Northwest Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Weather Alert

North Coast, Central Coast, Northwest Coast Range, West Coast Range, Lower Columbia, Portland Metro, Central Willamette Valley, South Willamette Valley, North Cascade Foothills, Lane Co. Cascade Foothills, WA-Willapa Hills, WA-South Coast, WA-Lower Columbia & I-5 Cowlitz Co., WA-Vancouver Area, WA-South Cascade Foothills

Flood Watch

NOAA Issue Date: 12/4/2023 03:28:00 PM What Flooding caused by excessive rainfall continues to be possible. Where Portions of northwest Oregon, including the following areas, Cascade foothills in Lane county, central coast range of western Oregon, central Oregon coast, central Willamette Valley, coast range of northwest Oregon, greater Portland metro area, lower Columbia, north Oregon coast, northern Oregon Cascade foothills and south Willamette Valley and southwest Washington, including the following areas, greater Vancouver area, i-5 corridor in Cowlitz county, south Washington Cascade foothills, south Washington coast and Willapa hills. When Through Wednesday afternoon. Impacts Excessive runoff may result in flooding of rivers, creeks, streams, and other low-lying and flood-prone locations. Creeks and streams may rise out of their Banks. Additional details - periods of rain will continue Monday through Wednesday, heaviest Monday night through Tuesday night as another atmospheric river aims at southwest Washington and northwest Oregon. This is also when flooding concerns are highest. Additional rain amounts expected between 4 PM PST Monday and 4 AM PST Wednesday (36 hour rain totals): 3 to 5 inches along the south Washington coast, north Oregon coast, and central Oregon coast, 3 to 5 inches with localized amounts up to 7.5 inches over the coast range and Willapa hills (highest amounts in higher terrain), 1.25 to 2.5 inches across the interior lowlands of southwest Washington and northwest Oregon (highest from Salem northward), 1 to 6 inches across the south Washington and north Oregon Cascades, 0.25 to 1.5 inches for the Lane county Cascades, 2 to 4 inches for the Columbia river gorge, and up to 2 inches for the Hood River Valley. - http://www.weather.gov/safety/flood Precautionary/preparedness actions... You should Monitor later forecasts and be alert for possible flood warnings. Those living in areas prone to flooding should be prepared to take action should flooding develop.

Weather Alert

Benton Co., Clackamas Co., Clatsop Co., Columbia Co., Lane Co., Lincoln Co., Linn Co., Marion Co., Multnomah Co., Polk Co., Tillamook Co., Washington Co., Yamhill Co.

Flood Advisory

NOAA Issue Date: 12/4/2023 02:58:00 PM What Urban and small stream flooding caused by excessive rainfall is expected. Where Much of southwest Washington and northwest Oregon, excluding the high Cascades, mid-Columbia gorge and Hood River Valley. When Until 100 AM PST Thursday. Impacts Minor flooding in low-lying and poor drainage areas. Ponding of water is expected later tonight and Wednesday. Areas most likely to see such flooding will be the coast, coast mountains, and throughout the i-5 corridor. Additional details - at 246 PM PST, rain, heavy at times, will spread across southwest Washington and far northwest Oregon later tonight. Rain will gradually spread to the east and southeast through Wednesday morning. Another 3 to 6 inches of rain are expected along the coast and coast mountains, with 1 to 3 inches for the interior lowlands. Rainfall more variable in the Cascades, with 1 to 4 inches expected, heaviest being north of Santiam river basin. This will cause urban and small stream flooding. With already saturated soils, this new rainfall will cause many smaller streams and culverts to run full, and cause minor flooding. In addition, areas with poor drainage, such as railroad crossings and underpasses, will quickly see standing water. - rainfall will gradually ease later Wednesday afternoon. - http://www.weather.gov/safety/flood Precautionary/preparedness actions... Turn around, don't drown when encountering flooded roads. Most flood deaths occur in vehicles. Be especially cautious at night when it is harder to recognize the dangers of flooding. Be aware of your surroundings and do not drive on flooded roads.

I-205: SB MP 8.32 to 11.06
I-205, West Linn

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures on I-205 north from 10 p.m. Wednesday to 5 a.m. Thursday. Lane shift on OR 43 between Burns Street and I-205 weekdays with left turn restrictions.
Last Updated
12/03/2023 4:35 AM

I-205: MP 8.64 to 9.51
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 8.51 to MP 9.51 (Oregon City) Effective December 1, 2023, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 2, 2023.
Last Updated
12/04/2023 7:00 PM

I-205: MP 8.88 to 9.29
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 8.88 to MP 9.30 (Oregon City) Effective December 4, 2023, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 8, 2023.
Last Updated
12/04/2023 7:00 PM

I-205: MP 8.88 to 9.29
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 8.88 to MP 9.30 (Oregon City) Effective December 18, 2023, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 22, 2023.
Last Updated
12/04/2023 7:00 PM

I-205: MP 9.01
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective December 20, 2023, the I-205 southbound Exit 8 off-ramp to OR43 will be closed Monday through Friday nights between the hours of 10 PM & 5 AM, Friday through Saturday 10 PM & 7 AM, and Saturday through Sunday 10 PM & 8 AM. The estimated compltion date for this work is December 22, 2023.
Last Updated
12/04/2023 7:00 PM

I-205: MP 9.26 to 9.01
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 9.27 to MP 9.01 (Oregon City) Effective December 20, 2023, this section of I-205 southbound will be restricted to 12 feet 00 inches in width at night, between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 21, 2023.
Last Updated
12/04/2023 7:00 PM

I-205: MP 9.26 to 9.01
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 9.27 to MP 9.00 (Oregon City) Effective December 4, 2023, this section of I-205 southbound will be intermittently restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 8, 2023.
Last Updated
12/04/2023 7:00 PM

I-205: MP 9.56
I-205, 1 mile North of Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective December 27, 2023, the I-205 southbound Exit 9 off-ramp to OR99E will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this work is January 2, 2024.
Last Updated
12/04/2023 7:00 PM

I-205: NB MP 21.1 to 22
I-205, Interstate 84

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impact.
Last Updated
11/26/2023 9:14 AM

I-5: NB MP 240.88
I-5, 7 miles North of Albany

Information
Informational only
Rest Area
Comments
The access road that connects the north bound rest area and the south bound rest area is closed.
Last Updated
12/04/2023 7:55 AM

I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway

Construction Work
Estimated delay under 20 minutes
Comments
SW 26th Avenue under I-5 is closed through spring 2024. Periodic lane and shoulder closures on I-5.
Last Updated
10/08/2023 8:20 AM

I-5: MP 308.38 to 308
I-5, Oregon Washington Border

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 308.00 to MP 308.38 (Interstate Bridge - Portland) Effective January 20, 2023, this section of I-5 northbound will be restricted to 12 feet 00 inches in width between the hours of 11 PM and 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 21, 2023.
Last Updated
12/04/2023 7:00 PM

I-84: WB MP 2 to 9.7
I-84, Portland, Intersection with 33rd Ave

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impact.
Last Updated
11/26/2023 9:15 AM

I-84: MP 5.01 to 5.95
I-84, Portland, Intersection with 82nd Ave

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 5.00 to MP 6.00 (Portland) Effective August 8, 2023, this section of I-84 eastbound will be intermittently restricted to 14 feet 00 inches in width at night, between the hours of 9 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 15, 2023.
Last Updated
12/04/2023 7:00 PM

I-84: MP 5.87 to 5.51
I-84, 1 mile East of Portland, Intersection with 82nd Ave

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 5.6 to MP 6.35 (Portland) Effective August 8, 2023, this section of I-84 westbound will be intermittently restricted to 14 feet 00 inches in width at night, between the hours of 9 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 15, 2024.
Last Updated
12/04/2023 7:00 PM

I-84: WB MP 12.52 to 16.67
I-84, Gresham, Intersection with 181st Ave

Construction Work
No to Minimum Delay
Comments
No traffic impact. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
12/03/2023 4:34 AM

I-84: MP 13.03 to 77

Snow Zone
Informational only
Affected Area
NE 181st in Troutdale east to just west of the Rowena Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: MP 13.03 to 44
TROUTDALE - CASCADE LOCKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/04/2023 8:35 PM

I-84: EB MP 58.39 to 59
I-84, 6 miles West of Hood River

Construction Work
Closure
Off Ramp
Comments
I-84 Exit 58 to Mitchell Point Overlook closed around-the-clock. Ramps Affected. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/04/2023 2:15 PM

US101: MP 0 to 3.33
US101, Oregon - Washington Border

Commercial Vehicle Information
Informational only
Details
US101 MP 0.00 to MP 3.33 (Astoria-Megler/Columbia River Bridge - Astoria) Effective September 19, 2021, US101 crossing the Astoria-Megler/Columbia River Bridge is restricted to the following weights for non-divisible loads: 21,500 lbs. single axle, 43,000 lbs. tandem axle, 204,800 lbs. GVW, other group axle weights shown in Weight Table 4; 24,000 lbs. single axle, 48,000 lbs. tandem axle, 174,400 GVW, other group axle weights shows in Weight Table 5 (requires minimum of 9 axles and 4 consecutive sets of tandem axles to qualify for Weight Table 5). The estimated completion date for this project is November 30, 2024.
Last Updated
12/04/2023 7:00 PM

US101: MP 22.5
US101, 2 miles South of Seaside

Weather Impact
Informational only
Comments
Watch out for rising water near Seaside. ODOT has posted signs on the roadway near the high water location MP22.50-25.00.
Last Updated
12/04/2023 11:41 PM

US101: MP 98.85 to 104.2

Snow Zone
Informational only
Affected Area
Cascade Head - just north of Neskowin Creek to just north of the Salmon River
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US101B: SB MP 0.15 to 2
ORE202, Intersection with Oregon Coast Highway US101

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
11/21/2023 10:35 AM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds weekdays. Lane closures from 8 a.m. to 5 p.m. and at night from 9 p.m. to 5 a.m.
Last Updated
11/26/2023 9:17 AM

US26: MP 8 to 9.34
US26, 1 mile West of Necanicum

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
12/02/2023 5:37 AM

US26: MP 9.72 to 35.11

Snow Zone
Informational only
Affected Area
David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 25.12 to 42.5

Snow Zone
Informational only
Affected Area
Sandy to Zigzag
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.1 to 41.59
US26, 3 miles West of Welches

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures Tuesday. Periodic daytime lane closures. Pedestrian detours. Bicycle use roadway travel lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21599)
Last Updated
12/03/2023 4:36 AM

US26: MP 37.73 to 45.43

Snow Zone
Informational only
Affected Area
Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.73 to 45.43
SUNSET SUMMIT REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
55 F
Last Updated
12/04/2023 8:36 PM

US26: MP 42.5 to 60
GOVERNMENT CAMP REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
47 F
New Snow
0 in.
Roadside Snow
2 in.
Last Updated
12/04/2023 8:20 PM

US26: MP 59.57 to 75.5

Snow Zone
Informational only
Affected Area
Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 59.57 to 67
BLUE BOX PASS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
47 F
New Snow
0 in.
Roadside Snow
13 in.
Comments
Areas of fog.
Last Updated
12/04/2023 8:04 PM

US30: MP 0 to 0.56
US30BP, Intersection with Lower Columbia River Highway US30

Commercial Vehicle Information
Informational only
Details
US30 Bypass/Bridge Ave EB & WB (east leg) MP 0.33 to MP 0.55 (Portland) Effective January 8, 2024, this section of US30 Bypass/Bridge Avenue eastbound and westbound will be closed at all hours. The estimated completion date for this work is June 25, 2024.
Last Updated
12/04/2023 7:00 PM

US30: MP 3.94 to 6.51
US30, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures. Pedestrian detours. Bicycle use roadway travel lanes.
Last Updated
10/22/2023 4:38 PM

US30: MP 11.93
HWY100, 5 miles East of Corbett

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
12/04/2023 7:00 PM

US30: MP 18.37 to 65.99
CLATSKANIE REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/04/2023 8:37 PM

US30: MP 23.15
US30, 2 miles East of Warren

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
12/04/2023 7:00 PM

US30: MP 48.31 to 61.01

Snow Zone
Informational only
Affected Area
Rainier to Clatskanie
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 61.61 to 61.47
US30, Intersection with Mist - Clatskanie Highway ORE47

Construction Work
No to Minimum Delay
Comments
Road construction is occurring. Prepare to slow. Work will be daily, Monday through Friday between 6am and 6pm. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21239)
Last Updated
11/28/2023 11:24 AM

US30: MP 72.32 to 76.76

Snow Zone
Informational only
Affected Area
Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 93 to 96
US30, 4 miles East of Astoria

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
11/27/2023 8:57 AM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
5/21/2023 4:12 PM

US30BY: MP 4.75 to 5.1
US30BP, Intersection with Pacific Highway I-5

Construction Work
No to Minimum Delay
Comments
Around-the-clock lane closure on westbound Lombard between Omaha and Greenwich Avenues, and eastbound between Denver Avenue and Greenwich Avenue. Pedestrian detours. Shoulder closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/R1ADACurbRamps.aspx)
Last Updated
12/03/2023 4:36 AM

ORE173: MP 0.12 to 5.49

Snow Zone
Informational only
Affected Area
Timberline - US26/Government Camp to Timberline Lodge
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE173: MP 0.12 to 5.49
TIMBERLINE LODGE REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
43 F
New Snow
0 in.
Roadside Snow
16 in.
Last Updated
12/04/2023 8:21 PM

ORE18: MP 12 to 18

Snow Zone
Informational only
Affected Area
Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE18: MP 40.44 to 50.1
ORE18, 7 miles West of McMinnville

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. We're resurfacing the pavement to repair cracking and improve smoothness of the road and making intersection safety improvements. Expect construction noise, lane and shoulder closures, with delays up to 20 minutes. Sunday Nights – Friday Morning: 7 p.m. - 5 a.m. Work zone controlled by flaggers. Bicyclists may be placed onto the roadway during times of active construction. Bicyclists may be placed onto the roadway during times of active construction. Shoulder/Lane Closures may also be in place for access to work areas around Norton Rd. and Cumulus Ave. Cruickshank Rd. is now open again for commuter travel. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21548)
Last Updated
11/01/2023 5:05 AM

ORE202: MP 7.75 to 7.78
ORE202, 2 miles North of Olney

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
12/02/2023 5:37 AM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Informational only
Comments
Daytime and nighttime single lane closures between Foster Road and Lindy Street. Glenwood and Ogden Streets closed at their intersection with 82nd Ave <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
11/26/2023 9:24 AM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective January 31, 2024, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 18, 2024.
Last Updated
12/04/2023 7:00 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective October 25, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 29, 2023.
Last Updated
12/04/2023 7:00 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective December 13, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width at night between the hours of 7 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 16, 2024.
Last Updated
12/04/2023 7:00 PM

ORE213: MP 15.7
ORE213, Intersection with Woodburn - Estacada Highway ORE211

Construction Work
Estimated delay under 20 minutes
Comments
Daytime shoulder closures along Toliver Road and OR 213. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20478)
Last Updated
8/27/2023 1:12 PM

ORE214: MP 19.34
ORE214, 6 miles South of Silver Creek Falls State Park

Crash/Hazard
No to Minimum Delay
Comments
High water is causing minimal delay to traffic. Use caution.
Last Updated
12/03/2023 8:27 PM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Ongoing closures: One westbound lane is closed on the Allen Boulevard overpass and the Denney Road overpass. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W and from OR 99W to 72nd Avenue. Expect shoulder closures on OR 217, various on- and off-ramps, and on local roads near the highway ramps. Various on- and off-ramps temporarily narrowed. Pedestrian detours on the Denny Road overpass, Hall Boulevard overpass in Beaverton, and at the end of the OR 99W southbound off-ramp. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
12/03/2023 4:38 AM

ORE217: MP 2.26 to 2.7
ORE217, 2 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 31, 2023.
Last Updated
12/04/2023 7:00 PM

ORE217: SB MP 2.85 to 3.19
ORE217, 3 miles South of US 26

Construction Work
Closure
Off Ramp
Comments
Road work has the OR 217 southbound Denney Road off-ramp and on-ramp closed for approximately five months. Use an alternate route. Ramps Affected.
Last Updated
5/02/2023 5:00 AM

ORE217: MP 3.56
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is March 31, 2024.
Last Updated
12/04/2023 7:00 PM

ORE217: MP 3.83
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is March 17, 2024.
Last Updated
12/04/2023 7:00 PM

ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is February 28, 2024.
Last Updated
12/04/2023 7:00 PM

ORE217: MP 4.741
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 on-ramp from Greenburg Rd (Tigard) Effective August 15, 2023, the OR217 northbound Exit 5 on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 30, 2023.
Last Updated
12/04/2023 7:00 PM

ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is February 28, 2024.
Last Updated
12/04/2023 7:00 PM

ORE217: MP 5.13
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 off-ramp to Greenburg Rd (Tigard) Effective November 4, 2022, the OR217 northbound Exit 5 off-ramp to Greenburg Road will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is November 30, 2023.
Last Updated
12/04/2023 7:00 PM

ORE217: MP 5.69
ORE217, 6 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is November 30, 2023.
Last Updated
12/04/2023 7:00 PM

ORE22: MP 4 to 5
ORE22, 4 miles East of Intersection with Salmon River Highway ORE18

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
High water. Prepare to slow.
Last Updated
12/05/2023 1:40 AM

ORE22: WB MP 12
ORE22, 10 miles East of Intersection with I-5, in Salem

Crash/Hazard
No to Minimum Delay
Off Ramp
Comments
High water is causing minimal delay to traffic. Use caution. Ramps Affected.
Last Updated
12/03/2023 2:51 PM

ORE22: MP 32 to 73

Snow Zone
Informational only
Affected Area
Gates City Limit to Marion Forks
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE22: MP 66.23 to 73
MARION FORKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Intermittent Showers
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
46 F
Last Updated
12/04/2023 8:29 PM

ORE224: MP 49.911
ORE224, Ripplebrook Ranger Station

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/04/2023 7:00 PM

ORE226: MP 22.5
ORE226, 3 miles West of Lyons

Crash/Hazard
No to Minimum Delay
Comments
High water is causing minimal delay to traffic. Use caution.
Last Updated
12/03/2023 8:03 PM

ORE229: MP 9 to 20
ORE229, 9 miles South of Intersection with Oregon Coast Highway US101

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
11/14/2023 10:32 AM

ORE35: MP 60 to 83.56

Snow Zone
Informational only
Affected Area
White River - Jct US26 to ODOT Maintenance Station
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE35: MP 60 to 62
WHITE RIVER REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
43 F
New Snow
0 in.
Roadside Snow
3 in.
Last Updated
12/04/2023 8:21 PM

ORE47: MP 0 to 11.71

Snow Zone
Informational only
Affected Area
OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE47: MP 25.37 to 25.57
ORE47, 1 mile East of Washington - Yamhill County Line

Information
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 2 Lanes (Westbound) 2 Lanes
Comments
Utility work is occurring. Prepare to slow. Traffic controlled by flaggers and signage, use caution
Last Updated
11/29/2023 6:16 PM

ORE47: MP 46.14 to 11.84
ORE202, Intersection with Mist - Clatskanie Highway ORE110

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
12/02/2023 5:37 AM

ORE47: MP 48.59 to 50.02
ORE47, 3 miles South of Messing Creek Bridge

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
12/02/2023 5:37 AM

ORE47: MP 52.28 to 53.02
ORE47, 6 miles South of Messing Creek Bridge

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
12/02/2023 5:37 AM

ORE47: MP 88.05
ORE47, 1 mile North of Forest Grove

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
12/04/2023 7:00 PM

ORE53: MP 14.5
ORE53, 5 miles North of Intersection with Oregon Coast Highway US101

Crash/Hazard
No to Minimum Delay
Comments
High water is causing minimal delay to traffic. Use caution.
Last Updated
12/05/2023 2:03 AM

ORE53: MP 17.76
ORE53, 1 mile North of Intersection with Oregon Coast Highway US101

Commercial Vehicle Information
Informational only
Details
OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/04/2023 7:00 PM

ORE6: MP 16.06 to 37.5

Snow Zone
Informational only
Affected Area
Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 16.06 to 37.5
WILSON RIVER SMT REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
55 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/04/2023 8:36 PM

ORE8: MP 2.81 to 7
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
No traffic impact.
Last Updated
11/05/2023 5:42 PM

ORE8: MP 15.22
ORE8, Cornelius

Construction Work
No to Minimum Delay
Comments
No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22609)
Last Updated
12/03/2023 4:37 AM

ORE99: MP -0.36
ORE99W, Portland

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
Last Updated
12/04/2023 7:00 PM

ORE99: MP 1.41
ORE99W, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/04/2023 7:00 PM

ORE99: MP 11.81
ORE99E, Oregon City

Commercial Vehicle Information
Informational only
Details
OR99E NB off-ramp to I-205 NB (Oregon City) Effective September 30, 2023, the OR99E Northbound off-ramp to I-205 northbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 1, 2024.
Last Updated
12/04/2023 7:00 PM

ORE99E: MP 9.8
ORE99E, 1 mile North of Gladstone

Construction Work
Informational only
Comments
No traffic impacts.
Last Updated
10/29/2023 4:05 PM

ORE99E: MP 20.3 to 21.8
ORE99E, Canby

Construction Work
No to Minimum Delay
Comments
Around-the-clock single lane closures in both directions. Left turn restrictions. Flaggers directing traffic at the intersection of SW Berg Parkway from 7 a.m. to 4 p.m. Nov. 27-30. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18775)
Last Updated
11/28/2023 3:12 PM

ORE99E: MP 21.27 to 21.42
ORE99E, Canby

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane (Southbound) Median , 1 Lane
Comments
Road work has the NB and SB left lanes closed between Grant and Elm. Prepare to slow or move over for worker safety.
Last Updated
11/27/2023 8:33 AM

ORE99W: MP 3.21 to 3.71
ORE99W, Intersection with Beaverton - Hillsdale Highway ORE10

Construction Work
No to Minimum Delay
Comments
Daytime and nighttime single lane closures between Foster Road and Glencoe Road. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=VERNEW)
Last Updated
12/03/2023 4:37 AM

ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)

Construction Work
Estimated delay under 20 minutes
Comments
Periodic nighttime lane closures from 9 p.m. to 5 a.m. Monday through Thursday from I-5 to McDonald. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
Last Updated
11/26/2023 9:21 AM

ORE99W: MP 58.9 to 60.31
ORE99W, 1 mile South of Rickreall

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Reduced Speed Limit of 45 mph in the project area. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21374)
Last Updated
11/30/2023 9:10 AM