Northwest Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

ORE229, 10 miles North of Siletz MP 14 - 15

A landslide has occurred. Use an alternate route.

<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)

Updated
4/2/2026 10:33:00 AM

Closure

HWY100, 4 miles West of Ainsworth State Park MP 18 - 20

A section of the Historic Columbia River Highway/U.S. 30 between Multnomah Falls and Oneonta Trailhead is closed to all users until Spring 2026.

I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)

Updated
4/3/2026 7:47:00 PM

Conditional Closure

US30, 6 miles West of The Dalles MP 67 - 69

The highway is open to local traffic and local deliveries only. No through traffic allowed.
Updated
4/6/2026 4:19:00 AM

I-205: MP 8.56 to 9.56
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, February 25, 2026, this section of I-205 northbound will be restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is April 24, 2026
Last Updated
4/06/2026 4:00 PM

I-205: MP 8.56 to 9.9
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective March 2, 2026, this section of I-205 southbound will be intermittently restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is May 2, 2026
Last Updated
4/06/2026 4:00 PM

I-205: SB MP 8.8 to 9.3
I-205, OR 99E

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane and ramp closures in Oregon City and West Linn with pedestrian detours on OR 43 and OR 99E between 8 p.m. and 6 a.m. The I-205 Improvements Project is upgrading the Abernethy Bridge — a critical link on I-205 connecting West Linn and Oregon City — to withstand a major earthquake. We are also realigning I-205 interchanges at OR 43 and OR 99E, making safety improvements for people biking, walking and rolling and building a new sound wall in Oregon City. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
Last Updated
4/03/2026 6:13 PM

I-205: MP 9.01
I-205, OR 99E

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/14/2026 12:00:00 AM
Details
Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective April14, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is April 17, 2026.
Last Updated
4/06/2026 4:00 PM

I-205: MP 9.23
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB Exit 9 off-ramp to OR99E NB (Oregon City) Effective February 25, 2026, the I-205 northbound Exit 9 off-ramp to OR99E northbound will be closed Monday through Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. The estimated completion date for this work is April 17, 2026.
Last Updated
4/06/2026 4:00 PM

I-205: MP 9.56
I-205, OR 213 Park Place

Commercial Vehicle Information
Informational only
Details
Alert: I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective April 6, 2026, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently restricted to 9 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 9 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 24, 2026.
Last Updated
4/06/2026 4:00 PM

I-405: MP 1.6 to 1.94
I-405, Intersection with US26

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/6/2026 12:00:00 AM
Details
Alert: I-405 NB Exit 2A off-ramp to Salmon St/Providence Park (Portland) Effective June 6, 2026, the I-405 northbound Exit 2A off-ramp to Salmon Street/Providence Park will be closed between the hours of 4:30 PM & 11:30 PM. The estimated completion date for this work is June 6, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/30/2026 6:19 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/30/2026 6:19 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
3/30/2026 6:19 PM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
2/12/2026 4:28 PM

I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027.
Last Updated
4/06/2026 4:00 PM

I-5: MP 263.49
I-5, 9 miles South of Woodburn

Commercial Vehicle Information
Informational only
Details
Alert: Brooklake Road EB & WB (Brooks) Effective March 17, 2026, Brooklake Road, between Richland Road and Front Street, will be restricted to 10 feet 00 inches in width at all hours, The estimated completion date for this work is April 17, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
3/30/2026 6:24 PM

I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
Last Updated
4/03/2026 3:49 PM

I-5: MP 301.5 to 302.7
I-5, 1 mile South of I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in Sunday night thru Friday night between the hours of 10 PM and 5 AM and Saturday night between the hours of 10:PM and 8:AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 9, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: MP 301.58
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 301.58 (Portland) Effective March 11, 2026, this section of I-5 southbound will be restricted to 14 feet 7 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 14 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: MP 301.59 to 301.96
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/20/2026 12:00:00 AM
Details
Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective April 20, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 8, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: MP 301.6 to 302.8
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 302.33 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange

Construction Work
No to Minimum Delay
Comments
Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
Last Updated
4/03/2026 4:28 PM

I-5: MP 302.4 to 302.6
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB on-ramp from NE Broadway (Portland) Effective April 5, 2026, the I-5 northbound on-ramp from NE Broadway will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 9, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: MP 302.4 to 302
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/12/2026 12:00:00 AM
Details
Alert: I-5 NB MP 302.4 to MP 302.6 (Portland) Effective April 12, 2026, this section of I-5 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 16, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: MP 302.4
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/22/2026 12:00:00 AM
Details
Alert: I-5 NB on-ramp from NE Broadway (Portland) Effective April 22, 2026, the I-5 northbound on-ramp from NE Broadway will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 26, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: MP 303.37 to 302.28
I-5, 1 mile South of Portland, Intersection with Going St

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/16/2026 12:00:00 AM
Details
Alert: I-5 SB MP 303.161 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 15 feet 5 inches in height at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026.
Last Updated
4/06/2026 4:00 PM

I-5: MP 303.37 to 302.28
I-5, 1 mile South of Portland, Intersection with Going St

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/16/2026 12:00:00 AM
Details
Alert: I-5 SB MP 303.37 to MP 302.28 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026.
Last Updated
4/06/2026 4:00 PM

I-84: WB MP 0 to 16
I-84, Interstate 5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/06/2026 2:22 PM

I-84: EB MP 0 to 16
I-84, Interstate 5

Construction Work
Informational only
Comments
Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/03/2026 6:06 PM

I-84: WB MP 11.15
I-84, Portland, Intersection with 148th Ave

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder
Comments
A disabled vehicle is creating a hazard, causing minimal delay to traffic. Use caution.
Last Updated
4/06/2026 6:56 PM

I-84: MP 13.03 to 77

Snow Zone
Informational only
Affected Area
NE 181st in Troutdale east to just west of the Rowena Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: WB MP 18
I-84, 1 mile East of Troutdale

Construction Work
Informational only
Comments
Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/03/2026 6:01 PM

I-84: MP 35.58 to 39
I-84, 5 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
Alert: I-84 WB MP 35 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
Last Updated
4/06/2026 4:00 PM

I-84: MP 36 to 39
I-84, 5 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB MP 36 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 eastbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
Last Updated
4/06/2026 4:00 PM

I-84: EB MP 37 to 38
I-84, 6 miles East of Multnomah Falls

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) Median , 1 Lane
Comments
Road work has the EB left lane closed at mile post 37. The onramp from Warrendale to EB is closed. Prepare to slow or move over for worker safety. Ramps Affected.
Last Updated
3/01/2026 2:11 PM

I-84: MP 37 to 37.6
I-84, 6 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB on-ramp from NE Frontage Rd/Hwy 100 (Warrendale) Effective March 1, 2026, the I-84 eastbound on-ramp from NE Frontage Road/Highway 100 will be closed at all hours. The estimated completion date for this work is July 7, 2026.
Last Updated
4/06/2026 4:00 PM

I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls

Construction Work
Informational only
Comments
Expect EB and WB lane closures on I-84 at McCord Creek BR. with one lane open each direction. Traffic revisions in place. Frontage Rd onramp closed. We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
Last Updated
4/03/2026 5:37 PM

I-84: WB MP 38.5 to 37.5
I-84, 7 miles West of Cascade Locks

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane
Comments
Road work has the WB left lane closed at mile post 38.5. Prepare to slow or move over for worker safety.
Last Updated
3/01/2026 12:56 PM

US101: MP 4.91
US101, Astoria

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/27/2026 12:00:00 AM
Details
Alert: US101 NB & SB MP 4.91 New Young's Bay Bridge (Astoria) Effective April 27, 2026, this section of US101 northbound and southbound will be closed at night between the hours of 8:00 PM & 6:00 AM. The estimated completion date for this work is April 28, 2026.
Last Updated
4/06/2026 4:00 PM

US101: MP 28.8 to 31.27
US101, Cannon Beach

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
2/28/2026 1:24 PM

US101: MP 29.52 to 29.54
US101, Cannon Beach

Construction Work
Closure with Detour
Off Ramp
Comments
Road construction has closed the road. Follow detour. Ramps Affected. Mainline US-101 will remain Open. On & Off Ramps will be affected.
Last Updated
4/06/2026 8:04 AM

US101: MP 102 to 103
US101, 5 miles South of Neskowin

Information
Estimated delay of 20 minutes - 2 hours
Lanes Affected
(Northbound) 2 Lanes
Comments
Expect delays due to highway erosion. Prepare to slow. Northbound lanes are closed. Traffic is being flagged through the area. Use caution and expect delays.
Last Updated
4/02/2026 8:02 AM

US101: MP 112.35 to 121.44
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. From NE West Devils Lake Road to Salishan Hills Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
3/30/2026 9:53 PM

US101: MP 121 to 124.94
US101, 3 miles North of Lincoln Beach

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time from Salishan Hills Drive to North Fogarty Creek State Park (Road) <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
3/30/2026 6:22 PM

US101: MP 127.61
US101, Depoe Bay

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
Last Updated
4/03/2026 11:55 AM

US101: MP 134
US101, 7 miles North of Newport

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
3/30/2026 6:37 PM

US101: MP 136
US101, 5 miles North of Newport

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
3/30/2026 6:37 PM

US101: MP 141.37 to 141.98
US101, Newport

Weather Impact
Informational only
Comments
Winds have prompted ODOT to warn drivers that Yaquina Bay Bridge may close to high profile vehicles MP141. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
3/24/2026 10:53 AM

US101B: MP 4.78
US101B, 2 miles West of Astoria

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/28/2026 12:00:00 AM
Details
Alert: US101 Bus EB & WB MP 4.78 Lewis & Clark River Bridge (Astoria) Effective April 28, 2026, this section of US101 Business eastbound and westbound will be closed, Tuesday night through Wednesday morning between the hours of 7:00 PM and 6:00 AM. The estimated completion date for this work is April 29, 2026.
Last Updated
4/06/2026 4:00 PM

US101B: MP 6.89
US101B, Astoria

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/29/2026 12:00:00 AM
Details
Alert: US101 Bus EB & WB MP 6.89 the Old Youngs Bay Bridge (Astoria) Effective April 29, 2026, this section of US101 Business eastbound and westbound will be closed, Wednesday and Thursday nights between the hours of 7:00 PM and 6:00 AM. The estimated completion date for this work is May 1, 2026.
Last Updated
4/06/2026 4:00 PM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic. Project Description: We are constructing safety improvements to help people travel Outer SE Powell Boulevard more safely from SE 99th Avenue to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits). The first phase, from SE 122nd Avenue to SE 136th Avenue, is complete. The overall Outer Powell Project will add a center turn lane, sidewalks and bike lanes. These improvements reduce the frequency and severity of crashes as well as help people driving, taking transit, walking and biking share the road with fewer conflicts. Pre-construction activities are underway. Road construction began spring 2025 and is anticipated to last five years.
Last Updated
4/03/2026 7:39 PM

US26: MP 5.87 to 7.9
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 3, 2026.
Last Updated
4/06/2026 4:00 PM

US26: MP 7.9 to 9.96
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width from at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2026.
Last Updated
4/06/2026 4:00 PM

US26: MP 9.72 to 35.11

Snow Zone
Informational only
Affected Area
David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 13
US26, 4 miles East of Necanicum

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 2 Lanes
Comments
Sunken grade. Prepare to slow.
Last Updated
4/05/2026 10:15 PM

US26: MP 25.12 to 42.5

Snow Zone
Informational only
Affected Area
Sandy to Zigzag
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.73 to 45.43

Snow Zone
Informational only
Affected Area
Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 59.57 to 75.5

Snow Zone
Informational only
Affected Area
Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 48.31 to 61.01

Snow Zone
Informational only
Affected Area
Rainier to Clatskanie
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 72.32 to 76.76

Snow Zone
Informational only
Affected Area
Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30BY: MP 0 to 1
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Project Description: The St. Johns Bridge closes at night for inspections Tuesday night through Saturday night, February 17 through February 21.
Last Updated
1/11/2026 6:50 AM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
No traffic impacts. Project Description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
4/03/2026 7:51 PM

US30BY: MP 8.19 to 8.41
US30BP, 3 miles West of Intersection with East Portland Highway I-205

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
5/1/2026 12:00:00 AM
Details
Alert: US30 Bypass EB & WB MP 8.19 to MP 8.41 (Portland) Effective May 1, 2026, this section of US30 Bypass eastbound and westbound will be closed all weekend starting at 10:00 PM on Friday to 5:00 AM on Monday. The estimated completion date for this work is May 4, 2026.
Last Updated
4/06/2026 4:00 PM

ORE141: MP 3.8 to 4.44
ORE141, Tigard

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
Last Updated
10/19/2025 6:14 AM

ORE141: MP 7.07 to 3.3
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
Last Updated
6/08/2025 6:59 AM

ORE141: MP 7.07 to 5.01
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
Last Updated
11/09/2025 5:54 PM

ORE153: MP 6 to 7
ORE153, Amity

Commercial Vehicle Information
Informational only
Details
Alert: OR153 EB & WB MP 6 to MP 7 (Amity) Effective January 5, 2026, this section of OR153 eastbound and westbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
Last Updated
4/06/2026 4:00 PM

ORE173: MP 0.12 to 5.49

Snow Zone
Informational only
Affected Area
Timberline - US26/Government Camp to Timberline Lodge
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE18B: MP 2 to 2.67
ORE18B, Willamina

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
4/06/2026 7:01 AM

ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
3/30/2026 6:36 PM

ORE202: MP 12.43
ORE202, 2 miles South of Olney

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
3/30/2026 6:22 PM

ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 10/28/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117)
Last Updated
3/13/2026 6:05 AM

ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld

Commercial Vehicle Information
Informational only
Details
Alert: OR202 EB & WB MP 38.5 to 38.63 (Vesper) Effective March 11, 2026, this section of OR202 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is October 27, 2026.
Last Updated
4/06/2026 4:00 PM

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
Last Updated
9/28/2025 8:36 AM

ORE211: MP 12.33 to 12.34
ORE211, Molalla

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/7/2026 12:00:00 AM
Details
Alert: OR211 EB and WB MP 12.33 to MP 12.34 (Molalla) Effective April 07, 2026, this section of OR211 eastbound and westbound will be restricted to 10 feet 00 inches in width daily between the hours of 10 AM and 3:30 PM. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 14, 2026.
Last Updated
4/06/2026 4:00 PM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Informational only
Comments
Day and nighttime single lane closures on SE 82 Ave. (OR 213) between SE Foster Rd. and SE Lindy St. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
1/27/2026 4:06 PM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
No to Minimum Delay
Comments
Nighttime intermittent shoulder closures on OR 217 southbound Monday through Thursday nights. Project Description: This project addresses long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! This is some of the shortest merging spacing in the region. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
4/06/2026 12:29 AM

ORE219: MP 18.35 to 20.8
ORE219, Newberg

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE22: MP 21 to 24.07
ORE22, 4 miles West of Salem

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
Last Updated
3/30/2026 6:35 PM

ORE22: MP 32 to 73

Snow Zone
Informational only
Affected Area
Gates City Limit to Marion Forks
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE223: MP 2.13 to 4.28
ORE223, Dallas

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
3/30/2026 6:20 PM

ORE224: MP -0.01 to 0.36
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
4/9/2026 12:00:00 AM
Details
Alert: OR224 WB off-ramp to SE 17th Ave/OR99E SB (Milwaukie) Effective April 9, 2026, the OR224 westbound off-ramp to SE 17th Avenue and OR99E southbound, will be closed at night, between the hours of 8 PM and 6 AM. The estimated completion date for this work is April 10, 2026.
Last Updated
4/06/2026 4:00 PM

ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/17/2025 3:08 PM

ORE224: MP 36 to 37
ORE224, 13 miles East of Estacada

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts expected. Project Description: Repairs are being made on OR 224 at milepost 36.7 (approximately 10 miles east of Estacada) after a winter storm event in December.
Last Updated
3/29/2026 10:33 AM

ORE229: MP 14.1 to 14.3
ORE229, 10 miles North of Siletz

Commercial Vehicle Information
Informational only
Details
Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time.
Last Updated
4/06/2026 4:00 PM

ORE229: MP 14.2 to 15.1
ORE229, 10 miles North of Siletz

Crash/Hazard
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
A landslide has occurred. Use an alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)
Last Updated
4/02/2026 10:33 AM

ORE240: MP 11.04 to 11.26
ORE240, Newberg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE35: MP 60 to 83.56

Snow Zone
Informational only
Affected Area
White River - Jct US26 to ODOT Maintenance Station
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE43: MP 8 to 9
ORE43, 6 miles South of Portland

Construction Work
No to Minimum Delay
Comments
Traffic impacts: Shoulder closures and pedestrian detours on OR 43 at Marylhurst Dr. Project Description: This project will reduce conflicts and improve safety on OR 43 (Willamette Drive) for travelers at the Marylhurst Drive intersection.
Last Updated
12/21/2025 9:03 AM

ORE43: MP 11.08
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective April 6, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Monday through Thursday nights between the hours of 10 PM and 5 AM, Friday nights between the hours of 10 PM and 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. The estimated completion date for this work is April 24, 2026.
Last Updated
4/06/2026 4:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective March 2, 2026, this section of OR43 northbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is April 24, 2026.
Last Updated
4/06/2026 4:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, March 2, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is April 24, 2026.
Last Updated
4/06/2026 4:00 PM

ORE47: MP 0 to 11.71

Snow Zone
Informational only
Affected Area
OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE47: MP 48.69
ORE47, 3 miles South of Messing Creek Bridge

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
4/13/2026 9:00:00 AM
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
4/04/2026 1:52 AM

ORE47: MP 48.79
ORE47, 3 miles South of Messing Creek Bridge

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
4/13/2026 9:00:00 AM
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
4/04/2026 1:56 AM

ORE51: MP 5.81 to 6.34
ORE51, Independence

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
3/30/2026 6:20 PM

ORE53: MP 11
ORE53, Clatsop - Tillamook County Line

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
3/30/2026 6:35 PM

ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
Last Updated
3/30/2026 6:33 PM

ORE6: MP 5.69 to 5.82
ORE6, 6 miles East of Tillamook

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
Last Updated
3/30/2026 6:33 PM

ORE6: MP 5.69 to 5.82
ORE6, 6 miles East of Tillamook

Commercial Vehicle Information
Informational only
Details
Alert: OR6 EB & WB MP 5.69 to 5.82 (Mills Creek Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
Last Updated
4/06/2026 4:00 PM

ORE6: MP 16.06 to 37.5

Snow Zone
Informational only
Affected Area
Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone.
Last Updated
1/15/2026 1:59 PM

ORE6: MP 19.78 to 19.88
ORE6, 19 miles West of Glenwood

Commercial Vehicle Information
Informational only
Details
Alert: OR6 EB & WB MP 19.78 to 19.88 (Fisherman's Foot Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026.
Last Updated
4/06/2026 4:00 PM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
Last Updated
3/30/2026 6:22 PM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Commercial Vehicle Information
Informational only
Details
Alert: OR6 EB & WB MP 32.05 to 32.1 (Devils Lake Fork Wilson River Bridge) Effective February 9, 2026, this section of OR6 eastbound and westbound will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs GVW, Weight Table 2, for all loads at all hours. The estimated completion date for this work is August 28, 2026.
Last Updated
4/06/2026 4:00 PM

ORE6: MP 33 to 42
ORE6, Tillamook - Washington County Line

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Watch for flaggers and workers. New guardrail will be installed the week of 1/19/26.
Last Updated
3/30/2026 6:36 PM

ORE6: MP 49 to 51
ORE6, Intersection with Nehalem Highway ORE47

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
3/30/2026 6:19 PM

ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
Last Updated
12/09/2025 8:27 AM

ORE8: MP 3.15 to 3.9
ORE8, Highway 217

Commercial Vehicle Information
Informational only
Details
Alert: OR8 EB and WB MP 3.15 to MP 3.9 (Beaverton) Effective March 25, 2026, this section of OR8 eastbound and westbound will be restricted to 10 feet 00 inches in width at night, half hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 9, 2026.
Last Updated
4/06/2026 4:00 PM

ORE8: MP 3.15 to 3.9
ORE8, Highway 217

Commercial Vehicle Information
Informational only
Details
Alert: OR8 EB and WB MP 3.15 to MP 3.9 (Beaverton) Effective March 25, 2026, this section of OR8 eastbound and westbound will be restricted to 14 feet 00 inches in width every day, half an hour before sunrise to half an hour after sunset. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 9, 2026.
Last Updated
4/06/2026 4:00 PM

ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217

Construction Work
No to Minimum Delay
Comments
Lane closures, turning restrictions on Canyon Road near Rose Biggi Avenue and Cedar Hills. • Travelers can expect around-the-clock lane reduction for two weeks on Canyon Rd. between SW Hall Blvd and Cedar Hills Blvd, ending by April 9. This partnership project between ODOT, City of Beaverton and Metro will improve pedestrian safety on SW Canyon Road (OR 8) from SW Hall Boulevard to SW Cedar Hills Boulevard in Central Beaverton by adding two new crosswalks, a flashing beacon, new lighting and a landscaped center median. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
Last Updated
4/03/2026 7:56 PM

ORE99E: MP 11.63
ORE99E, Oregon City

Commercial Vehicle Information
Informational only
Details
Alert: OR99E SB off-ramp to I-205 SB (Oregon City) Effective March 2, 2026, the OR99E southbound off-ramp to I-205 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is April 24, 2026.
Last Updated
4/06/2026 4:00 PM

ORE99E: MP 40.75 to 40.81
ORE99E, Brooks

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
2/12/2026 4:20 PM

ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE99W: MP 44 to 45
ORE99W, Amity

Commercial Vehicle Information
Informational only
Details
Alert: OR99W NB & SB MP 44 to MP 45 (Amity) Effective January 5, 2026, this section of OR99W northbound and southbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and on Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
Last Updated
4/06/2026 4:00 PM

ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
3/30/2026 6:21 PM

HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park

Construction Work
Closure
Comments
A section of the Historic Columbia River Highway/U.S. 30 between Multnomah Falls and Oneonta Trailhead is closed to all users until Spring 2026. I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
Last Updated
4/03/2026 7:47 PM