Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

I-105: EB MP 0.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Two westbound lanes are available south of the Willamette River Bridge during the day, and one lane at night between 10:00 pm and 6:00 am. Two lanes are also open in the eastbound lanes. Travelers should expect this traffic configuration to remain for several weeks. The 6th Avenue on-ramp to eastbound I-105 remains open at this time. Work continues around the 6th and 7th Avenue ramps. Travelers should expect lane closures and changes in traffic patterns in the work zone.
Last Updated
4/02/2019 6:31 PM

I-205: SB MP 13.45 to 14.17

Construction Work
No to Minimum Delay
Comments
Periodic shoulder closures.
Last Updated
4/22/2019 2:31 AM

I-205: SB MP 16.3 to 25.6

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane and ramp closures. Division Street on-ramp to northbound I-205 and auxiliary lane closed 24/7. Periodic nighttime single and double lane closures in both directions and periodic ramp closures. Periodic nighttime ramp closures at the I-205 northbound Division Street on-ramp, northbound Exit 20 toward Washington and Stark Streets, the southbound Washington Street on-ramp, and northbound Exit 23B to Killingsworth Street/U.S. 30 Bypass. Periodic daytime single lane closures in both directions on Glisan Street and on Washington and Stark. Pedestrian detours at Washington, Stark and Glisan Streets.
Last Updated
4/22/2019 2:31 AM

I-205: MP 19.68

Construction Work
Closure
On Ramp
Comments
The Division on-ramp to I-205 north is closed 24/7. Use SE 82nd Avenue to Washington Street. Ramps Affected.
Last Updated
4/22/2019 2:31 AM

I-405: SB MP 1.46 to 3.98

Construction Work
No to Minimum Delay
Comments
Daytime lane closures with flaggers directing traffic on Mississippi Avenue and Interstate Avenue for overhead work on I-405. Periodic shoulder closures. Delays for people walking and biking.
Last Updated
4/22/2019 2:32 AM

I-405: NB MP 2.9

Construction Work
No to Minimum Delay
Comments
Daytime lane closures with flaggers directing traffic on Mississippi Avenue and Interstate Avenue for overhead work on I-405. Periodic shoulder closures. Delays for people walking and biking.
Last Updated
4/22/2019 2:32 AM

I-405: SB MP 3.7

Construction Work
No to Minimum Delay
Comments
Daytime lane closures with flaggers directing traffic on Mississippi Avenue and Interstate Avenue for overhead work on I-405. Periodic shoulder closures. Delays for people walking and biking.
Last Updated
4/22/2019 2:32 AM

I-5: NB MP 10 to 12.5

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
4/23/2019 12:00 AM

I-5: NB MP 33

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Monday night, guard rails will be placed and traffic shifted as project nears final stages. Watch for workers and equipment in the off-ramp area. This project will widen the existing northbound off-ramp to allow for dual right turn lanes. No traffic delays expected, but there may be some queueing in the peak hour. Watch for workers and equipment off the shoulder. OREGON 62 (Crater Lake Highway), MP .7 -1.73 / 5.38 - 5.77, Rogue Valley Expressway Project Phases I & II ($120 million) Some punch list items and awaiting signal turn on and final striping which is weather dependent. Weather permitting, look for the opening sometime after May 1.
Last Updated
4/22/2019 11:59 PM

I-5: SB MP 48

Maintenance Work
No to Minimum Delay
Off Ramp
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution. Ramps Affected.
Last Updated
4/26/2019 1:38 AM

I-5: SB MP 118 to 113

Construction Work
Informational only
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is or will be occurring. Use caution. This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction will continue until summer 2021. On Roberts Mountain (MP 118-116), the speed limit has been reduced to 55 mph in the southbound direction. The southbound shoulder is closed in this area. Elsewhere, watch for intermittent lane and shoulder closures. For more information, visit: www.RobertsMountain.com.
Last Updated
4/22/2019 11:57 PM

I-5: NB MP 124

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Pedestrians should watch for construction activity north of the bridge, from Gaddis Park to the pedestrian bridge.
Last Updated
4/22/2019 11:57 PM

I-5: SB MP 294.21 to 288.55

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane and ramp closures in both directions. The southbound on- and off-ramps to Lower Boones Ferry (exit 290) and Nyberg Street (exit 289) will be closed at night between 10 p.m. and 5 a.m. Shoulder closures.
Last Updated
4/22/2019 2:30 AM

I-5: SB MP 301.45 to 301.92

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Full closures of the ramps from I-84 west to I-5 north and I-5 south to I-84 east from 10pm April 26 to 5am April 29. Weekend full closures of the ramps from I-84 west to I-5 north and I-5 south to I-84 east. The ramp from I-84 west to I-5 north will be closed from 10 p.m. Friday 4/26 through Saturday night/Sunday morning. The ramp from I-5 south to I-84 east will be closed Saturday night/Sunday morning through 5 a.m. Monday, April 29. Nighttime lane closures on the ramp from I-5 north to I-84 west Thursday, April 25.
Last Updated
4/23/2019 3:31 PM

I-5: NB MP 305 to 307.97

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane and ramp closures weekdays and daytime lane closures on ramps for paving. Nighttime lane closures with flagging at the intersections of Victory Boulevard and Marine Drive. Nighttime ramp closures on Broadway/Weidler, Going Street, Rosa Parks Way, Lombard Boulevard, Victory Boulevard, Marine Drive and Jantzen Beach from 9 p.m. to 5 a.m. Daytime single lane closures on the ramps from 9 a.m. to 3 p.m.
Last Updated
4/22/2019 2:30 AM

I-82: EB MP 1.77 to 10.27

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Lane closures and speed reductions are in place in the construction zone EB and WB. No to minimum delay. This project includes replacement of bridge end panels and paving.
Last Updated
4/22/2019 7:01 PM

I-84: WB MP 17 to 17.6

Construction Work
Estimated delay under 20 minutes
Comments
Daytime and nighttime single lane closures on I-84 and daytime lane closures on Graham Road. Expect flaggers directing traffic with short-term traffic holds on Graham Road Monday from 10 a.m. to noon. Daytime lane closures on I-84 between 8 a.m. and 6 p.m., and shoulder closures. Nighttime lane closures from 10 p.m. to 5:30 a.m.
Last Updated
4/22/2019 2:30 AM

I-84: WB MP 51 to 53

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Single lane closure for eastbound I-84 and shoulder closures from 7 a.m. to 5 p.m. Monday through Thursday.
Last Updated
4/22/2019 2:30 AM

I-84: EB MP 100.61 to 103.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:01 PM

I-84: EB MP 109.17 to 110.77

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:00 PM

I-84: EB MP 125.5 to 137.78

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Intermittent single lane closures will be in place both EB and WB in the construction zone. No to minimum delay.
Last Updated
4/21/2019 6:36 PM

I-84: EB MP 131.61 to 136.9

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:00 PM

I-84: EB MP 146.46 to 148.18

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place from 6AM to 10PM for cable barrier installation. No to minimal delay.
Last Updated
4/22/2019 9:00 PM

I-84: EB MP 152 to 64

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Intermittent single lane closures will be in place both EB and WB in the construction zone. No to minimum delay. This construction project includes installation of new guardrail end treatments, bridge screening, and bridge rail replacement.
Last Updated
4/21/2019 6:34 PM

I-84: EB MP 214 to 259.97

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures are in place both EB and WB in the construction zone. No to minimum delay. This project includes grading, structures, signing, illumination, and signals.
Last Updated
4/22/2019 5:06 PM

I-84: EB MP 260.32 to 272.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Intermittent lane closures may be in place EB and WB in the construction zone. No to minimum delay expected. This project includes grading, drainage, structures, paving, illumination, and roadside development.
Last Updated
4/22/2019 9:01 PM

I-84: EB MP 353.2

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder
Comments
Roadwork is occuring on the shoulder causing no to minimal delays . Use caution. The westbound Port of Entry scale is closed.
Last Updated
4/22/2019 5:09 PM

I-84: WB MP 376 to 378

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments
Single lane closures will be in place in the construction zone. No to minimal delays.
Last Updated
4/22/2019 5:07 PM

US101: MP 4.53 to 5.33

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring. Use caution. US 101: Young’s Bay (New Youngs Bay) Bridge Repair Project (Clatsop County) (Oregon Coast Highway, mileposts 4.53 to 5.33) This project includes work as follows: • Raising the left span tower bracing above the high route clearance requirement; • replacing rocker bearings; • repairing the damaged concrete with cathodic protection; and • replacing compression joint seals. Initially in mid March, the traveling public will notice the contractor building the containment structure which will be attached to the sides of the bridge, and a barge in the water with support boats bringing crew and materials to and from the barge. Once the containment structure is in place, actual construction will begin. Most of the construction will be performed below the bridge from the barge. The traveling public can expect periodic single lane closures at night to allow the contractor to move equipment. The lane closures will be Sunday night through Friday morning, 9 p.m. to 5:30 a.m. A complete two week night time closure of the bridge is scheduled in 2021 toward the end of the project. This closure will be for 14 consecutive nights. Pedestrian traffic will also not be allowed during the complete closures. An alternative route during periods of lane closures and the full night time closure is U.S. 101B over the Old Youngs Bay and Lewis and Clark River Bridges. The public is encouraged to sign up for project updates to be delivered via email by copying an pasting the following link into your web browser and following the steps to enroll: https://public.govdelivery.com/accounts/ORDOT/subscriber/new?topic_id=ORDOT_126
Last Updated
3/27/2019 9:24 AM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Night work continues until Memorial Day, but will be intermittent depending on weather. Lane closures are in effect from 7 p.m. to 6 a.m. Monday night through Thursday night. Flaggers are directing traffic at the signal at SE 1st St during lane closures. Crews are installing steel and titanium reinforcement to the bridge deck. Work at the Devil’s Lake Outlet bridge is expected to last until the spring of 2020. Work at Schooner Creek bridge is expected to start in summer of 2019. Expect minor delays.
Last Updated
4/14/2019 11:56 AM

US101: MP 141.44 to 141.83

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project will paint the steel bridge members under the roadway deck in two spans of the steel structure. These members are in need of additional protection from the harsh coastal environment. Most of the work will be done under the bridge with no impact to traffic. There will be occasional nighttime lane closures to set up containment under the bridge and move equipment. Intermittent night work will continue with lane closures allowed from 8 p.m. to 6 a.m. The eastern sidewalk is closed for the duration of the project. A temporary pedestrian crossing at the south end of the bridge will allow pedestrians to cross U.S. 101. At the north end, pedestrians can use the existing sidewalks under the bridge, which will be signed as the pedestrian detour route. This project is expected to last until October 2019. Expect minor delays.
Last Updated
4/14/2019 9:20 AM

US101: MP 190.1 to 190.84

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
4/12/2019 9:07 PM

US101: MP 233.4 to 234.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. This project will paint the steel truss section of McCullough Bridge, replace rivets, remove rust and repair damaged steel. Construction is scheduled for completion in fall 2021. For more information, visit: www.McCulloughBridge.com. Watch for intermittent nighttime (7 p.m. to 7 a.m.) lane closures each Sunday night to Friday morning. During daylight hours, watch for intermittent shoulder closures and/or northbound and southbound traffic lane shifting to accommodate sidewalk work at the corner of Ferry Road & U.S. 101. Pedestrians should watch for intermittent sidewalk closures. At all times, at least one of the bridge’s sidewalks will remain open.
Last Updated
4/22/2019 11:54 PM

US101: MP 295 to 300

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will pave five miles of U.S. 101 and repair four bridges between the Sixes area and the north end of Port Orford. The speed limit has been reduced to 40 mph at milepost 295, the one-mile section of highway between Crystal Creek and Sixes River. Watch for intermittent weekday lane closures and brief delays throughout the project area as the contractor continues with bridge work. Flaggers will provide traffic control as needed.
Last Updated
4/22/2019 11:55 PM

US101: MP 348

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is reduced to a single lane, and controlled with a temporary traffic signal. Expect delays and use caution. The bridge is limited to a single lane of traffic until summer 2019. A temporary signal is in place to provide traffic control. Expect brief delays.
Last Updated
4/22/2019 11:56 PM

US197: MP 46.22 to 46.75

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic may be controlled by flagger in the construction zone. Expect delays of up to 20 minutes. Use caution.
Last Updated
4/21/2019 7:55 PM

US20: MP 19.93 to 19.9

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Intermittent lane closures may be in place during night construction operations. No to minimum delay.
Last Updated
4/25/2019 1:04 PM

US20: MP 51.4 to 52.2

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays, use caution. US 20 / Philomath Blvd: Boulevard Apartment in Philomath Water/Sewer Line Work Water and sewer line work along and across the highway will be occurring June 2018 to TBD. This work is for a proposed apartment complex. After the water and sewer line work is completed, the contractor is expected to begin work on highway improvements which will likely include a left turn lane and a pedestrian crossing. Lane closures, when needed, on US20 can be expected: Sunday night through Thursday night from 7:00 PM to 6:00 AM. No holiday weekend closures will be permitted/allowed.
Last Updated
4/12/2019 8:39 PM

US20: MP 98 to 88.2

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/15/2019 7:01 AM

US26: MP 0.42 to 1.12

Construction Work
No to Minimum Delay
Comments
Westbound single lane closures at night Monday through Friday from 8 p.m. to 6 a.m.
Last Updated
4/22/2019 9:02 AM

US26: WB MP 1.76

Construction Work
Estimated delay under 20 minutes
Comments
Periodic single lane closures from 7 a.m. to 3:30 p.m. in both directions and Saturday beginning at 6 a.m. for eastbound.
Last Updated
4/22/2019 2:44 AM

US26: MP 7.5 to 7.95

Construction Work
No to Minimum Delay
Comments
No traffic impacts. The Oregon Department of Transportation (ODOT) will construct roadway improvements on Powell Boulevard(US Highway 26) from SE 122nd Avenue to SE 136th Avenue. This project will address the high rate of collisions on Outer Powell for the past several years. The purpose of this project is to increase safety for people who walk, drive, take the bus and ride bikes, making Outer Powell a safer place for everyone.
Last Updated
4/05/2019 1:21 PM

US26: MP 91.12 to 103.09

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Flaggers will control traffic during construction operations. Expect delays up to 20 minutes between 8AM and 5PM. The WB slow lane is closed. This project includes rock fall mitigation and the installation of drainage, guardrail, pavement markings, and permanent signing.
Last Updated
4/21/2019 6:44 PM

US30: WB MP 98.13 to 98.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. 6th Through 11th Street: Waterfront Bridges (Astoria) Project (Clatsop County) (Various Streets) This project consists of performing work as follows: - Install and remove temporary traffic control and pedestrian routes (TPAR) - Install and remove temporary potable water and sanitary sewer systems - Perform earthwork - Install storm sewer systems and water quality structures - Remove and reconstruct six bridges and trolley crossings (Including tracks) - Construct roadway, sidewalks and ADA ramps - Install permanent signs and illumination systems - Perform additional and incidental work and called for by the Plans and Specifications This Project replaces six aging bridges at the Astoria Waterfront, at 6th through 11th Streets and to install drainage and water quality facilities at the intersection of Highway 30 and 30th Street in Astoria. Streets will be closed while construction is occurring except for Highway 30. Flaggers will control single lane traffic while construction is occurring at 30th St. The odd numbered streets (7th, 9th and 11th) are scheduled to begin bridge demolition mid-October 2018, and are to be completed by June 15, 2019. The remaining work is to be completed no later than June 30, 2020. Temporary Pedestrian Access Routes (TPAR) will be maintained throughout the work zones and will be ADA compliant.
Last Updated
4/12/2019 9:03 PM

US395: MP 0.78 to 0.99

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes
Comments
Intermittent lane closures will be in place SB in the construction zone on Emigrant Avenue. No to minimum delay. This project includes grading, drainage, paving, signing, and roadside development on Emigrant Avenue.
Last Updated
4/22/2019 9:01 PM

US97: MP 0.27 to 6.98

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is controlled by a temporary signal in the construction zone. Flaggers may occasionally control traffic, expect minor delays. This project includes bridge upgrades and structure replacement on Highway 97 over Spanish Hollow Creek and Trout Creek.
Last Updated
4/21/2019 6:38 PM

US97: MP 57 to 75

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
No work is planned for the week of April 22nd.
Last Updated
4/21/2019 6:41 PM

US97: MP 74.9 to 75.18

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Traffic is controlled by a temporary signal in the construction zone. Flaggers may occasionally control traffic, expect minor delays. This project includes bridge upgrades and structure replacement on Highway 97 over Trout Creek.
Last Updated
4/21/2019 6:42 PM

US97: MP 136.9 to 137.17

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Intermittent lane closures may be in place during night construction operations. No to minimum delay.
Last Updated
4/25/2019 1:38 PM

US97: NB MP 140.1 to 139.9

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Intermittent lane closures may be in place during night construction operations. No to minimum delay.
Last Updated
4/25/2019 1:05 PM

US97: MP 240.55 to 257.77

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Bump grinding, work zone controlled with flagging and pilot car, expect minor delays.
Last Updated
4/23/2019 2:42 AM

US97: MP 265.65 to 280.51

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Guardrail, sign and grading work. Work zone controlled with flagging and pilot car, expect 20 minute delays.
Last Updated
4/23/2019 2:48 AM

ORE104: MP 1 to 4

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/25/2019 6:16 PM

ORE126: MP 2

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
4/18/2019 7:04 PM

ORE126: MP 31.56 to 32.4

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. 24-hour flagging beginning tomorrow at 6 a.m. through May 10 at noon. A westbound passing lane is being added. Flaggers will direct traffic 24-hours a day beginning April 24 through May 10, including weekends.
Last Updated
4/23/2019 12:43 PM

ORE140: MP 7.75

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Watch for traffic control barrier on Little Butte Creek Bridge near Brownsboro. Two-lane traffic will be maintained through the OR 140 work zone. This project upgrades the bridge and culvert rails for safety. In addition, the Little Butte Creek Bridge will receive a deck overlay. Work on the Oregon 238 bridge rail is rescheduled to June 2-7. Expect detour due to one week full closure between West Main Street and Rossanley Drive.
Last Updated
4/23/2019 12:01 AM

ORE18: MP 50 to 52.6

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Motorists should expect intermittent delays Monday between 12:00 a.m. and 5:00 a.m. and Monday – Friday between 7:00 p.m. and 5:00 a.m. OR18 EB & WB MP 50 to MP 52.6 (Dayton) Effective May 6, 2019, this section of OR18 eastbound and westbound will be closed at 9 a.m. Monday – 6 a.m. Friday. A signed detour will be in place along with flaggers to help control intersection traffic on the detour. Open for Weekend Traffic. The estimated completion date for this project is May 24, 2019.
Last Updated
4/17/2019 10:33 AM

ORE18: MP 51

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/25/2019 10:44 PM

ORE207: MP 7 to 26

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
4/25/2019 8:05 AM

ORE22: MP 39 to 35

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 2 Lanes
Comments
Road construction is occurring. Use caution.
Last Updated
4/12/2019 9:06 PM

ORE22: MP 47.57 to 47.77

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. The Contractor will be performing work on the bridge deck, installing guardrail, and shoulder work. Single ane closures controlled by flaggers will be in place 24 hours a day Sunday night until Friday at noon.Traffic should expect delays of 20 minutes or less.
Last Updated
4/24/2019 1:19 PM

ORE228: MP 11.8

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Conducting bridge strengthening project on McKercher bridge, the first phase should be done about the 12th of April. The second phase will begin about 6 weeks later. We will be able to accommaodate oversize loads. 10:50 with flaggers / emerg contact Doug Rogerson 541-936-0221 10:50 ODOT Insp. Del Webb 541-206-3881
Last Updated
4/15/2019 5:19 PM

ORE241: MP 0.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. Watch for intermittent lane closures and delays of less than 20 minutes. Flaggers will provide traffic control as needed. For more information, visit: www.IsthmusSloughBridge.com.
Last Updated
4/22/2019 11:54 PM

ORE281: MP 2.75

Construction Work
Estimated delay under 20 minutes
Comments
Daytime lane closures with flaggers directing traffic at both intersections.
Last Updated
4/22/2019 2:45 AM

ORE34: MP 1.62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. An existing bridge near milepost 1.5 is being replaced with a new structure. This new structure will be constructed one half at a time. Due to limited working space one lane of traffic will be closed for the duration of the project. Crews will continue working on driving pile for another week. Once pile driving is complete crews will work on removing the closed portion of the old structure. One lane, two way traffic will be controlled by a temporary signal or flaggers at all times. Expect minor delays.
Last Updated
4/14/2019 9:15 AM

ORE38: MP 1 to 57.13

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures and expect brief delays due to paving work. Flaggers will provide traffic control as needed.
Last Updated
4/22/2019 11:58 PM

ORE42: MP 4.5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/19/2019 12:06 PM

ORE42: WB MP 75

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/26/2019 4:35 AM

ORE47: MP 62.9 to 74

Construction Work
Estimated delay under 20 minutes
Comments
Tree trimming around power lines will result in alternating lane closures, Mon-Fri 8:00am - 3:30pm. Expect delays.
Last Updated
2/04/2019 8:00 AM

ORE47: MP 69.72 to 69.87

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. OR 47 Beaver Creek Bridge Replacement Project (Washington County) (Nehalem Highway, mileposts 69.72 to 69.87) This project consists of performing work as follows: construct work area isolation and remove existing bridge; construct pile foundations, abutments and bridge superstructure; install drainage and storm water facilities and roadway paving; install cast in place retaining wall; and perform additional and incidental work as called for by specifications and plans. Work has commenced for this season. Final wearing course paving and striping will continue next spring and will be completed by May 30, 2019.
Last Updated
2/06/2019 1:48 PM

ORE58: MP 13 to 46

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/25/2019 8:11 AM

ORE58: MP 28 to 29

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
4/24/2019 2:21 PM

ORE58: MP 37 to 46

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments
Road construction is occurring. Work will be done Monday thru Thrusday, 8am to 4pm. Use caution.
Last Updated
4/23/2019 9:33 AM

ORE58: MP 54.5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/24/2019 1:08 PM

ORE62: MP 0.7 to 5.7

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Contractor is waiting for good weather window for final striping, along with working on various end-of-project – punch list - items, such as signs, signal/electrical work and corrective work on erosion control. No opening date yet, but weather-permitting, it may be end of this month or early May.
Last Updated
4/22/2019 11:22 PM

ORE8: MP 3.18 to 10

Construction Work
Estimated delay under 20 minutes
Comments
Lane closures and pedestrian detours on 185th Avenue.
Last Updated
4/22/2019 2:44 AM

ORE8: EB MP 14.07

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane closures with flagging on the bridge over Dairy Creek. Nighttime lane closures with flagging are from 7:30 p.m. to 6 a.m., 7 p.m. Friday until 9 a.m. Saturday and 8 p.m. Saturday until 10 a.m. Sunday. Project description: ODOT is resurfacing the TV Highway bridge over Dairy Creek in Washington County, between Cornelius and Hillsboro.
Last Updated
4/22/2019 2:45 AM

ORE82: MP 30.02 to 32.58

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Flaggers will control traffic during construction operations. Expect delays up to 20 minutes. This project includes grading, paving, and bank stabilization.
Last Updated
4/22/2019 7:01 PM

ORE99: SB MP 2 to 2.74

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Expect single lane traffic on Oregon 99 through end of the year for project that builds new signal and highway connection across railroad tracks into Twin Creek development.
Last Updated
4/23/2019 12:00 AM

ORE99E: MP 12.73

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane closures at 7 p.m., with flagging at 9 p.m., until 5 a.m. Monday through Friday near the tunnel. Daytime lane closures 9 a.m. to 3 p.m.
Last Updated
4/22/2019 2:25 PM

ORE99W: SB MP 11 to 11.22

Construction Work
No to Minimum Delay
Comments
Daytime bike lane closure and shoulder closures.
Last Updated
4/22/2019 2:45 AM

ORE99W: MP 62 to 64

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Motorist should expect intermittent lane closures nightly Sunday through Friday, 7:00 p.m. to 6:00 a.m
Last Updated
4/12/2019 8:40 PM

ORE99W: MP 63

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
4/26/2019 1:04 AM