North Oregon Road Conditions

Road Conditions by Route

I-84 MP 44.1

Informational only; Commercial Vehicle Information
Details: I-84 EB MP 44.1 (Cascade Locks) Effective August 24, 2015, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 3 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 24, 2015.
Updated: 08/02/2015 7:00 pm

I-84 MP 45.33 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River) Effective July 26, 2015, this section of I-84 will be restricted to 19 feet 00 in. in width from Midnight Sunday night to 12 Noon on Fridays. Estimated date of completion is November 30, 2016.
Updated: 08/02/2015 7:00 pm

I-84 MP 46 to 64

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: I-84 reduced to one lane in each direction from Monday, August 3 at 5 a.m. to Thursday, August 6 at 8 p.m., expect up to 20 minute delays MP 50-55. Project Description: This project will replace 12-miles of center concrete barriers on I-84 from Cascade Locks (milepost 46) to Hood River (milepost 64) between July and November 2015, before paving in summer 2016. The project will result in a smoother ride, increased safety and extend the life of the highway. Traffic Impacts: Travelers should expect I-84 to be reduced to one lane in each direction (west and eastbound) as crews replace the center barrier from around milepost 50 to milepost 55 (east of Cascade Locks); travelers can expect up to 20 minute delays. The left lanes (fast lanes) will be closed starting on Monday, August 3 at 5 a.m. then reopening on Thursday, August 6 at 8 p.m. with a temporary barrier in place to protect work crews. Motorists should exercise caution in the project workzone, as construction vehicles may be entering and exiting travel lanes.
Updated: 08/01/2015 12:43 am

I-84 MP 55.13

Informational only; Commercial Vehicle Information
Details: I-84 WB MP 55.13 (Wyeth) Effective August 25, 2015, this section of I-84 westbound will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 3 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 25, 2015.
Updated: 08/02/2015 7:00 pm

I-84 MP 62.05

Informational only; Commercial Vehicle Information
Details: I-84 MP 62.05 WB (Crossing Under Exit 62/US30 - Hood River) Effective July 26, 2015, I-84 westbound crossing under Exit 62 (US30) will be restricted to 15 feet 05 in. in height. Estimated date of completion is November 30, 2016.
Updated: 08/02/2015 7:00 pm

I-84 MP 63.92

Informational only; Commercial Vehicle Information
Details: I-84 MP 63.92 WB (Crossing Under Exit 63/2nd St - Hood River) Effective July 26, 2015, I-84 westbound crossing under Exit 63 (2nd St) will be restricted to 15 feet 09 in. in height. Estimated date of completion is November 30, 2016.
Updated: 08/02/2015 7:00 pm

I-84 MP 83.5 to 88.5

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Contractors will be working around exit 87 on the 3 Mile Creek Bridge. Barrier will be used to route traffic for that exit around the workzone. Speeds have bene reduced to 50mph on I84 through the work zone for the entirety of the project. Between August 29th and 30th the contractor may perform a single lane closure of the westbound fast lane between exit 87 and exit 84 to survey the existing roadway for the next stage of construction. Traffic can expect minimal delays. Traffic can expect minimal delays.
Updated: 07/31/2015 10:52 am

I-84 MP 86.77

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 87 ramp to US197 (The Dalles) Effective August 14, 2015, the ramp from I-84 eastbound Exit 87 to US197 will be intermittently closed Monday through Friday between the hours of 10 PM & 5 AM. Estimated date of completion is September 3, 2015.
Updated: 08/02/2015 7:00 pm

I-84 MP 95 to 111

No to Minimum Delay; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Striping and rumble strip installation will be occurring nights from 7pm to 7am. I84 will be reduced to a single lane in both directions. Oregon Mainline Paving will be replacing the top 2” of pavement in both the slow and fast lanes on Interstate 84. They will also replace the shoulder rumble strips, along with substandard median barrier with new barrier that meets today’s requirements for crash worthiness. The barrier replacement will take place during the day, while the paving operation and other project related activities will happen at night.
Updated: 07/31/2015 11:05 am

I-84 MP 96.04 to 110.15

Informational only; Commercial Vehicle Information
Details: I-84 MP 95.80 to MP 110.46 EB & WB (east of The Dalles) Effective May 1, 2015, this section of I-84 will be restricted to 11 feet 06 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is September 18, 2015.
Updated: 08/02/2015 7:00 pm

ORE19 MP 43.92

Informational only; Commercial Vehicle Information
Details: OR19 MP 43.92 NB & SB (south of Condon) Effective August 17, 2015, this section of OR19 will be restricted to 13 feet 00 in. in width between the hours of 7 AM & 5 PM. Estimated date of completion is August 21, 2015.
Updated: 08/02/2015 7:00 pm

ORE35 MP 101.82

Informational only; Commercial Vehicle Information
Details: OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Updated: 08/02/2015 7:00 pm

ORE206 MP 14.73

Informational only; Commercial Vehicle Information
Details: OR206 MP 14.73 EB & WB (crossing over US97 - Wasco) Effective August 24, 2015, this section of OR206 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 5 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 27, 2015.
Updated: 08/02/2015 7:00 pm

US26 MP 49 to 56

Estimated delay under 20 minutes; Construction Work
Comments: Blasting work Monday and Thursday with one hour closure on US 26 from 6:30-7:30 p.m.; expect 20-minute delays during daylight Monday to Thursday. Project Description: Construction of safety improvements to prevent severe and fatal crashes on U.S. 26 from east of Kiwanis Camp Road to east of the Mirror Lake Curves and preserve the highway to Oregon Highway 35 is underway on Mt. Hood. Work on the nearly eight mile stretch of U.S. 26 includes: • Paving between Silent Rock and OR 35. • Cutting back the slope along a 600 foot section at Map Curve to provide a 27 foot wide ditch for rocks to land away from the road. • Cutting back the rock slope east of the runaway truck ramp to east of the Mirror Lake trailhead. • Highway widening to install a median barrier. • Constructing a retaining wall to reduce impacts to existing trails from highway widening work. • Extending the westbound passing lanes for a total of about 1,400 feet. Traffic Impacts: K&E Excavating will work Monday through Friday from sunrise to sunset. This week's work requires blasting on Monday and Thursday with flagging throughout the three-mile project area from 6 a.m. to 7 p.m. Monday through Thursday. Hauling will also continue along Lolo Pass Road and Trillium Lake Road. Details include: U.S. 26 • Travelers should expect up to one hour closure of U.S. 26 from 6:30 to 7:30 p.m. Monday, August 3 and Thursday, August 6 for rock blasting. This is subject to change due to site conditions and work progress. • Monday through Thursday during daylight hours, travelers will encounter traffic stops controlled by flaggers, with lane and shoulder closures from sunrise to sunset throughout the three-mile project area. Travelers should plan for 20-minute delays any time the contractor is working. Periodic flagging could also occur on Friday. • One lane will remain open in each direction for a nearly three-mile stretch of U.S. 26 from east of Kiwanis Camp Road to east of the Mirror Lake Curves. This lane closure will remain in place around-the-clock until October 31. Lolo Pass Road • Periodic hauling will continue along Lolo Pass Road and take place Monday through Friday from sunrise to sunset. People in the area should use caution and expect truck traffic. Trillium Lake Road, Road 31, and Laurel Hill Trail • Hauling will continue along Trillium Lake Road and take place Monday through Thursday from sunrise to sunset and Friday until noon. • Road 31 will be closed to all traffic around-the-clock Monday through Friday. • Laurel Hill Trail will be closed as crews work on nearby slopes.
Updated: 08/01/2015 12:55 am

US26 MP 50.12 to 57.2

Informational only; Commercial Vehicle Information
Details: US26 MP 47.20 to MP 57.45 EB & WB (Government Camp) Beginning April 1, 2015, this section of US26 will be closed for approximately 30 minutes per the following schedule: In April, May, September, and October: 30-minute closures may occur Mon/Tues/Thurs nights between the hours of 5:30 PM & 6:30 PM. In June, July, and August: 30-minute closures may occur Mon/Tues/Thurs nights between 6:30 PM & 7:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. Effective April 6, 2015, this section of US26 will be restricted to 22 feet 00 in. in width at all hours. Estimated date of completion is October 31, 2015.
Updated: 08/02/2015 7:00 pm

US26 MP 53.51

Informational only; Commercial Vehicle Information
Details: US26 MP 53.51 EB & WB (Government Camp) Effective April 1, 2015, this section of US26 will be restricted to 17 feet 03 in. in height. Estimated date of completion is October 31, 2015.
Updated: 08/02/2015 7:00 pm

US30 MP 30.42

Informational only; Commercial Vehicle Information
Details: US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Updated: 08/02/2015 7:00 pm

US97 MP 27.1 to 56.7

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Contractors will be reducing the highway to a single lane from MP 43.5-45.4 during daytime hours on US97. Traffic can expect 5-10 minute delays. KERR Contractors will be replacing 29 miles of pavement on U.S. 97 between Grass Valley (MP 27.1) and Shaniko (MP 56.7). The project also includes the construction of passing lanes between MP 43.8 and MP 45.4, installation of new highway signs between Moro and Madras, and adding ADA compliant sidewalk ramps in Grass Valley.
Updated: 07/31/2015 11:07 am

US395 MP .04 to 6

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Intersection improvements and traffic signal upgrades occurring. Intermittent lane restrictions, flaggers and minor delays expected.
Updated: 06/26/2015 10:39 am

US395 MP 1.14

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes
Comments: Installation of new traffic signals is occurring, and sidewalks are closed at 11th & Frazer. Expect flaggers and delays up to 20 mins, use caution.
Updated: 06/30/2015 08:11 am

US395 MP 1.24

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Installation of pedestrian improvements are occurring at 13th & Frazer. Expect occasional lane closures, flaggers, and minor delays.
Updated: 07/27/2015 08:33 am

US730 MP 182.5

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring with intermittent delays up to 20 mins; watch for flaggers. There is a detour for Powerline Rd access to U.S. 730.
Updated: 06/28/2015 1:29 pm

Pan and Zoom Map ODOT RealTime The OReGO Interest List