State of Oregon Road Conditions

Alerts!

I-5, 9 miles South of Albany MP 225; Closure
A vehicle fire has occurred, use caution.
Updated: 07/24/2014 3:53 pm

Northwest Oregon Road Conditions by Route

I-5 MP 271.6 to 274.69

Informational only; Commercial Vehicle Information
Details: I-5 MP 271.35 to MP 276.01 NB & SB (Woodburn) Effective August 26, 2013, this section of I-5 will be restricted to 17 feet 01 in. in height. In addition, the on- and off-ramps to/from I-5 northbound and southbound Exit 271 to OR214 and OR219 will be restricted to 16 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 16 feet 00 in. in width. Estimated date of completion is September 30, 2016.
Updated: 07/24/2014 10:00 am

I-5 MP 271.69 to 274.69

Informational only; Commercial Vehicle Information
Details: I-5 MP 271.35 to MP 276.01 NB & SB (Woodburn) Effective August 26, 2013, this section of I-5 will be restricted to 17 feet 01 in. in height. In addition, the on- and off-ramps to/from I-5 northbound and southbound Exit 271 to OR214 and OR219 will be restricted to 16 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 16 feet 00 in. in width. Estimated date of completion is September 30, 2016.
Updated: 07/24/2014 10:00 am

I-5 MP 283.88

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Work is scheduled to begin again in spring 2014. Project Description: Work is underway on a project to improve safety on Wilsonville Road at the I-5 interchange. The contractor will expand Wilsonville Road from six to eight lanes near the I-5 interchange, improve the I-5 on- and off-ramps, and add landscaping and bicycle and pedestrian facilities. Traffic Impacts: No traffic impacts. Work is scheduled to begin again in spring 2014. For more information:
Updated: 07/18/2014 10:44 pm

I-5 MP 290.48

Informational only; Commercial Vehicle Information
Details: I-5 MP 290.48 (Lower Boones Ferry Rd crossing under I-5) - Lake Oswego Effective June 14, 2014, Lower Boones Ferry Rd crossing under I-5 will be intermittently closed between the hours of 10 PM & 7 AM. These closures are NOT on the I-5 mainline, and the Exit 290 ramps will remain open. Estimated date of completion is July 25, 2015.
Updated: 07/24/2014 10:00 am

I-5 MP 291.89

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective August 4, 2014, the ramp from I-5 northbound Exit 292A to OR217 northbound will be closed between the hours of 9:30 PM & 5 AM (NIGHTTIME). Estimated date of completion is August 8, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 293.36

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 294 ramp to Barbur Blvd (OR99W) - Tigard Effective May 26, 2014, the ramp from I-5 northbound Exit 294 to Barbur Blvd (OR99W) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 29, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 295.04 to 299.25

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramp from OR43 / Hood St to SB I-5 will be intermittently closed during the same times. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 295.041 to 298.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd & OR99W / Barbur Blvd to NB I-5 will be intermittently closed during the same times. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 298.48 to 297

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder
Comments: ODOT contractor will have limited truck traffic in and out of the project site on southbound I-5 for the next few weeks during the day. Project Description: This project replaces a viaduct on I-5 that crosses a ravine at S.W. Iowa Street, between Terwilliger Boulevard (exit 297) and Corbett Avenue (exit 298) in Portland and includes building a temporary detour bridge on the west side of I-5. Traffic Impacts: No traffic impacts. The speed limit on I-5 is reduced to 50 mph in the work area. This speed reduction is in effect 24 hours a day and will remain in place for the duration of the project. Please be alert to enhanced police traffic patrols in the work area. For more information:
Updated: 07/24/2014 2:18 pm

I-5 MP 299.9

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from OR43 NB (Portland) Effective August 10, 2014, the ramp from OR43 northbound to I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 300.26 to 300.36

Informational only; Commercial Vehicle Information
Details: I-5 MP 300.26 to MP 300.36 NB (Marquam Bridge - Portland) Effective August 10, 2014, this section of I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 302.92

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 302C to Greeley St (Portland) Effective August 10, 2014, the ramp from I-5 northbound Exit 302C to Greeley St will be closed between the hours of 4 AM and 12 noon for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 307.49

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from OR99E & Marine Dr (North Portland) Effective July 27, 2014, the ramp from OR99E and Marine Dr to I-5 northbound will be closed between the hours of 5 AM & 1 PM (DAYTIME). Estimated date of completion is July 27, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 307.69

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Jantzen Beach (North Portland) Effective July 27, 2014, the ramp from Jantzen Beach to I-5 southbound will be closed between the hours of 5 AM & 1 PM (DAYTIME). Estimated date of completion is July 27, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 5.41

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 6 ramp to I-205 SB (Portland) Effective August 22, 2014, this ramp from I-84 eastbound Exit 6 to I-205 southbound will be closed between the hours of 10 PM & 12 midnight. Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 17

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. A project to improve the interchanges at I-84 in Troutdale and Marine Drive just started. Check back here for details in Mid-March.
Updated: 07/18/2014 10:46 pm

I-84 MP 17.68

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.68 WB (Sandy River Bridge - Troutdale) I-84 WB crossing the Sandy River Bridge is restricted to single trip permits beyond Weight Table 5.
Updated: 07/24/2014 10:00 am

I-84 MP 17.82

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.82 EB & WB (Jordan Rd Underpass) Effective September 1, 2010, the Jordan Rd underpass at Exit 18 will be restricted to 13 feet 00 in. in width. This restriction is NOT on the I-84 mainline. Effective April 15, 2013, the height will be restricted to 14 feet 9 inches crossing under I-84 on Jordan Rd. Estimated date of completion is November 1, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 12.29 to 13.75

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is August 7, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 12.46 to 13.95

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is August 7, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 20.99

Informational only; Commercial Vehicle Information
Details: I-205 NB Exit 21B ramp to I-84 WB (Portland) Effective August 23, 2014, the ramp from I-205 northbound Exit 21B to I-84 westbound will be closed between the hours of 12 midnight and 2 AM. In addition, the ramp from Glisan St to I-84 westbound will be close during the same time. Estimated date of completion is August 23, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 24.5

Estimated delay under 20 minutes; Construction Work
Comments: Two lanes may be closed from 8 a.m. to 3 p.m. on NE Airport Way Monday through Friday. Project Description: This project will help improve traffic flow at this busy interchange by constructing a new free-flowing on-ramp from NE Airport Way westbound onto I-205 northbound. Motorists on NE Airport Way eastbound will have two left turn lanes onto I-205 northbound and will no longer have to share signal time with westbound motorists on NE Airport Way. Traffic Impacts: Single lanes may be closed from 8 a.m. to 3 p.m. on eastbound and westbound NE Airport Way Monday through Friday. Please note: There may also be occasional daytime short-duration closures of the I-205 multi-use bicycle/pedestrian path on the north side of Airport Way, Monday- Friday from 7 a.m. to 5 p.m. for construction work next to the path. Flaggers will stop trail users for less than 20 minutes at a time. Expect intermittent sidewalk closures on NE Airport Way while the contractor is working in the project area. For more information:
Updated: 07/18/2014 10:10 pm

I-205 MP 24.92

Informational only; Commercial Vehicle Information
Details: I-205 NB on-ramp from Airport Way (Portland) Effective April 1, 2013, the ramp from Airport Way to I-205 northbound will be restricted to 16 feet 00 in. in width, and 18 feet 03 in. in height at all hours. Estimated date of completion is November 15, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP .65 to 1.4

Informational only; Commercial Vehicle Information
Details: I-405 NB MP 0.60 to MP 1.40 (Portland) Effective July 25, 2014, this section of I-405 northbound will be restricted to 13 feet 00 in. in width, and 15 feet 01 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from SW 6th Ave to I-405 northbound will be closed Monday to Wednesday nights during the same time. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP .77 to 4.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 4.20 to MP 0.77 SB (Portland) Effective August 10, 2014, this section of I-405 southbound will be closed between the hours of 4 AM and 11 AM for one day only. In addition, the following ramps will be closed during the same time: on-ramp from US26 eastbound to I-405 southbound; on-ramp from US30 eastbound to I-405 southbound; on-ramp from NW Couch St to I-405 southbound; on-ramp from NW Taylor St to I-405 southbound; on-ramp from SW Montgomery St to I-405 southbound; on-ramp from SW 5th Ave to I-405 southbound.
Updated: 07/24/2014 10:00 am

I-405 MP 1.24

Informational only; Commercial Vehicle Information
Details: I-405 NB Exit 1D ramp to US26 WB (Portland) Effective July 25, 2014, the ramp from I-405 northbound Exit 1D to US26 westbound will be closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP 1.56 to 1.62

Informational only; Commercial Vehicle Information
Details: I-405 NB MP 1.54 to MP 1.63 (Portland) Effective July 25, 2014, this section of I-405 northbound will be restricted to 16 feet 00 in. in width, and 15 feet 11 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from I-405 northbound Exit 2A to Salmon St will be closed during the same time. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP 3.2 to 4.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 4.2 to MP 3.2 SB (Fremont Bridge - Portland) Effective August 10, 2014, this section of I-405 southbound will be closed between the hours of 4 AM and 12 noon for one day only. In addition, the following ramps will be closed during the same time: ramp from I-5 northbound to I-405 southbound; ramp from I-5 southbound to I-405 southbound; ramp from Kerby St to I-405 southbound; ramp from I-405 southbound Exit 3 to US30 westbound.
Updated: 07/24/2014 10:00 am

ORE8 MP 11.28 to 14.66

Estimated delay under 20 minutes; Construction Work
Comments: The left lane of Baseline Street between Adams and Dennis Avenues is closed 24 hours a day, seven days a week. Project Description: ODOT and the City of Hillsboro are partnering on a paving and utility improvement project on Tualatin Valley (TV) Highway (OR 8) between Minter Bridge Road and 331st Avenue. Work on TV Highway involves grinding, reconstructing, paving and restriping; significantly upgrading the City’s water and storm water systems; improving more than 100 ADA ramps (accessible curb ramps); and repairing and paving the Dairy Creek Bridge. Traffic Impacts: The contractor is working on Oak Street and Baseline Street on storm sewer pipe replacement, sidewalk and ADA ramp work, and reconstructing and repaving lanes. Work will be moving west to east on Oak Street in 3-block sections starting at Dennis Avenue and ending at 10th Avenue. Work will be moving east to west on Baseline Street in 3-block sections starting at 10th Avenue and ending at Dennis Avenue. Expect the following work on Oak Street and Baseline Street over the next couple of months: - The right lane of Oak Street from Dennis Avenue to 1st Avenue is currently closed 24 hours a day (until approximately the end of March 2014). This includes times when the contractor is not actively working on the project - The right or left lane of Baseline Street from 10th Avenue to 7th Avenue will be closed 24 hours a day (until approximately April 2014) - At night from 8 p.m. to 6 a.m., the middle lane of Oak Street and Baseline Street may also be closed to create a wider work area. Cross streets in this section may also be impacted during the work - Work will take place at night and during the day - Access to the Tuality Hospital emergency room, hospital and clinics will be available at all times Other project work: - Work is wrapping up on Baseline and Oak streets between 10th Avenue and Dennis Avenue testing and chlorinating the new water lines. There will be daytime single lane closures from 9 a.m. to 3 p.m. and nighttime double lane closures from 8 p.m. to 6 a.m. intermittently through this section. Construction will continue through 2015, with daytime and nighttime lane closures up to 7 days a week as crews move through the project. On TV Highway and some side streets, road users should plan for congestion, delays and uneven road surfaces. There is increased traffic enforcement in the area. Please drive cautiously and follow construction signage. For more information:
Updated: 07/24/2014 2:06 pm

ORE8 MP 12.53 to 13.58

Informational only; Commercial Vehicle Information
Details: OR8 MP 12.53 to MP 13.58 WB (Hillsboro) Effective May 16, 2014, this section of OR8 westbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 31, 2014.
Updated: 07/24/2014 10:00 am

ORE8 MP 12.6 to 12.77

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Eastbound) Median , All Lanes , Shoulder (Westbound) Median , All Lanes , Shoulder
Comments: Road work has flaggers directing traffic from SE 9th Ave. to SE 7th Ave., day and night. Use caution and expect delays.
Updated: 07/21/2014 11:27 am

ORE8 MP 16.28 to 16.55

Informational only; Commercial Vehicle Information
Details: OR8 MP 16.65 to MP 16.15 EB (Cornelius) Effective June 24, 2014, this section of OR8 eastbound will be restricted to 14 feet 00 in. in width on Monday to Friday between the hours of 9 AM & 3 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

ORE10 MP 2.74 to 2.56

Estimated delay under 20 minutes; Construction Work
Comments: Shoulder closures may occur anytime of the day or night seven days a week. Be alert to flaggers in the work zones. Project description: As part of the 2010/2011 signal upgrades project, interconnect will be installed to improve traffic signal timing in the area of SW Laurelwood Avenue and SW 78th Avenue.
Updated: 07/18/2014 10:48 pm

ORE18 MP 51.57

Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE22 MP 6.49

Informational only; Commercial Vehicle Information
Details: OR22/OR99E Business MP 6.45 to MP 6.55 EB (Salem) Effective August 3, 2014, this section of OR22/OR99E Business eastbound will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

ORE22 MP 6.51

Informational only; Commercial Vehicle Information
Details: OR22/OR99E Business MP 6.55 to MP 6.45 WB (Salem) Effective August 17, 2014, this section of OR22/OR99E Business westbound will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is August 30, 2014.
Updated: 07/24/2014 10:00 am

ORE22 MP 10.49

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 07/24/2014 10:00 am

ORE22 MP 10.66

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 07/24/2014 10:00 am

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 07/24/2014 10:00 am

ORE43 MP .59

Informational only; Commercial Vehicle Information
Details: OR43 MP 0.59 SB (Portland) Effective March 12, 2014, this section of OR43 southbound will be restricted to 15 feet 00 in. in width, and 16 feet 07 in. in height. Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 07/24/2014 10:00 am

ORE53 MP 5.981

Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Updated: 07/24/2014 10:00 am

ORE99 MP -.36

Informational only; Commercial Vehicle Information
Details: OR99W MP -0.36 NB & SB (Steel Bridge in Portland) Effective August 14, 2014, OR99W crossing the Steel Bridge in Portland will be closed between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 2.59 to 2.99

Informational only; Commercial Vehicle Information
Details: OR99E MP 2.5 to MP 3.0 NB & SB (Portland) Effective July 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 2 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 16, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 2.61 to 2.99

Informational only; Commercial Vehicle Information
Details: OR99E MP 2.5 to MP 3.0 NB & SB (Portland) Effective July 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 2 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 16, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.05 to 3.72

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.00 to MP 3.75 NB & SB (Portland) Effective March 24, 2014, this section of OR99W (Barbur Blvd) will be restricted to 12 feet 00 in. in width. In addition, the height will be restricted to 17 feet 02 in. southbound, and 17 feet 00 in. northbound. Estimated date of completion is October 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.19 to 3.66

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.00 to MP 3.75 NB & SB (Portland) Effective March 24, 2014, this section of OR99W (Barbur Blvd) will be restricted to 12 feet 00 in. in width. In addition, the height will be restricted to 17 feet 02 in. southbound, and 17 feet 00 in. northbound. Estimated date of completion is October 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.2

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.10 to MP 3.25 NB (Portland) Effective August 24, 2010, this section of OR99W (Barbur Blvd) will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are allowed. In addition, the height will be restricted to 17 feet 00 in. in height at the same time. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 6.16 to 6.3

Informational only; Commercial Vehicle Information
Details: OR99E MP 6.0 to MP 6.4 SB (Milwaukie) Effective February 17, 2014, this section of OR99E southbound will be restricted to 14 feet 00 in. in width, and 16 feet 04 in. in height between the hours of 7 AM & 2:30 PM (DAYTIME), Beginning July 22, 2014, the restriction on Saturdays and Sundays will change to 7 AM to 8 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 6.54 to 7.33

Informational only; Commercial Vehicle Information
Details: OR99E MP 6.37 to MP 7.37 NB & SB (Milwaukie) Effective June 16, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 11, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.09 to 7.93

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 7 to MP 8 NB (Tigard) Effective March 31, 2014, this section of OR99W (Barbur Blvd) northbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.161 to 7.671

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 7.15 to MP 7.70 NB (Tigard) Effective May 26, 2014, this section of OR99W (Barbur Blvd) northbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 29, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.41

Informational only; Commercial Vehicle Information
Details: OR99E MP 7.41 NB & SB (Portland) Effective March 10, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.02 to 8.66

Informational only; Commercial Vehicle Information
Details: OR99W MP 8.02 to MP 8.66 NB & SB (Tigard) Effective July 29, 2014, this section of OR99W will be restricted to 12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is August 6, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.621

Informational only; Commercial Vehicle Information
Details: OR99W SB ramp to OR217 NB (Tigard) Effective June 16, 2014, the ramp from OR99W southbound to OR217 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 6 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.99 to 11.02

Informational only; Commercial Vehicle Information
Details: OR99E MP 8.80 to MP 11.13 NB & SB (Gladstone) Effective January 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 11.2

Informational only; Commercial Vehicle Information
Details: OR99E MP 11.20 to MP 11.36 NB & SB (Oregon City) Effective April 28, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width, and 18 feet 03 in. in height on Monday to Friday between the hours of 9 AM & 3 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 11.46 to 11.92

Informational only; Commercial Vehicle Information
Details: OR99W MP 11.43 to MP 12.11 NB & SB (King City) Effective June 27, 2014, this section of OR99W will be restricted to 14 feet 00 in. in width on Monday to Friday between the hours of 8 PM & 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.20 SB (Tualatin River Bridge - King City) OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE99 MP 20.23 to 21.86

Informational only; Commercial Vehicle Information
Details: OR99E MP 20 to MP 22 NB & SB (Canby) Effective February 10, 2014, this section of OR99E will be restricted to 10 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr after sunrise (NIGHTTIME). Estimated date of completion is October 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 23.71 to 29.81

Informational only; Commercial Vehicle Information
Details: OR99W MP 23.71 to MP 30.00 NB & SB (between Newberg and Dayton) Effective July 16, 2014, this section of OR99W will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 5 AM. No restrictions will be in place from 5 AM Friday until 8 PM Sunday. The estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE130 MP 3.23

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE130 MP 3.6

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE130 MP 3.82

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE130 MP 4.15

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE130 MP 4.76

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE130 MP 5.11

Closure; Maintenance Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Highway 130 is closed to all traffic at the bridge at mile 5.11 for bridge work. This closure is expected to last until late September, 2014. Highway 130 will be closed until the end of September, 2014, as contractors repair the bridges along the highway. The bridges will be closed in succession until the work is complete, preventing through traffic from accessing the highway. There are two detours from this location: vehicles can travel from Hebo to Grand Ronde on Highway 22, or they can travel from Hebo to Lincoln City on Highway 101 and from Lincoln City to Grand Ronde on Highway 18. Highways 18 and 101 are better suited to large vehicles.
Updated: 06/18/2014 12:41 pm

ORE130 MP 5.97

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 5.97 (Muscott Bridge near Dolph) Effective June 27, 2014, this section of OR130 will be closed. Estimated date of re-opening is August 27, 2014.
Updated: 07/24/2014 10:00 am

ORE130 MP 7.55

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 7.55 (Weed Bridge near Dolph) Effective August 27, 2014, this section of OR130 will be closed. Estimated date of re-opening is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE140 MP 0 to .09

Informational only; Commercial Vehicle Information
Details: OR140 MP 0.00 to MP 0.09 NB & SB (Hillsboro) Effective August 18, 2014, this section of OR219 will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is August 23, 2014.
Updated: 07/24/2014 10:00 am

ORE155 MP 8.58 to 9.19

Informational only; Commercial Vehicle Information
Details: OR155 MP 8.58 to MP 9.19 (Dayton) Effective July 25, 2014, this section of OR155 will be closed between the hours of 5:45 PM & 7 PM for one day only.
Updated: 07/24/2014 10:00 am

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE211 MP 5.2 to 5.6

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Lane closures will occur Monday through Friday from 7 a.m. to 5 p.m. for road construction on Dubarko Road, east and west of OR211. Project Description: Work is underway on a project to realign the intersection of Dubarko Road at OR 211 to reduce crashes. This work will improve safety by providing drivers on Dubarko Road a better view of OR 211 so they can judge for safe turning gaps. Work includes realigning the intersection and cutting back steep slopes to improve visibility. Construction work will require flagging, lane closures and a 14-day closure of Dubarko Road between Meing and OR 211. Work is expected to wrap up in October 2014. Traffic Impacts: Lane closures will occur Monday through Friday from 7 a.m. to 5 p.m. for tree removal on Dubarko Road, east and west of OR211. Expect intermittent traffic stops of up to 20 minutes on OR211 for tree removal.
Updated: 07/18/2014 10:42 pm

ORE213 MP 29.65 to 29.71

Informational only; Commercial Vehicle Information
Details: OR213 MP 29.65 to MP 29.71 NB & SB (Silverton) Effective August 2, 2014, this section of OR213 will be closed between the hours of 10 AM & 11:30 AM for one day only.
Updated: 07/24/2014 10:00 am

ORE214 MP 36.63 to 37.87

Informational only; Commercial Vehicle Information
Details: OR214 EB & WB MP 36.24 to MP 37.87 (Woodburn) Effective August 26, 2013, OR214 between Willow Ave (west of I-5) and Settlemeier Ave (east of I-5) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2016.
Updated: 07/24/2014 10:00 am

ORE214 MP 49.91 to 50.58

Informational only; Commercial Vehicle Information
Details: OR214 MP 49.91 to MP 50.58 NB & SB (Silverton) Effective August 2, 2014, this section of OR214 will be closed between the hours of 10 AM & 11:30 AM for one day only.
Updated: 07/24/2014 10:00 am

ORE214 MP 50.5 to 50.66

Informational only; Commercial Vehicle Information
Details: OR214 MP 50.66 to MP 50.50 NB (Silverton) Effective August 3, 2014, this section of OR214 will be closed between the hours of 12 noon and 1:30 PM for one day only.
Updated: 07/24/2014 10:00 am

ORE217 MP 0 to 7.52

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. Project Description: This project will make operational and safety improvements on OR 217 including widening the right shoulders on three sections of OR 217, paving both directions of OR 217 from U.S. 26 to I-5, improving signage in the OR 217 corridor and upgrading the center median barrier. Traffic Impacts: See below. Daytime Closures: Monday, Feb 24 to Friday, Feb. 28 from 7 a.m. to 5 p.m.: - Expect limited shoulder closures on northbound and southbound OR217 between US 26 and I-5. For more information:
Updated: 07/18/2014 10:47 pm

ORE217 MP 6.69

ON RAMP
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) , Shoulder
Comments: Lane restrictions occurring at the intersection of the I-5 sb on and off- ramps at 68th Avenue for underground work, Monday through Friday. Ramps Affected. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to S.W. 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Daytime lane restrictions will occur at the intersection of the southbound I-5 on and off- ramp at 68th Avenue for underground signalization work Monday through Friday starting at approximately 9 a.m. Lane restrictions will re-open by 3:30 p.m. For more project information:
Updated: 05/10/2014 04:48 am

ORE219 MP 23.46

Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE219 MP 26.77

Informational only; Commercial Vehicle Information
Details: OR219 MP 26.8 NB & SB (north of St Paul) Effective July 30, 2014, this section of OR219 will be closed between the hours of 7 AM & 5 PM (DAYTIME). Estimated date of completion is August 1, 2014.
Updated: 07/24/2014 10:00 am

ORE221 MP .34 to .48

Informational only; Commercial Vehicle Information
Details: OR221 MP 0.34 to MP 0.48 (Dayton) Effective July 25, 2014, this section of OR221 will be closed between the hours of 5:45 PM & 7 PM for one day only.
Updated: 07/24/2014 10:00 am

ORE221 MP 20.38

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 04/25/2014 07:37 am

ORE223 MP 2.91 to 3.5

Informational only; Commercial Vehicle Information
Details: OR223 MP 2.91 to MP 3.50 NB & SB (Dallas) Effective July 26, 2014, this section of OR223 will be closed between the hours of 8 AM & 2 PM for one day only.
Updated: 07/24/2014 10:00 am

ORE224 MP 4.36 to 6.56

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Project Description: The Sunrise JTA Project will address existing congestion and safety problems in the Oregon 212/224 corridor by constructing a new road from I-205 to 122nd Avenue. Major project elements include: - Constructing a new two-lane limited access highway (one lane each direction) from the Milwaukie Expressway (OR 224) at I-205 to SE 122nd Avenue at OR 212/224. - Constructing a new I-205 overcrossing that will connect 82nd Drive and 82nd Avenue. - Improving bicycle and pedestrian accommodations in the project area. - Improving the intersection of SE 122nd Avenue and OR 212/224. Traffic Impacts: Monday, Feb. 24 and Tuesday, Feb. 25 - Two northbound lanes of I-205 will be closed between Sunnybrook Road and Highway 212/224 for installation of overhang forms for the new SE 82nd Avenue bridge over I-205. The first lane will be closed from 8 p.m. to 5 a.m. and the second lane will be closed from 10 p.m. to 5 a.m. Wednesday, Feb. 26 and Thursday, Feb. 27 - Two southbound lanes of I-205 will be closed between Sunnybrook Road and Highway 212/224 for installation of overhang forms for the new SE 82nd Avenue bridge over I-205. The first lane will be closed from 8 p.m. to 5 a.m. and the second lane will be closed from 10 p.m. to 5 a.m. For more information:
Updated: 07/18/2014 10:43 pm

ORE229 MP 23.79 to 23.94

Informational only; Commercial Vehicle Information
Details: OR229 MP 23.79 to MP 23.94 NB & SB (Siletz) Effective August 9, 2014, this section of OR229 will be closed between the hours of 10 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

ORE240 MP 6

Estimated delay under 20 minutes; Crash/Hazard
Comments: A crash has occurred, use caution.
Last Updated: 07/24/2014 3:52 pm

ORE99E MP 9 to 12

No to Minimum Delay; Construction Work
Comments: Expect single lane and shoulder closures in both directions of OR 99E (McLoughlin Boulevard) Monday through Friday. Project Description: This project was designed to preserve the roadway on OR 99E (McLoughlin Boulevard) between Naef Road and the Clackamas River Bridge. The purpose of this project is to address the failing sections of roadway on OR 99E by repairing the pavement and preserving it for years to come. Project elements include: - Rebuilding sections of the road on OR 99E under the pavement - Repaving the roadway on OR 99E between Roethe Road and the Clackamas River Bridge - Connecting sidewalks in multiple locations - Improving sub-standard handicap ramps in multiple locations - Striping bike lanes - Connecting the traffic signals to improve traffic flow The electrical contractor, Sundown Electric, has started the underground electrical work for traffic signal timing and sidewalk work will follow. The signal detection loops will be installed and connected to the new signal timing system after the highway paving is completed. After the sidewalks and curbs are complete, Oregon Mainline Paving and several of their sub-contractors will begin paving the road in the spring of 2014. The travel lanes and bike lanes will be striped and legends installed after the paving is complete. The contractor will complete all work by fall 2014. Traffic Impacts: Expect shoulder closures on both northbound and southbound OR 99E (McLoughlin Boulevard) any time of the day or night Monday through Friday. Single Lane closures will occur Monday through Friday from 9 a.m. to 3 p.m. For more project information:
Updated: 07/18/2014 10:44 pm

ORE99E MP 11.2 to 11.6

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road work has the right lane closed near Clackamette Drive, use caution.
Updated: 07/24/2014 3:03 pm

ORE99E MP 21.14 to 21.42

Estimated delay under 20 minutes; Construction Work
Comments: Expect single lane closures from 9 a.m. to 3 p.m. Monday through Friday to install new signal equipment and ADA ramps at Elm, Grant and Ivy. Project description: This project will improve the traffic signals on Oregon Highway 99E (Pacific Highway E) in Canby at the intersections of Elm, Grant and Ivy Streets. Construction begins Monday, March 3 and is expected to be complete in summer 2014. The project includes the following improvements at the intersections of Elm Street, Grant Street and Ivy Street: • Upgrading traffic signals to include improving signal timing. • Installing new signal poles - no more ugly span wires hanging over the highway. • Constructing new ADA ramps at the four corners of each intersection. Traffic Impacts: Expect single lane closures from 9 a.m. to 3 p.m. Monday through Friday to install new signal equipment and ADA ramps at Elm, Grant and Ivy. Shoulder closures can occur anytime during the day and night seven days a week. Be alert to flaggers in the work zones.
Updated: 07/18/2014 10:29 pm

ORE99W MP 6.97 to 7.37

Estimated delay under 20 minutes; Construction Work
Comments: Traffic Impacts: Expect lane restrictions Monday through Friday from 9 a.m. to 3 p.m. Shoulder closures may occur anytime of the day or night. Project description: As part of the 2010/2011 signal upgrades project, interconnect will be installed to improve traffic signal timing in the area of SW 53rd and SW 60th Ave.
Updated: 07/18/2014 10:35 pm

ORE99W MP 7.93 to 8.65

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Expect alternating lane closures eb and wb OR 99W from OR 217 to 72nd Avenue Monday through Friday, 9 p.m. to 5:30 a.m. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to SW 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Expect alternating overnight lane closures on the eastbound and westbound lanes on OR 99W (Pacific Highway) for approximately 1.5 miles from OR 217 to 72nd Avenue for construction activities Monday through Friday, starting at approximately 9 p.m. All lanes will re-open by 5:30 a.m. the following morning. Bicyclists: Check this link for detour information: http://www.tigard-or.gov/community/bike_tigard/default.asp For more project information:
Updated: 07/18/2014 10:40 pm

US20 MP 16.29 to 21.88

Informational only; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Majority of work will take place away from the main highway. Watch for flaggers on the roadway. Please proceed with caution. Blasting has started. Approximately one blast per week is currently scheduled. Phase 3 construction will accomplish the following: 2-3 million cubic yards of earthwork, landslide mitigation, construction of 70,000 feet of drains, erosion control and landscaping.
Updated: 07/21/2014 10:25 am

US20 MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville) Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 07/24/2014 10:00 am

US26 MP .59 to .94

Informational only; Commercial Vehicle Information
Details: US26 MP 0.94 to MP 0.59 WB (Ross Island Bridge - Portland) Effective August 10, 2014, this section of US26 westbound (Ross Island Bridge) will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP .95

Informational only; Commercial Vehicle Information
Details: US26 EB ramp to OR99E SB (Ross Island Bridge - Portland) Effective August 10, 2014, the ramp from US26 eastbound (Ross Island Bridge) to OR99E southbound will be closed between the hours of 4 AM & 9:30 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP 1.15

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from OR99E NB / Woodward St (Portland) Effective August 10, 2014, the ramp from OR99E northbound / Woodward St to US26 westbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP 4.37 to 4.48

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) Median , All Lanes , Shoulder
Comments: Road construction is occurring, expect delays of up to 20 minutes and drive through the area with caution. This project consists of performing bridge rehabilitation work including placing a new concrete overlay on the bridge surface and installing scour protection at the bridge bents underneath the structure along US26 approximately four miles east of its intersection with US101 (Oregon Coast Highway). The scheduled work includes the Contractor performing bridge repairs. Flaggers will control single lane traffic during construction activities as required. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in October 2014.
Updated: 06/24/2014 09:06 am

US26 MP 4.4

Informational only; Commercial Vehicle Information
Details: US26 MP 4.3 to MP 4.5 EB & WB (east of Seaside) Effective July 23, 2014, this section of US26 will be restricted to 11 feet 00 in. in width Monday through Friday. No restrictions will be in place after 3 PM on Friday. Loads over 11 feet in width may be allowed on a case-by-case basis only by single trip permit. Contact the Over-Dimension Permit Unit for more information. The estimated date of completion is July 24, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 16.16 to 16.48

Estimated delay under 20 minutes; Maintenance Work
Comments: Bridge work is occurring. Use caution. Expect minor delays
Updated: 06/02/2014 07:07 am

US26 MP 16.28

Informational only; Commercial Vehicle Information
Details: US26 MP 16.28 EB & WB (Elsie) Effective July 13, 2014, this section of US26 will be restricted to 12 feet 00 in. in width. No restrictions will be in place from 11 AM Friday until 7 PM on Sunday. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 24.38

Informational only; Commercial Vehicle Information
Details: US26 MP 24.4 WB (Sandy) Effective April 21, 2014, this section of US26 westbound will be restricted to 20 feet 00 in. in width on Monday to Friday between the hours of 9 AM & 3 PM, and Monday to Friday between the hours of 7 PM & 6 AM. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 30.43 to 32.47

Informational only; Commercial Vehicle Information
Details: US26 MP 32.47 to MP 30.43 WB (Cherryville) Effective August 22, 2014, this section of US26 westbound will be restricted to 12 feet 00 in. in width between the hours of 8 AM & 12 noon (DAYTIME) for one day only.
Updated: 07/24/2014 10:00 am

US26 MP 49 to 56

Estimated delay under 20 minutes; Construction Work
Comments: Flagging and traffic stops up to 20-minutes Monday to Friday 7a-9p. Only one lane is open in each direction. Expect delays, and congestion. Expect intermittent flagging and traffic stops up to 20-munutes Monday through Friday from 7 a.m. to 9 p.m. Traffic is reduced to traveling in one lane in each direction travelers will encounter delays. Blasting the tall slopes will require one-hour closures of U.S. 26 Monday through Thursday from 5:30 p.m. to 7:30 p.m. Details about this work will be available in mid- to late- July. This work will not take place until late July. Here are the other traffic impacts related to this project: *Blasting the rock-slopes will require up-to 1 hour closures of U.S. 26 three days a week *Monday through Thursday between 5:30 p.m. to 7:30 p.m. Blasting is not expected to start until late July. *Intermittent traffic stops lasting 20-minutes anytime the contractor is actively working. *Increased truck traffic on U.S. 26. *Intermittent single lane closures and flagging for other work instead of full highway closures. *Construction work will not occur on holidays or Sundays. *No construction work will occur from November to March of each year. During this time all existing lanes will re-open. ODOT is constructing a project along a nearly eight mile stretch of U.S. 26 between Kiwanis Camp Road and OR 35 to improve safety by reducing severe crossover crashes and rockfall. Work includes: *Paving between Silent Rock and OR 35 *Cutting back the slope along a 600 foot section at Map Curve to provide a 27 foot wide ditch for rocks to land away from the road• *Cutting back the rock slope east of the runaway truck ramp to east of the Mirror Lake trailhead *Highway widening to install a median barrier• *Construction of a retaining wall to reduce impacts to existing trails from highway widening work *Extending the westbound passing lanes for a total of about 1,400 feet• Project Schedule: Work is expected to take place in 2014, 2015 and 2016 in the months of April-October each year in 2014, 2015 and 2016.
Updated: 07/07/2014 2:19 pm

US26 MP 50 to 57.45

Informational only; Commercial Vehicle Information
Details: US26 MP 49.20 to MP 57.45 EB & WB (Government Camp) Beginning June 30, 2014, this section of US26 will be closed for approximately 30-minutes on Mon/Tues/Thurs nights between the hours of 6:30 PM & 7:30 PM. Beginning September 1, 2014, the 30 minute closures will occur between 5:30 PM & 6:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is November 1, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 50.12 to 57.203

Informational only; Commercial Vehicle Information
Details: US26 MP 49.20 to MP 57.45 EB & WB (Government Camp) Beginning June 30, 2014, this section of US26 will be closed for approximately 30-minutes on Mon/Tues/Thurs nights between the hours of 6:30 PM & 7:30 PM. Beginning September 1, 2014, the 30 minute closures will occur between 5:30 PM & 6:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is November 1, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 53.51

Informational only; Commercial Vehicle Information
Details: US26 MP 53.51 EB & WB (Government Camp) Effective June 16, 2014, this section of US26 will be restricted to 17 feet 03 in. in height. Estimated date of completion is August 18, 2016.
Updated: 07/24/2014 10:00 am

US26 MP 61

Estimated delay under 20 minutes; Construction Work
Comments: Single lane closures will occur in both directions from 8 a.m. to 5:30 p.m. on NW Helvetia Road to NW Schaaf Road from Monday through Friday. Project Description: The U.S. 26 Brookwood Parkway/Helvetia Interchange project will improve traffic flow and safety in the interchange area. Project elements include: - Constructing a new westbound U.S. 26 to southbound Brookwood Parkway exit loop ramp. - Reconstructing the westbound U.S. 26 entrance ramp from Helvetia Road. - Widening the Brookwood Parkway overcrossing to accommodate additional northbound and southbound lanes over U.S 26. - Extending the right-turn lane from northbound Brookwood Parkway to the eastbound U.S. 26 entrance ramp. - Adding sidewalks and bike lanes within the interchange area. Traffic Impacts: Daytime single lane closures will occur in both directions from 8 a.m. to 5:30 p.m. on NW Helvetia Road north of the eastbound ramp interchange to the intersection of NW Helvetia Road and NW Jacobson Road on Monday, February 24 through Friday, February 28. Traffic will be controlled by flaggers within the work zone. Please note: NW Groveland Drive is permanently closed at NW Helvetia Road. NW Groveland Drive will be accessible from NW Groveland Road via NW West Union Road. A speed reduction zone is currently in place on NW Helvetia Road/NW Brookwood Parkway from the NW Helvetia Road/NW West Union Road intersection to the NW Brookwood Parkway/NW Huffman Street intersection. The posted speed limit has been changed to 40 mph throughout the entire work zone. For more information:
Updated: 05/10/2014 04:49 am

US26 MP 61.06

Informational only; Commercial Vehicle Information
Details: US26 MP 61.06 EB & WB (Brookwood/Helvetia Rd Interchange - Hillsboro) Effective May 14, 2014, this section of US26 will be intermittently closed Monday through Friday nights between the hours of 10 PM & 5 AM. All traffic can bypass the closure by taking Exit 61, then re-entering the highway. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

US30 MP 0

Informational only; Commercial Vehicle Information
Details: US30 Bypass WB ramp to/from US30 EB (St John's Bridge - Portland) Effective August 10, 2014, the ramps to/from US30 Bypass westbound to US30 eastbound will be closed between the hours of 7:30 AM & 12 noon for one day only.
Updated: 07/24/2014 10:00 am

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 07/24/2014 10:00 am

US30 MP .91

Informational only; Commercial Vehicle Information
Details: US30 Bypass MP 0.91 EB & WB (St John's Bridge - Portland) Effective August 10, 2014, this section of US30 Bypass will be rstricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7:30 AM & 12 noon for one day only.
Updated: 07/24/2014 10:00 am

US30 MP 12.59

Informational only; Commercial Vehicle Information
Details: US30 MP 12.5 to MP 12.7 WB (south of Scappoose) Effective August 22, 2014, this section of US30 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 1 AM. Estimated date of completion is August 23, 2014.
Updated: 07/24/2014 10:00 am

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 07/24/2014 10:00 am

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 07/24/2014 10:00 am

US30 MP 20.39

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 07/24/2014 10:00 am

US30 MP 48.67

Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Updated: 07/24/2014 10:00 am

US30 MP 62.24 to 94.67

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) Median , All Lanes , Shoulder
Comments: Road construction is occurring, use caution. Contractor installing rumble strips. Flaggers will be controlling traffic, expect up to 20 minute delays. The week of June 23, 2014 the scheduled work includes installation of centerline rumble strips on US30. Work will begin at mile post 62.24, west of Clatskanie, and proceed west to mile post 94.67, east of Astoria, with single lane closures. Flaggers will hold traffic at each end of the work zone, and pilot cars will guide traffic through the work zone, expect delays of up to 20 minutes. Construction activities are scheduled Sunday night through Thursday night, 8:00 p.m. through 6:00 a.m. the following morning. The week of June 30, 2014 the scheduled work includes installation of centerline rumble strips on US30. Work will take place between mile post 37.34 and mile post 45.87 within single lane closures. Flaggers will hold traffic at each end of the work zone, and pilot cars will guide traffic through the work zone, expect delays of up to 20 minutes. Construction activities are schedule Sunday night through Wednesday night, 8:00 p.m. through 6:00 a.m. the following morning.
Updated: 06/24/2014 11:24 am

US101 MP 0

No to Minimum Delay; Maintenance Work
Lanes Affected: (Northbound) 2 Lanes
Comments: Bridge work is occurring causing no to minimum delays, use caution.
Updated: 07/24/2014 08:21 am

US101 MP 1.8 to 3.03

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring on the Astoria Bridge. Expect delays of up to 20 minutes and drive through the area with caution. This project consists of recoating the steel above the bridge deck on the southern side of the Columbia River Bridge along U.S. 101 north of Astoria. This project consists of recoating the steel above the bridge deck on the southern side of the Columbia River Bridge along U.S. 101 north of Astoria. The scheduled work includes installation of the containment structures and painting the bridge steel above the bridge deck. Flaggers will control single lane traffic during construction activities as required. Lane delays will be allowed anytime on weekdays and weekends. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in July 2015.
Updated: 06/24/2014 08:57 am

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 07/24/2014 10:00 am

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Updated: 07/24/2014 10:00 am

US101 MP 39.53

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder
Comments: Road construction is occurring, use caution. Contractors repairing bridge deck. Flaggers will control single lane traffic. Delays up to 20 minutes. US101: Necarney Creek (Sam Reed) Bridge (Oregon Coast Highway, mile post 39.53) This project consists of recoating the steel below the bridge deck. The scheduled work includes installation of containment structures and painting the bridge below the bridge deck. Flaggers will control single lane traffic during construction activities, Monday through Thursday, 7:30 a.m. to 6:30 p.m., and Friday, 7:30 a.m. to 12:00 p.m. (noon). Expect delays of up to 20 minutes. The project is scheduled to be completed in March 2015.
Updated: 06/24/2014 11:11 am

US101 MP 39.53

Informational only; Commercial Vehicle Information
Details: US101 MP 39.53 NB & SB (South of Arch Cape) Effective May 20, 2014, this section of US101 crossing the Necarney Creek (Sam Reed Bridge) will be restricted to 16 feet 00 in. in width Monday through Friday between the hours of 7 AM & 5 PM. Estimated date of completion is March 15, 2015.
Updated: 07/24/2014 10:00 am

US101 MP 40.71

Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita) Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.
Updated: 07/24/2014 10:00 am

US101 MP 115.9 to 116.8

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Expect some delays while flaggers are stopping traffic for short periods of time. Nighttime lane closures 7 PM to 6:30 AM. The project will widen US101 with a lane in each direction and center turn lane. It will create wider shoulders, new curb and sidewalk, a new pedestrian crossing, a new signal at 32nd Street, retaining walls and landscaping.
Updated: 07/21/2014 10:11 am

US101 MP 116.35 to 116.47

Informational only; Commercial Vehicle Information
Details: US101 MP 116.3 to MP 116.5 NB & SB (Lincoln City) Effective July 1, 2014, this section of US101 will be restricted to 12 feet 00 in. in width. Loads over 12 feet in width may be allowed on a case-by-case basis only by single trip permit. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is September 16, 2014.
Updated: 07/24/2014 10:00 am

US101 MP 120

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Bridge work will reduce one lane of travel Monday thru Friday between 8:30 and 4 PM. Expect no to minor delays. Proceed with caution. Crews will be replacing the expansion joints on the bridge. The project will still allow a full lane of travel in each direction. Therefore, the project is not expected to result in a significant delay to motorists and bicyclists.
Updated: 07/21/2014 2:00 pm

US101 MP 132

Estimated delay under 20 minutes; Crash/Hazard
Comments: A crash has occurred, use caution.
Last Updated: 07/24/2014 3:58 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 07/24/2014 10:00 am

North Oregon Road Conditions by Route

I-84 MP 63.02 to 63.92

Informational only; Commercial Vehicle Information
Details: I-84 MP 63 to MP 64 EB (Hood River) Effective August 1, 2014, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width, and 16 feet 05 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 63.4 to 63.7

Informational only; Commercial Vehicle Information
Details: I-84 MP 63.41 to MP 63.75 WB (Hood River) Effective August 11, 2014, this section of I-84 westbound will be restricted to 12 feet 00 in. in width between the hours of 9:30 PM & 5 AM (NIGHTTIME). Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 63.7 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 63.5 to MP 64.5 WB (Hood River) Effective August 1, 2014, this section of I-84 westbound will be restricted to 13 feet 00 in. in width, and 15 feet 09 in. in height between the hours of 9:30 PM & 5 AM (NIGHTTIME). Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 64.44 to 67.72

Informational only; Commercial Vehicle Information
Details: I-84 MP 64.4 to MP 69.0 EB & WB (Hood River) Effective July 28, 2014, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Loads over 16 feet in width may be allowed on a case-by-case basis. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 76 to 84

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 07/24/2014 12:57 pm

I-84 MP 76.46 to 84.76

Informational only; Commercial Vehicle Information
Details: I-84 MP 76 to MP 85 EB & WB (west of The Dalles) Effective July 20, 2014, this section of I-84 will be restricted to 16 feet 00 in. in width on Monday to Thursday between the hours of 7 AM & 5 PM (DAYTIME). In addition, the height will be restricted to 16 feet 10 in. in height eastbound, and 19 feet 09 in. in height westbound during the same hours. Loads over 16 feet in width may be allowed on a case-by-case basis. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is August 8, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 76.5 to 84.78

Informational only; Commercial Vehicle Information
Details: I-84 MP 76 to MP 85 EB & WB (west of The Dalles) Effective July 20, 2014, this section of I-84 will be restricted to 16 feet 00 in. in width on Monday to Thursday between the hours of 7 AM & 5 PM (DAYTIME). In addition, the height will be restricted to 16 feet 10 in. in height eastbound, and 19 feet 09 in. in height westbound during the same hours. Loads over 16 feet in width may be allowed on a case-by-case basis. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is August 8, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 82 to 76

No to Minimum Delay; Maintenance Work
Lanes Affected: (Westbound) 1 Lane
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 07/23/2014 06:56 am

I-84 MP 103.75 to 104.83

Informational only; Commercial Vehicle Information
Details: I-84 MP 103.5 to MP 105.0 EB & WB (Biggs Junction) Effective July 22, 2013, this section of I-84 will be restricted to 19 feet 00 in. in width. The height will be restricted to 19 feet 04 in. in height eastbound, and 17 feet 10 in. in height westbound. In addition, effective June 3, 2014, the I-84 eastbound and westbound ramps to/from US97 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width should use Exit 109 (Rufus) to/from US97. Estimated date of completion is June 1, 2015.
Updated: 07/24/2014 10:00 am

I-84 MP 104.37 to 104.78

Informational only; Commercial Vehicle Information
Details: I-84 MP 103.5 to MP 105.0 EB & WB (Biggs Junction) Effective July 22, 2013, this section of I-84 will be restricted to 19 feet 00 in. in width. The height will be restricted to 19 feet 04 in. in height eastbound, and 17 feet 10 in. in height westbound. In addition, effective June 3, 2014, the I-84 eastbound and westbound ramps to/from US97 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width should use Exit 109 (Rufus) to/from US97. Estimated date of completion is June 1, 2015.
Updated: 07/24/2014 10:00 am

I-84 MP 104.5 to 106

No to Minimum Delay; Construction Work
Comments: I84 will be reduced to one lane in both EB and WB direction with traffic pattern changes. Speeds on I84 through the work zone are reduced to 50 MPH. During the week of July 20th – July 26th the contractor will be performing bridge demolition and working on ramp construction outside of the roadway. Bridge Removal will occur at night to minimize the effects on traffic. Between the hours of 11:00 p.m. and 5:00 a.m. Monday through Friday morning Interstate 84 will be closed at the bridge. Traffic will be routed up and over the bridge removal area using the existing on and off ramps. Flagging will be used during this time to manage traffic. Delays during flagging operations will be 5 to 10 minutes. I84 is reduced to one lane in both EB and WB direction. Speeds on I84 through the work zone have been reduced to 50 MPH.
Updated: 07/24/2014 08:59 am

I-84 MP 138 to 160

No to Minimum Delay; Construction Work
Comments: Road construction is occurring with single lane closures. 7pm to 7am Sunday through Thursday nights causing no to minimum delays. Use caution. During the week of July 20th – July 26th the contractor will be installing rumble strips and performing project clean-up work from Arlington (MP138) to Tower Rd. (MP159). Lane closures will be in effect from 7 p.m. to 7 a.m. Sunday night through Thursday night. Traffic can expect minimal delays.
Updated: 07/24/2014 04:44 am

I-84 MP 138.18 to 159.3

Informational only; Commercial Vehicle Information
Details: I-84 MP 138.04 to MP 159.30 EB & WB (between Arlington and Boardman) Effective May 5, 2014, this section of I-84 will be restricted to 12 feet 00 in. in width Sunday through Thursday between the hours of 7 PM & 7 AM. In addition, the height will be restricted to 15 feet 08 in. in height westbound, and 16 feet 06 in. in height eastbound during the same time. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 138.53 to 159.3

Informational only; Commercial Vehicle Information
Details: I-84 MP 138.04 to MP 159.30 EB & WB (between Arlington and Boardman) Effective May 5, 2014, this section of I-84 will be restricted to 12 feet 00 in. in width Sunday through Thursday between the hours of 7 PM & 7 AM. In addition, the height will be restricted to 15 feet 08 in. in height westbound, and 16 feet 06 in. in height eastbound during the same time. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

ORE19 MP 105.6

Informational only; Commercial Vehicle Information
Details: OR19 MP 105.60 (North Fork John Day River Bridge - Kimberly) Effective August 4, 2014, OR19 crossing North Fork John Day River Bridge at Kimberly is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. All loads must straddle centerline and proceed at 5 mph when crossing the bridge. Estimated date of completion is August 18, 2014.
Updated: 07/24/2014 10:00 am

ORE35 MP 101.82

Informational only; Commercial Vehicle Information
Details: OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Updated: 07/24/2014 10:00 am

ORE207 MP 11.6 to 12.2

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Bridge construction is occurring, with intermittent flagging operations. Delays up to 20 mins weekdays between 6AM and 6PM.
Updated: 07/22/2014 12:46 pm

ORE207 MP 11.86

Informational only; Commercial Vehicle Information
Details: OR207 MP 11.86 (Umatilla River Bridge - south of Hermiston) OR207 crossing the Umatilla River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE216 MP 13 to 17

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 07/24/2014 09:39 am

US26 MP 49 to 56

Estimated delay under 20 minutes; Construction Work
Comments: Flagging and traffic stops up to 20-minutes Monday to Friday 7a-9p. Only one lane is open in each direction. Expect delays, and congestion. Expect intermittent flagging and traffic stops up to 20-munutes Monday through Friday from 7 a.m. to 9 p.m. Traffic is reduced to traveling in one lane in each direction travelers will encounter delays. Blasting the tall slopes will require one-hour closures of U.S. 26 Monday through Thursday from 5:30 p.m. to 7:30 p.m. Details about this work will be available in mid- to late- July. This work will not take place until late July. Here are the other traffic impacts related to this project: *Blasting the rock-slopes will require up-to 1 hour closures of U.S. 26 three days a week *Monday through Thursday between 5:30 p.m. to 7:30 p.m. Blasting is not expected to start until late July. *Intermittent traffic stops lasting 20-minutes anytime the contractor is actively working. *Increased truck traffic on U.S. 26. *Intermittent single lane closures and flagging for other work instead of full highway closures. *Construction work will not occur on holidays or Sundays. *No construction work will occur from November to March of each year. During this time all existing lanes will re-open. ODOT is constructing a project along a nearly eight mile stretch of U.S. 26 between Kiwanis Camp Road and OR 35 to improve safety by reducing severe crossover crashes and rockfall. Work includes: *Paving between Silent Rock and OR 35 *Cutting back the slope along a 600 foot section at Map Curve to provide a 27 foot wide ditch for rocks to land away from the road• *Cutting back the rock slope east of the runaway truck ramp to east of the Mirror Lake trailhead *Highway widening to install a median barrier• *Construction of a retaining wall to reduce impacts to existing trails from highway widening work *Extending the westbound passing lanes for a total of about 1,400 feet• Project Schedule: Work is expected to take place in 2014, 2015 and 2016 in the months of April-October each year in 2014, 2015 and 2016.
Updated: 07/07/2014 2:19 pm

US26 MP 50 to 57.45

Informational only; Commercial Vehicle Information
Details: US26 MP 49.20 to MP 57.45 EB & WB (Government Camp) Beginning June 30, 2014, this section of US26 will be closed for approximately 30-minutes on Mon/Tues/Thurs nights between the hours of 6:30 PM & 7:30 PM. Beginning September 1, 2014, the 30 minute closures will occur between 5:30 PM & 6:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is November 1, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 50.12 to 57.203

Informational only; Commercial Vehicle Information
Details: US26 MP 49.20 to MP 57.45 EB & WB (Government Camp) Beginning June 30, 2014, this section of US26 will be closed for approximately 30-minutes on Mon/Tues/Thurs nights between the hours of 6:30 PM & 7:30 PM. Beginning September 1, 2014, the 30 minute closures will occur between 5:30 PM & 6:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is November 1, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 53.51

Informational only; Commercial Vehicle Information
Details: US26 MP 53.51 EB & WB (Government Camp) Effective June 16, 2014, this section of US26 will be restricted to 17 feet 03 in. in height. Estimated date of completion is August 18, 2016.
Updated: 07/24/2014 10:00 am

US26 MP 75.11

Informational only; Commercial Vehicle Information
Details: US26 MP 75.11 EB & WB (Warm Springs) Effective August 4, 2014, this section of US26 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads over 16 feet in width may be allowed on a case-by-case basis only. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 76.42

Informational only; Commercial Vehicle Information
Details: US26 MP 76.44 EB & WB (Warm Springs) Effective August 4, 2014, this section of US26 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM. Loads over 16 feet in width may be allowed on a case-by-case basis only. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 104.36

Informational only; Commercial Vehicle Information
Details: US26 MP 104.36 EB & WB (Warm Springs) Effective August 11, 2014, this section of US26 will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 4:30 PM. Loads over 16 feet in width may be allowed on a case-by-case basis only. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

US30 MP 30.42

Informational only; Commercial Vehicle Information
Details: US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Updated: 07/24/2014 10:00 am

US30 MP 51.26

Informational only; Commercial Vehicle Information
Details: US30/OR35 connection to/from I-84 Exit 64 (Hood River) Effective August 1, 2014, the US30/OR35 connection to/from I-84 Exit 64 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

US97 MP .43 to 2

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Expect occasional flagging on US97 at the ramp and US30 intersection for select operations. Delays during flagging operations will be less than 20 min During the week of July 20th – July 26th the contractor will be performing bridge demolition and working on ramp construction outside of the roadway. Bridge Removal will occur at night to minimize the effects on traffic. Between the hours of 11:00 p.m. and 5:00 a.m. Monday through Friday morning Interstate 84 will be closed at the bridge. Traffic will be routed up and over the bridge removal area using the existing on and off ramps. Flagging will be used during this time to manage traffic. Delays during flagging operations will be 5 to 10 minutes. I84 is reduced to one lane in both EB and WB direction. Speeds on I84 through the work zone have been reduced to 50 MPH.
Updated: 07/17/2014 8:41 pm

US730 MP 180.66 to 186.36

Informational only; Commercial Vehicle Information
Details: US730 MP 180.0 to MP 186.5 EB & WB (Umatilla) Effective July 13, 2014, this section of US730 will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM (DAYTIME). Loads over 16 feet in width may be allowed on a case-by-case basis. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is July 18, 2014.
Updated: 07/24/2014 10:00 am

Northeast Oregon Road Conditions by Route

I-84 MP 245.85 to 260.67

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Single lane traffic both EB & WB. The on ramp Exit 256 will be closed through July 14. Expect reduced speeds, traffic pattern changes and single lane travel for eb and wb travel with traffic separated by concrete barrier. Bicycles are NOT allowed through the seven-mile work zone from Hilgard State Park to La Grande (MP 252-261).Travelers can expect traffic pattern changes between July 15 and the end of the month as crews gradually move traffic off the eastbound freeway lanes to the newly resurfaced westbound freeway. The eastbound lanes will then be closed to accommodate resurfacing work. Traffic will remain single lane in both directions, separated by concrete barriers, until fall. The westbound freeway on-ramp at Exit 259 where U.S. 30 connects to the freeway at the west end of La Grande will also remain closed until fall. Travelers are cautioned to expect reduced speeds, traffic pattern changes and narrow lanes with no shoulders in this work zone. Residence at Perry will also see changes at the Exit 256 interchange, west of Perry. The I-84 westbound on-ramp will open and the eastbound off-ramp at this interchange will close.
Updated: 07/10/2014 8:27 pm

I-84 MP 248.47 to 260.29

Informational only; Commercial Vehicle Information
Details: I-84 MP 260.7 to MP 248.0 WB (La Grande to Meacham) Effective March 31, 2014, this section of I-84 westbound will have the following restrictions in place (NOTICE: there are multiple curves within the project area, use extra caution): mobile/modular units - restricted to 14 feet 00 in. in overall width (including eaves) and the unit/trailer is limited to 70' in length, including the tongue. Other non-divisible loads: restricted to 14 feet 00 in. in overall width and 120' overall length. The trailer is limited to 70' in length. Legal width loads/vehicles (8 ft 6 in. or less in width) are restricted to 140' overall length and the trailer length is not limited. Estimated date of completion is November 1, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 248.54 to 260.29

Informational only; Commercial Vehicle Information
Details: I-84 MP 248.0 to MP 260.7 EB (Meacham to La Grande) Effective March 31, 2014, this section of I-84 eastbound will have the following restrictions in place (NOTICE: there are multiple curves within the project area, use extra caution): mobile/modular units - restricted to 12 feet 00 in. in overall width (including eaves) and the unit/trailer is limited to 70' in length, including the tongue. Other non-divisible loads: restricted to 12 feet 00 in. in overall width and 120' overall length. The trailer is limited to 70' in length. Legal width loads/vehicles (8 ft 6 in. or less in width) are restricted to 140' overall length and the trailer length is not limited. Estimated date of completion is November 1, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 256.4

Informational only; Commercial Vehicle Information
Details: I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

I-84 MP 259

ON RAMP
Closure; Construction Work
Comments: West Bound on ramp at exit 259 is closed for construction Ramps Affected.
Updated: 06/30/2014 1:43 pm

I-84 MP 259.171

Informational only; Commercial Vehicle Information
Details: I-84 WB ramp from US30 Exit 259 (La Grande) Effective March 31, 2014, the ramp from US30 to I-84 westbound at Exit 259 will be closed. Estimated date of completion is November 1, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 265.34

Informational only; Commercial Vehicle Information
Details: I-84 WB Exit 265 ramp to US30 and OR203 (south of La Grande) Effective August 20, 2014, the ramp from I-84 westbound Exit 265 to US30 and OR203 will be closed between the hours of 8 AM & 2 PM (DAYTIME). Estimated date of completion is August 20, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 276.65 to 285.33

Future Event: Estimated delay under 20 minutes; Construction Work
Expected Start Date: 8/5/2014 4:00:00 PM
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: A chip seal is occurring. Watch for lane closures, reduced speeds, day/nighttime flaggers, pilot cars, and loose rock on the roadway. Work expected to start in August.
Updated: 07/01/2014 9:02 pm

I-84 MP 278.37 to 283.89

Informational only; Commercial Vehicle Information
Details: I-84 MP 276.75 to MP 285.33 EB & WB (west of North Powder) Effective June 10, 2014, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 6 PM & 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. In addition, the height will be restricted to 16 feet 03 in. in height eastbound, and 16 feet 07 in. in height westbound during the same time. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 278.4 to 283.94

Informational only; Commercial Vehicle Information
Details: I-84 MP 276.75 to MP 285.33 EB & WB (west of North Powder) Effective June 10, 2014, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 6 PM & 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. In addition, the height will be restricted to 16 feet 03 in. in height eastbound, and 16 feet 07 in. in height westbound during the same time. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 294 to 291

No to Minimum Delay; Maintenance Work
Lanes Affected: (Westbound) 1 Lane
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 07/24/2014 06:51 am

ORE203 MP 8.54 to 8.9

Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring at this location. No impact to the roadway at this time while the detour is created. Traffic will be routed on a detour adjacent to the Highway Construction. Impacts to traffic will be minimal but occasionally controlled by flaggers with up to 20 minute wait times.
Updated: 07/22/2014 12:42 pm

ORE204 MP 39.45

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 06/23/2014 08:24 am

ORE339 MP 2.76

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 07/24/2014 10:00 am

ORE339 MP 3.16

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 07/24/2014 10:00 am

ORE339 MP 3.31

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 07/24/2014 10:00 am

US30 MP 1.58 to 2.1

Informational only; Commercial Vehicle Information
Details: US30 MP 1.58 to MP 2.10 (La Grande) Effective July 30, 2014, this section of US30 will be closed between the hours of 5:30 PM & 8:30 PM for one day only.
Updated: 07/24/2014 10:00 am

West Oregon Road Conditions by Route

99 MP 12.21

Informational only; Commercial Vehicle Information
Details: Old OR99 (DC388) Old Winchester Bridge (Roseburg) Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.
Updated: 07/24/2014 10:00 am

I-5 MP 112.13 to 151.8

Informational only; Commercial Vehicle Information
Details: I-5 MP 112 to MP 154 NB & SB (Dillard to Scotts Valley) Effective March 3, 2014, this section of I-5 will be restricted to 13 feet 00 in. in width between the hours of 7 PM & 7 AM. The width will be restricted to 19 feet 00 in. in width at all other hours. No width restrictions will be in place from 3 PM Friday until 9 PM Sunday. In addition, the height will be restricted to 15 feet 11 in. in height northbound, and 15 feet 10 in. in height southbound with the width is restricted. No width or height restrictions will be in place from 3 PM Friday until 9 PM Sunday. Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 112.23 to 151.81

Informational only; Commercial Vehicle Information
Details: I-5 MP 112 to MP 154 NB & SB (Dillard to Scotts Valley) Effective March 3, 2014, this section of I-5 will be restricted to 13 feet 00 in. in width between the hours of 7 PM & 7 AM. The width will be restricted to 19 feet 00 in. in width at all other hours. No width restrictions will be in place from 3 PM Friday until 9 PM Sunday. In addition, the height will be restricted to 15 feet 11 in. in height northbound, and 15 feet 10 in. in height southbound with the width is restricted. No width or height restrictions will be in place from 3 PM Friday until 9 PM Sunday. Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 123.91

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 124 on-ramp from OR138 (Roseburg) Effective July 16, 2014, the I-5 SB Exit 124 on-ramp from OR138 will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 124.16

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 124 off-ramp to OR138 (Roseburg) Effective July 1, 2014, the ramp from I-5 southbound Exit 124 to OR138 will be intermittently closed on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 124.2

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from OR138 EB (Roseburg) Effective July 31, 2014, the ramp from OR138 eastbound to I-5 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 7 PM & 7 AM. The estimated date of completion is August 11, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 124.37

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from OR138 WB (Roseburg) Effective August 7, 2014, the ramp from OR138 westbound to I-5 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 7 PM & 7 AM. The estimated date of completion is August 13, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 126.92

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 127 on-ramp from WB Edenbower Blvd (Roseburg) Effective August 4, 2014, the ramp from westbound Edenbower Blvd to I-5 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is August 6, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 148

Unconfirmed; Crash/Hazard
Comments: An unconfirmed report of a crash has been received, use caution.
Last Updated: 07/24/2014 3:28 pm

I-5 MP 151.8

Informational only; Commercial Vehicle Information
Details: I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

I-5 MP 151.81

Informational only; Commercial Vehicle Information
Details: I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

I-5 MP 160 to 171

NB Estimated Delay 5 minutes; SB Estimated Delay 3 minutes; Construction Work
Lanes Affected: (Southbound) 1 Lane (Northbound) 1 Lane
Comments: Road construction, use caution and expect delays. From July 7 to July 31, watch for intermittent single-lane closures through the work zone (MP 162-170). Watch for congestion and delays during peak travel times, including Sunday afternoons and evenings. Consider alternate routes. The SB Exit 170 on-ramp is closed. Watch for intermittent nighttime SB ramp closures at Exit 162 (Drain/OR 38 junction) and Exit 163 (Curtin) after July 7. All NB ramps are open during this construction phase. Watch for construction signs, roadside message boards and traffic control devices. Watch for workers and construction vehicles. The speed limit on I-5 is 65 mph through the work zone.
Updated: 07/19/2014 1:39 pm

I-5 MP 162.06 to 169.58

Informational only; Commercial Vehicle Information
Details: I-5 MP 162 to MP 170 NB & SB (south of Cottage Grove) Effective May 8, 2014, this section of I-5 will be restricted to 16 feet 00 in. in width, and 16 feet 11 in. in height. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 162.39 to 162.83

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 162 ramps to/from OR38 / OR99 (Curtin) Effective July 28, 2014, I-5 northbound Exit 162 ramps to/from OR38 / OR99 will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 9 AM. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 162.57

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 162 ramp to OR38 / OR99 (Curtin) Effective June 16, 2014, the ramp from I-5 southbound Exit 162 to OR38 / OR99 will be intermittently closed between the hours of 7 PM & 9 AM. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 163.17

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Bear Creek Rd (Curtin) Effective May 27, 2014, the ramp from Bear Creek Rd to I-5 southbound will be intermittently closed between the hours of 7 PM & 9 AM. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 163.42 to 163.78

Informational only; Commercial Vehicle Information
Details: I-5 MP 163.4 to MP 164.0 NB (Curtin) Effective May 8, 2014, this section of I-5 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 163.49 to 163.78

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 163 ramps to/from Curtin / Lorane Effective July 28, 2014, I-5 northbound Exit 163 ramps to/from Curtin / Lorane will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 9 AM. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 163.67

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 163 ramp to Bear Creek Rd (Curtin) Effective July 14, 2014, the ramp from I-5 southbound Exit 163 to Bear Creek Rd will be intermittently closed between the hours of 7 PM & 9 AM. Estimated date of completion is August 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 168.46

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from OR99 SB (south of Cottage Grove) Effective May 15, 2014, the ramp from OR99 southbound to I-5 southbound will be closed. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 192 to 193.5

No to Minimum Delay; Construction Work
Comments: No work is planned this week. Please drive carefully through the work zone. No work is planned this week. Please drive carefully through the work zone. Project summary: Replace the Interstate 5 Bridge over the Willamette River between Eugene and Springfield. Contractors have completed construction of the new bridges. The Patterson Slough Bridges are also complete. Construction continues on the bike-ped viaduct along Franklin Boulevard, as does landscaping in parks adjacent to the project.
Updated: 07/18/2014 3:20 pm

I-5 MP 192.1 to 193.4

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Watch for construction vehicles entering and exiting the work zone at Jenkins Drive. The south side sidewalk is closed; use north side sidewalk. Watch for construction vehicles entering and exiting the work zone at Jenkins Drive. Pedestrians and bicyclists: The sidewalk on the south side of Franklin Boulevard to be closed due to adjacent business construction. Use the new crosswalk east of Jenkins Drive to access the new viaduct path on the north side of Franklin Boulevard.
Updated: 07/18/2014 3:20 pm

I-5 MP 195.02 to 195.46

Informational only; Commercial Vehicle Information
Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April 9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in width and 16 feet 03 in. in height on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 195.45 to 195.46

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder
Comments: The on ramp to south bound I-5 from WB beltline may be closed weeknights from 8pm to 5:30 am. Follow detour route signs. Traffic has been shifted onto the new Beltline Bridge in a new temporary alignment which will allow the remainder of the old bridge to be demolished. The onramp to SB I-5 from WB beltline may be closed weeknights from 8pm to 5:30 am A speed limit reduction to 35 MPH is now in effect on Beltline. A speed limit reduction to 50 MPH is now in effect for I-5 through the construction zone. Most work will be happening behind barrier. Look for periodic lane closures and trucks entering and exiting the highway. Project Summary: This project will rebuild the interchange at Interstate 5 and Randy Pape’ Beltline Highway to meet modern design and safety standards. State funds from the Jobs and Transportation Act will build: - A new I-5 southbound to westbound Beltline off-ramp. - A new I-5 southbound to eastbound Beltline off-ramp. - A new westbound Beltline to southbound I-5 on-ramp - A new Beltline Bridge over I-5 - And base construction and structures for a new multi-use path to connect south of the interchange to north of the interchange. The path will open upon completion of Unit 4 scheduled to be constructed in 2016. This is a two year project. Construction of Unit 3 is scheduled to be completed by November 2014.
Updated: 07/18/2014 3:23 pm

I-5 MP 195.45 to 195.46

Informational only; Construction Work
Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes
Comments: The posted speed limit has been reduced to 35 on the Beltline bridge and 50 on Interstate 5 near the interchange due to construction work zone. New, lower speed limits have been implemented on the Randy Papé Beltline bridge over Interstate 5, and on I-5 beneath the bridge where construction has begun on a two-year project to improve the I-5/Beltline interchange. Beginning Wednesday, April 17, 2013, the posted, enforceable speed limit on the Beltline bridge over I-5 will be 35 miles per hour. The speed limit on I-5 near the interchange will be reduced to 50 miles per hour. The speed limit reductions will be enforced until the project is completed in fall of 2014. The speed limit reductions are intended to improve work zone safety for all highway users and construction workers. From 2007 through 2011 in Oregon, 53 people died and more than 2,200 were injured in work zone crashes. The majority of people injured or killed in these crashes were drivers, passengers or pedestrians, not workers. The single biggest factor in crashes is driver inattention; that’s why orange cones, variable message signs and other tools are used to alert motorists. The other major contributing factor is speed, which is why work zones often require lower speed limits. National Work Zone Awareness Week is April 16-19. To learn more about work zone safety, visit ODOT’s safety website at: http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx
Updated: 04/01/2014 05:54 am

I-5 MP 225

Closure; Crash/Hazard
Lanes Affected: (Northbound) 1 Lane , Shoulder
Comments: A vehicle fire has occurred, use caution.
Last Updated: 07/24/2014 3:53 pm

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 07/24/2014 10:00 am

ORE34 MP .13

Informational only; Commercial Vehicle Information
Details: Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Updated: 07/24/2014 10:00 am

ORE42 MP 38.2 to 45.9

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect traffic control with flaggers and pilot car, 24 hours a day, from 7 PM Sunday to 7 PM Saturday. Use caution and watch for signs. This is for improving sight distances for drivers in the county line curves area of the highway.
Updated: 07/19/2014 1:32 pm

ORE42 MP 43.59 to 44.95

Informational only; Commercial Vehicle Information
Details: OR42 MP 44 to MP 46 EB & WB (East of Remote) Effective May 19, 2014, this section of OR42 will be restricted to 16 feet 00 in. in width. Estimated date of completion is September 15, 2014.
Updated: 07/24/2014 10:00 am

ORE42 MP 57

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road maintenance operations are occurring, use caution. Single lane of travel both directions. Expect delays.
Updated: 07/24/2014 10:50 am

ORE58 MP 6.5 to 11

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Expect lane closures and flaggers controlling traffic 24 hours a day with 20 minute delays. Watch for flaggers and trucks in work zone. The Contractor will continue working on the full rebuild section between mileposts 10 and 11, with 24 hour flagging for the next week. Paving and other work outside of the rebuild area will occur Sunday through Thursday with weeknight lane closures usually limited to the hours of 7PM to 7AM. Please watch for flaggers and trucks entering and leaving the work area, as well as abrupt edges. Project Summary: This is a pavement preservation project that will replace the deteriorating surfacings in this section. There is also a section of total surfacing replacement that will require around the clock flagging.
Updated: 07/18/2014 3:48 pm

ORE58 MP 10

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road construction is occurring, use caution.
Updated: 07/10/2014 11:03 am

ORE99 MP 118

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Southbound) 2 Lanes
Comments: A crash has occurred, use caution.
Last Updated: 07/24/2014 3:50 pm

ORE126 MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield) OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE138 MP 11.5

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution. Traffic control with flaggers.
Updated: 07/24/2014 09:03 am

ORE138 MP 53 to 29

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution. Watch for slow moving vehicles. Expect delays.
Updated: 07/24/2014 3:43 pm

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE225 MP .01 to 2.53

Informational only; Commercial Vehicle Information
Details: OR225 (McVay Hwy) MP 0.00 to MP 2.52 (Eugene/Springfield) Effective July 18, 2014, this section of OR225 (McVay Hwy) will be closed. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE229 MP 23.79 to 23.94

Informational only; Commercial Vehicle Information
Details: OR229 MP 23.79 to MP 23.94 NB & SB (Siletz) Effective August 9, 2014, this section of OR229 will be closed between the hours of 10 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

ORE241 MP .51

Informational only; Commercial Vehicle Information
Details: OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Updated: 07/24/2014 10:00 am

ORE569 MP 7.05

OFF RAMP
Closure with Detour; Maintenance Work
Comments: Beltline on ramps will be intermittently closed between the hours of 9 p.m. and 5 a.m. from Prairie Road and Northwest Expressway. Use detour route. Ramps Affected. Beginning July 14 and continuing until July 30, the following ramps will be intermittently closed between the hours of 9 p.m. and 5 a.m.: • OR 569 WB Exit 7A ramp to Prairie Road • OR 569 on-ramp from Prairie Road • OR 569 WB on-ramp from Northwest Expressway • OR 569 EB Exit 7 ramp to Northwest Expressway Detour Route Information - When the ramps listed above are closed, traffic should use OR 99 and River Road to access OR 569.
Updated: 07/18/2014 4:49 pm

ORE569 MP 12.26 to 13

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

ORE569 MP 12.53 to 12.95

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

ORE569 MP 12.76

Informational only; Commercial Vehicle Information
Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the ramp from OR569 westbound to I-5 southbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

ORE569 MP 12.79

Informational only; Commercial Vehicle Information
Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the ramp from OR569 eastbound to I-5 northbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

US20 MP 16.29 to 21.88

Informational only; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Majority of work will take place away from the main highway. Watch for flaggers on the roadway. Please proceed with caution. Blasting has started. Approximately one blast per week is currently scheduled. Phase 3 construction will accomplish the following: 2-3 million cubic yards of earthwork, landslide mitigation, construction of 70,000 feet of drains, erosion control and landscaping.
Updated: 07/21/2014 10:25 am

US20 MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville) Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 07/24/2014 10:00 am

US20 MP 27 to 30

No to Minimum Delay; Maintenance Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Crack sealing project will start June 9th until July 21st. Work hours are 7:30 PM to 6 AM, Monday thru Thursday. Expect alternating lane closures. An ODOT contractor will be crack sealing US20 through Sweet Home. All work will be completed during the nighttime hours. Work should wrap up by July 21st.
Updated: 06/06/2014 12:32 pm

US20 MP 92.29 to 92.83

Informational only; Commercial Vehicle Information
Details: US20/OR126 MP 92.29 to MP 92.83 EB & WB (Sisters) As of June 26, 2014, the 12 width restriction through Sisters has been lifted; however there are new requirements for loads over 12 wide traveling through this area. The movement of two loads each exceeding 12 in width traveling in opposing directions through Sisters at the same time is not allowed through a six block section of downtown Sisters between S Pine St and S Larch St due to horizontal width constraints. The lead pilot vehicle operator must ensure no oversize load over 12' in width enters the restricted section from the opposite direction before the permitted vehicle enters the restricted section. Pilot vehicles escorting wide loads exceeding 12' in width must announce their approaching presence on CB radio channel 17 prior to entering the six block section of downtown Sisters between S Pine St and S Larch St. In the event of an oncoming oversize load, one of the lead pilot vehicle operators must direct his piloted load to wait and allow the approaching load to pass safely before proceeding.
Updated: 07/24/2014 10:00 am

US101 MP 132

Estimated delay under 20 minutes; Crash/Hazard
Comments: A crash has occurred, use caution.
Last Updated: 07/24/2014 3:58 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 07/24/2014 10:00 am

US101 MP 146.9 to 155.2

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Night paving from 7 PM to 7 AM, Sunday thru Thursday. Flaggers and pilot cars will be controlling traffic. Proceed with caution. US101 will be repaved from just south of Newport to Waldport. This project is anticipated to be done by July 31st.
Updated: 07/21/2014 10:10 am

US101 MP 154.7 to 155.25

Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Night paving from 7 PM to 7 AM, Sunday thru Thursday. Flaggers and pilot cars will be controlling traffic. 5 to 15 minute delays should be expected. US101 will be repaved from just south of Newport to Waldport. The project is anticipated to be done by July 31st.
Updated: 07/21/2014 10:10 am

US101 MP 175

Estimated delay under 20 minutes; Construction Work
Comments: Expect intermittent single lane closures controlled by flaggers when the contractor is working. Delays will average 10-15 minutes. Drive with caution. Delays will average 10-15 minutes with a maximum of 20 minutes. Project Summary: This project will construct a new cathodic protection system to protect the bridge from the harsh coastal environment and extend its useful life. The concrete surface of the structure will be sprayed with a sacrificial carbon based coating so that the steel reinforcements do not corrode. The cathodic protection system consists of the carbon based coating and an electrical system on a low voltage impressed current. Big Creek Bridge is one of Oregon’s original coastal bridges built in 193l and designed by renowned ODOT bridge designer Conde McCullough. It was constructed by Union Bridge Company. It is listed on the Historic Register.
Updated: 07/18/2014 3:52 pm

US101 MP 190.98

Informational only; Commercial Vehicle Information
Details: US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

US101 MP 211

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Intermittent traffic control with flaggers or a temporary traffic signal, as needed, for bridge work. This is a two year project for paint and repairs to the bridge over the Umpqua River & McIntosh Slough Bridge.
Updated: 07/19/2014 1:38 pm

US101 MP 211.21

Informational only; Commercial Vehicle Information
Details: US101 MP 211.21 NB & SB (Reedsport) Effective March 6, 2014, this section of US101 will be restricted to 16 feet 00 in. in width. Throughout the duration of the project, every 120 days there will be a 10-day period when no restrictions will be in place. Contact the Over-Dimension Permit Unit for specific dates. Estimated date of completion is September 30, 2015.
Updated: 07/24/2014 10:00 am

US101 MP 233.4 to 234.5

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Expect intermittent nighttime lane closures, with flaggers for traffic control, on the McCullough Bridge. This project is expected to take 5 years. Crews will be working on the arches, applying a non-corrosive surface to them. This is the same work that has just been completed for the South end of the Bridge. Due to construction activity and safety concerns, the access road at the NE corner of the bridge is restricted. Only ODOT workers and contractors are permitted in this area. Please do not drive or park on the access road.
Updated: 07/19/2014 1:30 pm

US101 MP 233.99

Informational only; Commercial Vehicle Information
Details: US101 MP 233.99 (McCullough Bridge - Coos Bay) Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.
Updated: 07/24/2014 10:00 am

US101 MP 234 to 238

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: Expect intermittent lane and shoulder closures, with flaggers, for finish work. Watch for traffic pattern changes. This project is expected to be finished near the end of October.
Updated: 07/19/2014 1:32 pm

US101 MP 238 to 240

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Road maintenance operations are occurring, use caution.
Updated: 07/24/2014 3:45 pm

Central Oregon Road Conditions by Route

ORE19 MP 105.6

Informational only; Commercial Vehicle Information
Details: OR19 MP 105.60 (North Fork John Day River Bridge - Kimberly) Effective August 4, 2014, OR19 crossing North Fork John Day River Bridge at Kimberly is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. All loads must straddle centerline and proceed at 5 mph when crossing the bridge. Estimated date of completion is August 18, 2014.
Updated: 07/24/2014 10:00 am

ORE27 MP 1.9

Informational only; Commercial Vehicle Information
Details: OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 07/24/2014 10:00 am

ORE27 MP 2.88

Informational only; Commercial Vehicle Information
Details: OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 07/24/2014 10:00 am

ORE27 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 07/24/2014 10:00 am

ORE27 MP 27.23

Informational only; Commercial Vehicle Information
Details: OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Updated: 07/24/2014 10:00 am

US20 MP 7.5

No to Minimum Delay; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road maintenance operations occuring on Plainview Road. Traffic may be stopped periodically on US20, use caution.
Updated: 07/24/2014 3:40 pm

US20 MP 12 to 62

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Chip seal construction, Mon - Fri, 5AM to 8PM. Expect delays of up to 20 minutes. Traffic controlled by flaggers and pilot cars. Loose gravel on roadway with a 35 MPH advisory speed. No centerline on roadway. No passing permitted except in designated signed locations that are spaced approximately 5 miles apart. All work scheduled to be completed by July 18.
Updated: 07/10/2014 7:37 pm

US20 MP 92.29 to 92.83

Informational only; Commercial Vehicle Information
Details: US20/OR126 MP 92.29 to MP 92.83 EB & WB (Sisters) As of June 26, 2014, the 12 width restriction through Sisters has been lifted; however there are new requirements for loads over 12 wide traveling through this area. The movement of two loads each exceeding 12 in width traveling in opposing directions through Sisters at the same time is not allowed through a six block section of downtown Sisters between S Pine St and S Larch St due to horizontal width constraints. The lead pilot vehicle operator must ensure no oversize load over 12' in width enters the restricted section from the opposite direction before the permitted vehicle enters the restricted section. Pilot vehicles escorting wide loads exceeding 12' in width must announce their approaching presence on CB radio channel 17 prior to entering the six block section of downtown Sisters between S Pine St and S Larch St. In the event of an oncoming oversize load, one of the lead pilot vehicle operators must direct his piloted load to wait and allow the approaching load to pass safely before proceeding.
Updated: 07/24/2014 10:00 am

US20 MP 99 to 99.9

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Daytime work on streetscape features is planned, causing no to minimum delays, Mondays through Fridays, 7am to 6pm. Installation of site furnishings, landscaping, and signs throughout project. Sidewalk work on Fir. Light poles scheduled to be installed in late July. No lane or sidewalk closures during the daytime. Nightime lane and sidewalk closures when needed.
Updated: 07/10/2014 8:11 pm

US26 MP .9 to 1.4

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 07/24/2014 08:49 am

US26 MP 19

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring. Traffic signal is shut off at Combs Flat Rd and crew is flagging intersection. Use caution in area.
Updated: 07/23/2014 3:03 pm

US26 MP 34.8 to 53

Informational only; Crash/Hazard
Comments: A wildfire in the area, use caution.
Last Updated: 07/24/2014 3:58 pm

US26 MP 104.36

Informational only; Commercial Vehicle Information
Details: US26 MP 104.36 EB & WB (Warm Springs) Effective August 11, 2014, this section of US26 will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 4:30 PM. Loads over 16 feet in width may be allowed on a case-by-case basis only. Contact the Over-Dimension Permit Unit for more information. Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

US26 MP 125.5 to 190.56

Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Expect lane closures, reduced speeds, day/nighttime flaggers, pilot cars, loose rock on the roadway and delays up to 20 minutes. Work expected to start sometime in July and take about a week.
Updated: 07/24/2014 2:34 pm

US26 MP 161.88 to 162.36

Informational only; Commercial Vehicle Information
Details: US26 MP 161.50 to MP 162.36 EB & WB (John Day) Effective August 9, 2014, this section of US26 will be closed between the hours of 10 AM & 11:45 AM for one day only.
Updated: 07/24/2014 10:00 am

US97 MP 97

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction of curb, sidewalk, drainage facilities, lighting, and landscaping, is occurring causing no to minimum delays. Work Mon-Fri 7pm-4pm. 1. Contractor will be working on pole bases and conduit on the east side July 14-31, 2014 2. Contractor will be installing signs July 22, 2014. 3. Contractor will be applying pavement markings on July 28, 2014.
Updated: 07/18/2014 11:00 pm

US97 MP 113

No to Minimum Delay; Maintenance Work
Lanes Affected: (Northbound) , Shoulder (Southbound) , Shoulder
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 07/24/2014 06:55 am

US97 MP 123 to 133

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) , Shoulder (Southbound) , Shoulder
Comments: Road construction is occurring on north and southbound shoulders causing no to minimum delays, use caution. Permanent striping work will be completed later this summer.
Updated: 07/24/2014 08:58 am

US97 MP 139 to 142

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: On US97 between Pinebrook and the 3rd Street/Business 97 exit, there will bridge construction in the median and shoulders during the daytime. Murphy Road is scheduled to be closed for several weeks from Parrell to 3rd Street starting the week of August 4. Earthwork and paving on 3rd Street south of Murphy Road. Road work on Murphy Road from Parrell Road to 3rd Street. Exit 141 to 3rd Street from US97 is closed. Southbound US97 highway traffic can access 3rd Street (US97 Business) using eastbound Powers Road. Northbound US97 highway traffic can access 3rd Street (US97 Business) (US20 Route) using Badger Road. Southbound 3rd Street (US97 Business) will be closed south of Murphy Road. Southbound 3rd Street (US97 Business) traffic can use Pinebrook to get onto US97. Business Access remains open for all businesses on 3rd Street.
Updated: 07/22/2014 05:03 am

US395 MP 31.46 to 31.02

Informational only; Construction Work
Comments: Road construction is occurring on the shoulders, use caution. Expect lane closures, flaggers and delays up to 20 minutes.
Updated: 07/01/2014 3:11 pm

US395 MP 97 to 102

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Expect lane closures, reduced speeds, day/nighttime flaggers, pilot cars, loose rock on the roadway and delays up to 20 minutes. Work expected to start after July 4 holiday and take about two weeks.
Updated: 07/22/2014 1:04 pm

East Oregon Road Conditions by Route

I-84 MP 347.84 to 352.84

Informational only; Commercial Vehicle Information
Details: I-84 MP 346.20 to MP 353.03 EB & WB (Huntington) Effective June 10, 2014, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 6 PM & 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. In addition, the height will be restricted to 16 feet 06 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 378.01

Informational only; Commercial Vehicle Information
Details: I-84 MP 378.01 EB & WB (Idaho Border) Effective July 18, 2014, this section of I-84 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE78 MP 52 to 69

No to Minimum Delay; Crash/Hazard
Comments: A wildfire is in the area, use caution.
Last Updated: 07/21/2014 12:43 pm

US20 MP 171.13 to 203

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution. Flaggers and pilot cars will be controlling traffic in the affected lane. Monday thru Friday 8am to 4pm.
Updated: 07/24/2014 08:03 am

US20 MP 184 to 194

No to Minimum Delay; Maintenance Work
Lanes Affected: (Westbound) , Shoulder (Eastbound) , Shoulder
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 07/24/2014 06:14 am

US20 MP 265.39 to 266.63

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Road construction is occurring causing a less than 20 minute delay. Shoulders are closed. Flaggers are controlling traffic in the workzone. 8AM to 4PM Monday - Friday.
Updated: 07/01/2014 3:14 pm

US26 MP 125.5 to 190.56

Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Expect lane closures, reduced speeds, day/nighttime flaggers, pilot cars, loose rock on the roadway and delays up to 20 minutes. Work expected to start sometime in July and take about a week.
Updated: 07/24/2014 2:34 pm

US26 MP 161.88 to 162.36

Informational only; Commercial Vehicle Information
Details: US26 MP 161.50 to MP 162.36 EB & WB (John Day) Effective August 9, 2014, this section of US26 will be closed between the hours of 10 AM & 11:45 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP 210 to 216

Estimated delay under 20 minutes; Maintenance Work
Comments: Chip sealing is occurring causing no to minimum delays. Loose gravel, use caution. Watch for flaggers, traffic changes, and pilot cars.
Updated: 07/24/2014 08:26 am

US26 MP 245 to 248

Informational only; Crash/Hazard
Comments: Wildfire in the area, use caution. Expect possible delays.
Last Updated: 07/24/2014 03:53 am

US30 MP .46

Informational only; Commercial Vehicle Information
Details: US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

US95 MP 21

No to Minimum Delay; Information
Lanes Affected: (Northbound) 1 Lane
Comments: Damaged pavement, watch for rough road. Use caution.
Last Updated: 07/10/2014 07:25 am

US395 MP 31.46 to 31.02

Informational only; Construction Work
Comments: Road construction is occurring on the shoulders, use caution. Expect lane closures, flaggers and delays up to 20 minutes.
Updated: 07/01/2014 3:11 pm

US395 MP 97 to 102

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Expect lane closures, reduced speeds, day/nighttime flaggers, pilot cars, loose rock on the roadway and delays up to 20 minutes. Work expected to start after July 4 holiday and take about two weeks.
Updated: 07/22/2014 1:04 pm

Southwest Oregon Road Conditions by Route

I-5 MP 0 to 13.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 0 to MP 14 NB & SB (California border) Effective April 1, 2014, this section of I-5 will be restricted to 13 feet 00 in. in width between the hours of 7 PM & 7 AM. The width will be restricted to 19 feet 00 in. in width at all other hours. No width restrictions will be in place from 3 PM Friday until 9 PM Sunday. In addition, the height will be restricted to 16 feet 04 in. in height northbound, and 16 feet 09 in. in height southbound with the width is restricted. No width or height restrictions will be in place from 3 PM Friday until 9 PM Sunday. Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 16 to 14

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Southbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution. Southbound lane closed. Expect delays.
Updated: 07/24/2014 12:46 pm

I-5 MP 24

Estimated delay under 20 minutes; Construction Work
Comments: All lanes on I-5 are open, the speed limit is 50 MPH in the work zone. Contractors are working on the frontage roads and interchange areas. This is all part of the Fern Valley interchange project. Watch for traffic pattern changes, and directional signs on the frontage road and intersections. Expect intermittent lane closures throughout the work zone. Utility crews are working in the area, use caution.
Updated: 07/19/2014 1:41 pm

I-5 MP 35.8 to 36.64

Informational only; Commercial Vehicle Information
Details: I-5 MP 35.5 to MP 38.0 NB & SB (north of Central Point) Effective July 14, 2014, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. No restrictions will be in place from 7 AM on Friday until 7 PM on Sunday. Estimated date of completion is August 27, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 36.64

Informational only; Commercial Vehicle Information
Details: I-5 MP 36.64 Tolo Rd crossing over I-5 (Central Point) Effective July 22, 2013, Tolo Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Updated: 07/24/2014 10:00 am

I-5 MP 43 to 49

OFF RAMP
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes
Comments: Night work, 7 PM to 7 AM, Sundays throughThursdays, with single lane closures. I-5 ramp closures will be one at a time, with advance warning signs. Ramps Affected. Watch for directional construction signs, and workers near the travel lanes. The speed limit is reduced during construction to 50 MPH. Expect rough pavement surfaces in areas within the work zone, and use caution.
Updated: 07/19/2014 1:42 pm

I-5 MP 43.08 to 49.49

Informational only; Commercial Vehicle Information
Details: I-5 MP 42.5 to MP 49.5 NB & SB (south of Grants Pass) Effective July 3, 2014, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. In addition, the height will be restricted to 17 feet 05 in. in height southbound, and 16 feet 07 in. in height northbound when the width is restricted. No width or height restrictions will be in place from 7 AM Friday until 7 PM Sunday. Estimated date of completion is August 27, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 44.001 to 43.55

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 43 ramps to/from OR99 - OR234 (Rogue River) Effective July 9, 2014, the I-5 Exit 43 ramps to/from OR99 will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 44.01 to 45.4

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 45A ramps to/from OR99 (Rogue River) Effective July 9, 2014, the I-5 Exit 45A ramps to/from OR99 will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 45.08 to 45.42

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 45A ramps to/from OR99 (Rogue River) Effective July 9, 2014, the I-5 Exit 45A ramps to/from OR99 will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 45.72 to 45.95

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 45B on/off ramps to/from Valley of the Rogue State Park (Rogue River) Effective June 26, 2014, the I-5 NB & SB Exit 45B on- and off-ramps to/from Valley of the Rogue State Park will be intermittently closed on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 45.82 to 46.08

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 45B on/off ramps to/from Valley of the Rogue State Park (Rogue River) Effective June 26, 2014, the I-5 NB & SB Exit 45B on- and off-ramps to/from Valley of the Rogue State Park will be intermittently closed on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 48.51 to 55.78

Informational only; Commercial Vehicle Information
Details: I-5 MP 46 to MP 56 NB & SB (south of Grants Pass) Effective June 24, 2014, this section of I-5 will be restricted to 13 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). The width will be restricted to 16 feet 00 in. in width from 1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2 hr after sunset (DAYTIME). No restrictions will be in place from 7 AM Friday until 8 PM Sunday. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 48.52 to 55.74

Informational only; Commercial Vehicle Information
Details: I-5 MP 46 to MP 56 NB & SB (south of Grants Pass) Effective June 24, 2014, this section of I-5 will be restricted to 13 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). The width will be restricted to 16 feet 00 in. in width from 1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2 hr after sunset (DAYTIME). No restrictions will be in place from 7 AM Friday until 8 PM Sunday. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 49.03

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Depot St (Rogue River) Effective June 29, 2014, the ramp from Depot St to I-5 northbound will be intermittently closed between the hours of 7 PM & 7 AM. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 66.55 to 81.08

Informational only; Commercial Vehicle Information
Details: I-5 MP 66.5 to MP 81.7 NB & SB (north of Grants Pass) Effective January 3, 2014, this section of I-5 will be restricted to 16 feet 00 in. in width at all hours. No restrictions will be in place from 3 PM Friday until 7 PM Sunday. Estimated date of completion is August 30, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 66.64 to 81.08

Informational only; Commercial Vehicle Information
Details: I-5 MP 66.5 to MP 81.7 NB & SB (north of Grants Pass) Effective January 3, 2014, this section of I-5 will be restricted to 16 feet 00 in. in width at all hours. No restrictions will be in place from 3 PM Friday until 7 PM Sunday. Estimated date of completion is August 30, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 67 to 82

OFF RAMP
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes , Shoulder
Comments: Expect intermittent single lane closures both night and daytime, for finish work. Ramps Affected. This is part of a project to pave I-5 between Hugo and Glendale, and make safety improvements. Use caution and watch for construction equipment and workers in the area.
Updated: 07/19/2014 1:40 pm

I-5 MP 78.11

Informational only; Commercial Vehicle Information
Details: I-5 SB MP 78.11 (crossing under Speaker Rd) Effective May 19, 2013, I-5 southbound crossing under Speaker Rd will be restricted to 16 feet 08 in. in height between the hours of 7 PM & 9 AM. No height restriction will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is August 30, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 101

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 2 Lanes
Comments: Road maintenance operations are occurring, use caution. Alternating lane closures in the northbound lanes for bridge work. Expect delays.
Updated: 07/24/2014 08:02 am

I-5 MP 104.85

Informational only; Commercial Vehicle Information
Details: I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Updated: 07/24/2014 10:00 am

ORE39 MP -6.67

Informational only; Commercial Vehicle Information
Details: OR39/US97 Business MP -6.67 SB (north Klamath Falls) Effective July 21, 2014, this section of OR39/US97 Business southbound will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 6 PM (DAYTIME). Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

ORE42 MP 38.2 to 45.9

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect traffic control with flaggers and pilot car, 24 hours a day, from 7 PM Sunday to 7 PM Saturday. Use caution and watch for signs. This is for improving sight distances for drivers in the county line curves area of the highway.
Updated: 07/19/2014 1:32 pm

ORE42 MP 43.59 to 44.95

Informational only; Commercial Vehicle Information
Details: OR42 MP 44 to MP 46 EB & WB (East of Remote) Effective May 19, 2014, this section of OR42 will be restricted to 16 feet 00 in. in width. Estimated date of completion is September 15, 2014.
Updated: 07/24/2014 10:00 am

ORE42 MP 57

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road maintenance operations are occurring, use caution. Single lane of travel both directions. Expect delays.
Updated: 07/24/2014 10:50 am

ORE62 MP 1.4

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Expect single lane closures during late night to early morning hours. Use caution and watch for construction signs. The Medford Water Commission is relocating the water main for the Oregon 62 Expressway project next year. The current work zone is near Whittle Ave.
Updated: 07/19/2014 1:42 pm

ORE62 MP 22

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring, on Tiller Trail Highway mile point 43-44. Expect delays. On Tiller Trail Highway, drivers should expect up to 20 minute delays, controlled by flaggers. Construction is underway to widen and straighten the alignment on this section of the roadway linking Jackson and Douglas Counties. Four slide areas will also be improved. Jackson County roads are the contact for anything regarding this project.
Updated: 07/19/2014 1:43 pm

ORE99 MP 16

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes , Shoulder
Comments: Watch for flaggers and traffic control changes in the Talent area. Use caution and expect minor delays, most of the work is on the shoulders. This is for installing a new water line to Ashland.
Updated: 07/20/2014 1:35 pm

ORE140 MP 4.63

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Westbound) 1 Lane
Comments: A crash has occurred, use caution.
Last Updated: 07/24/2014 3:40 pm

ORE140 MP 51 to 16

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Intermittent traffic control with flaggers for shoulder work. Use caution, watch for advance warning signs. This is a safety project for Lake of the Woods Hwy; Installing rumble strips and upgrading signs at curves and intersections.
Updated: 07/19/2014 1:18 pm

ORE234 MP .04

Informational only; Commercial Vehicle Information
Details: OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE542 MP 11 to 12

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution. Traffic controlled by flaggers. Expect delays.
Updated: 07/24/2014 3:46 pm

US97 MP 227.5

No to Minimum Delay; Crash/Hazard
Lanes Affected: (Northbound) , Shoulder
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 07/24/2014 3:29 pm

US97 MP 272.98

Informational only; Commercial Vehicle Information
Details: US97 MP 272.99 SB (Klamath Falls) Effective July 24, 2014, this section of US97 southbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is July 24, 2014.
Updated: 07/24/2014 10:00 am

US97 MP 273

Estimated delay under 20 minutes; Maintenance Work
Comments: Bridge work is occurring. Use caution. Expect minor delays, traffic control with flaggers.
Updated: 07/24/2014 09:00 am

US101 MP 296.4

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Southbound) , Shoulder
Comments: Bridge work is occurring. Use caution. Expect minor delays
Updated: 07/24/2014 1:50 pm

US101 MP 330 to 331

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic on the Hunter Creek Bridge is a single lane, controlled by a temporary traffic signal. Additional flaggers as needed. Use caution. The signal is the contractor's responsibility.
Updated: 07/19/2014 1:36 pm

US101 MP 354 to 356

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring, use caution. Intermittent traffic control with flaggers.
Updated: 07/19/2014 1:37 pm

US199 MP 6.9

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: Traffic is now on the new Applegate River Bridge. Expect intermittent lane closures, flaggers, and brief delays, 6 pm to 10 am. Watch for workers and equipment on the shoulder of the highway on US 199 and Riverbanks Road.
Updated: 07/19/2014 1:40 pm

South Oregon Road Conditions by Route

ORE39 MP 12.48 to 18.93

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Traffic control with flaggers and pilot cars, for paving. Expect delays. This project is repaving between Merrill and the California State Line.
Updated: 07/19/2014 1:18 pm

ORE140 MP 4.63

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Westbound) 1 Lane
Comments: A crash has occurred, use caution.
Last Updated: 07/24/2014 3:40 pm

ORE140 MP 25 to 34.4

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Intermittent traffic control with flaggers, Monday through Friday, 7 AM to 5 PM, for road work at Bly Mountain.
Updated: 07/19/2014 1:19 pm

ORE140 MP 25.17 to 31.57

Informational only; Commercial Vehicle Information
Details: OR140 MP 25.13 to MP 34.47 (Bly Mountain) Effective July 18, 2014, this section of OR140 will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2014.
Updated: 07/24/2014 10:00 am

US97 MP 227.5

No to Minimum Delay; Crash/Hazard
Lanes Affected: (Northbound) , Shoulder
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 07/24/2014 3:29 pm

US97 MP 272.98

Informational only; Commercial Vehicle Information
Details: US97 MP 272.99 SB (Klamath Falls) Effective July 24, 2014, this section of US97 southbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is July 24, 2014.
Updated: 07/24/2014 10:00 am

US97 MP 273

Estimated delay under 20 minutes; Maintenance Work
Comments: Bridge work is occurring. Use caution. Expect minor delays, traffic control with flaggers.
Updated: 07/24/2014 09:00 am

Southeast Oregon Road Conditions by Route

ORE78 MP 52 to 69

No to Minimum Delay; Crash/Hazard
Comments: A wildfire is in the area, use caution.
Last Updated: 07/21/2014 12:43 pm

US95 MP 21

No to Minimum Delay; Information
Lanes Affected: (Northbound) 1 Lane
Comments: Damaged pavement, watch for rough road. Use caution.
Last Updated: 07/10/2014 07:25 am

City of Bend Road Conditions by Route

US20 MP 19.831 to 19.861

Informational only; Commercial Vehicle Information
Details: US20/US97 Business MP 19.77 to MP 19.96 EB & WB (Bend) Effective July 24, 2014, this section of US20/US97 Business will be restricted to 15 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

US20 MP 19.861 to 19.91

Informational only; Commercial Vehicle Information
Details: US20/US97 Business MP 19.77 to MP 19.96 EB & WB (Bend) Effective July 24, 2014, this section of US20/US97 Business will be restricted to 15 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

City of Eugene Road Conditions by Route

I-5 MP 192 to 193.5

No to Minimum Delay; Construction Work
Comments: No work is planned this week. Please drive carefully through the work zone. No work is planned this week. Please drive carefully through the work zone. Project summary: Replace the Interstate 5 Bridge over the Willamette River between Eugene and Springfield. Contractors have completed construction of the new bridges. The Patterson Slough Bridges are also complete. Construction continues on the bike-ped viaduct along Franklin Boulevard, as does landscaping in parks adjacent to the project.
Updated: 07/18/2014 3:20 pm

I-5 MP 192.1 to 193.4

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Watch for construction vehicles entering and exiting the work zone at Jenkins Drive. The south side sidewalk is closed; use north side sidewalk. Watch for construction vehicles entering and exiting the work zone at Jenkins Drive. Pedestrians and bicyclists: The sidewalk on the south side of Franklin Boulevard to be closed due to adjacent business construction. Use the new crosswalk east of Jenkins Drive to access the new viaduct path on the north side of Franklin Boulevard.
Updated: 07/18/2014 3:20 pm

I-5 MP 195.02 to 195.46

Informational only; Commercial Vehicle Information
Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April 9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in width and 16 feet 03 in. in height on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 195.45 to 195.46

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder
Comments: The on ramp to south bound I-5 from WB beltline may be closed weeknights from 8pm to 5:30 am. Follow detour route signs. Traffic has been shifted onto the new Beltline Bridge in a new temporary alignment which will allow the remainder of the old bridge to be demolished. The onramp to SB I-5 from WB beltline may be closed weeknights from 8pm to 5:30 am A speed limit reduction to 35 MPH is now in effect on Beltline. A speed limit reduction to 50 MPH is now in effect for I-5 through the construction zone. Most work will be happening behind barrier. Look for periodic lane closures and trucks entering and exiting the highway. Project Summary: This project will rebuild the interchange at Interstate 5 and Randy Pape’ Beltline Highway to meet modern design and safety standards. State funds from the Jobs and Transportation Act will build: - A new I-5 southbound to westbound Beltline off-ramp. - A new I-5 southbound to eastbound Beltline off-ramp. - A new westbound Beltline to southbound I-5 on-ramp - A new Beltline Bridge over I-5 - And base construction and structures for a new multi-use path to connect south of the interchange to north of the interchange. The path will open upon completion of Unit 4 scheduled to be constructed in 2016. This is a two year project. Construction of Unit 3 is scheduled to be completed by November 2014.
Updated: 07/18/2014 3:23 pm

I-5 MP 195.45 to 195.46

Informational only; Construction Work
Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes
Comments: The posted speed limit has been reduced to 35 on the Beltline bridge and 50 on Interstate 5 near the interchange due to construction work zone. New, lower speed limits have been implemented on the Randy Papé Beltline bridge over Interstate 5, and on I-5 beneath the bridge where construction has begun on a two-year project to improve the I-5/Beltline interchange. Beginning Wednesday, April 17, 2013, the posted, enforceable speed limit on the Beltline bridge over I-5 will be 35 miles per hour. The speed limit on I-5 near the interchange will be reduced to 50 miles per hour. The speed limit reductions will be enforced until the project is completed in fall of 2014. The speed limit reductions are intended to improve work zone safety for all highway users and construction workers. From 2007 through 2011 in Oregon, 53 people died and more than 2,200 were injured in work zone crashes. The majority of people injured or killed in these crashes were drivers, passengers or pedestrians, not workers. The single biggest factor in crashes is driver inattention; that’s why orange cones, variable message signs and other tools are used to alert motorists. The other major contributing factor is speed, which is why work zones often require lower speed limits. National Work Zone Awareness Week is April 16-19. To learn more about work zone safety, visit ODOT’s safety website at: http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx
Updated: 04/01/2014 05:54 am

ORE99 MP 118

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Southbound) 2 Lanes
Comments: A crash has occurred, use caution.
Last Updated: 07/24/2014 3:50 pm

ORE126 MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield) OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 07/24/2014 10:00 am

ORE225 MP .01 to 2.53

Informational only; Commercial Vehicle Information
Details: OR225 (McVay Hwy) MP 0.00 to MP 2.52 (Eugene/Springfield) Effective July 18, 2014, this section of OR225 (McVay Hwy) will be closed. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE569 MP 7.05

OFF RAMP
Closure with Detour; Maintenance Work
Comments: Beltline on ramps will be intermittently closed between the hours of 9 p.m. and 5 a.m. from Prairie Road and Northwest Expressway. Use detour route. Ramps Affected. Beginning July 14 and continuing until July 30, the following ramps will be intermittently closed between the hours of 9 p.m. and 5 a.m.: • OR 569 WB Exit 7A ramp to Prairie Road • OR 569 on-ramp from Prairie Road • OR 569 WB on-ramp from Northwest Expressway • OR 569 EB Exit 7 ramp to Northwest Expressway Detour Route Information - When the ramps listed above are closed, traffic should use OR 99 and River Road to access OR 569.
Updated: 07/18/2014 4:49 pm

ORE569 MP 12.26 to 13

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

ORE569 MP 12.53 to 12.95

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

ORE569 MP 12.76

Informational only; Commercial Vehicle Information
Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the ramp from OR569 westbound to I-5 southbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

ORE569 MP 12.79

Informational only; Commercial Vehicle Information
Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the ramp from OR569 eastbound to I-5 northbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 07/24/2014 10:00 am

City of La Grande Road Conditions by Route

I-84 MP 259

ON RAMP
Closure; Construction Work
Comments: West Bound on ramp at exit 259 is closed for construction Ramps Affected.
Updated: 06/30/2014 1:43 pm

I-84 MP 259.171

Informational only; Commercial Vehicle Information
Details: I-84 WB ramp from US30 Exit 259 (La Grande) Effective March 31, 2014, the ramp from US30 to I-84 westbound at Exit 259 will be closed. Estimated date of completion is November 1, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 265.34

Informational only; Commercial Vehicle Information
Details: I-84 WB Exit 265 ramp to US30 and OR203 (south of La Grande) Effective August 20, 2014, the ramp from I-84 westbound Exit 265 to US30 and OR203 will be closed between the hours of 8 AM & 2 PM (DAYTIME). Estimated date of completion is August 20, 2014.
Updated: 07/24/2014 10:00 am

US30 MP 1.58 to 2.1

Informational only; Commercial Vehicle Information
Details: US30 MP 1.58 to MP 2.10 (La Grande) Effective July 30, 2014, this section of US30 will be closed between the hours of 5:30 PM & 8:30 PM for one day only.
Updated: 07/24/2014 10:00 am

City of Medford Road Conditions by Route

ORE62 MP 1.4

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Expect single lane closures during late night to early morning hours. Use caution and watch for construction signs. The Medford Water Commission is relocating the water main for the Oregon 62 Expressway project next year. The current work zone is near Whittle Ave.
Updated: 07/19/2014 1:42 pm

Portland Metro Road Conditions by Route

I-5 MP 290.48

Informational only; Commercial Vehicle Information
Details: I-5 MP 290.48 (Lower Boones Ferry Rd crossing under I-5) - Lake Oswego Effective June 14, 2014, Lower Boones Ferry Rd crossing under I-5 will be intermittently closed between the hours of 10 PM & 7 AM. These closures are NOT on the I-5 mainline, and the Exit 290 ramps will remain open. Estimated date of completion is July 25, 2015.
Updated: 07/24/2014 10:00 am

I-5 MP 291.89

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective August 4, 2014, the ramp from I-5 northbound Exit 292A to OR217 northbound will be closed between the hours of 9:30 PM & 5 AM (NIGHTTIME). Estimated date of completion is August 8, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 293.36

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 294 ramp to Barbur Blvd (OR99W) - Tigard Effective May 26, 2014, the ramp from I-5 northbound Exit 294 to Barbur Blvd (OR99W) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 29, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 295.04 to 299.25

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramp from OR43 / Hood St to SB I-5 will be intermittently closed during the same times. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 295.041 to 298.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd & OR99W / Barbur Blvd to NB I-5 will be intermittently closed during the same times. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 298.48 to 297

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder
Comments: ODOT contractor will have limited truck traffic in and out of the project site on southbound I-5 for the next few weeks during the day. Project Description: This project replaces a viaduct on I-5 that crosses a ravine at S.W. Iowa Street, between Terwilliger Boulevard (exit 297) and Corbett Avenue (exit 298) in Portland and includes building a temporary detour bridge on the west side of I-5. Traffic Impacts: No traffic impacts. The speed limit on I-5 is reduced to 50 mph in the work area. This speed reduction is in effect 24 hours a day and will remain in place for the duration of the project. Please be alert to enhanced police traffic patrols in the work area. For more information:
Updated: 07/24/2014 2:18 pm

I-5 MP 299.9

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from OR43 NB (Portland) Effective August 10, 2014, the ramp from OR43 northbound to I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 300.26 to 300.36

Informational only; Commercial Vehicle Information
Details: I-5 MP 300.26 to MP 300.36 NB (Marquam Bridge - Portland) Effective August 10, 2014, this section of I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 302.92

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 302C to Greeley St (Portland) Effective August 10, 2014, the ramp from I-5 northbound Exit 302C to Greeley St will be closed between the hours of 4 AM and 12 noon for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 307.49

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from OR99E & Marine Dr (North Portland) Effective July 27, 2014, the ramp from OR99E and Marine Dr to I-5 northbound will be closed between the hours of 5 AM & 1 PM (DAYTIME). Estimated date of completion is July 27, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 307.69

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Jantzen Beach (North Portland) Effective July 27, 2014, the ramp from Jantzen Beach to I-5 southbound will be closed between the hours of 5 AM & 1 PM (DAYTIME). Estimated date of completion is July 27, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 5.41

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 6 ramp to I-205 SB (Portland) Effective August 22, 2014, this ramp from I-84 eastbound Exit 6 to I-205 southbound will be closed between the hours of 10 PM & 12 midnight. Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

I-84 MP 17

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. A project to improve the interchanges at I-84 in Troutdale and Marine Drive just started. Check back here for details in Mid-March.
Updated: 07/18/2014 10:46 pm

I-84 MP 17.68

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.68 WB (Sandy River Bridge - Troutdale) I-84 WB crossing the Sandy River Bridge is restricted to single trip permits beyond Weight Table 5.
Updated: 07/24/2014 10:00 am

I-84 MP 17.82

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.82 EB & WB (Jordan Rd Underpass) Effective September 1, 2010, the Jordan Rd underpass at Exit 18 will be restricted to 13 feet 00 in. in width. This restriction is NOT on the I-84 mainline. Effective April 15, 2013, the height will be restricted to 14 feet 9 inches crossing under I-84 on Jordan Rd. Estimated date of completion is November 1, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 12.29 to 13.75

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is August 7, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 12.46 to 13.95

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is August 7, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 20.99

Informational only; Commercial Vehicle Information
Details: I-205 NB Exit 21B ramp to I-84 WB (Portland) Effective August 23, 2014, the ramp from I-205 northbound Exit 21B to I-84 westbound will be closed between the hours of 12 midnight and 2 AM. In addition, the ramp from Glisan St to I-84 westbound will be close during the same time. Estimated date of completion is August 23, 2014.
Updated: 07/24/2014 10:00 am

I-205 MP 24.5

Estimated delay under 20 minutes; Construction Work
Comments: Two lanes may be closed from 8 a.m. to 3 p.m. on NE Airport Way Monday through Friday. Project Description: This project will help improve traffic flow at this busy interchange by constructing a new free-flowing on-ramp from NE Airport Way westbound onto I-205 northbound. Motorists on NE Airport Way eastbound will have two left turn lanes onto I-205 northbound and will no longer have to share signal time with westbound motorists on NE Airport Way. Traffic Impacts: Single lanes may be closed from 8 a.m. to 3 p.m. on eastbound and westbound NE Airport Way Monday through Friday. Please note: There may also be occasional daytime short-duration closures of the I-205 multi-use bicycle/pedestrian path on the north side of Airport Way, Monday- Friday from 7 a.m. to 5 p.m. for construction work next to the path. Flaggers will stop trail users for less than 20 minutes at a time. Expect intermittent sidewalk closures on NE Airport Way while the contractor is working in the project area. For more information:
Updated: 07/18/2014 10:10 pm

I-205 MP 24.92

Informational only; Commercial Vehicle Information
Details: I-205 NB on-ramp from Airport Way (Portland) Effective April 1, 2013, the ramp from Airport Way to I-205 northbound will be restricted to 16 feet 00 in. in width, and 18 feet 03 in. in height at all hours. Estimated date of completion is November 15, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP .65 to 1.4

Informational only; Commercial Vehicle Information
Details: I-405 NB MP 0.60 to MP 1.40 (Portland) Effective July 25, 2014, this section of I-405 northbound will be restricted to 13 feet 00 in. in width, and 15 feet 01 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from SW 6th Ave to I-405 northbound will be closed Monday to Wednesday nights during the same time. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP .77 to 4.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 4.20 to MP 0.77 SB (Portland) Effective August 10, 2014, this section of I-405 southbound will be closed between the hours of 4 AM and 11 AM for one day only. In addition, the following ramps will be closed during the same time: on-ramp from US26 eastbound to I-405 southbound; on-ramp from US30 eastbound to I-405 southbound; on-ramp from NW Couch St to I-405 southbound; on-ramp from NW Taylor St to I-405 southbound; on-ramp from SW Montgomery St to I-405 southbound; on-ramp from SW 5th Ave to I-405 southbound.
Updated: 07/24/2014 10:00 am

I-405 MP 1.24

Informational only; Commercial Vehicle Information
Details: I-405 NB Exit 1D ramp to US26 WB (Portland) Effective July 25, 2014, the ramp from I-405 northbound Exit 1D to US26 westbound will be closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP 1.56 to 1.62

Informational only; Commercial Vehicle Information
Details: I-405 NB MP 1.54 to MP 1.63 (Portland) Effective July 25, 2014, this section of I-405 northbound will be restricted to 16 feet 00 in. in width, and 15 feet 11 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from I-405 northbound Exit 2A to Salmon St will be closed during the same time. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP 3.2 to 4.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 4.2 to MP 3.2 SB (Fremont Bridge - Portland) Effective August 10, 2014, this section of I-405 southbound will be closed between the hours of 4 AM and 12 noon for one day only. In addition, the following ramps will be closed during the same time: ramp from I-5 northbound to I-405 southbound; ramp from I-5 southbound to I-405 southbound; ramp from Kerby St to I-405 southbound; ramp from I-405 southbound Exit 3 to US30 westbound.
Updated: 07/24/2014 10:00 am

ORE8 MP 11.28 to 14.66

Estimated delay under 20 minutes; Construction Work
Comments: The left lane of Baseline Street between Adams and Dennis Avenues is closed 24 hours a day, seven days a week. Project Description: ODOT and the City of Hillsboro are partnering on a paving and utility improvement project on Tualatin Valley (TV) Highway (OR 8) between Minter Bridge Road and 331st Avenue. Work on TV Highway involves grinding, reconstructing, paving and restriping; significantly upgrading the City’s water and storm water systems; improving more than 100 ADA ramps (accessible curb ramps); and repairing and paving the Dairy Creek Bridge. Traffic Impacts: The contractor is working on Oak Street and Baseline Street on storm sewer pipe replacement, sidewalk and ADA ramp work, and reconstructing and repaving lanes. Work will be moving west to east on Oak Street in 3-block sections starting at Dennis Avenue and ending at 10th Avenue. Work will be moving east to west on Baseline Street in 3-block sections starting at 10th Avenue and ending at Dennis Avenue. Expect the following work on Oak Street and Baseline Street over the next couple of months: - The right lane of Oak Street from Dennis Avenue to 1st Avenue is currently closed 24 hours a day (until approximately the end of March 2014). This includes times when the contractor is not actively working on the project - The right or left lane of Baseline Street from 10th Avenue to 7th Avenue will be closed 24 hours a day (until approximately April 2014) - At night from 8 p.m. to 6 a.m., the middle lane of Oak Street and Baseline Street may also be closed to create a wider work area. Cross streets in this section may also be impacted during the work - Work will take place at night and during the day - Access to the Tuality Hospital emergency room, hospital and clinics will be available at all times Other project work: - Work is wrapping up on Baseline and Oak streets between 10th Avenue and Dennis Avenue testing and chlorinating the new water lines. There will be daytime single lane closures from 9 a.m. to 3 p.m. and nighttime double lane closures from 8 p.m. to 6 a.m. intermittently through this section. Construction will continue through 2015, with daytime and nighttime lane closures up to 7 days a week as crews move through the project. On TV Highway and some side streets, road users should plan for congestion, delays and uneven road surfaces. There is increased traffic enforcement in the area. Please drive cautiously and follow construction signage. For more information:
Updated: 07/24/2014 2:06 pm

ORE8 MP 12.53 to 13.58

Informational only; Commercial Vehicle Information
Details: OR8 MP 12.53 to MP 13.58 WB (Hillsboro) Effective May 16, 2014, this section of OR8 westbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 31, 2014.
Updated: 07/24/2014 10:00 am

ORE8 MP 12.6 to 12.77

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Eastbound) Median , All Lanes , Shoulder (Westbound) Median , All Lanes , Shoulder
Comments: Road work has flaggers directing traffic from SE 9th Ave. to SE 7th Ave., day and night. Use caution and expect delays.
Updated: 07/21/2014 11:27 am

ORE10 MP 2.74 to 2.56

Estimated delay under 20 minutes; Construction Work
Comments: Shoulder closures may occur anytime of the day or night seven days a week. Be alert to flaggers in the work zones. Project description: As part of the 2010/2011 signal upgrades project, interconnect will be installed to improve traffic signal timing in the area of SW Laurelwood Avenue and SW 78th Avenue.
Updated: 07/18/2014 10:48 pm

ORE43 MP .59

Informational only; Commercial Vehicle Information
Details: OR43 MP 0.59 SB (Portland) Effective March 12, 2014, this section of OR43 southbound will be restricted to 15 feet 00 in. in width, and 16 feet 07 in. in height. Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 07/24/2014 10:00 am

ORE99 MP -.36

Informational only; Commercial Vehicle Information
Details: OR99W MP -0.36 NB & SB (Steel Bridge in Portland) Effective August 14, 2014, OR99W crossing the Steel Bridge in Portland will be closed between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 2.59 to 2.99

Informational only; Commercial Vehicle Information
Details: OR99E MP 2.5 to MP 3.0 NB & SB (Portland) Effective July 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 2 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 16, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 2.61 to 2.99

Informational only; Commercial Vehicle Information
Details: OR99E MP 2.5 to MP 3.0 NB & SB (Portland) Effective July 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 2 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 16, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.05 to 3.72

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.00 to MP 3.75 NB & SB (Portland) Effective March 24, 2014, this section of OR99W (Barbur Blvd) will be restricted to 12 feet 00 in. in width. In addition, the height will be restricted to 17 feet 02 in. southbound, and 17 feet 00 in. northbound. Estimated date of completion is October 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.19 to 3.66

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.00 to MP 3.75 NB & SB (Portland) Effective March 24, 2014, this section of OR99W (Barbur Blvd) will be restricted to 12 feet 00 in. in width. In addition, the height will be restricted to 17 feet 02 in. southbound, and 17 feet 00 in. northbound. Estimated date of completion is October 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.2

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.10 to MP 3.25 NB (Portland) Effective August 24, 2010, this section of OR99W (Barbur Blvd) will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are allowed. In addition, the height will be restricted to 17 feet 00 in. in height at the same time. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 6.16 to 6.3

Informational only; Commercial Vehicle Information
Details: OR99E MP 6.0 to MP 6.4 SB (Milwaukie) Effective February 17, 2014, this section of OR99E southbound will be restricted to 14 feet 00 in. in width, and 16 feet 04 in. in height between the hours of 7 AM & 2:30 PM (DAYTIME), Beginning July 22, 2014, the restriction on Saturdays and Sundays will change to 7 AM to 8 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 6.54 to 7.33

Informational only; Commercial Vehicle Information
Details: OR99E MP 6.37 to MP 7.37 NB & SB (Milwaukie) Effective June 16, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 11, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.09 to 7.93

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 7 to MP 8 NB (Tigard) Effective March 31, 2014, this section of OR99W (Barbur Blvd) northbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.161 to 7.671

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 7.15 to MP 7.70 NB (Tigard) Effective May 26, 2014, this section of OR99W (Barbur Blvd) northbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 29, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.41

Informational only; Commercial Vehicle Information
Details: OR99E MP 7.41 NB & SB (Portland) Effective March 10, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.02 to 8.66

Informational only; Commercial Vehicle Information
Details: OR99W MP 8.02 to MP 8.66 NB & SB (Tigard) Effective July 29, 2014, this section of OR99W will be restricted to 12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is August 6, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.621

Informational only; Commercial Vehicle Information
Details: OR99W SB ramp to OR217 NB (Tigard) Effective June 16, 2014, the ramp from OR99W southbound to OR217 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 6 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.99 to 11.02

Informational only; Commercial Vehicle Information
Details: OR99E MP 8.80 to MP 11.13 NB & SB (Gladstone) Effective January 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 11.2

Informational only; Commercial Vehicle Information
Details: OR99E MP 11.20 to MP 11.36 NB & SB (Oregon City) Effective April 28, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width, and 18 feet 03 in. in height on Monday to Friday between the hours of 9 AM & 3 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 11.46 to 11.92

Informational only; Commercial Vehicle Information
Details: OR99W MP 11.43 to MP 12.11 NB & SB (King City) Effective June 27, 2014, this section of OR99W will be restricted to 14 feet 00 in. in width on Monday to Friday between the hours of 8 PM & 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.20 SB (Tualatin River Bridge - King City) OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 07/24/2014 10:00 am

ORE140 MP 0 to .09

Informational only; Commercial Vehicle Information
Details: OR140 MP 0.00 to MP 0.09 NB & SB (Hillsboro) Effective August 18, 2014, this section of OR219 will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is August 23, 2014.
Updated: 07/24/2014 10:00 am

ORE217 MP 0 to 7.52

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. Project Description: This project will make operational and safety improvements on OR 217 including widening the right shoulders on three sections of OR 217, paving both directions of OR 217 from U.S. 26 to I-5, improving signage in the OR 217 corridor and upgrading the center median barrier. Traffic Impacts: See below. Daytime Closures: Monday, Feb 24 to Friday, Feb. 28 from 7 a.m. to 5 p.m.: - Expect limited shoulder closures on northbound and southbound OR217 between US 26 and I-5. For more information:
Updated: 07/18/2014 10:47 pm

ORE217 MP 6.69

ON RAMP
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) , Shoulder
Comments: Lane restrictions occurring at the intersection of the I-5 sb on and off- ramps at 68th Avenue for underground work, Monday through Friday. Ramps Affected. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to S.W. 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Daytime lane restrictions will occur at the intersection of the southbound I-5 on and off- ramp at 68th Avenue for underground signalization work Monday through Friday starting at approximately 9 a.m. Lane restrictions will re-open by 3:30 p.m. For more project information:
Updated: 05/10/2014 04:48 am

ORE224 MP 4.36 to 6.56

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Project Description: The Sunrise JTA Project will address existing congestion and safety problems in the Oregon 212/224 corridor by constructing a new road from I-205 to 122nd Avenue. Major project elements include: - Constructing a new two-lane limited access highway (one lane each direction) from the Milwaukie Expressway (OR 224) at I-205 to SE 122nd Avenue at OR 212/224. - Constructing a new I-205 overcrossing that will connect 82nd Drive and 82nd Avenue. - Improving bicycle and pedestrian accommodations in the project area. - Improving the intersection of SE 122nd Avenue and OR 212/224. Traffic Impacts: Monday, Feb. 24 and Tuesday, Feb. 25 - Two northbound lanes of I-205 will be closed between Sunnybrook Road and Highway 212/224 for installation of overhang forms for the new SE 82nd Avenue bridge over I-205. The first lane will be closed from 8 p.m. to 5 a.m. and the second lane will be closed from 10 p.m. to 5 a.m. Wednesday, Feb. 26 and Thursday, Feb. 27 - Two southbound lanes of I-205 will be closed between Sunnybrook Road and Highway 212/224 for installation of overhang forms for the new SE 82nd Avenue bridge over I-205. The first lane will be closed from 8 p.m. to 5 a.m. and the second lane will be closed from 10 p.m. to 5 a.m. For more information:
Updated: 07/18/2014 10:43 pm

ORE99E MP 9 to 12

No to Minimum Delay; Construction Work
Comments: Expect single lane and shoulder closures in both directions of OR 99E (McLoughlin Boulevard) Monday through Friday. Project Description: This project was designed to preserve the roadway on OR 99E (McLoughlin Boulevard) between Naef Road and the Clackamas River Bridge. The purpose of this project is to address the failing sections of roadway on OR 99E by repairing the pavement and preserving it for years to come. Project elements include: - Rebuilding sections of the road on OR 99E under the pavement - Repaving the roadway on OR 99E between Roethe Road and the Clackamas River Bridge - Connecting sidewalks in multiple locations - Improving sub-standard handicap ramps in multiple locations - Striping bike lanes - Connecting the traffic signals to improve traffic flow The electrical contractor, Sundown Electric, has started the underground electrical work for traffic signal timing and sidewalk work will follow. The signal detection loops will be installed and connected to the new signal timing system after the highway paving is completed. After the sidewalks and curbs are complete, Oregon Mainline Paving and several of their sub-contractors will begin paving the road in the spring of 2014. The travel lanes and bike lanes will be striped and legends installed after the paving is complete. The contractor will complete all work by fall 2014. Traffic Impacts: Expect shoulder closures on both northbound and southbound OR 99E (McLoughlin Boulevard) any time of the day or night Monday through Friday. Single Lane closures will occur Monday through Friday from 9 a.m. to 3 p.m. For more project information:
Updated: 07/18/2014 10:44 pm

ORE99E MP 11.2 to 11.6

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road work has the right lane closed near Clackamette Drive, use caution.
Updated: 07/24/2014 3:03 pm

ORE99W MP 6.97 to 7.37

Estimated delay under 20 minutes; Construction Work
Comments: Traffic Impacts: Expect lane restrictions Monday through Friday from 9 a.m. to 3 p.m. Shoulder closures may occur anytime of the day or night. Project description: As part of the 2010/2011 signal upgrades project, interconnect will be installed to improve traffic signal timing in the area of SW 53rd and SW 60th Ave.
Updated: 07/18/2014 10:35 pm

ORE99W MP 7.93 to 8.65

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Expect alternating lane closures eb and wb OR 99W from OR 217 to 72nd Avenue Monday through Friday, 9 p.m. to 5:30 a.m. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to SW 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Expect alternating overnight lane closures on the eastbound and westbound lanes on OR 99W (Pacific Highway) for approximately 1.5 miles from OR 217 to 72nd Avenue for construction activities Monday through Friday, starting at approximately 9 p.m. All lanes will re-open by 5:30 a.m. the following morning. Bicyclists: Check this link for detour information: http://www.tigard-or.gov/community/bike_tigard/default.asp For more project information:
Updated: 07/18/2014 10:40 pm

US26 MP .59 to .94

Informational only; Commercial Vehicle Information
Details: US26 MP 0.94 to MP 0.59 WB (Ross Island Bridge - Portland) Effective August 10, 2014, this section of US26 westbound (Ross Island Bridge) will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP .95

Informational only; Commercial Vehicle Information
Details: US26 EB ramp to OR99E SB (Ross Island Bridge - Portland) Effective August 10, 2014, the ramp from US26 eastbound (Ross Island Bridge) to OR99E southbound will be closed between the hours of 4 AM & 9:30 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP 1.15

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from OR99E NB / Woodward St (Portland) Effective August 10, 2014, the ramp from OR99E northbound / Woodward St to US26 westbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP 61

Estimated delay under 20 minutes; Construction Work
Comments: Single lane closures will occur in both directions from 8 a.m. to 5:30 p.m. on NW Helvetia Road to NW Schaaf Road from Monday through Friday. Project Description: The U.S. 26 Brookwood Parkway/Helvetia Interchange project will improve traffic flow and safety in the interchange area. Project elements include: - Constructing a new westbound U.S. 26 to southbound Brookwood Parkway exit loop ramp. - Reconstructing the westbound U.S. 26 entrance ramp from Helvetia Road. - Widening the Brookwood Parkway overcrossing to accommodate additional northbound and southbound lanes over U.S 26. - Extending the right-turn lane from northbound Brookwood Parkway to the eastbound U.S. 26 entrance ramp. - Adding sidewalks and bike lanes within the interchange area. Traffic Impacts: Daytime single lane closures will occur in both directions from 8 a.m. to 5:30 p.m. on NW Helvetia Road north of the eastbound ramp interchange to the intersection of NW Helvetia Road and NW Jacobson Road on Monday, February 24 through Friday, February 28. Traffic will be controlled by flaggers within the work zone. Please note: NW Groveland Drive is permanently closed at NW Helvetia Road. NW Groveland Drive will be accessible from NW Groveland Road via NW West Union Road. A speed reduction zone is currently in place on NW Helvetia Road/NW Brookwood Parkway from the NW Helvetia Road/NW West Union Road intersection to the NW Brookwood Parkway/NW Huffman Street intersection. The posted speed limit has been changed to 40 mph throughout the entire work zone. For more information:
Updated: 05/10/2014 04:49 am

US26 MP 61.06

Informational only; Commercial Vehicle Information
Details: US26 MP 61.06 EB & WB (Brookwood/Helvetia Rd Interchange - Hillsboro) Effective May 14, 2014, this section of US26 will be intermittently closed Monday through Friday nights between the hours of 10 PM & 5 AM. All traffic can bypass the closure by taking Exit 61, then re-entering the highway. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

US30 MP 0

Informational only; Commercial Vehicle Information
Details: US30 Bypass WB ramp to/from US30 EB (St John's Bridge - Portland) Effective August 10, 2014, the ramps to/from US30 Bypass westbound to US30 eastbound will be closed between the hours of 7:30 AM & 12 noon for one day only.
Updated: 07/24/2014 10:00 am

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 07/24/2014 10:00 am

US30 MP .91

Informational only; Commercial Vehicle Information
Details: US30 Bypass MP 0.91 EB & WB (St John's Bridge - Portland) Effective August 10, 2014, this section of US30 Bypass will be rstricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7:30 AM & 12 noon for one day only.
Updated: 07/24/2014 10:00 am

US30 MP 12.59

Informational only; Commercial Vehicle Information
Details: US30 MP 12.5 to MP 12.7 WB (south of Scappoose) Effective August 22, 2014, this section of US30 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 1 AM. Estimated date of completion is August 23, 2014.
Updated: 07/24/2014 10:00 am

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 07/24/2014 10:00 am

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 07/24/2014 10:00 am

City of Salem Road Conditions by Route

ORE22 MP 6.49

Informational only; Commercial Vehicle Information
Details: OR22/OR99E Business MP 6.45 to MP 6.55 EB (Salem) Effective August 3, 2014, this section of OR22/OR99E Business eastbound will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

ORE22 MP 6.51

Informational only; Commercial Vehicle Information
Details: OR22/OR99E Business MP 6.55 to MP 6.45 WB (Salem) Effective August 17, 2014, this section of OR22/OR99E Business westbound will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is August 30, 2014.
Updated: 07/24/2014 10:00 am

ORE221 MP 20.38

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 04/25/2014 07:37 am

City of Portland Road Conditions by Route

I-5 MP 290.48

Informational only; Commercial Vehicle Information
Details: I-5 MP 290.48 (Lower Boones Ferry Rd crossing under I-5) - Lake Oswego Effective June 14, 2014, Lower Boones Ferry Rd crossing under I-5 will be intermittently closed between the hours of 10 PM & 7 AM. These closures are NOT on the I-5 mainline, and the Exit 290 ramps will remain open. Estimated date of completion is July 25, 2015.
Updated: 07/24/2014 10:00 am

I-5 MP 291.89

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective August 4, 2014, the ramp from I-5 northbound Exit 292A to OR217 northbound will be closed between the hours of 9:30 PM & 5 AM (NIGHTTIME). Estimated date of completion is August 8, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 293.36

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 294 ramp to Barbur Blvd (OR99W) - Tigard Effective May 26, 2014, the ramp from I-5 northbound Exit 294 to Barbur Blvd (OR99W) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 29, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 295.04 to 299.25

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramp from OR43 / Hood St to SB I-5 will be intermittently closed during the same times. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 295.041 to 298.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd & OR99W / Barbur Blvd to NB I-5 will be intermittently closed during the same times. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

I-5 MP 298.48 to 297

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder
Comments: ODOT contractor will have limited truck traffic in and out of the project site on southbound I-5 for the next few weeks during the day. Project Description: This project replaces a viaduct on I-5 that crosses a ravine at S.W. Iowa Street, between Terwilliger Boulevard (exit 297) and Corbett Avenue (exit 298) in Portland and includes building a temporary detour bridge on the west side of I-5. Traffic Impacts: No traffic impacts. The speed limit on I-5 is reduced to 50 mph in the work area. This speed reduction is in effect 24 hours a day and will remain in place for the duration of the project. Please be alert to enhanced police traffic patrols in the work area. For more information:
Updated: 07/24/2014 2:18 pm

I-5 MP 299.9

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from OR43 NB (Portland) Effective August 10, 2014, the ramp from OR43 northbound to I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 300.26 to 300.36

Informational only; Commercial Vehicle Information
Details: I-5 MP 300.26 to MP 300.36 NB (Marquam Bridge - Portland) Effective August 10, 2014, this section of I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

I-5 MP 302.92

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 302C to Greeley St (Portland) Effective August 10, 2014, the ramp from I-5 northbound Exit 302C to Greeley St will be closed between the hours of 4 AM and 12 noon for one day only.
Updated: 07/24/2014 10:00 am

I-405 MP .65 to 1.4

Informational only; Commercial Vehicle Information
Details: I-405 NB MP 0.60 to MP 1.40 (Portland) Effective July 25, 2014, this section of I-405 northbound will be restricted to 13 feet 00 in. in width, and 15 feet 01 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from SW 6th Ave to I-405 northbound will be closed Monday to Wednesday nights during the same time. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP .77 to 4.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 4.20 to MP 0.77 SB (Portland) Effective August 10, 2014, this section of I-405 southbound will be closed between the hours of 4 AM and 11 AM for one day only. In addition, the following ramps will be closed during the same time: on-ramp from US26 eastbound to I-405 southbound; on-ramp from US30 eastbound to I-405 southbound; on-ramp from NW Couch St to I-405 southbound; on-ramp from NW Taylor St to I-405 southbound; on-ramp from SW Montgomery St to I-405 southbound; on-ramp from SW 5th Ave to I-405 southbound.
Updated: 07/24/2014 10:00 am

I-405 MP 1.24

Informational only; Commercial Vehicle Information
Details: I-405 NB Exit 1D ramp to US26 WB (Portland) Effective July 25, 2014, the ramp from I-405 northbound Exit 1D to US26 westbound will be closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP 1.56 to 1.62

Informational only; Commercial Vehicle Information
Details: I-405 NB MP 1.54 to MP 1.63 (Portland) Effective July 25, 2014, this section of I-405 northbound will be restricted to 16 feet 00 in. in width, and 15 feet 11 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from I-405 northbound Exit 2A to Salmon St will be closed during the same time. Estimated date of completion is July 29, 2014.
Updated: 07/24/2014 10:00 am

I-405 MP 3.2 to 4.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 4.2 to MP 3.2 SB (Fremont Bridge - Portland) Effective August 10, 2014, this section of I-405 southbound will be closed between the hours of 4 AM and 12 noon for one day only. In addition, the following ramps will be closed during the same time: ramp from I-5 northbound to I-405 southbound; ramp from I-5 southbound to I-405 southbound; ramp from Kerby St to I-405 southbound; ramp from I-405 southbound Exit 3 to US30 westbound.
Updated: 07/24/2014 10:00 am

ORE10 MP 2.74 to 2.56

Estimated delay under 20 minutes; Construction Work
Comments: Shoulder closures may occur anytime of the day or night seven days a week. Be alert to flaggers in the work zones. Project description: As part of the 2010/2011 signal upgrades project, interconnect will be installed to improve traffic signal timing in the area of SW Laurelwood Avenue and SW 78th Avenue.
Updated: 07/18/2014 10:48 pm

ORE43 MP .59

Informational only; Commercial Vehicle Information
Details: OR43 MP 0.59 SB (Portland) Effective March 12, 2014, this section of OR43 southbound will be restricted to 15 feet 00 in. in width, and 16 feet 07 in. in height. Estimated date of completion is August 22, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP -.36

Informational only; Commercial Vehicle Information
Details: OR99W MP -0.36 NB & SB (Steel Bridge in Portland) Effective August 14, 2014, OR99W crossing the Steel Bridge in Portland will be closed between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is August 15, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 2.59 to 2.99

Informational only; Commercial Vehicle Information
Details: OR99E MP 2.5 to MP 3.0 NB & SB (Portland) Effective July 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 2 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 16, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 2.61 to 2.99

Informational only; Commercial Vehicle Information
Details: OR99E MP 2.5 to MP 3.0 NB & SB (Portland) Effective July 9, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 2 PM (DAYTIME). Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 16, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.05 to 3.72

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.00 to MP 3.75 NB & SB (Portland) Effective March 24, 2014, this section of OR99W (Barbur Blvd) will be restricted to 12 feet 00 in. in width. In addition, the height will be restricted to 17 feet 02 in. southbound, and 17 feet 00 in. northbound. Estimated date of completion is October 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.19 to 3.66

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.00 to MP 3.75 NB & SB (Portland) Effective March 24, 2014, this section of OR99W (Barbur Blvd) will be restricted to 12 feet 00 in. in width. In addition, the height will be restricted to 17 feet 02 in. southbound, and 17 feet 00 in. northbound. Estimated date of completion is October 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 3.2

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 3.10 to MP 3.25 NB (Portland) Effective August 24, 2010, this section of OR99W (Barbur Blvd) will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are allowed. In addition, the height will be restricted to 17 feet 00 in. in height at the same time. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 6.16 to 6.3

Informational only; Commercial Vehicle Information
Details: OR99E MP 6.0 to MP 6.4 SB (Milwaukie) Effective February 17, 2014, this section of OR99E southbound will be restricted to 14 feet 00 in. in width, and 16 feet 04 in. in height between the hours of 7 AM & 2:30 PM (DAYTIME), Beginning July 22, 2014, the restriction on Saturdays and Sundays will change to 7 AM to 8 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 6.54 to 7.33

Informational only; Commercial Vehicle Information
Details: OR99E MP 6.37 to MP 7.37 NB & SB (Milwaukie) Effective June 16, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 11, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.09 to 7.93

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 7 to MP 8 NB (Tigard) Effective March 31, 2014, this section of OR99W (Barbur Blvd) northbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 31, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.161 to 7.671

Informational only; Commercial Vehicle Information
Details: OR99W (Barbur Blvd) MP 7.15 to MP 7.70 NB (Tigard) Effective May 26, 2014, this section of OR99W (Barbur Blvd) northbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 29, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 7.41

Informational only; Commercial Vehicle Information
Details: OR99E MP 7.41 NB & SB (Portland) Effective March 10, 2014, this section of OR99E will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.02 to 8.66

Informational only; Commercial Vehicle Information
Details: OR99W MP 8.02 to MP 8.66 NB & SB (Tigard) Effective July 29, 2014, this section of OR99W will be restricted to 12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is August 6, 2014.
Updated: 07/24/2014 10:00 am

ORE99 MP 8.621

Informational only; Commercial Vehicle Information
Details: OR99W SB ramp to OR217 NB (Tigard) Effective June 16, 2014, the ramp from OR99W southbound to OR217 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 6 AM. Estimated date of completion is July 25, 2014.
Updated: 07/24/2014 10:00 am

ORE217 MP 0 to 7.52

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. Project Description: This project will make operational and safety improvements on OR 217 including widening the right shoulders on three sections of OR 217, paving both directions of OR 217 from U.S. 26 to I-5, improving signage in the OR 217 corridor and upgrading the center median barrier. Traffic Impacts: See below. Daytime Closures: Monday, Feb 24 to Friday, Feb. 28 from 7 a.m. to 5 p.m.: - Expect limited shoulder closures on northbound and southbound OR217 between US 26 and I-5. For more information:
Updated: 07/18/2014 10:47 pm

ORE217 MP 6.69

ON RAMP
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) , Shoulder
Comments: Lane restrictions occurring at the intersection of the I-5 sb on and off- ramps at 68th Avenue for underground work, Monday through Friday. Ramps Affected. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to S.W. 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Daytime lane restrictions will occur at the intersection of the southbound I-5 on and off- ramp at 68th Avenue for underground signalization work Monday through Friday starting at approximately 9 a.m. Lane restrictions will re-open by 3:30 p.m. For more project information:
Updated: 05/10/2014 04:48 am

ORE99W MP 6.97 to 7.37

Estimated delay under 20 minutes; Construction Work
Comments: Traffic Impacts: Expect lane restrictions Monday through Friday from 9 a.m. to 3 p.m. Shoulder closures may occur anytime of the day or night. Project description: As part of the 2010/2011 signal upgrades project, interconnect will be installed to improve traffic signal timing in the area of SW 53rd and SW 60th Ave.
Updated: 07/18/2014 10:35 pm

ORE99W MP 7.93 to 8.65

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Expect alternating lane closures eb and wb OR 99W from OR 217 to 72nd Avenue Monday through Friday, 9 p.m. to 5:30 a.m. Project Description: The required road improvements include widening OR 99W southbound to include a new lane and sidewalk, a landscaped center median and widening the OR 217 northbound off-ramp to SW 72nd Avenue. This construction project is being done by a private contractor and is required by the City of Tigard for the development of a WalMart store on Dartmouth Street along OR 99W. A contractor for WalMart will make the required road improvements. Lanes will not close during daytime hours. Traffic Impacts: Expect alternating overnight lane closures on the eastbound and westbound lanes on OR 99W (Pacific Highway) for approximately 1.5 miles from OR 217 to 72nd Avenue for construction activities Monday through Friday, starting at approximately 9 p.m. All lanes will re-open by 5:30 a.m. the following morning. Bicyclists: Check this link for detour information: http://www.tigard-or.gov/community/bike_tigard/default.asp For more project information:
Updated: 07/18/2014 10:40 pm

US26 MP .59 to .94

Informational only; Commercial Vehicle Information
Details: US26 MP 0.94 to MP 0.59 WB (Ross Island Bridge - Portland) Effective August 10, 2014, this section of US26 westbound (Ross Island Bridge) will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP .95

Informational only; Commercial Vehicle Information
Details: US26 EB ramp to OR99E SB (Ross Island Bridge - Portland) Effective August 10, 2014, the ramp from US26 eastbound (Ross Island Bridge) to OR99E southbound will be closed between the hours of 4 AM & 9:30 AM for one day only.
Updated: 07/24/2014 10:00 am

US26 MP 1.15

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from OR99E NB / Woodward St (Portland) Effective August 10, 2014, the ramp from OR99E northbound / Woodward St to US26 westbound will be closed between the hours of 4 AM & 11 AM for one day only.
Updated: 07/24/2014 10:00 am