Northwest Oregon Road Conditions

Alerts!

Benton Co.; Weather Alert
Flood Warning, *NOAA Issue Date: 12/22/2014 10:42:00 AM Willamette tributaries bulletin ... The Flood Warning continues for the following rivers in Oregon ... Marys river near Philomath affecting Benton county Luckiamute river near Suver affecting Benton and Polk counties for the latest river stages and forecasts, visit weather. Gov/Portland. The next update for these locations will be issued by 4 PM Monday. The Flood Warning continues for the marys river near Philomath. * At 10 am Monday the stage was ... 20.2 feet / 5280 cfs. * Flood stage is 20.0 feet and flood flow is 5100 cfs. * Forecast This river is expected to fall below flood stage early afternoon Monday and continue falling for the next couple days. * Impact Above 20.0 ft, expect widespread low land and agricultural flooding. Some structures along the river may begin to flood. &&

Benton Co., Polk Co.; Weather Alert
Flood Warning, *NOAA Issue Date: 12/22/2014 10:42:00 AM Willamette tributaries bulletin ... The Flood Warning continues for the following rivers in Oregon ... Marys river near Philomath affecting Benton county Luckiamute river near Suver affecting Benton and Polk counties for the latest river stages and forecasts, visit weather. Gov/Portland. The next update for these locations will be issued by 4 PM Monday. The Flood Warning continues for the Luckiamute river near Suver. * At 9 am Monday the stage was ... 28.4 feet / 9500 cfs. * Flood stage is 27.0 feet and flood flow is 7500 cfs. * Forecast This river is expected to fall below flood stage Monday evening and continue falling for the next couple days. * Impact Above 27.0 ft, expect flooding of low lying and agricultural lands in the vicinity of sarah helmick state park, highway 99w, and parker road. Some secondary roads and rural access roads may be flooded at this point. Flooding along Buena Vista rd near the confluence with the Willamette is also likely, especiallly if the Willamette is running high. &&

ORE224, 8 miles East of Estacada MP 31 - 36; Closure
Hwy closed from Promontory Park MP 31 to MP 38. Escorted access has been halted due to a landslide and there is no date for resuming the escorts., OR 224 closed indefinitely from Promontory Park (mp 31) to US Forest Service Road 57 (mp 38). There is no estimated time or day to reopen OR 224. The highway will remain closed until all hazard trees are addressed.
Updated: 12/18/2014 4:19 pm

US101B, 2 miles West of Astoria MP 5; Closure with Detour
The Lewis and Clark River Bridge will be closed starting December 1, 2014; a detour will be in place. Use an alternate route., The Lewis & Clark River Bridge is scheduled to be closed to facilitate construction activities starting December 1, 2014. This closure is anticipated to last until August 1, 2015. A detour route will be designated with signing during the length of the closure. The project is scheduled to be completed in November 2017.
Updated: 12/10/2014 10:31 am

Road Conditions by Route

I-5 MP 240.95

REST AREA
Informational only
Comments: There is a traffic delay at the rest area. The access road from the north bound side to the south bound side is closed due to flooding.
Last Updated: 12/22/2014 10:05 am

I-5 MP 253 to 261

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median (Northbound) Median
Comments: Road construction is occurring in the highway median between the hours of 8:00 pm and 5:00 am, causing no to minimum delays, use caution. The scheduled work includes removal of the earthen berm and installation of cable barrier between mile post 253.83 and 258.92. Both the southbound left (fast) lane and northbound shoulder (northbound left lane may be closed sporadically) will be closed Sunday through Thursday nights from 8:00 p.m. until 5:00 a.m. to facilitate construction between mile post 253.83 and 258.92. The roadway shoulders along the median, both in the northbound and southbound directions, may be closed or have their width reduced at any hours of the day as required to facilitate the work. Drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in February 2015.
Updated: 11/20/2014 4:17 pm

I-5 MP 271.6 to 274.69

Informational only; Commercial Vehicle Information
Details: I-5 MP 271.35 to MP 276.01 NB & SB (Woodburn) Effective August 26, 2013, this section of I-5 will be restricted to 17 feet 01 in. in height. In addition, the on- and off-ramps to/from I-5 northbound and southbound Exit 271 to OR214 and OR219 will be restricted to 16 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 16 feet 00 in. in width. Estimated date of completion is September 30, 2016.
Updated: 12/22/2014 10:00 am

I-5 MP 289.8

No to Minimum Delay; Construction Work
Comments: Expect nighttime lane closure on southbound I-5 at the Tualatin River Bridge from 8 p.m. to 5 a.m. Monday through Friday. Construction is underway on a seismic retrofit project for five bridges along the Interstate 5 corridor between Portland’s South Waterfront district and the Tualatin River. Retrofitting the state’s older bridges to meet modern seismic specifications will help ensure I-5 would not be immobilized in the event Oregon experiences a powerful earthquake.
Updated: 09/27/2014 02:40 am

I-5 MP 290.4

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Construction is underway on a seismic retrofit project for five bridges along the Interstate 5 corridor between Portland’s South Waterfront district and the Tualatin River. Retrofitting the state’s older bridges to meet modern seismic specifications will help ensure I-5 would not be immobilized in the event Oregon experiences a powerful earthquake.
Updated: 09/27/2014 02:38 am

I-5 MP 290.48

Informational only; Commercial Vehicle Information
Details: I-5 MP 290.48 (Lower Boones Ferry Rd crossing under I-5) - Lake Oswego Effective June 14, 2014, Lower Boones Ferry Rd crossing under I-5 will be intermittently closed between the hours of 10 PM & 7 AM. These closures are NOT on the I-5 mainline, and the Exit 290 ramps will remain open. Estimated date of completion is July 25, 2015.
Updated: 12/22/2014 10:00 am

I-84 MP .44

Estimated delay of 20 minutes - 2 hours; Crash/Hazard
Lanes Affected: (Westbound) 2 Lanes
Comments: Left lanes closed at Grand due to crash, use caution.
Last Updated: 12/22/2014 10:29 am

I-84 MP 16.9

Informational only; Commercial Vehicle Information
Details: Marine Dr SB crossing under I-84 (Troutdale) Effective January 23, 2015, Marine Dr southbound crossing under I-84 will be closed. This closure is NOT on the I-84 mainline, and the I-84 eastbound and westbound Exit 17 ramps will remain open. Estimated date of completion is January 26, 2015.
Updated: 12/22/2014 10:00 am

I-84 MP 17

No to Minimum Delay; Construction Work
Comments: Traffic on North Frontage Road may be shifted into the lanes approximately 4 feet to the south near Marine Drive. Night time closures may occur. The project will widen Marine Drive between the two frontage roads to allow for two-way traffic. It will also replace the existing I-84 overpass bridges at Marine Drive with a new bridge. The Marine Drive intersections at the Frontage Roads will also be improved.
Updated: 09/27/2014 02:44 am

I-84 MP 17.68

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.68 WB (Sandy River Bridge - Troutdale) I-84 WB crossing the Sandy River Bridge is restricted to single trip permits beyond Weight Table 5.
Updated: 12/22/2014 10:00 am

I-84 MP 17.82 to 44

TROUTDALE - CASCADE LOCKS; Road/Weather Report
Weather Condition: Intermittent Showers
Pavement Condition: Bare Pavement
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 50 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 0 in.
Comments:
Last Updated: 12/22/2014 10:18 am

I-205 MP 0 to 8.8

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Southbound) , Shoulder (Northbound) , Shoulder
Comments: The right shoulders will be closed both directions for road sweeping operations until 3 p.m. Use caution.
Updated: 12/22/2014 09:01 am

I-205 MP 12.46

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 28, 2014.
Updated: 12/22/2014 10:00 am

I-205 MP 14.54

Informational only; Commercial Vehicle Information
Details: I-205 NB on-ramp from Sunnybrook Blvd (Clackamas) Effective December 28, 2014, the ramp from Sunnybrook Blvd to I-205 northbound will be intermittently closed between the hours of 8 PM & 5:30 AM (NIGHTTIME). Estimated date of completion is January 6, 2015.
Updated: 12/22/2014 10:00 am

I-405 MP .99

Informational only; Commercial Vehicle Information
Details: I-405 NB MP 0.99 (Portland) Effective January 9, 2015, this section of I-405 northbound will be restricted to 15 feet 08 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is January 10, 2015.
Updated: 12/22/2014 10:00 am

I-405 MP 1.17

Informational only; Commercial Vehicle Information
Details: I-405 NB on-ramp from SW 6th Ave (Portland) Effective January 9, 2015, the ramp from SW 6th Ave to I-405 northbound will be closed between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is January 10, 2015.
Updated: 12/22/2014 10:00 am

I-405 MP 1.24

Informational only; Commercial Vehicle Information
Details: I-405 NB Exit 1D ramp to US26 WB (Portland) Effective January 9, 2015, the ramp from I-405 northbound Exit 1D to US26 westbound will be closed between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is January 10, 2015.
Updated: 12/22/2014 10:00 am

ORE6 MP 27.9

WILSON RIVER SMT; Road/Weather Report
Weather Condition: Overcast
Pavement Condition: Bare Pavement
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 43 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 0 in.
Comments:
Last Updated: 12/22/2014 09:58 am

ORE8 MP 11.28 to 14.66

Estimated delay under 20 minutes; Construction Work
Comments: Night time lane closures between 10th Avenue and 1st Avenue between 5 PM to 6 AM with Monday through Saturday. Expect delays. Project Description: Project Description: ODOT and the City of Hillsboro are partnering on a paving and utility improvement project on Tualatin Valley (TV) Highway (OR 8) between Minter Bridge Road and 331st Avenue. Work on TV Highway involves grinding, reconstructing, paving and restriping; significantly upgrading the City’s water and storm water systems; improving more than 100 ADA ramps (accessible curb ramps); and repairing and paving the Dairy Creek Bridge. The contractor has added crews over this summer and plans to complete a significant amount of work by October 2014. On TV Highway and some side streets, road users should plan for congestion, delays and uneven road surfaces. There is increased traffic enforcement in the area. Traffic Impacts: Baseline Street: Reconstructing and repaving work is underway on nearly all three lanes of Baseline Street from 10th Avenue to 1st Avenue. This is the most disruptive work on Baseline Street to date and will take place day and night, Monday through Saturday, with two lanes in a 2-block section closed on Baseline Street 24/7. At night from 5 p.m. to 6 a.m., the side streets in the 2-block lane closure area may be closed at Baseline Street. This means that road users (at night) may not be able to turn onto or off of the side streets from/to Baseline Street. On Friday night, Sept. 19, the contractor will pave the left and center lanes of Baseline Street between 5th Avenue and 3rd Avenue. During the paving work, the connection from 4th Avenue to Baseline Street will be closed beginning at 7 p.m. (the south side of the intersection). After the paving is complete Saturday morning, Sept. 20, the left and center lane closure from 5th Avenue to 3rd Avenue will be lifted. Beginning Monday, Sept. 22, and continuing until Saturday morning, Sept. 27, the left and center lanes on Baseline Street between 3rd Avenue and 2nd Avenue will be closed 24/7. Paving of this section is scheduled for Friday night, Sept. 26 (weather permitting). There may be intermittent nighttime closures of the south side of the intersection of 3rd Avenue and Baseline Street throughout the week Access to the main entrance and emergency room of Tuality Hospital will remain open at all times, with the possibility of clearly marked detours. TriMet service on Baseline Street will be intermittently affected during this reconstruction work. Driveways into and out of businesses and residences on Baseline Street will have access during the lane closures, with the possibility of short closures. Oak Street: The contractor is grinding and paving the left and center lane of Oak Street from Dennis Avenue to 10th Avenue. The right lane in this section was paved earlier this year. The work is weather-dependent and will be rescheduled if there’s rain. Here are the specifics: • Monday morning, Sept. 22 at 6 a.m., the left and center lane of Oak Street from Dennis Avenue to 4th Avenue will be closed. These two lanes will be closed continuously until 6 a.m. Tuesday morning, Sept. 23, with the contractor working around the clock to finish the work. • Tuesday morning, Sept. 23 at 6 a.m., the left and center lane of Oak Street from 4th Avenue to 10th Avenue will be closed. These two lanes will be closed continuously until 6 a.m. Wednesday morning, Sept. 24, with the contractor working around the clock to finish the work. During this time, road users on Oak Street will not be permitted to turn left on 10th Avenue or continue straight across 10th Avenue to continue on Oak Street. All traffic on Oak Street at 10th Avenue will be required to turn right. • During these lane closures, the traffic on the cross streets from the north will not be permitted to turn onto Oak Street or continue straight across Oak Street. Traffic on the cross streets from the south will be permitted to turn right onto Oak Street, but not continue straight. Flaggers will be controlling traffic at all intersections. • For up to an hour during the paving of Oak Street, the intersection of Oak Street and 1st Avenue will be temporarily closed. A signed detour will take vehicles around the closure. Additionally, traffic on 1st Avenue spanning Oak Street will be reduced to one lane in each direction. • On-street parking on the south side of Oak Street will not be permitted between 1st Avenue and 10th Avenue during the paving. Signs will be displayed indicating the no-parking zones. Please do not park vehicles on Oak Street those two days. • Access to the main entrance and emergency room of Tuality Hospital will remain open at all times. If a detour is necessary to the emergency room, the new route will be clearly marked. • Driveways into and out of businesses and residences on Oak Street will have intermittent access during the lane closures.
Updated: 09/27/2014 02:56 am

ORE18 MP 51.57

Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 12/22/2014 10:00 am

ORE22 MP 10.49

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 12/22/2014 10:00 am

ORE22 MP 10.66

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 12/22/2014 10:00 am

ORE22 MP 25.74 to 26.05

Informational only; Commercial Vehicle Information
Details: OR22 MP 25.60 to MP 26.14 EB (Center St Bridge - Salem) Effective November 18, 2014, this section of OR22 eastbound will be restricted to 17 feet 05 in. in height. Estimated date of completion is February 28, 2015.
Updated: 12/22/2014 10:00 am

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 12/22/2014 10:00 am

ORE22 MP 68 to 73

MARION FORKS; Road/Weather Report
Weather Condition: Overcast
Pavement Condition: Bare Pavement
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 42 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 0 in.
Comments:
Last Updated: 12/22/2014 10:19 am

ORE35 MP 61.71

WHITE RIVER; Weather Warning
Weather Condition: Partly Cloudy
Pavement Condition: Spots of Ice
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 30 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 1 in.
Comments:
Last Updated: 12/22/2014 09:59 am

ORE43 MP .31

No to Minimum Delay; Construction Work
Comments: The I-5 bridge work over SW Hood Avenue in South Waterfront requires a 24-hour single lane closure on Hood Ave under the I-5 bridge until March 2015 Project Description: Construction is underway on a seismic retrofit project for five bridges along the Interstate 5 corridor between Portland’s South Waterfront district and the Tualatin River. Retrofitting the state’s older bridges to meet modern seismic specifications will help ensure I-5 would not be immobilized in the event Oregon experiences a powerful earthquake.
Updated: 09/27/2014 02:37 am

ORE43 MP .59

Informational only; Commercial Vehicle Information
Details: OR43 MP 0.59 SB (Portland) Effective August 25, 2014, this section of OR43 southbound will be restricted to 13 feet 00 in. in width, and 16 feet 07 in. in height. Estimated date of completion is February 26, 2015.
Updated: 12/22/2014 10:00 am

ORE43 MP 6.04 to 9.02

Informational only; Commercial Vehicle Information
Details: OR43 MP 6.04 to MP 9.02 NB & SB (West Linn) Effective October 15, 2014, this section of OR43 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 12/22/2014 10:00 am

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 12/22/2014 10:00 am

ORE53 MP 5.981

Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Updated: 12/22/2014 10:00 am

ORE99 MP -5.5 to -4.75

Informational only; Commercial Vehicle Information
Details: OR99W (Denver Ave) MP -5.50 to MP -4.75 SB (Portland) Effective November 10, 2014, this section of OR99W (Denver Ave) SB will be closed at all hours. Effective February 9, 2015, this section of OR99W (Denver Ave) SB will be closed between the hours of 9 PM & 5:30 AM (NIGHTTIME). Estimated date of completion is March 9, 2015.
Updated: 12/22/2014 10:00 am

ORE99 MP -5.45 to -4.75

Informational only; Commercial Vehicle Information
Details: OR99W (Denver Ave) MP -4.75 to MP -5.50 NB (Portland) Effective November 10, 2014, this section of OR99W (Denver Ave) NB will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is March 9, 2015.
Updated: 12/22/2014 10:00 am

ORE99 MP 2.61 to 3.07

Informational only; Commercial Vehicle Information
Details: OR99E MP 3.5 to MP 2.5 NB (Portland) Effective January 5, 2015, this section of OR99E northbound will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 8 PM. Estimated date of completion is January 17, 2015.
Updated: 12/22/2014 10:00 am

ORE99 MP 6.54

Informational only; Commercial Vehicle Information
Details: OR99E MP 6.16 to MP 7.41 NB & SB (Milwaukie) Effective October 29, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is January 9, 2015.
Updated: 12/22/2014 10:00 am

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.20 SB (Tualatin River Bridge - King City) OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 12/22/2014 10:00 am

ORE99 MP 20.23 to 21.86

Informational only; Commercial Vehicle Information
Details: OR99E MP 20 to MP 22 NB & SB (Canby) Effective December 1, 2014, this section of OR99E will be restricted to 10 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr after sunrise (NIGHTTIME). Estimated date of completion is March 31, 2015.
Updated: 12/22/2014 10:00 am

ORE104 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Updated: 12/22/2014 10:00 am

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 12/22/2014 10:00 am

ORE130 MP 3.23

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 12/22/2014 10:00 am

ORE130 MP 3.6

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 12/22/2014 10:00 am

ORE130 MP 3.82

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 12/22/2014 10:00 am

ORE130 MP 4.15

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 12/22/2014 10:00 am

ORE130 MP 4.76

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 12/22/2014 10:00 am

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 12/22/2014 10:00 am

ORE173 MP .12

TIMBERLINE LODGE; Severe Weather Hazard
Weather Condition: Overcast
Pavement Condition: Packed Snow
Commercial Restrictions:
Chain Restrictions: Chains Required. Traction tires allowed in place of chains on vehicles under 10,000 GVW and not towing. Vehicles towing must use chains.
Current Temp: 26 F
High Temp:
Low Temp:
Precipitation:
New Snow: Trace; Roadside Snow: 17 in.
Comments:
Last Updated: 12/22/2014 09:58 am

ORE214 MP 36.63 to 37.87

Informational only; Commercial Vehicle Information
Details: OR214 EB & WB MP 36.24 to MP 37.87 (Woodburn) Effective August 26, 2013, OR214 between Willow Ave (west of I-5) and Settlemeier Ave (east of I-5) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2016.
Updated: 12/22/2014 10:00 am

ORE214 MP 36.78 to 37.87

Estimated delay under 20 minutes; Construction Work
Comments: Work to widen bridge, reconstruct and widen OR214 from Willow Ave to Broughton Way. Construction of a transit facility at Evergreen Road. Signing, illumination and landscaping will also be done.
Updated: 08/04/2014 4:34 pm

ORE217 MP 0 to 7.52

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. Project Description: This project will make operational and safety improvements on OR 217 including widening the right shoulders on three sections of OR 217, paving both directions of OR 217 from U.S. 26 to I-5, improving signage in the OR 217 corridor and upgrading the center median barrier. Traffic Impacts: See below. Daytime Closures: Monday, Feb 24 to Friday, Feb. 28 from 7 a.m. to 5 p.m.: - Expect limited shoulder closures on northbound and southbound OR217 between US 26 and I-5. For more information:
Updated: 07/18/2014 10:47 pm

ORE217 MP 6.69

ON RAMP
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) , Shoulder
Comments: No traffic impacts. Ramps Affected. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to S.W. 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Daytime lane restrictions will occur at the intersection of the southbound I-5 on and off- ramp at 68th Avenue for underground signalization work Monday through Friday starting at approximately 9 a.m. Lane restrictions will re-open by 3:30 p.m. For more project information:
Updated: 09/27/2014 03:07 am

ORE219 MP 23.46

Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 12/22/2014 10:00 am

ORE224 MP 4.36 to 6.56

No to Minimum Delay; Construction Work
Comments: One-way traffic will be controlled by flaggers from 7 a.m. to 5 p.m. Monday thru Friday on SE Lawnfield Road near the intersection of SE 82nd Drive. Project Description: The Sunrise JTA Project will address existing congestion and safety problems in the Oregon 212/224 corridor by constructing a new road from I-205 to 122nd Avenue. Major project elements include: • Constructing a new two-lane limited access highway (one lane each direction) from the Milwaukie Expressway (OR 224) at I-205 to SE 122nd Avenue at OR 212/224. • Constructing a new I-205 overcrossing that will connect 82nd Drive and 82nd Avenue. • Improving bicycle and pedestrian accommodations in the project area. • Improving the intersection of SE 122nd Avenue and OR 212/224. Traffic Impacts: One-way traffic will be controlled by flaggers from 7 a.m. to 5 p.m. Monday through Friday on SE Lawnfield Road near the intersection of SE 82nd Drive for material delivery to the project site. In addition, on S.E. Mather Rd between S.E. Minuteman Way and SE 98th Court, flaggers will reduce traffic to one-way traffic from 7 am to 5 pm. for deliveries to the work site. Delays are minimal.
Updated: 09/27/2014 03:08 am

ORE224 MP 31 to 36

Closure; Crash/Hazard
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Hwy closed from Promontory Park MP 31 to MP 38. Escorted access has been halted due to a landslide and there is no date for resuming the escorts. OR 224 closed indefinitely from Promontory Park (mp 31) to US Forest Service Road 57 (mp 38). There is no estimated time or day to reopen OR 224. The highway will remain closed until all hazard trees are addressed.
Last Updated: 12/18/2014 4:19 pm

ORE99E MP 11.2 to 11.6

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Southbound) 1 Lane
Comments: Right lane closed due to road work, use caution.
Updated: 12/22/2014 09:38 am

ORE99E MP 16 to 13

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Northbound) 1 Lane
Comments: The right lane is closed NB between South End Road and 2nd street due to a landslide. Use caution.
Last Updated: 12/21/2014 8:55 pm

ORE99W MP 7.61

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. Project Description: Construction began on a project to improve safety and operations in the area of OR 99W northbound and I-5 northbound, spanning the Tigard/Portland city limits (from approximately SW 67th Avenue to SW 58th Avenue). Once complete, traffic in the area should see a reduction in crashes and all road users will have a safer environment. Construction is slated for completion in fall 2014. Traffic Impacts: Single lane closures northbound (Tigard to Portland direction) nightly Monday through Friday between 7 p.m. and 6:30 a.m.
Updated: 09/27/2014 03:06 am

ORE99W MP 7.93 to 8.65

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Expect alternating overnight lane closures OR 99W for approximately 1.5 miles from OR 217 and 72nd between 9 PM and 5:30 AM Monday through Friday. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to SW 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Expect alternating overnight lane closures on the eastbound and westbound lanes on OR 99W (Pacific Highway) for approximately 1.5 miles from OR 217 to 72nd Avenue for construction activities Monday through Friday, starting at approximately 9 p.m. All lanes will re-open by 5:30 a.m. the following morning. Bicyclists: Check this link for detour information: http://www.tigard-or.gov/community/bike_tigard/default.asp For more project information:
Updated: 09/27/2014 03:05 am

ORE99W MP 11.46 to 11.96

Estimated delay under 20 minutes; Construction Work
Comments: Single lane closures may occur on OR 99W and on Durham and Fischer Roads between 9 AM and 3 PM as well as 8 PM and 6 AM Monday through Friday. Project Description: Work is underway on a project to improve safety on OR 99W from Durham Road to Fischer Road in King City and Tigard. Safety improvements include: • Closing the center median opening on OR 99W at Royal Villa Drive. A left-turn lane and a U-turn signal will be installed at Fischer Road. This will assist southbound travelers who are bound for Royal Villa Drive or wish to head north • Building a bus stop pullout on OR 99W southbound just south of Fischer Road • Adding new sidewalk on OR 99W northbound from Fischer Road to Tigard Towne Square • Lengthening the left turn lane on OR 99W northbound for Fischer Road and for Durham Road • Adding new lighting at the intersection of OR 99W and Durham Road Traffic Impacts: Single lane closures may occur on OR 99W and on Durham and Fischer Roads between 9 a.m. and 3 p.m. for traffic signal work Monday through Friday. Please note: Kerr Contractors are also working concurrently within the same work zone for another project. Plan for congestion and short delays on OR 99W, Fischer Road and Durham Road throughout construction.
Updated: 09/27/2014 03:06 am

US20 MP 16.29 to 21.88

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Flaggers will be directing trucks entering and leaving the project. Expect some momentary delays. Proceed with caution. This project will accomplish movement of 2-3 million cubic yards of earthwork, landslide mitigation including placement of more than 400 ground anchors, construction of 70,000 feet of horizontal drains, erosion control, and landscaping.
Updated: 12/05/2014 09:09 am

US20 MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville) Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 12/22/2014 10:00 am

US26 MP 40.77

SUNSET SUMMIT; Road/Weather Report
Weather Condition: Overcast
Pavement Condition: Bare Pavement
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 43 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 0 in.
Comments:
Last Updated: 12/22/2014 09:58 am

US26 MP 54.14

GOVERNMENT CAMP; Road/Weather Report
Weather Condition: Overcast
Pavement Condition: Bare Pavement
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 35 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 0 in.
Comments:
Last Updated: 12/22/2014 09:58 am

US26 MP 57.1

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Project Description: This project replaces the Glencoe Road overpass at U.S. 26 in North Plains and improves the highway ramps, bicycle and pedestrian connections, signs, traffic signals, striping and drainage at this interchange. A culvert under Glencoe Road will also be replaced with a bridge. Work is expected to be complete in summer 2014.
Updated: 09/27/2014 02:50 am

US26 MP 59.57 to 67

BLUE BOX PASS; Road/Weather Report
Weather Condition: Overcast
Pavement Condition: Bare Pavement
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 36 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 4 in.
Comments:
Last Updated: 12/22/2014 09:33 am

US26 MP 61

Estimated delay under 20 minutes; Construction Work
Comments: No impacts to traffic Project Description: The U.S. 26 Brookwood Parkway/Helvetia Interchange project will improve traffic flow and safety in the interchange area. Project elements include: • Constructing a new westbound U.S. 26 to southbound Brookwood Parkway exit loop ramp. • Reconstructing the westbound U.S. 26 entrance ramp from Helvetia Road. • Widening the Brookwood Parkway overcrossing to accommodate additional northbound and southbound lanes over U.S 26. • Extending the right-turn lane from northbound Brookwood Parkway to the eastbound U.S. 26 entrance ramp. • Adding sidewalks and bike lanes within the interchange area. Traffic Impacts: Eastbound and westbound US26 will be closed from 10 p.m. to 5 a.m. Monday, Sept. 29 and Tuesday, Sept. 30 for the contractor to set the new steel girders over US26. During the closure, traffic will be detoured up and over using the US26 on-and off-ramps. Traffic on Helvetia Road will be stopped for up to 20 minutes on Monday night, Sept. 29 while the crane is picking up the girders from their current location at the Jacobson/Helvetia Road intersection and transporting them to the overpass. The restriction on Helvetia Road will begin at 8 p.m. and will continue intermittently throughout the night. Prior to the freeway closure and detour, the contractor will close a lane in both directions of US26 beginning at 8 p.m. The lane restriction will be removed when the contractor completes the highway closure prior to 5 a.m. each morning. Please note: NW Groveland Drive is permanently closed at NW Helvetia Road. NW Groveland Drive will be accessible from NW Groveland Road via NW West Union Road. A speed reduction zone is currently in place on NW Helvetia Road/NW Brookwood Parkway from the NW Helvetia Road/NW West Union Road intersection to the NW Brookwood Parkway/NW Huffman Street intersection. The posted speed limit has been changed to 40 mph in the work zone.
Updated: 11/05/2014 10:26 pm

US26 MP 61.06

Informational only; Commercial Vehicle Information
Details: US26 MP 61.06 EB & WB (Brookwood/Helvetia Rd Interchange - Hillsboro) Effective May 14, 2014, this section of US26 will be intermittently closed Monday through Friday nights between the hours of 10 PM & 5 AM. All traffic can bypass the closure by taking Exit 61, then re-entering the highway. Estimated date of completion is February 28, 2015.
Updated: 12/22/2014 10:00 am

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 12/22/2014 10:00 am

US30 MP .42

Informational only; Commercial Vehicle Information
Details: US30 Bypass MP 0.56 WB (Portland) Effective December 23, 2014, this section of US30 Bypass westbound will be restricted to 10 feet 00 in. in width on Monday to Thursday nights between the hours of 9 PM & 4 AM (NIGHTTIME). Estimated date of completion is January 16, 2015.
Updated: 12/22/2014 10:00 am

US30 MP 10.83 to 3.92

Estimated delay under 20 minutes; Maintenance Work
Comments: Right shoulder closed in a moving operation between Sauvies Island and Kittridge due to road work, use caution.
Updated: 12/22/2014 08:40 am

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 12/22/2014 10:00 am

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 12/22/2014 10:00 am

US30 MP 18.37 to 65.99

CLATSKANIE; Road/Weather Report
Weather Condition: Overcast
Pavement Condition: Bare Pavement
Commercial Restrictions:
Chain Restrictions: Carry Chains or Traction Tires
Current Temp: 50 F
High Temp:
Low Temp:
Precipitation:
New Snow: 0 in.; Roadside Snow: 0 in.
Comments:
Last Updated: 12/22/2014 09:59 am

US30 MP 20.39

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 12/22/2014 10:00 am

US30 MP 48.67

Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Updated: 12/22/2014 10:00 am

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 12/22/2014 10:00 am

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) Effective December 1, 2014, this section of US101 Business is closed. Estimated date of completion is September 8, 2015.
Updated: 12/22/2014 10:00 am

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Updated: 12/22/2014 10:00 am

US101 MP 39.53

Informational only; Commercial Vehicle Information
Details: US101 MP 39.53 NB & SB (South of Arch Cape) Effective May 20, 2014, this section of US101 crossing the Necarney Creek (Sam Reed Bridge) will be restricted to 16 feet 00 in. in width Monday through Friday between the hours of 7 AM & 5 PM. Estimated date of completion is March 15, 2015.
Updated: 12/22/2014 10:00 am

US101 MP 39.53

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder
Comments: Road construction is occurring, use caution. Contractors repairing bridge deck. Flaggers will control single lane traffic. Delays up to 20 minutes. US101: Necarney Creek (Sam Reed) Bridge (Oregon Coast Highway, mile post 39.53) This project consists of recoating the steel below the bridge deck. The scheduled work includes installation of containment structures and painting the bridge below the bridge deck. Flaggers will control single lane traffic during construction activities, Monday through Thursday, 7:30 a.m. to 6:30 p.m., and Friday, 7:30 a.m. to 12:00 p.m. (noon). Expect delays of up to 20 minutes. The project is scheduled to be completed in March 2015.
Updated: 11/25/2014 09:25 am

US101 MP 40.71

Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita) Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.
Updated: 12/22/2014 10:00 am

US101 MP 104 to 105

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Shoulder work will be continuing. Watch for construction vehicles entering and exiting the project site. Please proceed with caution. Beginning in May, 2015, a diversion will carry all traffic on US 101 at this location until mid-July. The purpose of this project is to assist the US Forest Service in the restoration efforts to restore the Salmon River Estuary. This project will install a new fish passage culvert to connect Fraser Creek on the east side of US 101 with the original Fraser Creek Channel on the west side of US101 that was cut off when US 101 was constructed.
Updated: 12/16/2014 10:52 am

US101 MP 104.4

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Watch for construction vehicles entering and exiting the highway. Starting May 2015 there will be a detour lane. The purpose of this project is to assist the US Forest Service in the restoration efforts to restore the Salmon River Estuary. This project will install a new fish passage culvert to connect Fraser Creek on the east side of US101 with the original Frasier Creek Channel on the west side of US101 that was cut off when US101 was constructed.
Updated: 12/05/2014 08:53 am

US101 MP 115.9 to 116.8

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: No lanes on US101 will be closed during the day but flaggers might stop traffic. The project will widen US101 with a lane in each direction and center turn lane. It will create wider shoulders, new curb and sidewalk, a new pedestrian crossing, a new signal at 32nd Street, retaining walls, and landscaping.
Updated: 12/05/2014 08:56 am

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 12/22/2014 10:00 am

US101B MP 4.78 to 6.89

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Bridge construction is occurring at the Old Youngs Bay bridge on US101 Business, one lane traffic with flaggers, use caution. US101(Bus.): Old Youngs Bay & Lewis & Clark River Bridges (Warrenton - Astoria Highway, mile post 4.78 and 6.89) This project consists of performing bridge rehabilitation work at both the Old Youngs Bay and Lewis & Clark River Bridges along US101(Bus.). The scheduled work includes the Contractor performing bridge rehabilitation work at the Old Youngs Bay Bridge. Flaggers will control single lane traffic during construction activities as required. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. There will be no lane closures occurring from noon Wednesday, November 26 through midnight Sunday, November 30. The Lewis & Clark River Bridge is scheduled to be closed to facilitate construction activities starting December 1, 2014. This closure is anticipated to last until August 1, 2015. A detour route will be designated with signing during the length of the closure. The project is scheduled to be completed in November 2017.
Updated: 11/24/2014 2:04 pm

US101B MP 4.78

Closure with Detour; Crash/Hazard
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: The Lewis and Clark River Bridge will be closed starting December 1, 2014; a detour will be in place. Use an alternate route. The Lewis & Clark River Bridge is scheduled to be closed to facilitate construction activities starting December 1, 2014. This closure is anticipated to last until August 1, 2015. A detour route will be designated with signing during the length of the closure. The project is scheduled to be completed in November 2017.
Last Updated: 12/10/2014 10:31 am