Statewide Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

I-205: SB MP 8.32 to 11.06
I-205, West Linn

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: Lane, shoulder and ramp closures in the project area. Nighttime ramp closure from I-205 southbound to OR99E from 10 pm to 5 am Tuesday. Nighttime ramp closure from OR43 southbound to I-205 northbound from 10 pm to 5 am Tuesday (ramp onto I-205 northbound accessible via roundabout). OR43 lane closure at I-205. Pedestrian detours on OR 43 and 99E.
Last Updated
5/27/2025 2:20 PM

I-5: NB MP 109 to 111
I-5, 11 miles North of Canyonville

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
6/02/2025 8:42 PM

I-5: SB MP 190 to 191
I-5, 2 miles South of Intersection with McKenzie Highway ORE126

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
6/15/2025 8:00:00 PM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Paving I5 NB and SB "B" lanes from 190 to 191. This work will require intermittent on and off ramp closures to the following I5 exits in the SB direction: On Ramp at Exit 191 at Glenwood Blvd., Off Ramp at Exit 189 to McVay/30th Ave., and On Ramp at Exit 189 at 30th Ave.
Last Updated
5/28/2025 3:24 PM

I-5: SB MP 203.56 to 216.92
I-5, 9 miles North of Intersection with Beltline Highway

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Road construction is occurring. Prepare to slow. Watch for workers. Nighttime lane closures for paving from 7:00pm to 5:30am. Lane width is restricted to 14 feet. Drive slowly and watch for workers in the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22508)
Last Updated
6/06/2025 5:06 AM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/19/2025 7:25 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/19/2025 7:25 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. On 4/23 and 4/24 from 9 p.m. to 5 a.m., expect the South Commercial Street ramp from northbound I-5 and the right lane of southbound I-5 near milepost 249.4 to close nightly, follow the signed detour.? Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
4/21/2025 12:27 PM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/19/2025 7:25 PM

I-5: SB MP 262 to 240.15
I-5, 8 miles North of Intersection with ORE22, in Salem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You'll see crews working on the shoulder preparing for the VMS boards and camera installation. Please drive with caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21553)
Last Updated
12/04/2024 6:46 AM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
6/04/2025 4:13 PM

I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
Last Updated
3/10/2025 6:05 AM

I-5: NB MP 302.69 to 302.77
I-5, 1 mile North of I-405 North Interchange

Construction Work
Future Event: Informational only
Expected Start Date
6/12/2025 11:00:00 PM
Comments
I-5 will close from 11 p.m. Thursday, June 12 to 4 a.m. Friday near NE Broadway so Pacific Power can install a new power line across I-5. Full closure NB and SB of I-5 with detour for powerline crossing work around the Rose Quarter just north of Broadway.
Last Updated
6/01/2025 8:13 AM

I-5: SB MP 302.69 to 302.77
I-5, 1 mile North of I-405 North Interchange

Construction Work
Future Event: Informational only
Expected Start Date
6/12/2025 11:00:00 PM
Comments
I-5 will close from 11 p.m. Thursday, June 12 to 4 a.m. Friday near NE Broadway so Pacific Power can install a new power line across I-5. Full closure NB and SB of I-5 with detour for powerline crossing work around the Rose Quarter just north of Broadway.
Last Updated
6/01/2025 8:14 AM

I-82: EB MP 0.4 to 11.21
I-82, Oregon - Washington Border

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews are continuing to work on replacing broken concrete pavement. Use caution throughout work zone.
Last Updated
5/30/2025 12:17 PM

I-84: WB MP 0.1 to 7.2
I-84, Interstate 5

Construction Work
Future Event: Informational only
Expected Start Date
6/7/2025 11:59:00 PM
Comments
Westbound Interstate 84 will close between I-205 and I-5 at midnight Saturday night, June 7 and remain closed until 4 p.m. Sunday, June 8. Westbound Interstate 84 will close between I-205 and I-5 at midnight Saturday night, June 7 and remain closed until 4 p.m. Sunday, June 8 for multiple agencies to do maintenance and graffiti cleanup. In partnership with Portland Bureau of Transportation and TriMet, ODOT will also use this closure to do maintenance state highway right-of-way in this section of the interstate. Eastbound I-84 will remain open.
Last Updated
6/02/2025 4:34 PM

I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls

Construction Work
No to Minimum Delay
Comments
Traffic impacts: No traffic impacts. Project Description: We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway.
Last Updated
4/13/2025 10:28 AM

I-84: EB MP 87 to 137.9
I-84, The Dalles

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. RUFUS: Crews are expected to be on-site cleaning up and demobilizing equipment. ARLINGTON: Crews are expected to be on-site cleaning up and demobilizing equipment.
Last Updated
5/25/2025 10:09 AM

I-84: EB MP 159 to 164
I-84, 5 miles West of Boardman

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Expect single lane, ramp or shoulder closures for the paving operation and/or guardrail upgrades. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22517)
Last Updated
5/30/2025 12:15 PM

I-84: WB MP 179 to 194
I-84, 11 miles East of Intersection with Columbia River Highway US30

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Expect single lane, ramp or shoulder closures for the paving operation and/or guardrail upgrades. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22517)
Last Updated
5/30/2025 12:15 PM

I-84: EB MP 188 to 203.65
I-84, 20 miles East of Intersection with Columbia River Highway US30

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect two-lane/ two-way traffic in the Eastbound lanes. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20548)
Last Updated
5/30/2025 12:20 PM

I-84: WB MP 239.65 to 239.3
I-84, 19 miles West of La Grande

Construction Work
Informational only
Frontage Road
Comments
Road construction is or will be occurring. Use caution. Contractor will be installing containment for bridge demolition. Contractor will also be clearing and grubbing and start installing the embankment. Old Emigrant Hill Frontage Rd will be closed during project. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20539)
Last Updated
5/30/2025 12:12 PM

I-84: WB MP 263.56 to 328.35
I-84, 3 miles East of La Grande

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be performing shoulder work at various locations between MP 263 to MP 286 on I-84 eastbound and westbound. Expect possible shoulder closures, use caution.
Last Updated
5/30/2025 12:58 PM

I-84: WB MP 318.6
I-84, 14 miles East of Baker City

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
4/03/2025 7:58 PM

I-84: EB MP 352.01 to 362.15
I-84, Baker - Malheur County Line

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crew will be performing corrective work on I-84 at MP 353 EB and WB, with possible daytime lane closures. Expect delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21795)
Last Updated
5/30/2025 12:32 PM

US101: MP 13 to 25
US101, 6 miles North of Gearhart

Maintenance Work
Estimated delay under 20 minutes
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
4/09/2025 12:15 AM

US101: MP 31
US101, 1 mile South of Cannon Beach

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/17/2025 9:26 PM

US101: MP 55.28 to 55.97
US101, Garibaldi

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20252
Last Updated
6/06/2025 12:24 PM

US101: MP 62.6 to 63
US101, 2 miles North of Tillamook

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
6/9/2025 8:00:00 AM
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
6/04/2025 4:26 PM

US101: MP 117.83 to 112.78
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures and delays nightly, Monday night through Friday morning, between 7PM and 6AM. Only 1 lane will be closed at a time. From NW Logan Rd to SW 48th Coast Ave. Some side streets maybe closed as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
5/31/2025 7:02 AM

US101: NB MP 124.9 to 123.42
US101, 1 mile South of Lincoln Beach

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures and delays nightly, Monday night through Friday morning, between 7PM and 6AM. Only 1 lane will be closed at a time from North Fogarty Creek State Park (Road) to Lancer Street/Seadrove Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
5/31/2025 7:05 AM

US101: MP 142.48 to 147.02
US101, Newport

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Road construction is scheduled to start in June near 40th ST. Prepare to slow. Watch for workers.
Last Updated
5/29/2025 8:19 AM

US101: MP 211.7
US101, Intersection with Umpqua Highway ORE38

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2025 8:43 PM

US101: SB MP 243
US101, 1 mile North of Intersection with Coos Bay - Roseburg Highway ORE42

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
6/06/2025 9:32 AM

US101: MP 288 to 290
US101, Langlois

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
6/02/2025 8:42 PM

US101: MP 312
US101, 12 miles South of Port Orford

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
6/02/2025 8:42 PM

US101: MP 333 to 334
US101, 4 miles South of Gold Beach

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
1/14/2025 2:36 PM

US101: MP 334.12 to 334.41
US101, 5 miles South of Gold Beach

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/27/2025 8:19 PM

US101: MP 356 to 356.7
US101, Brookings

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2025 8:42 PM

US199: MP 35 to 34
US199, 1 mile North of O'Brien

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/06/2025 8:36 AM

US20: MP 0.15
US20, Intersection with Corvallis - Lebanon Highway ORE34

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures, construction noise, and minor delays Sunday through Thursday nights from 7:00 PM to 6:00 AM. There will be times that sidewalk closures will be in place. Pedestrians will be detoured through the work zone with a signed detour route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21552)
Last Updated
3/04/2025 12:27 PM

US20: MP 0.51 to 2.8
US20, 3rd Street (Bend)

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be performing a single lane closure on US20, east and west bound from 15th street to 9th street. Expect minimal delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21489)
Last Updated
6/05/2025 8:20 AM

US20: MP 2.99 to 86.12
US20, 2 miles West of Intersection with Powell Butte Road

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The crew will be working at MP 70 to MP 80 this week. Expect no delays, use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21655)
Last Updated
6/05/2025 8:29 AM

US20: MP 128.73 to 131.92
US20, Hines

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Lane shift in place through the work zone. Follow all traffic control signs and use caution.
Last Updated
5/25/2025 1:25 PM

US20: MP 160.9
US20, 12 miles West of Intersection with Drewsey Road

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
5/11/2025 9:20 AM

US26: MP 2.73 to 2.74
US26, 3 miles East of I-405

Construction Work
Estimated delay under 20 minutes
Comments
Traffic impacts: No impacts. Project Description: We are improving safety for people walking, biking or rolling at the existing, striped crosswalk east of the intersection of U.S. 26 (SE Powell Boulevard) and SE 36th Avenue. Starting in early 2025, we begin construction to upgrade the currently unsignalized crosswalk on SE Powell Boulevard at SE 36th Avenue with a new pedestrian activated beacon, also known as a Rectangular Rapid Flashing Beacon, or RRFB. <!--Links Start Here--> [Link to Additional Information](https://www.tinyurl.com/SEPowellandSE36thAve)
Last Updated
5/27/2025 2:21 PM

US26: MP 5.56 to 5.62
US26, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Traffic impacts: Daytime single lane closures. Project description: We are creating safer and more accessible highway connections for all sidewalk users on U.S. 26 (SE Powell Boulevard). We are bringing sidewalk curb ramps into compliance with Americans with Disabilities Act (ADA) standards on highways throughout Oregon, including on all corners of the intersection of U.S. 26 (SE Powell Boulevard) at SE 92nd Avenue. <!--Links Start Here--> [Link to Additional Information](https://tinyurl.com/SEPowellandSE92ndAve)
Last Updated
6/01/2025 8:16 AM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane and shoulder closures, traffic shifts, and up to 20-min. traffic holds 8 a.m. to 5 p.m., weekdays. Flaggers directing traffic periodically. Project Description: We are constructing safety improvements to help people travel Outer SE Powell Boulevard more safely from SE 99th Avenue to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits). The first phase, from SE 122nd Avenue to SE 136th Avenue, is complete. The overall Outer Powell Project will add a center turn lane, sidewalks and bike lanes. These improvements reduce the frequency and severity of crashes as well as help people driving, taking transit, walking and biking share the road with fewer conflicts. Pre-construction activities are underway. Road construction is expected to begin spring 2025 and last five years.
Last Updated
2/09/2025 10:10 AM

US26: EB MP 14.22 to 23
US26, Gresham

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
Maintenance has a moving operation occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/06/2025 8:27 AM

US26: MP 18.48
ORE126, Prineville

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
5/20/2025 5:56 PM

US26: MP 19.85 to 20.58
US26, 6 miles North of Prineville

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be installing new sidewalks and ADA ramps. The shoulder will be closed during construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
Last Updated
5/25/2025 11:28 AM

US26: MP 47.25
US26, Manning

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
6/9/2025 8:00:00 AM
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
6/04/2025 4:18 PM

US26: MP 222.82
US26, 8 miles North of Ironside

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect daytime closures with flagging. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
5/11/2025 9:20 AM

US30: MP 3.94 to 6.51
US30, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes. Project Description: We are making safety improvements for travelers on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
Last Updated
2/09/2025 10:28 AM

US30: MP 49.07 to 50.98
US30, Hood River

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures and side street closures. Pedestrian detours. Project Description: We are improving safety and access for all by upgrading sidewalk curb ramps to the current Americans with Disabilities Act (ADA) accessibility standards on a section of U.S. 30 (Cascade Avenue and Oak Street in Hood River) from Mt. Adams Avenue to E 2nd Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22621)
Last Updated
2/09/2025 1:55 PM

US30: MP 49.84 to 51.23
US30, Baker City

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor is continuing work that will impact the intersection of 10th St, Hughes St, and Pocahontas. Expect delays, use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21643)
Last Updated
5/30/2025 12:25 PM

US30: MP 56.39 to 57.17
US30, 6 miles East of Clatskanie

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
6/10/2025 8:00:00 AM
Comments
Utility work is occurring. Prepare to slow.
Last Updated
6/06/2025 10:00 AM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
No traffic impacts. Project Description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
2/09/2025 10:29 AM

US30BY: MP 1.29 to 14.7
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
No traffic impacts. Project Description: This project rebuilds 300 sidewalk curb ramps at unsignalized intersections along U.S. 30 Bypass in Portland between N. Syracuse Street and NE 165th Avenue to meet ADA accessibility standards. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/r1adacurbramps.aspx)
Last Updated
3/02/2025 2:35 PM

US395: MP 35.76
US395, 1 mile South of Silvies

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work on outside shoulder. Expect daytime shoulder closures.
Last Updated
12/31/2024 5:40 PM

US395: MP 35.76
US395, 1 mile South of Silvies

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be working outside the shoulder but expect possible shoulder closures.
Last Updated
5/25/2025 1:10 PM

US730: MP 203.27
US730, Oregon - Washington Border

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be working outside the shoulder but expect possible shoulder closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
5/25/2025 1:10 PM

US95: MP 52.33
US95, 1 mile North of Rome

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:23 PM

US95: MP 98.2
US95, 23 miles North of McDermitt

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:23 PM

US95: MP 121.26
US95, McDermitt

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:21 PM

US97: MP 114.56 to 116.56
US97, 1 mile North of Terrebonne

Construction Work
No to Minimum Delay
Off Ramp
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. Lower Bridge Way intersection is reopened to vehicles turning right from Lower Bridge Way to US97 southbound, and to vehicles turning right from US97 to Lower Bridge Way. There will be no access from US97 Northbound to Lower Bridge Way. Follow signed detour for travel. Smith Rock Way will have intermittent closures to install railing. Expect minimal delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21162)
Last Updated
6/05/2025 8:29 AM

US97: MP 118.98 to 121.45
US97, 3 miles South of Terrebonne

Construction Work
Informational only
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is or will be occurring. Use caution. The contractor will be installing new sidewalks and ADA ramps. The shoulder will be closed during construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
Last Updated
5/25/2025 11:14 AM

US97: MP 146.54 to 146.57
US97, 7 miles South of Bend

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Crews will be working on the northbound weigh scale house. Exit will be closed during this work. Slow down, use caution, 55 MPH through workzone.
Last Updated
6/02/2025 7:57 AM

US97: MP 252.44 to 278.81
US97, 22 miles North of Klamath Falls

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Bridge work on USBR Bridge at MP 273.71, Link River Bridge at MP 275.03, and the Green Spring Bridge at MP 277.12. USBR Bridge at MP 273.71: Bridge work will be done under the bridge, no delays expected. Link River Bridge at MP 275.03: Lane shift traffic control installed on Main Street, bridge work will be done behind the barrier, no delays expected. Conger Avenue is closed for thru traffic, detour in place. OR140 at the Green Springs Bridge: Lane shift traffic control installed, bridge work will be done behind the barrier, no delays expected.
Last Updated
6/02/2025 8:37 PM

ORE104S: MP 4.62

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution.
Last Updated
6/04/2025 2:55 PM

ORE11: EB MP -1.54
ORE11, Intersection with Old Oregon Trail Highway I-84

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22560)
Last Updated
5/25/2025 1:30 PM

ORE11: MP 22.02
ORE11, 8 miles East of Milton - Freewater

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:22 PM

ORE11: MP 33.47
ORE11, 2 miles East of Oregon - Washington Border

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:22 PM

ORE126: MP 0.22 to 13.5
ORE126, Redmond

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be performing single lane closures controlled by flaggers on OR126, East and Westbound for striping maintenance from MP 0.22 to MP 1.0, 7pm to 6am, Sunday through Thursday. Expect delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20167)
Last Updated
6/05/2025 8:22 AM

ORE126: MP 10.88 to 36.44
ORE126, 2 miles West of Walterville

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. ODOT is replacing Curve Warning Signs. Expect single lane and shoulder closures as needed during the day or at night. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21577)
Last Updated
3/18/2025 2:37 PM

ORE126: MP 11 to 13
ORE126, 9 miles North of Intersection with McKenzie Highway ORE242

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
6/9/2025 8:00:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2" Inlay paving from MP 11 to 13. Expect minor delays and flaggers with piolet cars.
Last Updated
5/28/2025 3:26 PM

ORE126: MP 110.65 to 111.97
ORE126, Redmond

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. The contractor will be installing new sidewalks and ADA ramps, using single lane closures with flaggers in place. Expect delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
Last Updated
6/05/2025 8:16 AM

ORE131: MP 7.5
ORE131, Tillamook

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution.
Last Updated
6/04/2025 2:51 PM

ORE140: MP 3.74 to 4.75
ORE140, Klamath Falls

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
6/02/2025 8:37 PM

ORE140: MP 57 to 63
ORE140, 10 miles West of Klamath Falls

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2025 8:44 PM

ORE141: MP 3.8 to 4.44
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141) by installing two new enhanced pedestrian crossings at the intersections of SW Hall Boulevard at SW Spruce Street and SW Hemlock Street.? <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
Last Updated
5/28/2025 12:55 PM

ORE141: MP 7.07 to 3.3
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
Last Updated
6/01/2025 8:17 AM

ORE141: MP 7.07 to 5.01
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Lane shifts and sidewalk closures with detours at SW Garden Pl, SW Commercial St, SW Knoll Dr, SW Fanno Cr Dr, SW Greensward Ln intersections on Hall We are bringing over 100 sidewalk curb ramps into compliance with Americans with Disabilities Act (ADA) accessibility standards in Tigard along SW Hall Boulevard (OR 141) between OR 99W and SW Durham Road, and on SW 72nd Avenue between SW Gonzaga Street and SW Varns Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
Last Updated
4/28/2025 6:06 AM

ORE164: MP 6.27
ORE164, Jefferson

Maintenance Work
No to Minimum Delay
Comments
Bridge construction is occurring. Prepare to slow. Watch for workers. Be aware of pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21731)
Last Updated
3/21/2025 12:57 PM

ORE19: MP 58 to 73
ORE19, Fossil

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Crews will be working on a paving project on Hwy 19 from 5/20/25 to 6/3/25. Prepare to slow, use caution.
Last Updated
5/23/2025 10:01 AM

ORE201: MP 12.6
ORE201, 13 miles South of Intersection with Old Oregon Trail Highway I-84

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
4/03/2025 7:59 PM

ORE203: MP 14.05
ORE203, 6 miles North of Medical Springs

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor expects to work outside the shoulder with no shoulder or lane closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:23 PM

ORE206: MP 51.49 to 51.8
ORE206, 10 miles East of Condon

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. No anticipated impacts to motorists.
Last Updated
5/25/2025 10:10 AM

ORE207: MP 5.5 to 7
ORE207, Hermiston

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Watch for work on curb ramps, sidewalks, and paving throughout the work zone(s). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23429)
Last Updated
5/25/2025 1:20 PM

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Shoulder closures and pedestrian detours. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
Last Updated
2/09/2025 1:09 PM

ORE213: MP 0 to 0.49
ORE213, Oregon City

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Expect nighttime lane closures on OR 213 Monday nights through Saturday nights. Project Description: We are paving all lanes of OR 213 from I-205 to Redland Road.
Last Updated
5/04/2025 6:24 AM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Informational only
Comments
Traffic Impacts: Lane closures with side street closures between Foster and Lindy nightly 7pm to 7am. Flagging at intersection of Flavel. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
5/18/2025 6:20 AM

ORE213: MP 25.28 to 28
ORE213, 4 miles North of Silverton

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
6/11/2025 7:00:00 PM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Striping the recent 2" inlay paving project. Expect minor delays, flaggers, and pilot cars.
Last Updated
6/04/2025 3:39 PM

ORE217: SB MP 1.22 to 5.9
ORE217, 1 mile South of US 26

Construction Work
Informational only
Comments
OR 217 south closed from Canyon Road to OR 99W from Friday night, June 6 to Monday morning, June 9. OR 217 south closed between Canyon Road and OR 99W beginning Friday night, June 6, at 9 p.m. and reopening Monday morning, June 9, by 5 a.m. All southbound drivers will exit OR 217 at Canyon Road. All on- and off-ramps will close from the Beaverton-Hillsdale Highway on-ramp to the OR 99W off-ramp. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
6/02/2025 9:43 AM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
No to Minimum Delay
Comments
Weekend directional closures, and various impacts in the project area. Hall Blvd over OR 217 in Tigard is temporarily closed to replace the bridge. • Nighttime single lane closures on OR 217 6/2-6/6. • Weekend directional closure #2: OR 217 south closed between Canyon Road and OR 99W beginning Friday night, June 6, at 9 p.m. and reopening Monday morning, June 9, by 5 a.m. All southbound drivers will exit OR 217 at Canyon Road. o All on- and off-ramps will close from the Beaverton-Hillsdale Highway on-ramp to the OR 99W off-ramp. This is the second of five weekend directional closures. Crews will pave ramps, shoulders and new auxiliary lanes over the weekend closures. • Nighttime single lane closures on several overpasses 6/2-6/6. Crews may work on one or multiple overpasses each night including Allen Boulevard, Denney Road, Hall Boulevard in Beaverton, and Scholls Ferry Road. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
6/02/2025 8:14 AM

ORE217: SB MP 5.66 to 4.95
ORE217, 6 miles South of US 26

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Roadwork has the Southbound right lane closed from Hall to Greenburg, use caution.
Last Updated
6/06/2025 4:59 AM

ORE219: MP 21.61
ORE219, Newberg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect a 35 mph speed limit, watch for workers and drive with caution.
Last Updated
6/04/2025 7:58 PM

ORE22: EB MP 0 to 25
ORE22, Intersection with Salmon River Highway ORE18

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Mobile construction operation, nights.
Last Updated
6/03/2025 11:38 AM

ORE22: MP 2.55 to 3
ORE22, 3 miles East of Intersection with Salmon River Highway ORE18

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. OR22 will be paved the night of June 6th from about 7PM to 6AM. Expect minor delays, flaggers, and pilot cars.
Last Updated
6/05/2025 7:03 PM

ORE22: MP 22
ORE22, 3 miles West of Intersection with Salmon River Highway ORE18

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
6/10/2025 8:00:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. OR22 at Grand Ronde Road will be paved on June 10. Expect minor delays, flaggers, and a single lane closure.
Last Updated
5/28/2025 3:21 PM

ORE223: MP 0 to 4.83
ORE223, Intersection with Willamina - Salem Highway ORE22

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures as needed.? Starting the week of June 9, we're also working on traffic signals at night with flaggers helping direct traffic at the following intersections: OR 223 and SW Cherry Street, OR 223 and SW Clay Street and OR 99W and Rickreall Road. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
6/05/2025 2:44 PM

ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/17/2025 3:08 PM

ORE228: MP 7.58 to 20.02
ORE228, 2 miles East of Brownsville

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. ODOT is replacing Curve Warning Signs. Expect single lane and shoulder closures as needed during the day or at night. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21577)
Last Updated
4/12/2025 1:53 PM

ORE238: WB MP 38.75
ORE238, Intersection with Rogue Valley Highway ORE99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for intermittent lane closures through the work zone, Sunday night – Friday morning and possible shoulder/turning lane closures during the day. OR-99 (MP 4.36-5.71), OR-238 (MP 37.63-38.75), Hwy 62 (MP 0.91). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21676)
Last Updated
6/02/2025 8:44 PM

ORE240: MP 11.5
ORE240, Intersection with Pacific Highway West ORE99W

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
6/9/2025 8:00:00 PM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. OR240 where it intersects with OR99 eastbound will be paved on Monday night, June 9th. The contractor will return on Thursday night, June 12 to complete the striping work. There is a marked detour and traffic should expect minor delays and a single block road closure.
Last Updated
6/04/2025 3:36 PM

ORE242: MP 55.52 to 75.42
ORE242, 1 mile East of Intersection with McKenzie Highway ORE126

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. ODOT is replacing Curve Warning Signs. Expect single lane and shoulder closures as needed during the day or at night. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21577)
Last Updated
3/18/2025 2:37 PM

ORE244: MP 24.42
ORE244, Umatilla - Union County Line

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be working outside the shoulder but expect possible shoulder closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
5/30/2025 12:51 PM

ORE245: MP 28.96
ORE245, 8 miles South of Intersection with Whitney Highway ORE7

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:22 PM

ORE260: MP 19 to 20
ORE260, 3 miles East of Intersection with Redwood Highway US199

Maintenance Work
Estimated delay under 20 minutes
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
6/06/2025 9:26 AM

ORE34: EB MP 0.12
ORE34, Intersection with Pacific Highway West ORE99W

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution. Temporary detour bridge is in use. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20688)
Last Updated
3/01/2025 9:10 AM

ORE34: MP 2.33 to 54.53
ORE34, Waldport

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Road construction is scheduled to start in June. Prepare to slow. Watch for workers.
Last Updated
5/29/2025 8:32 AM

ORE351: MP 2 to 3
ORE351, 1 mile South of Joseph

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/04/2025 9:04 PM

ORE38: MP 37.2 to 38.07
ORE38, 1 mile East of Elkton

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/26/2025 8:32 PM

ORE380: MP 0.1 to 0.17
ORE380, Intersection with Ochoco Highway US26

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be installing new sidewalks and ADA ramps. The shoulder will be closed during construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
Last Updated
5/25/2025 11:29 AM

ORE42: EB MP 0 to 9.7
ORE42, Intersection with Oregon Coast Highway US101

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2025 8:40 PM

ORE42: MP 72 to 77
ORE42, 1 mile West of Winston

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2025 8:43 PM

ORE43: MP 8 to 9
ORE43, 6 miles South of Portland

Construction Work
No to Minimum Delay
Comments
Traffic impacts: Lane closure on OR 43. Pedestrian detours. Project Description: This project will reduce conflicts and improve safety on OR 43 (Willamette Drive) for travelers at the Marylhurst Drive intersection.
Last Updated
4/20/2025 6:39 AM

ORE451: MP 10.28 to 10.35
ORE451, Intersection with Central Oregon Highway ORE7

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be performing demolition and light earthwork at the intersection of OR451 and US20 in Vale. Expect possible daytime lane closures and delays. Use caution.
Last Updated
5/30/2025 1:30 PM

ORE47: MP 11.6
ORE47, Intersection with Nehalem Highway ORE202

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews working Monday through Friday from 7 a.m. to 5 p.m. You can expect lane and shoulder closures with flaggers helping direct traffic as needed. Expect a temporary full road closure of OR 47 with a detour using Apiary Road June 16 through August 21. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=N00031)
Last Updated
4/03/2025 3:55 PM

ORE47: MP 82.9 to 88
ORE47, 1 mile North of Banks

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work is currently scheduled for Monday through Thursday from 9 a.m. to 3 p.m. through August 30th, 2025.
Last Updated
6/04/2025 7:42 PM

ORE47: MP 90.63 to 90.36
ORE47, 2 miles South of Forest Grove

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/02/2025 8:01 AM

ORE58: MP 33.1 to 33.3
ORE58, 2 miles West of Oakridge

Maintenance Work
Estimated delay under 20 minutes
Comments
Bridge work is occurring. Prepare to slow. Expect short delays up to 20 minutes 8A-5P M-F for equipment entering and leaving the highway on the west side of the bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20543)
Last Updated
4/03/2025 10:15 AM

ORE58: MP 42 to 44
ORE58, 3 miles West of McCredie Springs

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557)
Last Updated
6/05/2025 12:25 PM

ORE58: MP 42.43 to 61.09
ORE58, 3 miles West of McCredie Springs

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. ODOT is replacing Curve Warning Signs. Expect single lane and shoulder closures as needed during the day or at night. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21577)
Last Updated
3/18/2025 2:36 PM

ORE58: MP 55 to 62
ORE58, 10 miles East of McCredie Springs

Maintenance Work
Estimated delay under 20 minutes
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/06/2025 2:50 AM

ORE78: MP 0.05
ORE78, Intersection with Central Oregon Highway US20

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/25/2025 1:27 PM

ORE78: MP 60.88
ORE78, 23 miles South of New Princeton

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
5/11/2025 9:19 AM

ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Nighttime lane closures and pedestrian detours on OR8 between OR 217 and SW 198th. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
Last Updated
3/16/2025 7:44 AM

ORE8: MP 4.9 to 6.45
ORE8, 2 miles West of Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Daytime lane closures, left turn lane closure at 174 Ave. Project Description: This project improves safety for people walking, rolling and bicycling by installing a crosswalk with a pedestrian-activated flashing beacon at the intersection of OR 8 at SW 174th Avenue in Aloha and a buffered bicycle lane from SW 153rd Drive to SW 182nd Avenue. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/pages/project-details.aspx?project=20328)
Last Updated
5/04/2025 6:22 AM

ORE82: MP 34.9
ORE82, 1 mile East of Minam

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:26 PM

ORE86: MP 34.01 to 70.58
ORE86, 7 miles West of Richland

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be performing guardrail replacement at various locations along OR86 between MP 34.01 and MP 70.58. Expect daytime lane closures with flagging in place. Use caution, expect delays.
Last Updated
5/30/2025 1:16 PM

ORE86: MP 49.6
ORE86, 9 miles East of Richland

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Contractor plans to work outside the shoulder. Expect possible shoulder closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/21/2025 6:23 PM

ORE86: MP 63.15 to 63.24
ORE86, 8 miles West of Oregon - Idaho Border

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. The work zone will be controlled by flaggers and temporary signals during the day, expect up to 20 minute wait times. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21873)
Last Updated
5/30/2025 12:26 PM

ORE99: MP 10.2 to 11.25
ORE99, 1 mile North of Phoenix

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for intermittent lane closures through the work zone, Monday – Friday as utility work is taking place.
Last Updated
6/02/2025 8:43 PM

ORE99: MP 11.4
ORE99, 2 miles East of Rogue River

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. This project will replace three 1920s-era bridges on Rogue River Highway with structures that are better able to withstand earthquakes. Watch for intermittent flagging and brief delays.
Last Updated
6/02/2025 8:43 PM

ORE99E: NB MP 5.72 to 8
ORE99E, 1 mile South of Milwaukie

Construction Work
No to Minimum Delay
Comments
No impacts. Project Description: This project installs an overhead RRFB with a pedestrian refuge island median, ADA compliant curb ramps with push buttons, speed feedback signs and illumination. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23521)
Last Updated
2/09/2025 1:35 PM

ORE99E: MP 20.3 to 21.8
ORE99E, Canby

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Single lane closures at night.
Last Updated
5/18/2025 6:19 AM

ORE99EB: NB MP 4.36 to 4.84
99EBus, Salem, Intersection with Market St

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21572)
Last Updated
2/03/2025 8:37 AM

ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: No impacts. Project description: The ARTS Program aims to reduce serious crashes at various intersections on state highway and on local roads. Intersections typically have high rates of crashes. This ARTS project improves safety and visibility on OR 99W from Ross Island Bridge to SW Wills Lane and U.S. 30 Bypass from Kerby Avenue to Northeast 165th Avenue. Improvements to upgrade signs, traffic signals and road markings will occur at 58 intersections on OR 99W and U.S. 30 Bypass. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
Last Updated
5/11/2025 6:22 AM

ORE99W: MP 57.49 to 57.81
ORE99W, Intersection with Willamina - Salem Highway ORE22

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures as needed.? Starting the week of June 9, we're also working on traffic signals at night with flaggers helping direct traffic at the following intersections: OR 223 and SW Cherry Street, OR 223 and SW Clay Street and OR 99W and Rickreall Road. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
6/05/2025 2:45 PM

ORE99W: MP 60.03
ORE99W, 2 miles South of Rickreall

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Clow Corner Road west of OR99W will be closed for 90 days starting May 13. A signed detour will be in place using Orrs Corner Road to Riddle. Clow Corner Road, east of OR 99W, will remain closed until June 30. A signed detour is in place using Polk Street/Hoffman Road. Use caution and watch for workers. 45MPH Reduced Speed Zone in effect. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21374)
Last Updated
5/14/2025 5:07 AM