Statewide Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

I-205: SB MP 8.8 to 9.3
I-205, OR 99E

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane and ramp closures in Oregon City and West Linn with pedestrian detours on OR 43 and OR 99E between 8 p.m. and 6 a.m. The I-205 Improvements Project is upgrading the Abernethy Bridge — a critical link on I-205 connecting West Linn and Oregon City — to withstand a major earthquake. We are also realigning I-205 interchanges at OR 43 and OR 99E, making safety improvements for people biking, walking and rolling and building a new sound wall in Oregon City. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
Last Updated
4/03/2026 6:13 PM

I-5: NB MP 58.18 to 66.7
I-5, Intersection with Pacific Highway ORE99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. <!--Links Start Here--> [Link to additional information](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D&reserved=0)
Last Updated
4/02/2026 4:21 PM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/30/2026 6:19 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/30/2026 6:19 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/30/2026 6:19 PM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
2/12/2026 4:28 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
3/30/2026 6:24 PM

I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
Last Updated
4/03/2026 3:49 PM

I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange

Construction Work
No to Minimum Delay
Comments
Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
Last Updated
4/03/2026 4:28 PM

I-84: WB MP 0 to 16
I-84, Interstate 5

Construction Work
Informational only
Comments
Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/03/2026 6:06 PM

I-84: EB MP 0 to 16
I-84, Interstate 5

Construction Work
Informational only
Comments
Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/03/2026 6:06 PM

I-84: WB MP 18
I-84, 1 mile East of Troutdale

Construction Work
Informational only
Comments
Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/03/2026 6:01 PM

I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls

Construction Work
Informational only
Comments
Expect EB and WB lane closures on I-84 at McCord Creek BR. with one lane open each direction. Traffic revisions in place. Frontage Rd onramp closed. We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
Last Updated
4/03/2026 5:37 PM

I-84: EB MP 87 to 138.9
I-84, The Dalles

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews may be onsite as weather permits for striping and work with the median barrier. Expect possible single lane closures with temporary crossover traffic in both eastbound and westbound lanes with speed reductions. Use caution.
Last Updated
3/13/2026 7:07 PM

I-84: EB MP 352.05 to 368.16
I-84, Baker - Malheur County Line

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Crews will be onsite continuing work. All traffic has transitioned to the eastbound side of the freeway. Follow traffic signs, be prepared to slow and use caution while passing through workzone(s).
Last Updated
3/26/2026 2:13 PM

US101: MP 28.8 to 31.27
US101, Cannon Beach

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
2/28/2026 1:24 PM

US101: MP 29.52 to 29.54
US101, Cannon Beach

Construction Work
Future Event: Closure with Detour
Expected Start Date
4/6/2026 8:00:00 AM
Off Ramp
Comments
Road construction has closed the road. Follow detour. Ramps Affected.
Last Updated
3/20/2026 12:21 PM

US101: MP 112.35 to 121.44
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. From NE West Devils Lake Road to Salishan Hills Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
3/30/2026 9:53 PM

US101: MP 121 to 124.94
US101, 3 miles North of Lincoln Beach

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time from Salishan Hills Drive to North Fogarty Creek State Park (Road) <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
3/30/2026 6:22 PM

US101: MP 127.61
US101, Depoe Bay

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
Last Updated
4/03/2026 11:55 AM

US101: MP 141.37 to 141.98
US101, Newport

Weather Impact
Informational only
Comments
Winds have prompted ODOT to warn drivers that Yaquina Bay Bridge may close to high profile vehicles MP141. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
3/24/2026 10:53 AM

US101: NB MP 236 to 236.5
US101, North Bend

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Lane closure causing minimal delay to traffic. Use caution.
Last Updated
1/17/2026 1:13 PM

US101: MP 300 to 330
US101, Port Orford

Weather Impact
Informational only
Comments
High wind warning. Use caution. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
4/01/2026 12:49 PM

US101: MP 300 to 330
US101, Port Orford

Weather Impact
Informational only
Comments
High wind warning. Use caution. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
4/01/2026 7:21 PM

US101: MP 312
US101, 12 miles South of Port Orford

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/02/2026 4:18 PM

US101: MP 327.4 to 329.5
US101, Wedderburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/02/2026 4:18 PM

US101: MP 354.8 to 359.3
US101, Brookings

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/02/2026 4:19 PM

US20: MP 1.82 to 2.8
US20, N.E. Purcell Blvd. (Bend)

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures during both day and night shifts, controlled with flaggers. Expect delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22442)
Last Updated
3/26/2026 5:41 PM

US20: NB MP 84 to 84.06
ORE99W, Intersection with Corvallis - Newport Highway US20

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis)
Last Updated
3/30/2026 6:21 PM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic. Project Description: We are constructing safety improvements to help people travel Outer SE Powell Boulevard more safely from SE 99th Avenue to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits). The first phase, from SE 122nd Avenue to SE 136th Avenue, is complete. The overall Outer Powell Project will add a center turn lane, sidewalks and bike lanes. These improvements reduce the frequency and severity of crashes as well as help people driving, taking transit, walking and biking share the road with fewer conflicts. Pre-construction activities are underway. Road construction began spring 2025 and is anticipated to last five years.
Last Updated
4/03/2026 7:39 PM

US30: WB MP 2.81 to 3.32
US30, Pendleton

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite to continue work on an ADA Curb Ramp project. Use caution, obey all signs while passing through the work zone.
Last Updated
3/10/2026 11:14 AM

US30BY: MP 0 to 1
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Project Description: The St. Johns Bridge closes at night for inspections Tuesday night through Saturday night, February 17 through February 21.
Last Updated
1/11/2026 6:50 AM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
No traffic impacts. Project Description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
4/03/2026 7:51 PM

US395: MP 4.33 to 6.03
US395, Hermiston

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite conducting work along side the highway. Traffic control devices will be in place while work is being performed. Exercise caution and obey all traffic control signs while passing through the work zone(s). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23430)
Last Updated
3/31/2026 4:24 AM

US97: MP 114.56 to 116.56
US97, 1 mile North of Terrebonne

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. The Lower Bridge Way intersection vehicles will only be able to make a right turn onto southbound US97, and a right turn from southbound US97 onto Lower Bridge Way. Vehicles will have no access from northbound US97 to Lower Bridge Way, please use signed detour. The contractor will be closing 11th St between Smith Rock Way and C St. Traffic should use signed detour. Odem Ave intersection will only be open to vehicles turning right from US97 southbound or vehicles turning right onto US97 southbound from Odem Ave. Follow any signed detours. Expect nightly single lane closures with flagging and a pilot car for paving operations. Follow any signed detours and use caution throughout work zone(s). Expect delays.
Last Updated
3/26/2026 5:40 PM

US97: NB MP 136.94
US97, Bend

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
3/02/2026 11:51 AM

ORE126: MP 0.22 to 13.5
ORE126, Redmond

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20167)
Last Updated
3/26/2026 5:06 PM

ORE126: EB MP 3.93 to 7.11
ORE126, Springfield

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-springfield)
Last Updated
3/30/2026 6:21 PM

ORE126: MP 110.65 to 111.97
ORE126, Redmond

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect single lane closures between 5th and 15th to construct new ADA ramps and enhance signal operations. Various corners will be closed to pedestrian traffic during this time. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
Last Updated
3/26/2026 4:28 PM

ORE138: MP 0.5 to 1.4
ORE138, Roseburg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/02/2026 4:20 PM

ORE141: MP 3.8 to 4.44
ORE141, Tigard

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
Last Updated
10/19/2025 6:14 AM

ORE141: MP 7.07 to 3.3
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
Last Updated
6/08/2025 6:59 AM

ORE141: MP 7.07 to 5.01
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
Last Updated
11/09/2025 5:54 PM

ORE18B: MP 2 to 2.67
ORE18B, Willamina

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
4/6/2026 7:00:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
2/11/2026 10:37 AM

ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
3/30/2026 6:36 PM

ORE202: MP 12.43
ORE202, 2 miles South of Olney

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
3/30/2026 6:22 PM

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
Last Updated
9/28/2025 8:36 AM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Informational only
Comments
Day and nighttime single lane closures on SE 82 Ave. (OR 213) between SE Foster Rd. and SE Lindy St. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
1/27/2026 4:06 PM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Nighttime lane closures on OR 217 southbound Monday through Thursday nights. Project Description: This project addresses long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! This is some of the shortest merging spacing in the region. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
2/22/2026 6:36 AM

ORE219: MP 18.35 to 20.8
ORE219, Newberg

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE22: MP 21 to 24.07
ORE22, 4 miles West of Salem

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
Last Updated
3/30/2026 6:35 PM

ORE223: MP 2.13 to 4.28
ORE223, Dallas

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
3/30/2026 6:20 PM

ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/17/2025 3:08 PM

ORE224: MP 36 to 37
ORE224, 13 miles East of Estacada

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts expected. Project Description: Repairs are being made on OR 224 at milepost 36.7 (approximately 10 miles east of Estacada) after a winter storm event in December.
Last Updated
3/29/2026 10:33 AM

ORE234: MP 14.66 to 15.37
ORE234, 3 miles West of Intersection with Crater Lake Highway ORE62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Sunken pavement; use caution. Crews will return in the spring to complete repairs and install safety features. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M25033)
Last Updated
3/09/2026 10:41 AM

ORE237: MP 31.54 to 32.15
ORE237, North Powder

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be on site prepping, forming, pouring, milling, paving and working on landscape. Use caution, prepare to slow.
Last Updated
3/31/2026 4:41 AM

ORE240: MP 11.04 to 11.26
ORE240, Newberg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE38: MP 4.9
ORE38, 5 miles East of Intersection with Oregon Coast Highway US101

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/02/2026 4:19 PM

ORE413: MP 11.03 to 11.45
ORE413, Intersection with Pine Creek Highway

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
3/24/2026 1:09 PM

ORE42: EB MP 0 to 9.7
ORE42, Intersection with Oregon Coast Highway US101

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/02/2026 4:17 PM

ORE42: MP 20.8 to 21.9
ORE42, Myrtle Point

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/02/2026 4:17 PM

ORE42: MP 72 to 77
ORE42, 1 mile West of Winston

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/02/2026 4:20 PM

ORE42: MP 72.76 to 73
ORE42, Winston

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
3/03/2026 8:07 PM

ORE43: MP 8 to 9
ORE43, 6 miles South of Portland

Construction Work
No to Minimum Delay
Comments
Traffic impacts: Shoulder closures and pedestrian detours on OR 43 at Marylhurst Dr. Project Description: This project will reduce conflicts and improve safety on OR 43 (Willamette Drive) for travelers at the Marylhurst Drive intersection.
Last Updated
12/21/2025 9:03 AM

ORE451: MP 10.28 to 10.35
ORE451, Intersection with Central Oregon Highway ORE7

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite preparing temporary signs and survey. Expect possible daytime lane and shoulder closures. Use caution, prepare to slow.
Last Updated
3/26/2026 2:16 PM

ORE51: MP 5.81 to 6.34
ORE51, Independence

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
3/30/2026 6:20 PM

ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
Last Updated
3/30/2026 6:33 PM

ORE6: MP 5.69 to 5.82
ORE6, 6 miles East of Tillamook

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
Last Updated
3/30/2026 6:33 PM

ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
Last Updated
1/15/2026 1:59 PM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
Last Updated
3/30/2026 6:22 PM

ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
Last Updated
12/09/2025 8:27 AM

ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217

Construction Work
No to Minimum Delay
Comments
Lane closures, turning restrictions on Canyon Road near Rose Biggi Avenue and Cedar Hills. • Travelers can expect around-the-clock lane reduction for two weeks on Canyon Rd. between SW Hall Blvd and Cedar Hills Blvd, ending by April 9. This partnership project between ODOT, City of Beaverton and Metro will improve pedestrian safety on SW Canyon Road (OR 8) from SW Hall Boulevard to SW Cedar Hills Boulevard in Central Beaverton by adding two new crosswalks, a flashing beacon, new lighting and a landscaped center median. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
Last Updated
4/03/2026 7:56 PM

ORE86: MP 42.01 to 42.4
ORE86, Richland

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
3/24/2026 1:11 PM

ORE99: MP 10.2 to 11.25
ORE99, 1 mile North of Phoenix

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane closures through the work zone on OR 99, Monday through Friday.
Last Updated
4/03/2026 8:00 AM

ORE99: MP 14.42 to 16.09
ORE99, Cottage Grove

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-cottagegrove)
Last Updated
3/30/2026 6:21 PM

ORE99E: MP 40.75 to 40.81
ORE99E, Brooks

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
2/12/2026 4:20 PM

ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
3/30/2026 6:21 PM

HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park

Construction Work
Closure
Comments
A section of the Historic Columbia River Highway/U.S. 30 between Multnomah Falls and Oneonta Trailhead is closed to all users until Spring 2026. I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
Last Updated
4/03/2026 7:47 PM