Statewide Oregon Road Conditions
Highways with no adverse conditions do not show up on this report.
Current Travel Conditions By Route
I-205: SB MP 8.8 to 9.3
I-205, OR 99E
Construction Work
Estimated delay under 20 minutes
- Comments
- Traffic Impacts: Lane and ramp closures in Oregon City and West Linn with pedestrian detours on OR 43 and OR 99E. Nighttime ramp closures: o I-205 northbound to OR99E (Exit 9 NB) Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. o OR43 to I-205 northbound Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. o I-205 Southbound to OR43 (Exit 8 SB) Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. nighttime lane closures: o OR 99E Northbound Lanes Monday and Tuesday 8:00 pm to 6:00 am. o I-205 northbound Monday through Thursday 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. Flagging: o Main St Monday through Saturday 7:00 am to 5:30 pm. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
- Last Updated
- 5/10/2026 6:14 AM
I-205: NB MP 9
I-205, OR 99E
Construction Work
No to Minimum Delay
Off Ramp
- Comments
- Road construction will have the off ramp closed at Exit 9 . Use caution and watch for workers. Ramps Affected.
- Last Updated
- 4/27/2026 10:41 PM
I-205: NB MP 23 to 12
I-205, NE Prescott St
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22772)
- Last Updated
- 4/16/2026 10:44 AM
I-5: NB MP 58.18 to 66.7
I-5, Intersection with Pacific Highway ORE99
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) , Shoulder (Northbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. <!--Links Start Here--> [Link to additional information](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D&reserved=0)
- Last Updated
- 4/28/2026 5:51 PM
I-5: SB MP 68
I-5, 8 miles South of Wolf Creek
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) , Shoulder
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 5/05/2026 10:09 PM
I-5: NB MP 131
I-5, 5 miles South of Sutherlin
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/13/2026 6:37 AM
I-5: NB MP 169.2 to 175.02
I-5, 5 miles South of Cottage Grove
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Construction starts April 26, 2026, expect: Single lane closures, 7:00 P.M. to 8:00 A.M. Exit 172 and 174 ramp closures with detours as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22938)
- Last Updated
- 5/07/2026 8:01 AM
I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/01/2026 8:32 PM
I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
Off Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/01/2026 8:32 PM
I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Estimated delay under 20 minutes
Off Ramp
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. Southbound Commercial Street on ramp will be closed will be 5/7/26 at 6 am to 5/9/26 6 am. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/07/2026 10:37 AM
I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 5/01/2026 8:33 PM
I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
- Last Updated
- 5/15/2026 4:20 AM
I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
- Last Updated
- 4/15/2026 4:11 PM
I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange
Construction Work
No to Minimum Delay
- Comments
- Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
- Last Updated
- 4/03/2026 4:28 PM
I-84: WB MP 0 to 16
I-84, Interstate 5
Construction Work
No to Minimum Delay
- Comments
- Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 4/10/2026 3:19 PM
I-84: EB MP 0 to 16
I-84, Interstate 5
Construction Work
No to Minimum Delay
- Comments
- Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 4/10/2026 3:31 PM
I-84: WB MP 18
I-84, 1 mile East of Troutdale
Construction Work
No to Minimum Delay
- Comments
- Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 4/10/2026 3:21 PM
I-84: EB MP 37 to 38
I-84, 6 miles East of Multnomah Falls
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) Median , 1 Lane
- Comments
- Road work has the EB left lane closed at mile post 37. The onramp from Warrendale to EB is closed. Prepare to slow or move over for worker safety. Ramps Affected.
- Last Updated
- 3/01/2026 2:11 PM
I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls
Construction Work
Estimated delay under 20 minutes
- Comments
- Expect EB and WB lane closures on I-84 at McCord Creek BR. with one lane open each direction. Traffic revisions in place. Frontage Rd onramp closed. We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
- Last Updated
- 4/15/2026 5:59 PM
I-84: WB MP 38.5 to 37.5
I-84, 7 miles West of Cascade Locks
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 1 Lane
- Comments
- Road work has the WB left lane closed at mile post 38.5. Prepare to slow or move over for worker safety.
- Last Updated
- 3/01/2026 12:56 PM
I-84: EB MP 87 to 138.9
I-84, The Dalles
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 2 Lanes (Eastbound) 2 Lanes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures 24 hours per day, 7 days per week. Watch for speed reduction throughout workzone(s). Use caution, prepare to slow.
- Last Updated
- 5/11/2026 1:54 AM
I-84: EB MP 159.3
I-84, 5 miles West of Boardman
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect flagging and single lane closures on Tower Bridge overpass 5/4/26 - 5/8/26. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22880)
- Last Updated
- 5/15/2026 7:44 AM
I-84: EB MP 217.77 to 238
I-84, 9 miles East of Pendleton
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 5/15/2026 8:54 AM
I-84: EB MP 249.25 to 259.3
I-84, 10 miles West of La Grande
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 5/15/2026 8:54 AM
I-84: EB MP 270.4 to 274
I-84, 9 miles East of La Grande
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 5/15/2026 8:55 AM
I-84: EB MP 338 to 344
I-84, 8 miles West of Huntington
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/12/2026 7:58 AM
I-84: EB MP 352.05 to 368.16
I-84, Baker - Malheur County Line
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Crews will be onsite continuing work. All traffic has transitioned to the eastbound side of the freeway. Follow traffic signs, be prepared to slow and use caution while passing through workzone(s).
- Last Updated
- 5/11/2026 2:00 AM
US101: MP 28.8 to 31.27
US101, Cannon Beach
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/01/2026 8:37 PM
US101: MP 112.35 to 121.44
US101, Lincoln City
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect nighttime lane closures and delays for ADA curb ramp construction. No lane closures will occur over the weekend. Some night work may occur as needed. From N 34th Street to SW 51st Street / SE 51st Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
- Last Updated
- 5/01/2026 8:40 PM
US101: MP 127.61
US101, Depoe Bay
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
- Last Updated
- 5/01/2026 8:37 PM
US101: NB MP 236 to 236.5
US101, North Bend
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Lane closure causing minimal delay to traffic. Use caution.
- Last Updated
- 1/17/2026 1:13 PM
US101: MP 312
US101, 12 miles South of Port Orford
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/28/2026 5:47 PM
US101: MP 327.4 to 329.5
US101, Wedderburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/28/2026 5:47 PM
US101: MP 354.8 to 359.3
US101, Brookings
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/28/2026 5:47 PM
US101B: WB MP 0.82 to 0.9
US101B, Warrenton
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/11/2026 8:01 AM
US101B: MP 4.5 to 7
US101B, 3 miles West of Astoria
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/11/2026 8:02 AM
US20: MP 1.75
US20, Albany
Construction Work
Future Event: Estimated delay under 20 minutes
- Expected Start Date
- 6/17/2026 6:00:00 AM
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Work is currently scheduled from 6 a.m. to 4 p.m. on 6/17/2026.
- Last Updated
- 5/11/2026 10:22 AM
US20: MP 1.82 to 2.8
US20, N.E. Purcell Blvd. (Bend)
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22442)
- Last Updated
- 5/11/2026 1:57 AM
US20: NB MP 84 to 84.06
ORE99W, Intersection with Corvallis - Newport Highway US20
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis)
- Last Updated
- 3/30/2026 6:21 PM
US20: MP 92.29 to 92.7
ORE126, Sisters
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect nightly single lane closures with flaggers throughout work zone Monday - Thursday, pm to 7am. Use caution, prepare to stop.
- Last Updated
- 5/11/2026 1:57 AM
US26: MP 5.85 to 9.96
US26, Portland
Construction Work
Informational only
- Comments
- Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. • SE 174 Avenue will close south of SE Powell Blvd. April 19 – 26. Signed detours will be available. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic.
- Last Updated
- 4/19/2026 8:42 AM
US26: MP 11 to 13
US26, 11 miles South of Intersection with The Dalles - California Highway US97
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/15/2026 6:16 AM
US26: MP 26.06 to 24.31
US26, Intersection with Ochoco Highway ORE126
Maintenance Work
No to Minimum Delay
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/15/2026 6:21 AM
US26: MP 26.66
US26, 8 miles East of Prineville
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/16/2026 8:22 AM
US30: EB MP 2.81 to 3.61
US30, Pendleton
Construction Work
No to Minimum Delay
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite to continue work on an ADA Curb Ramp project. Use caution, obey all signs while passing through the work zone.
- Last Updated
- 5/12/2026 5:53 AM
US30: MP 43.93 to 44.11
US30, 4 miles South of Haines
Construction Work
Closure with Detour
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- Road construction has closed the road. Follow detour. Crews will be onsite for paving and striping. US30 will be closed from MP 43.86 - MP 44.11. Follow detour, use caution, watch for wet paint and expect minimal delay. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23045)
- Last Updated
- 5/15/2026 7:45 AM
US30: MP 63.39
US30, 1 mile West of Clatskanie
Maintenance Work
Future Event: No to Minimum Delay
- Expected Start Date
- 5/18/2026 8:00:00 AM
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/14/2026 6:03 PM
US30: EB MP 98.45 to 100
US30, Astoria
Maintenance Work
No to Minimum Delay
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 4/27/2026 7:46 AM
US30: MP 99 to 99.34
US30, Astoria
Maintenance Work
No to Minimum Delay
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 4/27/2026 7:47 AM
US30: MP 99.15 to 99.05
US30, Astoria
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane
- Comments
- Utility work is occurring. Prepare to slow. NW Natural Utility Work.
- Last Updated
- 4/29/2026 7:43 AM
US30BY: WB MP 0.25 to 0.26
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. Project Description: This project restores the bridge on NW Bridge Ave. northwest of the St. Johns Bridge, connecting to U.S. 30 <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21704)
- Last Updated
- 4/19/2026 8:43 AM
US395: MP 4.33 to 6.03
US395, Hermiston
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite conducting work along side the highway. Traffic control devices will be in place while work is being performed. Exercise caution and obey all traffic control signs while passing through the work zone(s). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23430)
- Last Updated
- 5/12/2026 5:50 AM
US97: MP 114.56 to 116.56
US97, 1 mile North of Terrebonne
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Beginning Monday, April 27 at 7am, the Lower Bridge Way intersection at U.S. 97 will be closed to all traffic. There will be no access to or from Lower Bridge Way at U.S. 97, but U.S. 97 will remain open. Follow posted detours. Access to 11th Street will be closed on the north end of Terrebonne, use Central Avenue. Access to 11th St at south end of Terrebonne will be limited, use Smith Rock Way, Central Avenue and C Street. Prepare to slow, use caution, follow detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21162)
- Last Updated
- 5/13/2026 1:08 AM
ORE104: MP 1 to 3
ORE104, Warrenton
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/14/2026 4:24 PM
ORE126: MP 0.22 to 13.5
ORE126, Redmond
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20167)
- Last Updated
- 4/06/2026 1:51 AM
ORE126: EB MP 3.93 to 7.11
ORE126, Springfield
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-springfield)
- Last Updated
- 5/01/2026 8:35 PM
ORE126: MP 110.65 to 111.97
ORE126, Redmond
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures between 5th and 15th to construct new ADA ramps and enhance signal operations. Various corners will be closed to pedestrian traffic during this time. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
- Last Updated
- 5/11/2026 1:55 AM
ORE126B: WB MP 1.3 to 1.5
ORE126B, Springfield
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Bridge work is occurring. Prepare to slow. Week of the May 4th the contractor will be doing single lane closures at night from 7 PM - 5 AM. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21762)
- Last Updated
- 5/01/2026 8:39 PM
ORE138: MP 0.5 to 1.4
ORE138, Roseburg
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/28/2026 5:49 PM
ORE141: MP 3.8 to 4.44
ORE141, Tigard
Construction Work
Estimated delay under 20 minutes
- Comments
- Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
- Last Updated
- 10/19/2025 6:14 AM
ORE141: MP 7.07 to 3.3
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
- Last Updated
- 6/08/2025 6:59 AM
ORE141: MP 7.07 to 5.01
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
- Last Updated
- 11/09/2025 5:54 PM
ORE18B: MP 2 to 2.67
ORE18B, Willamina
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 5/01/2026 8:37 PM
ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 5/01/2026 8:31 PM
ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld
Maintenance Work
No to Minimum Delay
- Comments
- Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 10/28/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117)
- Last Updated
- 5/13/2026 5:20 AM
ORE211: MP 11.8
ORE211, Molalla
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
- Last Updated
- 9/28/2025 8:36 AM
ORE213: MP 7.23 to 7.41
ORE213, Portland
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
- Last Updated
- 5/05/2026 4:46 PM
ORE219: MP 18.35 to 20.8
ORE219, Newberg
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 5/01/2026 8:39 PM
ORE22: MP 13.1 to 13.3
ORE22, 12 miles West of Intersection with Salmon River Highway ORE18
Construction Work
Future Event: Estimated delay under 20 minutes
- Expected Start Date
- 5/18/2026 7:00:00 AM
- Lanes Affected
- (Westbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/12/2026 12:02 PM
ORE22: MP 21 to 24.07
ORE22, 4 miles West of Salem
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
- Last Updated
- 5/01/2026 8:40 PM
ORE223: MP 2.13 to 4.28
ORE223, Dallas
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 5/01/2026 8:33 PM
ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/17/2025 3:08 PM
ORE224: MP 36 to 37
ORE224, 13 miles East of Estacada
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts expected. Project Description: Repairs are being made on OR 224 at milepost 36.7 (approximately 10 miles east of Estacada) after a winter storm event in December.
- Last Updated
- 4/10/2026 2:53 PM
ORE234: MP 14.66 to 15.37
ORE234, 3 miles West of Intersection with Crater Lake Highway ORE62
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Sunken pavement; use caution. Crews will return in the spring to complete repairs and install safety features. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M25033)
- Last Updated
- 3/09/2026 10:41 AM
ORE237: MP 31.54 to 32.15
ORE237, North Powder
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be on site prepping, forming, pouring, milling, paving and working on landscape. Use caution, prepare to slow, obey all traffic signs throughout work zone(s).
- Last Updated
- 5/12/2026 5:50 AM
ORE240: MP 11.04 to 11.26
ORE240, Newberg
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 3/30/2026 6:34 PM
ORE241: MP 3.5 to 3.8
ORE241, 3 miles East of Coos Bay
Maintenance Work
No to Minimum Delay
- Comments
- Bridge work is occurring causing minimal delay to traffic. Use caution.
- Last Updated
- 4/28/2026 5:47 PM
ORE38: MP 4.9
ORE38, 5 miles East of Intersection with Oregon Coast Highway US101
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/10/2026 1:29 AM
ORE413: MP 11.03 to 11.45
ORE413, Intersection with Pine Creek Highway
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 3/24/2026 1:09 PM
ORE42: EB MP 0 to 9.7
ORE42, Intersection with Oregon Coast Highway US101
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/28/2026 5:41 PM
ORE42: MP 20.8 to 21.9
ORE42, Myrtle Point
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/28/2026 5:41 PM
ORE42: MP 36.1
ORE42, 1 mile West of Remote
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 4/28/2026 5:46 PM
ORE42: MP 72 to 77
ORE42, 1 mile West of Winston
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/08/2026 1:44 AM
ORE47: MP 1.47
ORE47, Clatskanie
Maintenance Work
Future Event: No to Minimum Delay
- Expected Start Date
- 5/18/2026 9:00:00 AM
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/14/2026 5:51 PM
ORE51: MP 5.81 to 6.34
ORE51, Independence
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
- Last Updated
- 5/01/2026 8:34 PM
ORE540: MP 0.79 to 0.9
ORE540, North Bend
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 4/06/2026 7:01 PM
ORE58: MP 42 to 44
ORE58, 3 miles West of McCredie Springs
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557)
- Last Updated
- 1/04/2026 12:26 PM
ORE58: MP 48.7 to 69.52
Snow Zone
Informational only
- Affected Area
- Willamette Pass Summit (Elev. 5128') - East of McCreadie Springs to Odell Lake
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
- Last Updated
- 5/11/2026 10:23 AM
ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
- Last Updated
- 5/01/2026 8:36 PM
ORE6: MP 33 to 42
ORE6, Tillamook - Washington County Line
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Watch for flaggers and workers. New guardrail will be installed the week of 1/19/26.
- Last Updated
- 5/01/2026 8:31 PM
ORE6: MP 49 to 51
ORE6, Intersection with Nehalem Highway ORE47
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 5/01/2026 8:32 PM
ORE62: MP 18 to 20
ORE62, Shady Cove
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 5/14/2026 9:18 AM
ORE62: MP 21
ORE62, Shady Cove
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 5/13/2026 9:38 AM
ORE62: MP 35.41
ORE62, 15 miles East of Shady Cove
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane traffic controlled by an automated flagging system. Most delays will be less than 5-10 minutes. Crews working Monday – Friday, with closures in place 24/7 until Fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22629)
- Last Updated
- 4/29/2026 5:17 PM
ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
- Last Updated
- 12/09/2025 8:27 AM
ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Nighttime lane closures (8:00 p.m. to 5:30 a.m.) on Canyon Road, Monday through Friday. • Travelers can expect nighttime flagging at Rose Biggi Avenue and Cedar Hills Thursday and Friday nights. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
- Last Updated
- 4/19/2026 8:44 AM
ORE8: WB MP 13.82 to 17.67
ORE8, Hillsboro
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No traffic impacts. Project Description: This safety improvement project in three locations on OR 8 in Hillsboro and Forest Grove includes new sidewalks, an enhanced pedestrian crosswalk, new lighting and upgraded traffic signals. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21608)
- Last Updated
- 5/10/2026 6:17 AM
ORE86: MP 34.01 to 70.58
ORE86, 7 miles West of Richland
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite replacing guardrail at various locations. Expect daytime lane closures with flagging.
- Last Updated
- 5/11/2026 1:57 AM
ORE86: MP 40.64
ORE86, Richland
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal control. Use caution, prepare to slow.
- Last Updated
- 4/21/2026 1:05 AM
ORE86: MP 42.01 to 42.4
ORE86, Richland
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 3/24/2026 1:11 PM
ORE86: MP 56.47
ORE86, 14 miles West of Oregon - Idaho Border
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal controls. Use caution, prepare to slow.
- Last Updated
- 4/21/2026 1:15 AM
ORE99: MP 10.2 to 11.25
ORE99, 1 mile North of Phoenix
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. The week of April 26, expect single lane traffic through the construction area as the contractor begins paving. Expect intermittent lane closures through the work zone on OR 99, Monday through Friday.
- Last Updated
- 4/28/2026 5:50 PM
ORE99: MP 14.42 to 16.09
ORE99, Cottage Grove
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-cottagegrove)
- Last Updated
- 5/01/2026 8:35 PM
ORE99E: MP 40.75 to 40.81
ORE99E, Brooks
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 5/01/2026 8:37 PM
ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 5/01/2026 8:40 PM
ORE99W: NB MP 38.07 to 37.8
ORE99W, McMinnville
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/05/2026 5:37 PM
ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
- Last Updated
- 5/05/2026 6:56 AM
ORE99W: NB MP 84.17 to 86.31
ORE99W, Intersection with Corvallis - Newport Highway US20
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Work on the project has now begun. Expect night time lane closures Monday through Thursday nights from 7:00 PM to 6:00 AM. Expect some noise and short delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22785)
- Last Updated
- 5/14/2026 10:36 AM
HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park
Construction Work
No to Minimum Delay
- Comments
- The east viaduct is opened. Periodic single-lane closures on the East Viaduct until 9 a.m. starting May 18. Use caution and watch for workers. I-84 is open; expect delays. Use I-84 Exit 31 or take transit to visit Multnomah Falls. The Historic Columbia River Highway viaducts, east and west of Multnomah Falls, are open to vehicles less than 35 feet long and bicycle travel only. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roads that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roads– called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct is open. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. Over the summer, travelers using the east viaduct can expect to see flaggers directing traffic while crews clean up the site, complete finishing touches on the railings and install permanent striping. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
- Last Updated
- 5/16/2026 8:50 AM