Northwest Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

HWY100, 2 miles East of Troutdale MP 3

The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
Updated
10/21/2024 9:06:00 AM

Closure

ORE141, Tigard MP 5

Hall Boulevard is closed where it passes over OR 217 in Tigard, at Pfaffle Street. Use Greenburg Road as a detour route.

The Hall Boulevard overpass over OR 217 near OR 99W and Pfaffle Street in Tigard is closed for nine months, starting in March 2024. The intersection of Pfaffle Street and Hall Boulevard is also closed. Drivers are not permitted to turn onto Hall Boulevard from Pfaffle Street or turn onto Pfaffle Street from Hall Boulevard. All vehicle traffic should use the signed detour using Greenburg Road. People walking and bicycling will still be able to cross OR 217 via a temporary pedestrian bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)

Updated
3/11/2024 11:33:00 AM

Closure

HWY100, 5 miles West of Ainsworth State Park MP 18

A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025.

Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle or bicycle access to Multnomah Falls heading eastbound on the Historic Highway. The Wahkeena-Multnomah Falls return trail #442 is open to hikers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)

Updated
10/1/2024 10:05:00 AM

I-205: SB MP 8.32 to 11.06
I-205, West Linn

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane and ramp closures. Nighttime closures of the I-205 north ramp to OR 99E (exit 9) and the OR 99E on-ramp to I-205 north 10 p.m. to 5 a.m. Wednesday through Friday, until 7 a.m. Saturday. If weather allows, nighttime closures of the I-205 north ramp to OR 43 (exit 8) and the OR 43 on-ramp to I-205 north 10 p.m. to 5 a.m. Monday and Tuesday. Nighttime lane closures on I-205 Wednesday through Friday nights and on OR 43 in both directions and on Willamette Falls Drive 8 p.m. to 6 a.m. Monday and Tuesday. Single lane closures on Clackamette Drive, Willamette Falls Drive. Auxiliary lane closure on OR 99E north. Pedestrian detours on OR 43 and OR 99E.
Last Updated
10/20/2024 1:27 PM

I-205: MP 8.5 to 9.29
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 8.50 to MP 9.50 (Oregon City) Effective October 21, 2024, this section of I-205 northbound and southbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 22, 2024.
Last Updated
10/21/2024 7:00 PM

I-205: MP 8.69
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 8.69 (Oregon City) Effective October 22, 2024, this section of I-205 southbound will be restricted to 16 feet 08 inches in height at night between the hours of 10 PM & 5 AM. Loads over 16 feet 08 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for more information. The estimated completion date for this work is October 25, 2024.
Last Updated
10/21/2024 7:00 PM

I-205: MP 9.031 to 9.29
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 9.00 to MP 9.40 (Oregon City) Effective October 22, 2024, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 25, 2024.
Last Updated
10/21/2024 7:00 PM

I-205: MP 9.51 to 8.64
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 9.55 to MP 8.64 (Oregon City) Effective October 22, 2024, this section of I-205 southbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 25, 2024.
Last Updated
10/21/2024 7:00 PM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
10/18/2024 4:41 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
10/18/2024 4:41 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
10/18/2024 4:41 PM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
10/18/2024 4:41 PM

I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is December 29, 2024.
Last Updated
10/21/2024 7:00 PM

I-5: SB MP 262 to 240.15
I-5, 8 miles North of Intersection with ORE22, in Salem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect occasional nighttime shoulder and lane closures from 9 p.m. to 5 a.m. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21553)
Last Updated
9/30/2024 4:17 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
10/11/2024 12:14 PM

I-5: NB MP 293.4 to 297.25
I-5, 1 mile North of Highway 217

Construction Work
Informational only
Comments
Four miles of I-5 will close from 9pm Friday June 28 through 5am Monday July 1 in SW Portland. Detours on I-205/I-84 or OR 217/U.S. 26/I-405. Four miles of I-5 will be closed from 9pm Friday June 28 through 5am Monday July 1 in SW Portland. Detours on I-205/I-84 or OR 217/U.S. 26/I-405. Crews are rebuilding the I-5 structure over SW 26th Avenue. <!--Links Start Here--> [I-5 over SW 26th Avenue Improvements Project](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20486)
Last Updated
6/28/2024 11:10 PM

I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway

Construction Work
Estimated delay under 20 minutes
Comments
Periodic lane closures on I-5 and SW 26th Ave.
Last Updated
8/25/2024 3:27 AM

I-5: MP 296.68
I-5, Portland, Intersection with SW Terwilliger Blvd

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 296.75 to MP 296.70 (Portland) Effective October 22, 2024, this section of I-5 southbound will be restricted to 14 feet 00 inches in width between the hours of 10 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this emergency work is October 23, 2024.
Last Updated
10/21/2024 7:00 PM

I-5: MP 298.24
I-5, 1 mile South of I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 297.80 to MP 298.40 (Portland) Effective October 24, 2024, this section of I-5 northbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM & Friday and Saturday nights between the hours of 10 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 27, 2024.
Last Updated
10/21/2024 7:00 PM

I-5: MP 305.66 to 306.65
I-5, 1 mile North of Portland, Intersection with Columbia Blvd

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 305.67 to MP 306.69 (Portland) Effective October 24, 2024, this section of I-5 northbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM & Friday and Saturday nights between the hours of 10 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 27, 2024.
Last Updated
10/21/2024 7:00 PM

I-5: MP 306.7 to 305.77
I-5, Portland, Intersection with Victory Blvd

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 306.69 to MP 305.85 (Portland) Effective October 24, 2024, this section of I-5 southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM & Friday and Saturday nights between the hours of 10 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 27, 2024.
Last Updated
10/21/2024 7:00 PM

I-84: EB MP 1.74
I-84, Portland, Intersection with 33rd Ave

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane , Shoulder
Comments
Road work has the EB right lane closed intermittently starting at 28th. Prepare to slow or move over for worker safety.
Last Updated
10/21/2024 10:23 PM

I-84: WB MP 12.52 to 16.67
I-84, Gresham, Intersection with 181st Ave

Construction Work
No to Minimum Delay
Comments
No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
6/28/2024 8:13 AM

I-84: MP 44.1
I-84, Cascade Locks

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 44.00 to MP 44.10 (Cascade Locks) Effective October 29, 2024, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width between the hours of 9 AM & 3 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

I-84: MP 55.13
I-84, 9 miles West of Hood River

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 55.00 to MP 55.20 (Cascade Locks) Effective October 22, 2024, this section of I-84 westbound will be restricted to 16 feet 00 inches in width between the hours of 9 AM & 3 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 24, 2024.
Last Updated
10/21/2024 7:00 PM

I-84: EB MP 58.39 to 59
I-84, 6 miles West of Hood River

Construction Work
Closure
Off Ramp
Comments
I-84 east Exit 58 closed around the clock. Ramps Affected. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
9/08/2024 7:38 AM

US101: MP 39
US101, 6 miles North of Nehalem

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane (Southbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Bridge work under 24 hour flagging, watch for flaggers.
Last Updated
9/22/2024 9:57 PM

US101: MP 55.28 to 55.97
US101, Garibaldi

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
10/18/2024 7:25 AM

US101: MP 117.39 to 115.74
US101, Lincoln City

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
10/23/2024 6:30:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
10/18/2024 11:54 AM

US101: MP 121.42 to 125
US101, 3 miles North of Lincoln Beach

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
10/10/2024 3:14 PM

US101: NB MP 124.9 to 123.42
US101, 1 mile South of Lincoln Beach

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
10/21/2024 6:01 AM

US101: MP 129.74
US101, 3 miles South of Depoe Bay

Construction Work
Informational only
Comments
Road construction is occurring on Otter Crest Loop frontage road, Ben Jones (Rocky Creek) Bridge. Occasional lane closures with flaggers helping direct. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21727)
Last Updated
10/01/2024 4:02 PM

US101B: MP 0.67 to 1.37
ORE202, Astoria

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18735)
Last Updated
10/01/2024 3:05 PM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8 a.m. to 5 p.m. and 9 p.m. to 5 a.m. weekdays. Flaggers periodically directing traffic.
Last Updated
10/20/2024 1:28 PM

US26: MP 8.1 to 8.71
US26, 1 mile West of Necanicum

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Road construction is occurring. Prepare to slow. Watch for workers. There will be a 24-hour single lane closure starting 10/7 for a few days. Delays may extend up to and over 20 minutes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21224)
Last Updated
10/10/2024 6:39 PM

US30: MP 3.94 to 6.51
US30, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes.
Last Updated
5/26/2024 7:33 AM

US30: MP 11.93
HWY100, 5 miles East of Corbett

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
10/21/2024 7:00 PM

US30: MP 21.41 to 22.45
US30, Scappoose

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Scheduled communications line work from 9 a.m. on 10/16 until 5 p.m. on 10/22.
Last Updated
10/16/2024 9:00 AM

US30: MP 23.15
US30, 2 miles East of Warren

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
10/21/2024 7:00 PM

US30: MP 93.1 to 94.79
US30, 4 miles East of Astoria

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
9/14/2024 2:22 PM

US30: MP 99.27 to 99.31
US30, Astoria

Information
Future Event: Estimated delay under 20 minutes
Expected Start Date
10/23/2024 8:00:00 AM
Lanes Affected
(Westbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow.
Last Updated
10/18/2024 4:54 PM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
8/11/2024 12:42 PM

US30BY: WB MP 0.42
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Paving and flagging on NE Lombard St between N Syracuse and N Leavitt. 7pm-5am Sept. and Oct. N Philadelphia St closes at N Ivanhoe during nightwork. Nighttime paving and traffic holds with flagging on NE Lombard St between N Syracuse and N Leavitt Ave. 7pm-5am Sept. and Oct. N Philadelphia St closes at N Ivanhoe during nightwork.
Last Updated
9/09/2024 1:33 PM

US30BY: MP 1.29 to 14.7
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Around-the-clock lane closures between Montana Avenue and NE 75th Street. Pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/r1adacurbramps.aspx)
Last Updated
10/13/2024 7:41 AM

ORE131: MP 8.33
ORE131, Tillamook

Commercial Vehicle Information
Informational only
Details
OR131 MP 8.33 (Trask River Bridge - Tillamook) Effective July 23, 2024, OR131 crossing Trask River Bridge at MP 8.33 is restricted to 14 tons for all vehicles.
Last Updated
10/21/2024 7:00 PM

ORE141: MP 4.25 to 4.44
ORE141, Tigard

Commercial Vehicle Information
Informational only
Details
OR141 (Hall Blvd) NB & SB MP 4.25 to MP 4.50 (Tigard) Effective March 4, 2024, this section of OR141 (Hall Boulevard) will be closed at all hours. The estimated completion date for this work is November 10, 2024.
Last Updated
10/21/2024 7:00 PM

ORE141: MP 4.69 to 4.73
ORE141, Tigard

Crash/Hazard
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Hall Boulevard is closed where it passes over OR 217 in Tigard, at Pfaffle Street. Use Greenburg Road as a detour route. The Hall Boulevard overpass over OR 217 near OR 99W and Pfaffle Street in Tigard is closed for nine months, starting in March 2024. The intersection of Pfaffle Street and Hall Boulevard is also closed. Drivers are not permitted to turn onto Hall Boulevard from Pfaffle Street or turn onto Pfaffle Street from Hall Boulevard. All vehicle traffic should use the signed detour using Greenburg Road. People walking and bicycling will still be able to cross OR 217 via a temporary pedestrian bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
3/11/2024 11:33 AM

ORE164: MP 6.27
ORE164, Jefferson

Maintenance Work
No to Minimum Delay
Comments
Bridge construction is occurring. Prepare to slow. Watch for workers. Be aware of pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21731)
Last Updated
5/02/2024 5:34 AM

ORE18: MP 1 to 17
ORE18, Otis

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Intermittent lane closures between 6/17/24 to 10/30/24. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20190)
Last Updated
7/05/2024 2:11 PM

ORE202: MP 24 to 29.5
ORE202, 5 miles North of Jewell

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
9/10/2024 7:22 PM

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Shoulder closures and pedestrian detours.
Last Updated
10/20/2024 1:29 PM

ORE211: MP 14 to 22
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Lane closures with flaggers directing traffic 7 a.m. to 3 p.m. on OR 211 from Molalla to Colton. Periodic nighttime lane closures with flaggers directing traffic.
Last Updated
9/23/2024 7:28 AM

ORE213: MP 2.23
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 (82nd Ave/Old Hwy 213) MP 2.24 crossing over railroad and light rail (Portland) Effective July 23, 2024, the state owned bridge on a city street (82nd Ave.) crossing over railroad and light rail is restricted to the following weights: 29 tons for SU5 & SU6 (5 and 6 axle single-unit truck); 31 tons for SU7 (7 axle single-unit truck).
Last Updated
10/21/2024 7:00 PM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Informational only
Comments
Daytime and nighttime lane closures between Foster Road and Causey Avenue. Partial side street closures at Knight and Clatsop. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
10/13/2024 7:44 AM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective January 31, 2024, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 29, 2024.
Last Updated
10/21/2024 7:00 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective March 11, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM, Friday and Saturday nights between the hours of 8 PM and 8 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 9, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime single lane closures on OR 217 in both directions weekdays. Daytime closure of the auxiliary lane on northbound OR 217 between 72nd Avenue and OR 99W 6 a.m. to 2 p.m. weekdays. Nighttime lane closures on the Denney Road overpass Monday through Wednesday. Sidewalk closure on the south side of Hall Boulevard between Scholls Ferry Road and Cascade Avenue. Ongoing closures: Hall Boulevard over OR 217 in Tigard is closed until early 2025 to replace the bridge. Periodic lane closures on Hall Boulevard between Scholls Ferry Road and Cascade Avenue. One lane in each direction is closed around-the-clock on the Scholls Ferry Road overpass for several months. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W and on OR 217 north from Scholls Ferry Road to Denney Road. Expect shoulder closures on OR 217, various on- and off-ramps, and on local roads near the highway ramps. Various on- and off-ramps temporarily narrowed. Pedestrian detours on the Hall Boulevard overpass in Beaverton. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
10/20/2024 1:30 PM

ORE217: MP 2.26 to 2.7
ORE217, 2 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 11, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 3.56
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 3.83
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 4.741
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 on-ramp from Greenburg Rd (Tigard) Effective August 15, 2023, the OR217 northbound Exit 5 on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 5.13
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 off-ramp to Greenburg Rd (Tigard) Effective November 4, 2022, the OR217 northbound Exit 5 off-ramp to Greenburg Road will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 5.69
ORE217, 6 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE217: MP 6.19
ORE217, 6 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 6 off-ramp to OR99W (Tigard) Effective October 21, 2024, the OR217 northbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width between the hours of 6 AM & 3 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE219: MP 10.06 to 36
ORE219, 9 miles South of Hillsboro

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Intermittent lane closures between 6/17/24 to 10/30/24. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20190)
Last Updated
9/14/2024 2:25 PM

ORE219: MP 18.7 to 19.6
ORE219, Newberg

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Between 5/5/2024 and 11/1/2024, traffic may be reduced to a single lane with delays up to 20 minutes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18749)
Last Updated
7/01/2024 7:40 PM

ORE224: MP 49.911
ORE224, Ripplebrook Ranger Station

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/21/2024 7:00 PM

ORE35: EB MP 57.47 to 57.68
US26, Intersection with Mount Hood Highway OR35

Construction Work
Informational only
Comments
Lane closures on OR 35 with traffic directed by a temporary signal. Shoulder closures weekdays on U.S. 26. Project Description: This project will resurface the bridge deck on the Oregon Highway 35 overpass at U.S. 26 (Mt. Hood Highway) interchange in Mt. Hood, east of Government Camp. Making these repairs now increases the service life of the road and provides a smoother, safer ride for travelers. <!--Links Start Here--> [Link to Additional Information](https://tinyurl.com/OR35atUS26)
Last Updated
7/07/2024 7:39 AM

ORE35: MP 57.591
US26, Intersection with Mount Hood Highway OR35

Commercial Vehicle Information
Informational only
Details
OR35 EB & WB MP 57.47 to MP 57.68 (Government Camp) Effective July 8, 2024, this section of OR35 eastbound and westbound will be restricted to 14 feet 6 inches in width at all hours. The estimated completion date for this work is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE43: MP 11.29 to 11.35
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
OR43 NB & SB MP 11.18 to MP 11.36 (West Linn) Effective November 4, 2024, this section of OR43 northbound and southbound will be restricted to 12 feet 00 inches in width at night between the hours of 8 PM & 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 8, 2024.
Last Updated
10/21/2024 7:00 PM

ORE47: MP 88.05
ORE47, 1 mile North of Forest Grove

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
10/21/2024 7:00 PM

ORE53: MP 17.76
ORE53, 1 mile North of Intersection with Oregon Coast Highway US101

Commercial Vehicle Information
Informational only
Details
OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/21/2024 7:00 PM

ORE6: MP 10.2
ORE6, 10 miles East of Tillamook

Construction Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
10/23/2024 8:00:00 AM
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
10/21/2024 5:30 PM

ORE99: MP -0.36
ORE99W, Portland

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective July 23, 2024, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
10/21/2024 7:00 PM

ORE99: MP 1.41
ORE99W, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/21/2024 7:00 PM

ORE99: MP 11.81
ORE99E, Oregon City

Commercial Vehicle Information
Informational only
Details
OR99E NB off-ramp to I-205 NB (Oregon City) Effective September 30, 2023, the OR99E Northbound off-ramp to I-205 northbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2024.
Last Updated
10/21/2024 7:00 PM

ORE99: MP 20.39 to 21.86
ORE99E, Canby

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 20.35 to MP 21.86 (Canby) Effective March 15, 2024, this section of OR99E northbound and southbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2024.
Last Updated
10/21/2024 7:00 PM

ORE99E: MP 20.3 to 21.8
ORE99E, Canby

Construction Work
Estimated delay under 20 minutes
Comments
Periodic nighttime lane closures with flaggers directing traffic as weather allows. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18775)
Last Updated
10/20/2024 1:28 PM

ORE99W: MP 3.25 to 3.65
ORE99W, Intersection with Beaverton - Hillsdale Highway ORE10

Construction Work
No to Minimum Delay
Comments
Nighttime lane closures and flagging to pave two bridges on OR 99W.
Last Updated
9/26/2024 1:46 PM

ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures 9 p.m. to 5 a.m. Flaggers directing traffic at intersections throughout the project area. The dedicated right turn lane from northbound OR99W to Main Street is closed. Right turns are still permitted. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
Last Updated
9/29/2024 7:33 AM

ORE99W: SB MP 34.5 to 37
ORE99W, McMinnville

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Intermittent lane closures between 6/17/24 to 10/30/24. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20190)
Last Updated
7/05/2024 2:29 PM

ORE99W: SB MP 35
ORE99W, McMinnville

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Bridge rail repair work. Construction occurring Monday- Friday from 7am-7pm, 10/08/24 - 11/15/24. There will be occasional single lane closure.
Last Updated
10/08/2024 10:46 AM

ORE99W: MP 58.9 to 60.31
ORE99W, 1 mile South of Rickreall

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21374)
Last Updated
8/26/2024 2:00 PM

HWY100: MP 0 to 51.53
HWY100, Troutdale

Construction Work
No to Minimum Delay
Comments
Periodic nighttime single lane closures with flaggers directing traffic between Troutdale and Corbett. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
9/29/2024 7:32 AM

HWY100: MP 2.55
HWY100, 2 miles East of Troutdale

Crash/Hazard
Closure
Comments
The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
Last Updated
10/21/2024 9:06 AM

HWY100: MP 17.5 to 17.68
HWY100, 5 miles West of Ainsworth State Park

Construction Work
Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle or bicycle access to Multnomah Falls heading eastbound on the Historic Highway. The Wahkeena-Multnomah Falls return trail #442 is open to hikers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
10/01/2024 10:05 AM