Northwest Oregon Road Conditions
Highways with no adverse conditions do not show up on this report.
Current Travel Conditions By Route
Closure
ORE229, 10 miles North of Siletz MP 14 - 15
A landslide has occurred. Use an alternate route.
- Updated
- 2/12/2026 4:35:00 PM
Closure
HWY100, 4 miles West of Ainsworth State Park MP 18 - 20
Road construction is occurring. Use an alternate route.
- Updated
- 10/13/2025 2:04:00 PM
Conditional Closure
US30, 6 miles West of The Dalles MP 67 - 69
The highway is open to local traffic and local deliveries only. No through traffic allowed.
- Updated
- 2/4/2026 5:19:00 PM
I-205: SB MP 3 to 13
I-205, Stafford Rd
Construction Work
Informational only
- Comments
- Traffic Impacts: No traffic impacts. Project description: In collaboration with South Metro Area Regional Transit (SMART) we are working on a project to support more reliable travel by using the highway shoulder for transit vehicles. This concept is referred to as Bus on Shoulder. The project extends approximately five miles in both directions of I-205 between Stafford Road and OR43 (Willamette Drive). Another segment in the southbound direction extends for approximately one mile between the OR 212 interchange and 82nd Drive. Authorized buses may use the shoulder in clearly marked areas when traffic drops below 35 mph. No other vehicles are authorized to use road shoulders to bypass traffic. Emergencies always take priority to use the shoulder. <!--Links Start Here--> [Link to Additional Information](http://www.tinyurl.com/i205busonshoulder)
- Last Updated
- 2/01/2026 6:43 AM
I-205: NB MP 3 to 13
I-205, Stafford Rd
Construction Work
Informational only
- Comments
- Traffic Impacts: No traffic impacts. Project description: In collaboration with South Metro Area Regional Transit (SMART) we are working on a project to support more reliable travel by using the highway shoulder for transit vehicles. This concept is referred to as Bus on Shoulder. The project extends approximately five miles in both directions of I-205 between Stafford Road and OR43 (Willamette Drive). Another segment in the southbound direction extends for approximately one mile between the OR 212 interchange and 82nd Drive. Authorized buses may use the shoulder in clearly marked areas when traffic drops below 35 mph. No other vehicles are authorized to use road shoulders to bypass traffic. Emergencies always take priority to use the shoulder. <!--Links Start Here--> [Link to Additional Information](http://www.tinyurl.com/i205busonshoulder)
- Last Updated
- 2/01/2026 6:43 AM
I-205: MP 8.56 to 9.56
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, January 8, 2026, this section of I-205 northbound will be restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-205: MP 8.56 to 9.9
I-205, OR 99E
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/20/2026 12:00:00 AM
- Details
- Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective February 20, 2026, this section of I-205 southbound will be intermittently restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is March 8, 2026
- Last Updated
- 2/13/2026 7:00 AM
I-205: SB MP 8.8 to 9.3
I-205, Abernethy Bridge
Construction Work
Estimated delay under 20 minutes
- Comments
- OR 99E closed overnight under the I-205 Abernethy Bridge on Feb 12 from 10 p.m. to 5 a.m. and Feb 13 from 10 p.m. to 7 a.m. Nighttime lane closures on I-205 northbound Monday from 10 pm to 5 am. Nighttime ramp closure from I-205 northbound to OR99E Monday from 10 pm to 5 am. Nighttime ramp closure from I-205 southbound to OR99E Tuesday through Friday from 10 pm to 5 am. Nighttime lane closures on OR99E Monday through Thursday from 8 pm to 6 am and Friday from 8 pm to 8 am. Daytime flagging on Clackamette Dr Monday through Friday from 7:30 am to 3:30 pm. Daytime flagging on Main St Monday through Saturday from 7 am to 5:30 pm. Pedestrian detours on OR43 and OR99E. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
- Last Updated
- 2/10/2026 11:35 AM
I-205: MP 9.01
I-205, OR 99E
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/16/2026 12:00:00 AM
- Details
- Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective February 16, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-205: MP 9.23
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 NB Exit 9 off-ramp to OR99E NB (Oregon City) Effective December 5, 2025, the I-205 northbound Exit 9 off-ramp to OR99E northbound will be closed Monday through Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. The estimated completion date for this work is March 1, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-205: MP 9.56
I-205, OR 213 Park Place
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective December 15, 2026, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently restricted to 9 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 9 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-405: MP 0.28 to 0.66
I-405, Interstate 5
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/15/2026 12:00:00 AM
- Details
- Alert: I-405 NB Exit 1A off-ramp to City Center/ S Waterfront (Portland) Effective March 15, 2026, the I-405 northbound Exit 1A off-ramp to City Center/S Waterfront, will be closed between the hours of 6:30 AM & 12:30 PM for the Shamrock Run Event.
- Last Updated
- 2/13/2026 7:00 AM
I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 2/12/2026 4:28 PM
I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
Off Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 2/12/2026 4:28 PM
I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 2/12/2026 4:29 PM
I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 2/12/2026 4:28 PM
I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
- Last Updated
- 2/12/2026 4:37 PM
I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd
Construction Work
Estimated delay under 20 minutes
- Comments
- Short-term overnight lane closures and shoulder closures on I-5. We are installing RealTime Variable Advisory Speed (VAS) signs along Interstate 5 south of downtown Portland from the Ross Island Bridge to Terwilliger Bouleva??rd to improve safety and traffic flow by providing drivers with real-time traffic information <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
- Last Updated
- 12/09/2025 8:41 AM
I-5: MP 301.5 to 302.7
I-5, 1 mile South of I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width nightly between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 3, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-5: MP 301.59 to 301.96
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective January 16, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 20, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-5: MP 301.6 to 302.8
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 302.33 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 3, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring as weather permits with single lane closure causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
- Last Updated
- 12/16/2025 2:42 PM
I-5: MP 302.09
I-5, I-405 North Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/6/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 302A off-ramp to Broadway-Weidler St/Moda Center (Portland) Effective March 6, 2026, the I-5 northbound Exit 302A off-ramp to Broadway-Weidler Street/Moda Center will be closed from 11 PM to 7 AM. The estimated completion date for this work is March 7, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-5: MP 302.98 to 303.45
I-5, 1 mile North of I-405 North Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/2/2026 12:00:00 AM
- Details
- Alert: I-5 NB MP 302.98 to MP 303.45 (Portland) Effective March 2, 2026, this section of I-5 northbound will be restricted to 15 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads wider than 15 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 6, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: WB MP 0 to 16
I-84, Interstate 5
Construction Work
Informational only
- Comments
- Traffic Impacts: No impacts. Project Description: We're improving safety at multiple I-84 interchange ramps between downtown Portland and Hood River by installing or upgrading lights, signs and trimming overgrown vegetation through fall 2026. When work begins in early 2026, expect intermittent lane closures with flaggers directing traffic at ramps and intersections. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 2/01/2026 6:40 AM
I-84: EB MP 0 to 16
I-84, Interstate 5
Construction Work
Informational only
- Comments
- Traffic Impacts: No impacts. Project Description: We're improving safety at multiple I-84 interchange ramps between downtown Portland and Hood River by installing or upgrading lights, signs and trimming overgrown vegetation through fall 2026. When work begins in early 2026, expect intermittent lane closures with flaggers directing traffic at ramps and intersections. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 2/01/2026 6:40 AM
I-84: MP 2 to 2.18
I-84, Portland, Intersection with 33rd Ave
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/25/2026 12:00:00 AM
- Details
- Alert: I-84 EB Exit 1 off-ramp to 33rd Ave (Portland) Effective February 25, 2026, the I-84 eastbound Exit 1 off-ramp to 33rd Avenue will be closed Monday between the hours of 5 AM & 11:59 AM. The estimated completion date for this work is February 25, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: MP 2.43 to 2.56
I-84, Portland, Intersection with 33rd Ave
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/26/2026 12:00:00 AM
- Details
- Alert: I-84 EB Exit 2 off-ramp to Cesar E. Chavez Blvd (Portland) Effective February 26, 2026, the I-84 eastbound Exit 2 off-ramp to Cesar E. Chavez Boulevard will be closed Tuesday between the hours of 5 AM & 11:59 AM. The estimated completion date for this work is February 26, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: MP 5.03 to 5.07
I-84, Portland, Intersection with 82nd Ave
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/27/2026 12:00:00 AM
- Details
- Alert: I-84 EB Exit 5 off-ramp to OR213/82nd Ave (Portland) Effective February 27, 2026, the I-84 eastbound Exit 5 off-ramp to OR213/82nd Avenue will be closed Wednesday between the hours of 5 AM & 11:59 AM. The estimated completion date for this work is February 27, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: MP 13.03 to 77
Snow Zone
Informational only
- Affected Area
- NE 181st in Troutdale east to just west of the Rowena Exit
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
I-84: MP 13.03 to 44
TROUTDALE - CASCADE LOCKS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 41 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/13/2026 6:59 AM
I-84: WB MP 15.8 to 16.8
I-84, 1 mile East of Fairview, Intersection with 223rd Ave
Construction Work
No to Minimum Delay
- Comments
- Nighttime single lane closures EB and WB starting at 8 p.m. on Tuesday, Jan. 13 and Wednesday, Jan. 14. A second lane closure will be taken at 10pm. Project Description: We are working on I-84 in both directions between I-205 and Marine Drive. Crews are repairing Asphaltic Plug Joints that run across the pavement at two locations. The work areas are located in proximity of the 148th and 122nd Avenue bridges in both the eastbound and westbound directions. The majority of joint work will be in the B and C lanes.
- Last Updated
- 1/11/2026 6:45 AM
I-84: WB MP 18
I-84, 1 mile East of Troutdale
Construction Work
Informational only
- Comments
- Traffic Impacts: No impacts. Project Description: ??We're building a new multi-use path parallel to Jordan Road from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. When construction begins in early 2026, expect delays at the I-84 westbound exit ramp to Sandy River Delta (exit 18). Periodic single lane closures on Jordan Road, with flaggers directing traffic as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 2/01/2026 6:39 AM
I-84: MP 20.16 to 22.77
I-84, 2 miles West of Corbett
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/23/2026 12:00:00 AM
- Details
- Alert: I-84 EB & WB MP 20.16 to MP 22.77 (Corbett) Effective February 23, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Friday between the hours of 7 AM and 5 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 6, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: EB MP 20.41 to 22.52
I-84, 2 miles West of Corbett
Construction Work
Informational only
- Comments
- Traffic Impacts: No traffic impacts. Project Description: We’re repairing several culverts under I-84 between the Sandy River and Multnomah Falls. Culverts resemble tunnels and are built under a highway or road to allow water such as streams and rivers to flow under the road surface to the other side. Culverts help prevent flooding and erosion. Culvert repairs will improve safety by managing stormwater and extending the lifespan of the highway. Work begins in early 2026 and continues to spring 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 1/11/2026 6:46 AM
I-84: MP 36 to 39
I-84, 5 miles East of Multnomah Falls
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/1/2026 12:00:00 AM
- Details
- Alert: I-84 EB MP 36 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 eastbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: MP 36 to 39
I-84, 5 miles East of Multnomah Falls
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/1/2026 12:00:00 AM
- Details
- Alert: I-84 WB MP 36 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: MP 37 to 37.6
I-84, 6 miles East of Multnomah Falls
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/1/2026 12:00:00 AM
- Details
- Alert: I-84 EB on-ramp from NE Frontage Rd/Hwy 100 (Warrendale) Effective March 1, 2026, the I-84 eastbound on-ramp from NE Frontage Road/Highway 100 will be closed at all hours. The estimated completion date for this work is July 7, 2026.
- Last Updated
- 2/13/2026 7:00 AM
I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls
Construction Work
Informational only
- Comments
- Traffic impacts: no traffic impacts. Project Description: We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
- Last Updated
- 1/11/2026 6:46 AM
US101: MP 0.83 to 1.26
US101, 1 mile South of Oregon - Washington Border
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Crews will be working Monday through Thursday from 8am to 4pm and Fridays from 7am to 12pm. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M24085)
- Last Updated
- 2/01/2026 7:11 PM
US101: MP 3.72
US101, Intersection with Nehalem Highway ORE202
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/19/2026 12:00:00 AM
- Details
- Alert: US101 NB on-ramp from US30 EB & WB (Astoria) Effective February 19, 2026, the US101 northbound on-ramp from US30 eastbound and westbound will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this emergency work is February 20, 2026.
- Last Updated
- 2/13/2026 7:00 AM
US101: MP 98.85 to 104.2
Snow Zone
Informational only
- Affected Area
- Cascade Head - just north of Neskowin Creek to just north of the Salmon River
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US101: MP 102 to 103
US101, 5 miles South of Neskowin
Information
Estimated delay of 20 minutes - 2 hours
- Lanes Affected
- (Northbound) 2 Lanes
- Comments
- Expect delays due to highway erosion. Prepare to slow. Northbound lanes are closed. Traffic is being flagged through the area. Use caution and expect delays.
- Last Updated
- 2/12/2026 4:35 PM
US101: MP 112.35 to 121.44
US101, Lincoln City
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. From NE West Devils Lake Road to Salishan Hills Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
- Last Updated
- 2/12/2026 4:36 PM
US101: MP 127.61
US101, Depoe Bay
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday 7AM - 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
- Last Updated
- 2/12/2026 4:20 PM
US101: MP 134
US101, 7 miles North of Newport
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 2/12/2026 4:34 PM
US101: MP 136
US101, 5 miles North of Newport
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 2/12/2026 4:34 PM
US101B: MP 6.7 to 7.1
US101B, Astoria
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Bridge work is occurring. Prepare to slow. Expect crews working during the day with single lane closures Monday through Friday from 9 a.m. to 4 p.m. In February, expect daytime full bridge closures with a signed detour. Watch for workers and drive with caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M24078)
- Last Updated
- 2/12/2026 4:34 PM
US101B: MP 6.7 to 7.1
US101B, Astoria
Commercial Vehicle Information
Informational only
- Details
- Alert: US101 Bus NB & SB MP 6.7 to MP 7.1 (Astoria) On February 12, 2026, this section of US101 Business (the Old Youngs Bay Bridge) northbound and southbound will be closed between the hours of 9 AM & 4:00 PM. This closure will occur again on February 18, 2026. The estimated completion date for this work is February 18, 2026.
- Last Updated
- 2/13/2026 7:00 AM
US26: MP 0.34 to 0.63
US26, I-405
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/15/2026 12:00:00 AM
- Details
- Alert: US26 WB (SW Kelly Ave) off-ramp to OR99W/SW Naito Parkway NB (Portland) Effective March 15, 2026, the OR99W/SW Naito Parkway NB (Portland) off ramp, from SW Kelly Ave, will be closed between the hours of 6:30 AM & 12:30 PM for the Shamrock Run Event.
- Last Updated
- 2/13/2026 7:00 AM
US26: MP 0.34 to 0.63
US26, I-405
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/15/2026 12:00:00 AM
- Details
- Alert: US-26, SB, S. Hood Ave to SW Barber Blvd (Portland). Effective March 15th, 2026, US-26, SB, S. Hood Ave to SW Barber Blvd (Portland), will be closed between the hours of 6:30am to 12:30pm on March 15th, 2026. Estimated completion date for this Shamrock Run event is March 15th, 2026.
- Last Updated
- 2/13/2026 7:00 AM
US26: MP 5.85 to 9.96
US26, Portland
Construction Work
Informational only
- Comments
- Traffic Impacts: Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. Travelers can expect congestion during peak periods. Alternate routes are available. Possible nighttime work with closures. Flaggers may be directing traffic. No work anticipated Dec. 22-Jan. 1.
- Last Updated
- 12/21/2025 9:02 AM
US26: MP 5.87 to 7.9
US26, Portland
Commercial Vehicle Information
Informational only
- Details
- Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 3, 2026.
- Last Updated
- 2/13/2026 7:00 AM
US26: MP 7.9 to 9.96
US26, Portland
Commercial Vehicle Information
Informational only
- Details
- Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width from at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2026.
- Last Updated
- 2/13/2026 7:00 AM
US26: MP 9.72 to 35.11
Snow Zone
Informational only
- Affected Area
- David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 13
US26, 4 miles East of Necanicum
Crash/Hazard
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 2 Lanes
- Comments
- Sunken grade. Prepare to slow.
- Last Updated
- 2/12/2026 4:36 PM
US26: MP 25.12 to 42.5
Snow Zone
Informational only
- Affected Area
- Sandy to Zigzag
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 37.73 to 45.43
Snow Zone
Informational only
- Affected Area
- Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 37.73 to 45.43
SUNSET SUMMIT REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 36 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/13/2026 6:55 AM
US26: MP 42.5 to 60
GOVERNMENT CAMP REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Clear, no precipitation
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 30 F
- New Snow
- 0 in.
- Roadside Snow
- 2 in.
- Last Updated
- 2/13/2026 7:01 AM
US26: MP 59.57 to 75.5
Snow Zone
Informational only
- Affected Area
- Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 59.57 to 67
BLUE BOX PASS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Spots of Ice
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 31 F
- New Snow
- 0 in.
- Roadside Snow
- 4 in.
- Last Updated
- 2/13/2026 6:34 AM
US30: MP 3.94 to 6.51
US30, Portland
Construction Work
Estimated delay under 20 minutes
- Comments
- Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes. Project Description: We are making safety improvements for travelers on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
- Last Updated
- 2/09/2025 10:28 AM
US30: MP 18.37 to 65.99
CLATSKANIE REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Ground Fog
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 40 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/13/2026 4:00 AM
US30: MP 19.05 to 17.02
US30, Scappoose
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) 2 Lanes (Westbound) 2 Lanes
- Comments
- Utility work is occurring. Prepare to slow. Tree trimming for Columbia River PUD scheduled from 8 a.m. to 4 p.m., weekdays, 2/12-2/19.
- Last Updated
- 2/10/2026 10:32 AM
US30: MP 48.31 to 61.01
Snow Zone
Informational only
- Affected Area
- Rainier to Clatskanie
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30: MP 61.62 to 67.91
US30, Intersection with Mist - Clatskanie Highway ORE47
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 2/12/2026 4:21 PM
US30: MP 72.32 to 76.76
Snow Zone
Informational only
- Affected Area
- Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30BY: MP 0 to 1
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
Future Event: Informational only
- Expected Start Date
- 2/17/2026 10:00:00 PM
- Comments
- Road construction is or will be occurring. Use caution. Project Description: The St. Johns Bridge closes at night for inspections Tuesday night through Saturday night, February 17 through February 21.
- Last Updated
- 1/11/2026 6:50 AM
US30BY: MP 0 to 1
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
Informational only
- Comments
- The St. Johns Bridge closes at night for inspections Tuesday night through Saturday night, March 9-14. Project Description: The St. Johns Bridge closes at night for inspections Tuesday night through Saturday night, March 9-14.
- Last Updated
- 2/01/2026 6:46 AM
US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. Project Description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
- Last Updated
- 2/09/2025 10:29 AM
US30BY: MP 0.6 to 1
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/9/2026 12:00:00 AM
- Details
- Alert: US30 Bypass EB & WB MP 0.91 (St. Johns Bridge/Portland) Effective March 9, 2026, this section of US30 Bypass eastbound and westbound will be closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is March 13, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE141: MP 3.8 to 4.44
ORE141, Tigard
Construction Work
Estimated delay under 20 minutes
- Comments
- Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
- Last Updated
- 10/19/2025 6:14 AM
ORE141: MP 7.07 to 3.3
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
- Last Updated
- 6/08/2025 6:59 AM
ORE141: MP 7.07 to 5.01
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
- Last Updated
- 11/09/2025 5:54 PM
ORE153: MP 6 to 7
ORE153, Amity
Commercial Vehicle Information
Informational only
- Details
- Alert: OR153 EB & WB MP 6 to MP 7 (Amity) Effective January 5, 2026, this section of OR153 eastbound and westbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE173: MP 0.12 to 5.49
Snow Zone
Informational only
- Affected Area
- Timberline - US26/Government Camp to Timberline Lodge
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE173: MP 0.12 to 5.49
TIMBERLINE LODGE REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Clear, no precipitation
- Pavement Condition
- Spots of Ice
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 27 F
- New Snow
- 0 in.
- Roadside Snow
- 12 in.
- Last Updated
- 2/13/2026 7:02 AM
ORE18: MP 12 to 18
Snow Zone
Informational only
- Affected Area
- Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE18B: MP 2 to 2.67
ORE18B, Willamina
Construction Work
Future Event: No to Minimum Delay
- Expected Start Date
- 4/6/2026 7:00:00 AM
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 2/11/2026 10:37 AM
ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 2/12/2026 4:35 PM
ORE211: MP 11.8
ORE211, Molalla
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
- Last Updated
- 9/28/2025 8:36 AM
ORE213: MP 7.23 to 7.41
ORE213, Portland
Construction Work
Informational only
- Comments
- Day and nighttime single lane closures on SE 82 Ave. (OR 213) between SE Foster Rd. and SE Lindy St. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
- Last Updated
- 1/27/2026 4:06 PM
ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Expect shoulder closures on OR 217. Project Description: This project addresses long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! This is some of the shortest merging spacing in the region. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
- Last Updated
- 2/01/2026 6:48 AM
ORE22: MP 32 to 73
Snow Zone
Informational only
- Affected Area
- Gates City Limit to Marion Forks
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE22: MP 66.23 to 73
MARION FORKS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Partly Cloudy
- Pavement Condition
- Spots of Ice
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 29 F
- New Snow
- 0 in.
- Roadside Snow
- 2 in.
- Last Updated
- 2/13/2026 6:59 AM
ORE223: MP 2.13 to 4.28
ORE223, Dallas
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 2/12/2026 4:27 PM
ORE224: MP -0.01 to 0.36
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/3/2026 12:00:00 AM
- Details
- Alert: OR224 WB MP -.01 to MP .36 & OR224 WB off-ramp to OR99E SB (Milwaukie) Effective March 3, 2026, this section of OR224 westbound and the OR224 westbound off-ramp to OR99E southbound will be closed at night between the hours of 8 PM and 6 AM. The estimated completion date for this work is March 5, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 4/17/2025 3:08 PM
ORE229: MP 10
ORE229, 10 miles South of Intersection with Oregon Coast Highway US101
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 2/12/2026 4:35 PM
ORE229: MP 14.1 to 14.3
ORE229, 10 miles North of Siletz
Commercial Vehicle Information
Informational only
- Details
- Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time.
- Last Updated
- 2/13/2026 7:00 AM
ORE229: MP 14.2 to 15.1
ORE229, 10 miles North of Siletz
Crash/Hazard
Closure
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- A landslide has occurred. Use an alternate route.
- Last Updated
- 2/12/2026 4:35 PM
ORE229: MP 21 to 22.9
ORE229, 3 miles North of Siletz
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 2/12/2026 4:29 PM
ORE35: MP 60 to 83.56
Snow Zone
Informational only
- Affected Area
- White River - Jct US26 to ODOT Maintenance Station
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE35: MP 60 to 62
WHITE RIVER REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Clear, no precipitation
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 28 F
- New Snow
- 0 in.
- Roadside Snow
- 4 in.
- Last Updated
- 2/13/2026 7:02 AM
ORE43: MP 8 to 9
ORE43, 6 miles South of Portland
Construction Work
No to Minimum Delay
- Comments
- Traffic impacts: Shoulder closures and pedestrian detours on OR 43 at Marylhurst Dr. Project Description: This project will reduce conflicts and improve safety on OR 43 (Willamette Drive) for travelers at the Marylhurst Drive intersection.
- Last Updated
- 12/21/2025 9:03 AM
ORE43: MP 11.08
ORE43, Interstate 205
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/16/2026 12:00:00 AM
- Details
- Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective February 16, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Monday through Thursday nights between the hours of 10 PM and 5 AM, Friday nights between the hours of 10 PM and 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE43: MP 11.13 to 11.18
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, February 9, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE43: MP 11.13 to 11.18
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective February 9, 2026, this section of OR43 northbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE47: MP 0 to 11.71
Snow Zone
Informational only
- Affected Area
- OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE47: MP 11.6
ORE47, Intersection with Nehalem Highway ORE202
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=N00031)
- Last Updated
- 2/12/2026 4:27 PM
ORE47: MP 25.37 to 25.69
ORE47, 1 mile East of Washington - Yamhill County Line
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect crews working during the day, Monday through Friday, with lane and shoulder closures and flaggers helping direct traffic as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22435-OR47)
- Last Updated
- 2/12/2026 4:26 PM
ORE47: MP 60 to 63
ORE47, Vernonia
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22435-vernonia)
- Last Updated
- 2/12/2026 4:21 PM
ORE51: MP 5.81 to 6.34
ORE51, Independence
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
- Last Updated
- 2/12/2026 4:24 PM
ORE53: MP 11
ORE53, Clatsop - Tillamook County Line
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 2/12/2026 4:36 PM
ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
- Last Updated
- 2/12/2026 4:37 PM
ORE6: MP 5.69 to 5.82
ORE6, 6 miles East of Tillamook
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
- Last Updated
- 2/12/2026 4:37 PM
ORE6: MP 5.69 to 5.82
ORE6, 6 miles East of Tillamook
Commercial Vehicle Information
Informational only
- Details
- Alert: OR6 EB & WB MP 5.69 to 5.82 (Mills Creek Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE6: MP 16.06 to 37.5
Snow Zone
Informational only
- Affected Area
- Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE6: MP 16.06 to 37.5
WILSON RIVER SMT REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 36 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/13/2026 6:55 AM
ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
- Last Updated
- 1/15/2026 1:59 PM
ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood
Commercial Vehicle Information
Informational only
- Details
- Alert: OR6 EB & WB MP 19.78 to 19.88 (Fisherman's Foot Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
- Last Updated
- 2/12/2026 4:21 PM
ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood
Commercial Vehicle Information
Informational only
- Details
- Alert: OR6 EB & WB MP 32.05 to 32.1 (Devils Lake Fork Wilson River Bridge) Effective February 9, 2026, this section of OR6 eastbound and westbound will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs GVW, Weight Table 2, for all loads at all hours. The estimated completion date for this work is August 28, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE6: MP 33 to 42
ORE6, Tillamook - Washington County Line
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Watch for flaggers and workers. New guardrail will be installed the week of 1/19/26.
- Last Updated
- 2/12/2026 4:36 PM
ORE6: MP 49.98 to 50.11
ORE6, 2 miles West of Intersection with Sunset Highway ORE47
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 2/02/2026 8:13 AM
ORE6: MP 50
ORE6, 2 miles West of Intersection with Sunset Highway ORE47
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Utility work is occurring. Prepare to slow.
- Last Updated
- 2/12/2026 4:35 PM
ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
- Last Updated
- 12/09/2025 8:27 AM
ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Lane closures on OR 8 between 8:00 p.m. and 5:00 a.m. Project Description: This partnership project between ODOT, City of Beaverton and Metro will improve pedestrian safety on SW Canyon Road (OR 8) from SW Hall Boulevard to SW Cedar Hills Boulevard in Central Beaverton by adding two new crosswalks, a flashing beacon, new lighting and a landscaped center median. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
- Last Updated
- 2/01/2026 6:47 AM
ORE99E: NB MP 5.72 to 8
ORE99E, 1 mile South of Milwaukie
Construction Work
No to Minimum Delay
- Comments
- No impacts. Project Description: This project installs an overhead RRFB with a pedestrian refuge island median, ADA compliant curb ramps with push buttons, speed feedback signs and illumination. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23521)
- Last Updated
- 2/09/2025 1:35 PM
ORE99E: MP 11.6 to 11.9
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- Alert: OR99E NB & SB MP 11.60 to MP 11.90 (Oregon City) Effective February 02, 2026, this section of OR99E northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE99E: MP 11.63
ORE99E, Oregon City
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 2/23/2026 12:00:00 AM
- Details
- Alert: OR99E SB off-ramp to I-205 SB (Oregon City) Effective February 23, 2026, the OR99E southbound off-ramp to I-205 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is March 8, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE99E: MP 11.64 to 11.81
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- Alert: OR99E NB & SB MP 11.64 to MP 11.81 (Oregon City) Effective February 12, 2026, this section of OR99E northbound and southbound will be closed Thursday and Friday night between the hours of 10:00 PM & 5:00 AM. The estimated completion date for this work is February 14, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE99E: MP 40.75 to 40.81
ORE99E, Brooks
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 2/12/2026 4:20 PM
ORE99EB: NB MP 0.65 to 8.26
99EBus, 1 mile South of Intersection with Pacific Highway I-5
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
- Last Updated
- 2/12/2026 4:25 PM
ORE99W: MP 1.24 to 3.18
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 3/15/2026 12:00:00 AM
- Details
- Alert: OR99W (Naito Parkway) NB & SB MP 1.24 to MP 3.18 (Portland) Effective March 15, 2026, this section of OR99W (Naito Parkway) northbound and southbound as well as the southbound right lane from SW Barber Boulevard to SW Capital Highway, will be closed between the hours of 6:30 AM & 12:30 PM for the Shamrock Run Event.
- Last Updated
- 2/13/2026 7:00 AM
ORE99W: MP 44 to 45
ORE99W, Amity
Commercial Vehicle Information
Informational only
- Details
- Alert: OR99W NB & SB MP 44 to MP 45 (Amity) Effective January 5, 2026, this section of OR99W northbound and southbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and on Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
- Last Updated
- 2/13/2026 7:00 AM
ORE99W: MP 57.58 to 57.81
ORE99W, Rickreall
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 2/12/2026 4:27 PM
ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
- Last Updated
- 2/12/2026 4:23 PM
HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park
Construction Work
Closure
- Comments
- Road construction is occurring. Use an alternate route. I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
- Last Updated
- 10/13/2025 2:04 PM