Southeast Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Conditional Closure

US30, 6 miles West of The Dalles MP 67 - 69

The highway is open to local traffic only. No through traffic allowed. Use Caution.
Updated
7/13/2025 8:00:00 AM

US95: MP 6
US95, 6 miles South of Oregon - Idaho Border

Crash/Hazard
No to Minimum Delay
Comments
A hazardous materials cleanup is causing minimal delay to traffic. Use caution.
Last Updated
2/14/2025 1:54 PM

US95: MP 52.33
US95, 1 mile North of Rome

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:23 PM

US95: MP 94.5 to 121.36
US95, 27 miles North of McDermitt

Information
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Chip sealing is occurring causing minimal delay. Obey traffic control. Use caution on loose gravel. Ramps Affected. Crew will be chipsealing US95 MP 94.50 - MP 121.36 this week. Expect multiple lane closures using flagging and pilot cars. Use caution, prepare to slow. Expect delays.
Last Updated
7/20/2025 12:42 PM

US95: MP 98.2
US95, 23 miles North of McDermitt

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:23 PM

US95: MP 121.26
US95, McDermitt

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/07/2025 2:21 PM

ORE78: MP 60.88
ORE78, 23 miles South of New Princeton

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
6/23/2025 10:39 AM