 p.m. and 6 a.m.
Last Updated
8/11/2020 8:33 PM

ORE22: MP 13.01 to 13.18

Commercial Vehicle Information
Informational only
Details
OR22 EB & WB on- and off-ramps to/from Cascade Hwy (Stayton) Effective August 30, 2020, the OR22 eastbound and westbound on- and off-ramps to/from Cascade Highway will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 6 AM. The estimated completion date for this work is September 2, 2020.
Last Updated
8/12/2020 4:22 PM

ORE22: MP 15 to 20.3

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Periodic lane closures, both during the day and at night: Monday morning through Friday afternoon between 9 a.m. and 3 p.m. Sunday night through Friday morning, between 6 p.m. and 6 a.m.
Last Updated
8/12/2020 6:26 AM

ORE22: MP 36

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
8/09/2020 10:28 PM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE224: MP 38.77 to 39.24

Commercial Vehicle Information
Informational only
Details
OR224 EB & WB MP 38.50 to MP 40.00 (Estacada) Effective August 21, 2020, this section of OR224 eastbound and westbound will be intermittently restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2020.
Last Updated
8/12/2020 7:03 PM

ORE224: MP 49.911

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
8/12/2020 7:02 PM

ORE47: MP 64.6

Commercial Vehicle Information
Informational only
Details
OR47 MP 64.60 (Beaver Creek Bridge - south of Vernonia) Effective September 23, 2019, OR47 crossing Beaver Creek Bridge at MP 64.60 is restricted to the following weights: 31 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
8/12/2020 7:02 PM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Last Updated
8/12/2020 7:02 PM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) Effective September 23, 2019, OR53 crossing Jack Horner Creek Bridge at MP 5.98 is restricted to the following weights: 26 tons for SU4 (4 axle single-unit trucks); 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE8: MP 10.1 to 10.2

Construction Work
No to Minimum Delay
Comments
Daytime and nighttime lane closures. Daytime lane and shoulder closures on OR 8 between SE 44th and 45th Avenue. Nighttime lane closures from 8 p.m. to 5:30 a.m. week nights on eastbound TV Highway between Brookwood Parkway and SE 44th Avenue.
Last Updated
7/31/2020 12:57 PM

ORE8: WB MP 13.3

Construction Work
No to Minimum Delay
Comments
Daytime and nighttime lane closures. Daytime lane and shoulder closures on Baseline Street (OR 8) and 1st Avenue and Oak Street (OR 8) and 1st Avenue. Nighttime lane closures with flaggers directing on SW Baseline Street, SW Oak Street and 1st Avenue from 7 p.m. to 6 a.m. week nights.
Last Updated
7/31/2020 12:56 PM

ORE99: MP -0.36

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
Last Updated
8/12/2020 7:02 PM

ORE99: MP -0.291 to -0.44

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP -0.44 to MP -0.29 (Portland) Effective August 31, 2020, this section of OR99W northbound and southbound will be closed between the hours of 10 PM & 5:30 AM. The estimated completion date for this work is September 4, 2020.
Last Updated
8/12/2020 4:22 PM

ORE99: MP 1.41

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
8/12/2020 7:02 PM

ORE99: MP 12.18

Commercial Vehicle Information
Informational only
Details
OR99W NB MP 12.10 to MP 12.27 (Tualatin) Effective September 16, 2020, this section of OR99W northbound will be intermittently restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 9 AM, and Saturday nights between the hours of 8 PM & 10 AM. Loads over 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2020.
Last Updated
8/12/2020 7:02 PM

ORE99: MP 12.18

Commercial Vehicle Information
Informational only
Details
OR99W NB MP 12.10 to MP 12.27 (Tualatin) Effective August 10, 2020, this section of OR99W northbound will be intermittently restricted to 9 feet 00 inches in width at all hours. The estimated completion date for this project is September 9, 2020.
Last Updated
8/12/2020 7:02 PM

ORE99E: MP -5.87 to -5.7

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
8/17/2020 9:00:00 AM
Off Ramp
Comments
The northbound span of the I-5 Interstate Bridge and the Marine Dr on ramp to I-5 NB closes September 12–20, 2020. Construction impacts Aug-Oct 2020. Ramps Affected. Travelers will experience bridge lifts, nighttime lane closures and intermittent nighttime ramp closures Aug - Oct 2020. Congestion and delays are expected during the closure of the northbound span of the I-5 Interstate Bridge Sept 12-20. Southbound travelers will also experience congestion traveling into Oregon in the 7 days following the closure, as one SB lane closes Sept 21-27.
Last Updated
8/07/2020 10:17 AM

ORE99W: MP -0.44 to -0.29

Maintenance Work
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Roadwork has the Steel Bridge closed in both directions. Use an alternate route.
Last Updated
8/03/2020 4:16 AM

ORE99W: NB MP 12.18

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane
Comments
Roadwork has the NB left lane closed across the Tualatin River Bridge for two weeks. Use caution.
Last Updated
8/11/2020 6:50 AM

ORE99W: NB MP 12.2

Construction Work
Estimated delay under 20 minutes
Comments
Beginning at 8 p.m. Monday, one lane of OR 99W northbound is closed 24/7 across the Tualatin River Bridge. Speed is reduced to 35 mph. Follow detour.
Last Updated
8/07/2020 12:02 PM

ORE99W: MP 49.7 to 51.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Motorist should expect intermittent, flagger controlled lane closures Monday through Thursday, between 9:00 a.m. and 4:00 p.m.; and Monday night through Friday morning, between 6:00 p.m. and 6:00 a.m.
Last Updated
8/09/2020 10:24 PM