Northwest Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

ORE229, 10 miles North of Siletz MP 14 - 15

A landslide has occurred. Use an alternate route.
Updated
1/22/2026 12:18:00 PM

Closure

HWY100, 4 miles West of Ainsworth State Park MP 18 - 20

Road construction is occurring. Use an alternate route.

I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)

Updated
10/13/2025 2:04:00 PM

Conditional Closure

US30, 6 miles West of The Dalles MP 67 - 69

The highway is open to local traffic and local deliveries only. No through traffic allowed.
Updated
1/28/2026 2:32:00 PM

I-205: SB MP 3 to 13
I-205, Stafford Rd

Construction Work
Informational only
Comments
Traffic Impacts: No traffic impacts. Project description: In collaboration with South Metro Area Regional Transit (SMART) we are working on a project to support more reliable travel by using the highway shoulder for transit vehicles. This concept is referred to as Bus on Shoulder. The project extends approximately five miles in both directions of I-205 between Stafford Road and OR43 (Willamette Drive). Another segment in the southbound direction extends for approximately one mile between the OR 212 interchange and 82nd Drive. Authorized buses may use the shoulder in clearly marked areas when traffic drops below 35 mph. No other vehicles are authorized to use road shoulders to bypass traffic. Emergencies always take priority to use the shoulder. <!--Links Start Here--> [Link to Additional Information](http://www.tinyurl.com/i205busonshoulder)
Last Updated
1/05/2026 10:34 AM

I-205: NB MP 3 to 13
I-205, Stafford Rd

Construction Work
Informational only
Comments
Traffic Impacts: No traffic impacts. Project description: In collaboration with South Metro Area Regional Transit (SMART) we are working on a project to support more reliable travel by using the highway shoulder for transit vehicles. This concept is referred to as Bus on Shoulder. The project extends approximately five miles in both directions of I-205 between Stafford Road and OR43 (Willamette Drive). Another segment in the southbound direction extends for approximately one mile between the OR 212 interchange and 82nd Drive. Authorized buses may use the shoulder in clearly marked areas when traffic drops below 35 mph. No other vehicles are authorized to use road shoulders to bypass traffic. Emergencies always take priority to use the shoulder. <!--Links Start Here--> [Link to Additional Information](http://www.tinyurl.com/i205busonshoulder)
Last Updated
1/05/2026 10:37 AM

I-205: SB MP 8.32 to 11.06
I-205, West Linn

Construction Work
Estimated delay under 20 minutes
Comments
Lane closures in the project area. Nighttime full closure of the Abernethy Bridge on I-205 northbound and southbound between Exit 9 and Exit 8 on Monday from 11 pm to 5 am. Nighttime lane closures on I-205 northbound Tuesday and Wednesday from 10 pm to 5 am. Nighttime ramp closure from I-205 northbound to OR99E Tuesday and Wednesday from 10 pm to 5 am. Nighttime lane closures on OR99E Tuesday through Thursday from 8 pm to 6 am and Friday from 8 pm to 8 am. Daytime lane closure on OR43 northbound Monday through Friday from 9 am to 3 pm. Roundabout will remain open to traffic. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
Last Updated
1/27/2026 4:05 PM

I-205: MP 8.56 to 9.56
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, January 8, 2026, this section of I-205 northbound will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 23, 2026.
Last Updated
1/28/2026 1:00 PM

I-205: MP 8.56 to 9.9
I-205, Abernethy Bridge

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/2/2026 12:00:00 AM
Details
Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective February 2, 2026, this section of I-205 southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 20, 2026
Last Updated
1/28/2026 1:00 PM

I-205: MP 9.01
I-205, Abernethy Bridge

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/16/2026 12:00:00 AM
Details
Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective February 16, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is February 22, 2026.
Last Updated
1/28/2026 1:00 PM

I-205: MP 9.23
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB Exit 9 off-ramp to OR99E NB (Oregon City) Effective December 5, 2025, the I-205 northbound Exit 9 off-ramp to OR99E northbound will be closed Monday through Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. The estimated completion date for this work is February 20, 2026.
Last Updated
1/28/2026 1:00 PM

I-205: MP 9.56
I-205, 1 mile North of Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
Alert: I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective December 15, 2025, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently restricted to 9 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 9 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 20, 2026.
Last Updated
1/28/2026 1:00 PM

I-205: SB MP 24.95
I-205, Oregon Washington Border

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
1/28/2026 2:49 PM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
1/12/2026 12:26 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
1/12/2026 12:26 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
1/16/2026 6:53 AM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
1/12/2026 12:26 PM

I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2026.
Last Updated
1/28/2026 1:00 PM

I-5: SB MP 252 to 260
I-5, 2 miles South of Intersection with ORE22, in Salem

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) Median
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
1/28/2026 2:58 PM

I-5: SB MP 255
I-5, 1 mile North of Intersection with ORE22, in Salem

Crash/Hazard
No to Minimum Delay
Comments
A fire in the area is causing minimal delay to traffic. Use caution.
Last Updated
1/28/2026 3:15 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Two northbound lanes of I-5 will be closed between 10 pm and 7 am the nights of February 3rd and 5th in order to set beams on east section of new bridge. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
1/14/2026 1:48 PM

I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd

Construction Work
Estimated delay under 20 minutes
Comments
Short-term overnight lane closures and shoulder closures on I-5. We are installing RealTime Variable Advisory Speed (VAS) signs along Interstate 5 south of downtown Portland from the Ross Island Bridge to Terwilliger Bouleva??rd to improve safety and traffic flow by providing drivers with real-time traffic information <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
Last Updated
12/09/2025 8:41 AM

I-5: MP 301.49 to 301.98
I-5, Interstate 84

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 301.98 to MP 301.49 (Portland) Effective January 15, 2026, this section of I-5 southbound will be restricted to 14 feet 05 inches in width every night between the hours of 10 PM and 5 AM. Loads wider than 14 feet 05 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 6, 2026.
Last Updated
1/28/2026 1:00 PM

I-5: MP 301.5 to 302.7
I-5, 1 mile South of I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
1/30/2026 12:00:00 AM
Details
Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width nightly between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 3, 2026.
Last Updated
1/28/2026 1:00 PM

I-5: MP 301.59 to 301.96
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective January 16, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 6, 2026.
Last Updated
1/28/2026 1:00 PM

I-5: MP 301.6 to 302.8
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
1/30/2026 12:00:00 AM
Details
Alert: I-5 SB MP 302.33 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 3, 2026.
Last Updated
1/28/2026 1:00 PM

I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange

Construction Work
No to Minimum Delay
Comments
Road construction is occurring as weather permits with single lane closure causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
Last Updated
12/16/2025 2:42 PM

I-5: MP 302.09
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/6/2026 12:00:00 AM
Details
Alert: I-5 NB Exit 302A off-ramp to Broadway-Weidler St/Moda Center (Portland) Effective March 6, 2026, the I-5 northbound Exit 302A off-ramp to Broadway-Weidler Street/Moda Center will be closed from 11 PM to 7 AM. The estimated completion date for this work is March 7, 2026.
Last Updated
1/28/2026 1:00 PM

I-84: WB MP 0 to 16
I-84, Interstate 5

Construction Work
Future Event: Informational only
Expected Start Date
2/1/2026 7:00:00 AM
Comments
Road construction is or will be occurring. Use caution. Project Description: We're improving safety at multiple I-84 interchange ramps between downtown Portland and Hood River by installing or upgrading lights, signs and trimming overgrown vegetation through fall 2026. When work begins in early 2026, expect intermittent lane closures with flaggers directing traffic at ramps and intersections. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
1/22/2026 12:20 PM

I-84: EB MP 0 to 16
I-84, Interstate 5

Construction Work
Future Event: Informational only
Expected Start Date
2/1/2026 7:00:00 AM
Comments
Road construction is or will be occurring. Use caution. Project Description: We're improving safety at multiple I-84 interchange ramps between downtown Portland and Hood River by installing or upgrading lights, signs and trimming overgrown vegetation through fall 2026. When work begins in early 2026, expect intermittent lane closures with flaggers directing traffic at ramps and intersections. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
1/22/2026 12:25 PM

I-84: MP 3.8
I-84, Portland, Intersection with 58th Ave

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/7/2026 12:00:00 AM
Details
Alert: I-84 EB on-ramp from Willow St (Portland) Effective Saturday February 7, 2026 the I-84 eastbound on-ramp from Willow Street will be closed for repairing an Attenuator from 6 AM to 12 PM. The estimated completion date for this work is Saturday February 7, 2026.
Last Updated
1/28/2026 1:00 PM

I-84: MP 12.71 to 14.05
I-84, Gresham, Intersection with 181st Ave

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/5/2026 12:00:00 AM
Details
Alert: I-84 WB MP 14.05 to MP 12.71 (Portland) Effective February 5, 2026, this section of I-84 westbound will be restricted to 18 in width, between the hours of 12 AM and 6 AM. The estimated completion date for this work is February 5, 2026.
Last Updated
1/28/2026 1:00 PM

I-84: MP 13
I-84, Gresham, Intersection with 181st Ave

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/5/2026 12:00:00 AM
Details
Alert: I-84 WB On-Ramp from NE 181st Ave (Portland) Effective February 5, 2026, the I-84 westbound on-ramp from NE 181st Avenue will be closed between the hours of 12 AM and 6 AM. The estimated completion date for this work is February 5, 2026.
Last Updated
1/28/2026 1:00 PM

I-84: MP 13.03 to 77

Snow Zone
Informational only
Affected Area
NE 181st in Troutdale east to just west of the Rowena Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: MP 13.03 to 44
TROUTDALE - CASCADE LOCKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Intermittent Showers
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
39 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
1/28/2026 9:59 AM

I-84: WB MP 15.8 to 16.8
I-84, 1 mile East of Fairview, Intersection with 223rd Ave

Construction Work
No to Minimum Delay
Comments
Nighttime single lane closures EB and WB starting at 8 p.m. on Tuesday, Jan. 13 and Wednesday, Jan. 14. A second lane closure will be taken at 10pm. Project Description: We are working on I-84 in both directions between I-205 and Marine Drive. Crews are repairing Asphaltic Plug Joints that run across the pavement at two locations. The work areas are located in proximity of the 148th and 122nd Avenue bridges in both the eastbound and westbound directions. The majority of joint work will be in the B and C lanes.
Last Updated
1/11/2026 6:45 AM

I-84: WB MP 17.87 to 7
I-84, 1 mile East of Troutdale

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder
Comments
Road maintenance operations will have the WB right lane and shoulder closed in a WB moving operation. Prepare to slow or move over for worker safety.
Last Updated
1/28/2026 9:09 AM

I-84: WB MP 18
I-84, 1 mile East of Troutdale

Construction Work
Future Event: Informational only
Expected Start Date
2/2/2026 7:00:00 AM
Comments
Road construction is or will be occurring. Use caution. Project Description: ??We're building a new multi-use path parallel to Jordan Road from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. When construction begins in early 2026, expect delays at the I-84 westbound exit ramp to Sandy River Delta (exit 18). Periodic single lane closures on Jordan Road, with flaggers directing traffic as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
1/22/2026 12:36 PM

I-84: MP 20.16 to 22.77
I-84, 2 miles West of Corbett

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/9/2026 12:00:00 AM
Details
Alert: I-84 EB & WB MP 20.16 to MP 22.77 (Corbett) Effective February 9, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Friday between the hours of 7 AM and 5 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 20, 2026.
Last Updated
1/28/2026 1:00 PM

I-84: EB MP 20.41 to 22.52
I-84, 2 miles West of Corbett

Construction Work
Informational only
Comments
Traffic Impacts: No traffic impacts. Project Description: We’re repairing several culverts under I-84 between the Sandy River and Multnomah Falls. Culverts resemble tunnels and are built under a highway or road to allow water such as streams and rivers to flow under the road surface to the other side. Culverts help prevent flooding and erosion. Culvert repairs will improve safety by managing stormwater and extending the lifespan of the highway. Work begins in early 2026 and continues to spring 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
1/11/2026 6:46 AM

I-84: MP 36 to 39
I-84, 5 miles East of Multnomah Falls

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2026 12:00:00 AM
Details
Alert: I-84 EB MP 36 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 eastbound will be restricted to 18 feet 00 inches in width every day and night of the week. Loads wider than 18 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 1, 2026.
Last Updated
1/28/2026 1:00 PM

I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls

Construction Work
Informational only
Comments
Traffic impacts: no traffic impacts. Project Description: We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
Last Updated
1/11/2026 6:46 AM

US101: MP 0.83 to 1.26
US101, 1 mile South of Oregon - Washington Border

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Crews will be working Monday through Thursday from 8am to 4pm and Fridays from 7am to 12pm. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M24085)
Last Updated
1/12/2026 12:42 PM

US101: MP 0.83 to 1.26
US101, 1 mile South of Oregon - Washington Border

Commercial Vehicle Information
Informational only
Details
Alert: US101 NB & SB MP 0.83 to 1.26 (Astoria-Megler Bridge - Astoria) Effective November 10, 2025, this section of US101 northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday 7:00 AM to 4:00 PM and Friday 7:00 AM to 12:00 PM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. Estimated completion date for this work is January 30, 2026.
Last Updated
1/28/2026 1:00 PM

US101: MP 98.85 to 104.2

Snow Zone
Informational only
Affected Area
Cascade Head - just north of Neskowin Creek to just north of the Salmon River
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US101: MP 102 to 103
US101, 5 miles South of Neskowin

Information
Estimated delay of 20 minutes - 2 hours
Lanes Affected
(Northbound) 2 Lanes
Comments
Expect delays due to highway erosion. Prepare to slow. Northbound lanes are closed. Traffic is being flagged through the area. Use caution and expect delays.
Last Updated
1/22/2026 12:18 PM

US101: MP 112.35 to 121.44
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. From NE West Devils Lake Road to Salishan Hills Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
1/12/2026 12:29 PM

US101: MP 127.61
US101, Depoe Bay

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday 7AM - 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
Last Updated
1/27/2026 10:38 AM

US101: MP 134
US101, 7 miles North of Newport

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
1/12/2026 12:40 PM

US101: MP 136
US101, 5 miles North of Newport

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
1/12/2026 12:41 PM

US101B: MP 6.61
US101B, Astoria

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
2/2/2026 8:00:00 AM
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
1/28/2026 8:51 AM

US101B: MP 6.7 to 7.1
US101B, Astoria

Maintenance Work
Estimated delay under 20 minutes
Comments
Bridge work is occurring. Prepare to slow. Expect crews working during the day with single lane closures Monday through Friday from 9 a.m. to 4 p.m. In February, expect daytime full bridge closures with a signed detour. Watch for workers and drive with caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M24078)
Last Updated
1/27/2026 12:55 PM

US101B: MP 6.7 to 7.1
US101B, Astoria

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/4/2026 12:00:00 AM
Details
Alert: US101B NB & SB MP 6.7 to MP 7.1 (Astoria) Effective February 4, 2026, this section of US101 Business (the Old Youngs Bay Bridge) northbound and southbound will be closed Wednesday and Thursday between the hours of 9 AM & 4:00 PM. The estimated completion date for this work is February 5, 2026.
Last Updated
1/28/2026 1:00 PM

US20: MP 11.87
US20, 6 miles East of Toledo

Information
No to Minimum Delay
Comments
Highway erosion is causing minimal delay to traffic. Use caution.
Last Updated
1/12/2026 12:41 PM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Traffic Impacts: Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. Travelers can expect congestion during peak periods. Alternate routes are available. Possible nighttime work with closures. Flaggers may be directing traffic. No work anticipated Dec. 22-Jan. 1.
Last Updated
12/21/2025 9:02 AM

US26: MP 5.87 to 7.9
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 3, 2026.
Last Updated
1/28/2026 1:00 PM

US26: MP 7.9 to 9.96
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width from at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2026.
Last Updated
1/28/2026 1:00 PM

US26: MP 9.72 to 35.11

Snow Zone
Informational only
Affected Area
David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 13
US26, 4 miles East of Necanicum

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 2 Lanes
Comments
Sunken grade. Prepare to slow.
Last Updated
1/12/2026 12:38 PM

US26: MP 25.12 to 42.5

Snow Zone
Informational only
Affected Area
Sandy to Zigzag
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 33
US26, 2 miles East of Cherryville

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road maintenance operations will have the WB right lane closed. Prepare to slow or move over for worker safety.
Last Updated
1/28/2026 10:33 AM

US26: MP 37.73 to 45.43

Snow Zone
Informational only
Affected Area
Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.73 to 45.43
SUNSET SUMMIT REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
1/28/2026 10:28 AM

US26: MP 42.5 to 60
GOVERNMENT CAMP REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
37 F
New Snow
0 in.
Roadside Snow
7 in.
Last Updated
1/28/2026 3:18 PM

US26: MP 59.57 to 75.5

Snow Zone
Informational only
Affected Area
Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 59.57 to 67
BLUE BOX PASS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
39 F
New Snow
0 in.
Roadside Snow
13 in.
Last Updated
1/28/2026 3:01 PM

US30: MP 3.94 to 6.51
US30, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes. Project Description: We are making safety improvements for travelers on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
Last Updated
2/09/2025 10:28 AM

US30: MP 18.37 to 65.99
CLATSKANIE REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
1/28/2026 10:28 AM

US30: MP 48.31 to 61.01

Snow Zone
Informational only
Affected Area
Rainier to Clatskanie
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 57
US30, 5 miles East of Clatskanie

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
1/28/2026 9:36 AM

US30: MP 61.62 to 67.91
US30, Intersection with Mist - Clatskanie Highway ORE47

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
1/12/2026 12:31 PM

US30: MP 72.32 to 76.76

Snow Zone
Informational only
Affected Area
Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30BY: MP 0 to 1
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
Future Event: Informational only
Expected Start Date
2/17/2026 10:00:00 PM
Comments
Road construction is or will be occurring. Use caution. Project Description: The St. Johns Bridge closes at night for inspections Tuesday night through Saturday night, February 17 through February 21.
Last Updated
1/11/2026 6:50 AM

US30BY: MP 0 to 1
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
Informational only
Comments
Nighttime bridge inspections are scheduled in early March. Closures are expected 9 PM March 9 through 5 AM March 14.
Last Updated
1/23/2026 11:58 AM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
No traffic impacts. Project Description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
2/09/2025 10:29 AM

US30BY: MP 0.6 to 1
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/9/2026 12:00:00 AM
Details
Alert: US30 Bypass EB & WB MP 0.91 (St. Johns Bridge/Portland) Effective March 9, 2026, this section of US30 Bypass eastbound and westbound will be closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is March 13, 2026.
Last Updated
1/28/2026 1:00 PM

ORE104: MP 1.17 to 1.69
ORE104, Warrenton

Maintenance Work
Estimated delay under 20 minutes
Comments
Utility work is occurring. Prepare to slow.
Last Updated
1/12/2026 6:55 PM

ORE141: MP 3.8 to 4.44
ORE141, Tigard

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
Last Updated
10/19/2025 6:14 AM

ORE141: MP 7.07 to 3.3
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
Last Updated
6/08/2025 6:59 AM

ORE141: MP 7.07 to 5.01
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
Last Updated
11/09/2025 5:54 PM

ORE153: MP 6 to 7
ORE153, Amity

Commercial Vehicle Information
Informational only
Details
Alert: OR153 EB & WB MP 6 to MP 7 (Amity) Effective January 5, 2026, this section of OR153 eastbound and westbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
Last Updated
1/28/2026 1:00 PM

ORE173: MP 0.12 to 5.49

Snow Zone
Informational only
Affected Area
Timberline - US26/Government Camp to Timberline Lodge
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE173: MP 0.12 to 5.49
TIMBERLINE LODGE REPORTING STATION

Severe Weather Hazard
Informational only
Weather Condition
Rain
Pavement Condition
Slush, Snow Pack Breaking Up
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
32 F
New Snow
Trace
Roadside Snow
10 in.
Last Updated
1/28/2026 3:18 PM

ORE18: MP 12 to 18

Snow Zone
Informational only
Affected Area
Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE202: MP 9
ORE202, 1 mile North of Olney

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
1/28/2026 7:57 AM

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
Last Updated
9/28/2025 8:36 AM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Informational only
Comments
Day and nighttime single lane closures on SE 82 Ave. (OR 213) between SE Foster Rd. and SE Lindy St. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
1/27/2026 4:06 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
Alert: OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective April 1, 2025, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM, Friday and Saturday nights between the hours of 9 PM and 8 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 2, 2026.
Last Updated
1/28/2026 1:00 PM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
No to Minimum Delay
Comments
Expect lane and shoulder closures on OR 217. Project Description: This project addresses long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! This is some of the shortest merging spacing in the region. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
1/27/2026 4:01 PM

ORE22: MP 20 to 21
ORE22, Intersection with Independence Highway ORE51

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
1/12/2026 12:31 PM

ORE22: MP 32 to 73

Snow Zone
Informational only
Affected Area
Gates City Limit to Marion Forks
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE22: MP 66.23 to 73
MARION FORKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Intermittent Showers
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
35 F
New Snow
0 in.
Roadside Snow
2 in.
Last Updated
1/28/2026 10:28 AM

ORE223: MP 2.13 to 4.28
ORE223, Dallas

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
1/20/2026 9:48 AM

ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/17/2025 3:08 PM

ORE229: MP 10
ORE229, 10 miles South of Intersection with Oregon Coast Highway US101

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
1/12/2026 12:39 PM

ORE229: MP 14.1 to 14.3
ORE229, 10 miles North of Siletz

Commercial Vehicle Information
Informational only
Details
Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time.
Last Updated
1/28/2026 1:00 PM

ORE229: MP 14.2 to 15.1
ORE229, 10 miles North of Siletz

Crash/Hazard
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
A landslide has occurred. Use an alternate route.
Last Updated
1/22/2026 12:18 PM

ORE35: MP 60 to 83.56

Snow Zone
Informational only
Affected Area
White River - Jct US26 to ODOT Maintenance Station
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE35: MP 60 to 62
WHITE RIVER REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Spots of Ice
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
33 F
New Snow
0 in.
Roadside Snow
9 in.
Last Updated
1/28/2026 3:19 PM

ORE43: MP 8 to 9
ORE43, 6 miles South of Portland

Construction Work
No to Minimum Delay
Comments
Traffic impacts: Shoulder closures and pedestrian detours on OR 43 at Marylhurst Dr. Project Description: This project will reduce conflicts and improve safety on OR 43 (Willamette Drive) for travelers at the Marylhurst Drive intersection.
Last Updated
12/21/2025 9:03 AM

ORE43: MP 11.08
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective January 16, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Monday through Thursday nights between the hours of 10 PM and 5 AM, Friday nights between the hours of 10 PM and 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. The estimated completion date for this work is January 30, 2026.
Last Updated
1/28/2026 1:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/9/2026 12:00:00 AM
Details
Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, February 9, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is February 23, 2026.
Last Updated
1/28/2026 1:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/9/2026 12:00:00 AM
Details
Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective February 9, 2026, this section of OR43 northbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is February 23, 2026.
Last Updated
1/28/2026 1:00 PM

ORE47: MP 0 to 11.71

Snow Zone
Informational only
Affected Area
OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE47: MP 11.6
ORE47, Intersection with Nehalem Highway ORE202

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=N00031)
Last Updated
1/12/2026 12:28 PM

ORE47: MP 25.37 to 25.69
ORE47, 1 mile East of Washington - Yamhill County Line

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect crews working during the day, Monday through Friday, with lane and shoulder closures and flaggers helping direct traffic as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22435-OR47)
Last Updated
1/12/2026 12:29 PM

ORE47: MP 60 to 63
ORE47, Vernonia

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22435-vernonia)
Last Updated
1/20/2026 9:05 AM

ORE51: MP 5.81 to 6.34
ORE51, Independence

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
1/14/2026 10:36 AM

ORE53: MP 11
ORE53, Clatsop - Tillamook County Line

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
1/12/2026 12:39 PM

ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
Last Updated
1/15/2026 1:54 PM

ORE6: MP 5.69 to 5.82
ORE6, 6 miles East of Tillamook

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
Last Updated
1/15/2026 1:58 PM

ORE6: MP 5.69 to 5.82
ORE6, 6 miles East of Tillamook

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/1/2026 12:00:00 AM
Details
Alert: OR6 EB & WB MP 5.69 to 5.82 (Mills Creek Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
Last Updated
1/28/2026 1:00 PM

ORE6: MP 16.06 to 37.5

Snow Zone
Informational only
Affected Area
Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 16.06 to 37.5
WILSON RIVER SMT REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
1/28/2026 10:28 AM

ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
Last Updated
1/15/2026 1:59 PM

ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/1/2026 12:00:00 AM
Details
Alert: OR6 EB & WB MP 19.78 to 19.88 (Fisherman's Foot Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
Last Updated
1/28/2026 1:00 PM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
2/1/2026 7:00:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
Last Updated
1/14/2026 6:55 PM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/9/2026 12:00:00 AM
Details
Alert: OR6 EB & WB MP 32.05 to 32.1 (Devils Lake Fork Wilson River Bridge) Effective February 9, 2026, this section of OR6 eastbound and westbound will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs GVW, Weight Table 1 (legal weight) for all loads at all hours. The estimated completion date for this work is August 28, 2026.
Last Updated
1/28/2026 1:00 PM

ORE6: MP 33 to 42
ORE6, Tillamook - Washington County Line

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Watch for flaggers and workers. New guardrail will be installed the week of 1/19/26.
Last Updated
1/14/2026 3:23 PM

ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
Last Updated
12/09/2025 8:27 AM

ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217

Construction Work
No to Minimum Delay
Comments
Safety project on Canyon Rd from Hall Blvd to Cedar Hills Blvd to add two new crosswalks, a flashing beacon, lighting and a landscaped center median. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
Last Updated
12/17/2025 12:38 PM

ORE99E: NB MP 5.72 to 8
ORE99E, 1 mile South of Milwaukie

Construction Work
No to Minimum Delay
Comments
No impacts. Project Description: This project installs an overhead RRFB with a pedestrian refuge island median, ADA compliant curb ramps with push buttons, speed feedback signs and illumination. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23521)
Last Updated
2/09/2025 1:35 PM

ORE99E: MP 11.6 to 11.9
ORE99E, Oregon City

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/2/2026 12:00:00 AM
Details
Alert: OR99E NB & SB MP 11.60 to MP 11.90 (Oregon City) Effective February 02, 2026, this section of OR99E northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 20, 2026.
Last Updated
1/28/2026 1:00 PM

ORE99E: MP 11.62 to 11.82
ORE99E, Oregon City

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/12/2026 12:00:00 AM
Details
Alert: OR99E NB & SB MP 11.62 to MP 11.82 (Oregon City) Effective February 12, 2026, this section of OR99E northbound and southbound will be closed between the hours of 8 PM and 9 AM. The estimated completion date for this work is February 13, 2026.
Last Updated
1/28/2026 1:00 PM

ORE99E: MP 11.64 to 11.81
ORE99E, Oregon City

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
2/12/2026 12:00:00 AM
Details
Alert: OR99E NB & SB MP 11.64 to MP 11.81 (Oregon City) Effective February 12, 2026, this section of OR99E northbound and southbound will be closed Thursday night between the hours of 10:00 PM & 5:00 AM and Friday night between the hours of 10:00 PM & 7:00 AM. The estimated completion date for this work is February 13, 2026.
Last Updated
1/28/2026 1:00 PM

ORE99EB: NB MP 0.65 to 8.26
99EBus, 1 mile South of Intersection with Pacific Highway I-5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
Last Updated
1/12/2026 12:29 PM

ORE99W: MP 44 to 45
ORE99W, Amity

Commercial Vehicle Information
Informational only
Details
Alert: OR99W NB & SB MP 44 to MP 45 (Amity) Effective January 5, 2026, this section of OR99W northbound and southbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and on Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
Last Updated
1/28/2026 1:00 PM

ORE99W: MP 57.58 to 57.81
ORE99W, Rickreall

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
1/20/2026 9:47 AM

ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
1/12/2026 12:30 PM

HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park

Construction Work
Closure
Comments
Road construction is occurring. Use an alternate route. I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
Last Updated
10/13/2025 2:04 PM