State of Oregon Road Conditions

Northwest Oregon Road Conditions by Route

I-5 MP 233 to 244

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 03/31/2016 08:11 am

I-5 MP 250.15 to 251.76

Estimated delay under 20 minutes; Construction Work
Comments: Construction activity near interchange. Expect night lane closures on I 5 south bound. On May 6, expect south I 5 on ramp closure for 2 weeks. Detour. Update: Motorists should be aware of the increased construction activity around the interchange, proceed with caution through the work zone and obey posted speed limits. Expect intermittent night time lane closures on I-5 south bound. Starting at 9 p.m., Friday, May 6, the south bound on-ramp to I-5 will be closed through Sunday, May 22. Traffic will be directed to enter I-5 northbound, take Exit 253 (OR 22/OR 99E Business Exit), cross over and enter I-5 southbound. Project Summary: The I-5 Kuebler Interchange Project will address the increasing congestion at the interchange by modifying the existing southbound off ramp, which will decrease the conflicts at Kuebler that have caused back-ups on I-5 southbound. The new ramp will meet modern standards and contain excess capacity. The project will also add a westbound to southbound I-5 loop on ramp and modify the eastbound to southbound I-5 on ramp.
Updated: 04/29/2016 09:42 am

I-5 MP 251.09

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Kuebler Blvd (Salem) Effective May 6, 2016 at 9 PM, the ramp from Kuebler Blvd to I-5 southbound will be closed. Estimated date of re-opening is May 23, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 299.52 to 300.66

Informational only; Commercial Vehicle Information
Details: I-5 MP 299.52 to MP 300.66 NB (Marquam Bridge - Portland) Effective May 20, 2016, this section of I-5 northbound will be closed between the hours of 9 PM & 5 AM. In addition, the following ramps will be closed during the same time: I-405 southbound to I-5 northbound; I-5 northbound Exit 300 to I-84 eastbound; OR43 (Macadam Ave) to I-5 northbound. Estimated date of completion is May 21, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 302

Estimated delay under 20 minutes; Construction Work
Comments: Night and daytime single lane closures on Broadway Mon-Fri. Expect nighttime single lane closures Monday-Friday 8 p.m. to 5 a.m. the next morning. Crews will be working off the roadway from 5 to 9 a.m. Travelers should expect daytime, perdiodic single lane closures and sidewalk closures on North Broadway Street Monday-Friday from 9 a.m. to 3 p.m. Bicyclists and pedestrians will be provided access through detour routes. Please be alert and follow detour signs. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/I-5-Southbound-Off-Ramp-at-North-Broadway-Project.aspx or 24-hour noise hotline at (971) 673-5239
Updated: 04/29/2016 2:34 pm

I-5 MP 302.6

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 302A to Moda Center (Portland) Effective March 25, 2015, the ramp from I-5 southbound Exit 302A ramp to Moda Center will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, and on Friday nights between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 0 to .5

Future Event: Closure; Maintenance Work
Expected Start Date: 5/6/2016 10:00:00 PM
Comments: Road maintenance operations Fri and Sat 10 p.m. to 6 a.m., use an alternate route from WB I-84 to SB I-5. Expect nighttime full closure of the westbound I-84 to southbound I-5 ramp Friday and Saturday nights from 10 p.m. to 6 a.m. the following morning. The center lane of westbound I-84 near Lloyd Center will also be closed at this time. Please be alert and detour to northbound I-5 to southbound I-405 before reconnecting with southbound I-5.
Updated: 04/29/2016 2:33 pm

I-84 MP .37

Informational only; Commercial Vehicle Information
Details: I-84 WB ramp to I-5 SB (Portland) Effective May 6, 2016, the ramp from I-84 westbound to I-5 southbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 8, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 16.66

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 17 ramp to Troutdale Effective February 15, 2016, the ramp from I-84 eastbound Exit 17 to Troutdale will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 16.67

Informational only; Commercial Vehicle Information
Details: I-84 WB Exit 17 on-ramp from Troutdale Effective February 15, 2016, the ramp from Troutdale to I-84 westbound at Exit 17 will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 17

No to Minimum Delay; Construction Work
Comments: Daytime shoulder closures on N Frontage Road and Marine Drive Monday-Friday 7 a.m. to 4 p.m. For more information: www.I-84TroutdaleExit17.org
Updated: 04/29/2016 2:58 pm

I-84 MP 40

Estimated delay under 20 minutes; Construction Work
Comments: WB I-84 traffic splits around workzone with WB left lane closed Mon-Fri; trucks use right lane. Day/night closure one EB lane and WB on-ramp. Westbound I-84 traffic will be split into two separate (Left/Right) lanes to go around the work-zone in the middle. Travelers should expect the left lane to be closed Monday 6a.m. to Friday at noon; the left travel lane will remain closed the weekend of Apr. 30-May 1, but both westbound lanes will be open the weekend of May 7-8. Trucks will be directed to use the right travel lane. A continuous 10-week eastbound lane closure and westbound on-ramp closure (leaving Bonneville Dam) is in place; follow detour signs for the ramp closure to Cascade Locks to access westbound I-84. For more information: www.I84Construction.org // http://www.oregon.gov/ODOT/HWY/REGION1/Pages/I84TannerCreek.aspx
Updated: 04/29/2016 3:59 pm

I-84 MP 40.14 to 40.42

Informational only; Commercial Vehicle Information
Details: I-84 MP 39.82 to MP 40.61 EB & WB (Bonneville Dam) Effective May 6, 2016, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is July 15, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.14 to 40.42

Informational only; Commercial Vehicle Information
Details: I-84 MP 39.82 to MP 40.61 EB (Bonneville Dam) Effective February 29, 2016, this section of I-84 eastbound will be restricted to 18 feet 00 in. in width. Estimated date of completion is May 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.17

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 40 ramp to Bonneville Dam Effective May 6, 2016, the ramp from I-84 eastbound Exit 40 to Bonneville Dam will be intermittently closed between the hours of 8 PM & 8 AM. Estimated date of completion is July 15, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.18

Informational only; Commercial Vehicle Information
Details: I-84 WB on-ramp from Exit 40 (Bonneville Dam) Effective February 29, 2016, the I-84 westbound on-ramp from Bonneville Dam will be closed. Estimated date of completion is May 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.18 to 40.57

Informational only; Commercial Vehicle Information
Details: I-84 MP 40.61 to MP 39.82 WB (Bonneville Dam) Effective April 9, 2016, this section of I-84 westbound will be restricted to 18 feet 00 in. in width. In addition, between the hours of 12 noon Friday to 8 PM Sunday, the left lane will have reduced width. Trucks must stay in the right lane through this area. Estimated date of completion is May 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 45.33 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River) Effective July 26, 2015, this section of I-84 will be restricted to 19 feet 00 in. in width from Midnight Sunday night to 12 Noon on Fridays. Estimated date of completion is November 30, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 45.33 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River) Effective May 1, 2016, this section of I-84 will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is October 21, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 51.22 to 54.77

Informational only; Commercial Vehicle Information
Details: I-84 MP 53 to MP 55 EB (E of Cascade Locks) Effective February 22, 2016, this section of I-84 will be restricted to 20 feet 00 in. in width Monday through Thursday between the hours of 6 AM & 6 PM. Estimated date of completion is May 26, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 53 to 55

Estimated delay under 20 minutes; Construction Work
Comments: Continuous, right lane closure on eastbound I-84 6 a.m. Monday to 6 p.m. Thursday from MP 53 to MP 55. Continuous right lane closure on I-84 starting 6 a.m. Monday and reopening Thursday at 6 p.m. Trail access west of Starvation Creek rest area will be closed 6 a.m. Monday through 6 p.m. Friday, along with Trail 413 (Mt. Defiance Trail), Trail 414 (Starvation Ridge Trail), and Trail 414A (Starvation Ridge Cutoff Trail). For more information: flh.fhwa.dot.gov/projects/or/lindsey-starvation
Updated: 04/29/2016 3:19 pm

I-84 MP 54.77 to 54.99

Informational only; Commercial Vehicle Information
Details: I-84 MP 54 to MP 55 EB (Starvation Creek) Effective April 6, 2016, this section of I-84 eastbound will be restricted to 20 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 62.05

Informational only; Commercial Vehicle Information
Details: I-84 MP 62.05 WB (Crossing Under Exit 62/US30 - Hood River) Effective July 26, 2015, I-84 westbound crossing under Exit 62 (US30) will be restricted to 15 feet 05 in. in height. Estimated date of completion is November 30, 2016.
Updated: 04/30/2016 7:00 pm

I-205 MP 11.98

No to Minimum Delay; Construction Work
Comments: No traffic impacts. SE Strawberry Lane at I-205 is now open for traffic, pedestrians, bicyclists & transit users as the Contractor cleans up the site. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/I-205-at-Strawberry-Lane.aspx or call the noise hotline at (503) 412-2371.
Updated: 04/29/2016 4:45 pm

I-205 MP 12 to 14

Estimated delay under 20 minutes; Construction Work
Comments: Shoulder closures on I-205 between exit 12 and exit 14 Mon-Fri. Travelers should be aware of changes to travel lanes during construction. I-205 (between exit 12 and 14) daytime right shoulder closures Monday-Friday for installation of signs and landscape materials. OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures in both directions Monday-Friday 9 a.m. to 2 p.m. for signal, permanent signs, striping, and landscaping work. Lane and shoulder closures on I-205 ramps, OR 224 (Milwaukie Expressway) ramps, and OR 213 (SE 82nd Avenue) from Mt Scott Creek Bridge to I-205 Monday-Friday 9 a.m. to 3 p.m. for permanent striping. SE 122 Avenue expect one way traffic controlled by flaggers for permanent striping, irrigation, and landscaping between OR 212/224 and SE Ford Street. For more information: www.sunrisejta.org
Updated: 04/29/2016 5:57 pm

I-205 MP 12.46

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is April 30, 2016.
Updated: 04/30/2016 7:00 pm

I-205 MP 19 to 23

No to Minimum Delay; Construction Work
Comments: Daytime shoulder closures in both directions for drilling. No traffic impacts; work will resume in May.
Updated: 04/10/2016 11:22 am

I-405 MP 3.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 3.20 SB (Fremont Bridge - Portland) Effective October 23, 2015, this section of I-405 southbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is April 29, 2016.
Updated: 04/30/2016 7:00 pm

ORE8 MP 6.45 to 6.75

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures and speed reduction to 25 mph on TV Highway. Temporary sidewalk closures with pedestrian detours. Speed reduced to 25 mph on TV Highway through the construction workzone. Periodic daytime single lane closures on westbound TV Highway and in both directions on SW 185th Avenue, Monday-Friday 9 a.m. to 3 p.m. Expect sidewalk closures with signed pedestrian detours on the north side of OR 8 at SW 185th; crosswalks will remain open. Temporary driveway closures along westbound OR 8, no more than two days at a time; alternative business access will be provided. Pedestrians on SW 185th southbound to OR8 detoured around driveway replacement work, via SW Alton. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/tv185th.aspx
Updated: 04/29/2016 5:34 pm

ORE8 MP 6.45 to 6.99

Informational only; Commercial Vehicle Information
Details: OR8 MP 6.29 to MP 6.99 EB & WB (Aloha) Effective November 10, 2015, this section of OR8 will be restricted to 14 feet 00 in. in width per the following schedule: Monday to Friday between the hours of 9 AM & 3 PM; Sunday to Thursday nights between the hours of 7 PM & 6:30 AM; Friday and Saturday nights between the hours of 7 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 29, 2016.
Updated: 04/30/2016 7:00 pm

ORE8 MP 11.28 to 14.66

No to Minimum Delay; Construction Work
Comments: No traffic impacts. For more information go to www.tvhwypaving.org
Updated: 04/29/2016 5:31 pm

ORE18 MP 51.57

Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

ORE22 MP 10.49

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 04/30/2016 7:00 pm

ORE22 MP 10.66

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 04/30/2016 7:00 pm

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 04/30/2016 7:00 pm

ORE22 MP 34 to 36

Estimated delay under 20 minutes; Maintenance Work
Comments: Herbicide Application
Updated: 04/27/2016 3:19 pm

ORE43 MP 3.67 to 5.742

Informational only; Commercial Vehicle Information
Details: OR43 MP 3.10 to MP 5.75 NB & SB (Lake Oswego) Effective May 16, 2016, this section of OR43 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7:30 PM & 5 AM. Estimated date of completion is May 20, 2016.
Updated: 04/30/2016 7:00 pm

ORE43 MP 6.04 to 9.02

Informational only; Commercial Vehicle Information
Details: OR43 MP 6.04 to MP 9.02 NB & SB (West Linn) Effective October 15, 2014, this section of OR43 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 04/30/2016 7:00 pm

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 04/30/2016 7:00 pm

ORE53 MP 5.981

Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Updated: 04/30/2016 7:00 pm

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.20 SB (Tualatin River Bridge - King City) OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE104 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Updated: 04/30/2016 7:00 pm

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE130 MP 3.23

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE130 MP 3.6

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE130 MP 3.82

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE130 MP 4.15

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE130 MP 4.76

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

ORE210 MP 9.03 to 9.2

No to Minimum Delay; Construction Work
Comments: No traffic impacts. For more information go to www.oregon.gov/ODOT/HWY/REGION1/Pages/SchollsCascade.aspx
Updated: 04/29/2016 5:37 pm

ORE211 MP 23 to 50

No to Minimum Delay; Construction Work
Comments: No traffic impacts.
Updated: 04/29/2016 5:55 pm

ORE212 MP 4.9 to 6.56

Estimated delay under 20 minutes; Construction Work
Comments: OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures Mon-Fri. Travelers should be aware of changes to travel lanes during construction. I-205 (between exit 12 and 14) daytime right shoulder closures Monday-Friday for installation of signs and landscape materials. OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures in both directions Monday-Friday 9 a.m. to 2 p.m. for signal, permanent signs, striping, and landscaping work. Lane and shoulder closures on I-205 ramps, OR 224 (Milwaukie Expressway) ramps, and OR 213 (SE 82nd Avenue) from Mt Scott Creek Bridge to I-205 Monday-Friday 9 a.m. to 3 p.m. for permanent striping. SE 122 Avenue expect one way traffic controlled by flaggers for permanent striping, irrigation, and landscaping between OR 212/224 and SE Ford Street. For more information: www.sunrisejta.org
Updated: 04/29/2016 6:00 pm

ORE213 MP .95 to 1.04

Informational only; Commercial Vehicle Information
Details: OR213 (NE 82nd Ave) MP 0.94 to MP 1.07 NB & SB (Portland) Effective May 9, 2016, this section of OR213 (NE 82nd Ave) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 12, 2016.
Updated: 04/30/2016 7:00 pm

ORE213 MP 3 to 4.24

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Ave) MP 3.00 to MP 4.24 NB & SB (Portland) Effective February 1, 2016, this section of OR213 (82nd Ave) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 30, 2016.
Updated: 04/30/2016 7:00 pm

ORE213 MP 3 to 4.25

Estimated delay under 20 minutes; Construction Work
Comments: Daytime single lane closures Monday-Friday 7:30 am-3 p.m. in both directions between E Burnside and SE Division streets. Single lane closures in both directions Monday-Friday from 7:30 a.m. to 3 p.m. between E Burnside and SE Division streets for sidewalk removal and installation of temporary signals. Work will start at 6 a.m. at E Burnside Street. Expect intermittent single nighttime lane closures on 82nd Avenue from SE Burnside to SE Yamhill Monday-Friday from 7p.m. 6 a.m. TriMet bus stops in the area will be temporarily relocated for the project work. Go to TriMet.org or call (503) 238-7433 to see schedule or bus stop location changes. For more information: www.82ndAvenueIntersectionImprovements.org or 24-hour noise hotline (503) 412-2348.
Updated: 04/29/2016 5:44 pm

ORE213 MP 3.45 to 5.24

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Ave) MP 5.24 to MP 3.45 NB (Portland) Effective April 30, 2016, this section of OR213 (82nd Ave) northbound will be closed between the hours of 9:15 AM and 12 noon for one day only.
Updated: 04/30/2016 7:00 pm

ORE213 MP 4.36

Estimated delay under 20 minutes; Construction Work
Comments: Lane and shoulder closures on OR 213 (82nd Avenue) Monday-Friday. Travelers should be aware of changes to travel lanes during construction. I-205 (between exit 12 and 14) daytime right shoulder closures Monday-Friday for installation of signs and landscape materials. OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures in both directions Monday-Friday 9 a.m. to 2 p.m. for signal, permanent signs, striping, and landscaping work. Lane and shoulder closures on I-205 ramps, OR 224 (Milwaukie Expressway) ramps, and OR 213 (SE 82nd Avenue) from Mt Scott Creek Bridge to I-205 Monday-Friday 9 a.m. to 3 p.m. for permanent striping. SE 122 Avenue expect one way traffic controlled by flaggers for permanent striping, irrigation, and landscaping between OR 212/224 and SE Ford Street. For more information: www.sunrisejta.org
Updated: 04/29/2016 6:02 pm

ORE213 MP 6.2 to 6.3

Estimated delay under 20 minutes; Construction Work
Comments: Night and daytime single lane closures Mon-Fri. Nighttime single lane closures on 82nd Avenue in both directions Monday-Friday 8 p.m. to 5 a.m. for pavement grinding and paving; signals will be shut off and flaggers directing traffic. Daytime single lane closure on 82nd Avenue in both directions as crews work on new curb ramps and storm drain work on three corners. Pedestrians will be detoured around construction work with signs in place. Additionally, City of Portland will be finishing water service work which will include pavement grinding and paving south of Duke Street in both southbound lanes of 82nd Avenue on Saturday. For more information: www.SE82ndAveAtDuke.com or 24-hour noise hotline (503) 412-2363.
Updated: 04/29/2016 5:47 pm

ORE219 MP .18 to 10.05

Informational only; Commercial Vehicle Information
Details: OR219 MP 0.18 to MP 10.05 NB & SB (south of Hillsboro) Effective May 16, 2016, this section of OR219 will be restricted to 12 feet 00 in. in width between the hours of 7 AM & 7 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is June 30, 2016.
Updated: 04/30/2016 7:00 pm

ORE219 MP 23.46

Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

ORE224 MP 3.96

Informational only; Commercial Vehicle Information
Details: OR224 crossing over I-205 (Milwaukie) Effective May 16, 2016, OR224 crossing over I-205 will be closed. Estimated date of completion is May 23, 2016.
Updated: 04/30/2016 7:00 pm

ORE224 MP 3.96

Informational only; Commercial Vehicle Information
Details: OR224 EB ramp to I-205 NB (Milwaukie) Effective May 16, 2016, the ramp from OR224 eastbound to I-205 northbound will be closed. Estimated date of completion is May 23, 2016.
Updated: 04/30/2016 7:00 pm

ORE224 MP 33.82

Informational only; Commercial Vehicle Information
Details: OR224 MP 31.7 to MP 36.9 EB & WB (south of Estacada) Effective December 3, 2015, this section of OR224 will be restricted to 14 feet 00 in. in width. Estimated date of completion is May 14, 2016.
Updated: 04/30/2016 7:00 pm

ORE226 MP 9.65 to 9.8

Informational only; Commercial Vehicle Information
Details: OR226 MP 9.65 to MP 9.80 EB & WB (Scio) Effective May 21, 2016, this section of OR226 will be closed between the hours of 11 AM & 1 PM for one day only.
Updated: 04/30/2016 7:00 pm

ORE99W MP -5.5 to -4.75

No to Minimum Delay; Construction Work
Comments: Project complete. No traffic impacts. For more information: www.NorthDenverAve.org
Updated: 04/03/2016 1:38 pm

ORE99W MP 5.6

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. This project is complete.
Updated: 04/10/2016 11:56 am

ORE99W MP 25.49 to 27.1

Estimated delay under 20 minutes; Construction Work
Comments: Modernization: lanes, ramp and shoulder of traffic periodically interrupted by closure or flagging at night from 6:00pm to 5:00am. Sunday night through Friday morning and weekdays daytime from 9:00am to 2:00pm. Work to include grading, drainage, structures, paving, sidewalks, signing, illumination, signals and roadside development.
Updated: 04/11/2016 09:01 am

US20 MP 16.29 to 21.88

Informational only; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Construction of Phase 3 is complete. Construction of Phase 4 will begin in late May or early June. This project will accomplish movement of 2-3 million cubic yards of earthwork, landslide mitigation including placement of more than 400 ground anchors, construction of 70,000 feet of horizontal drains, erosion control, and landscaping. Project information: www.us20pme.com
Updated: 04/22/2016 11:55 am

US20 MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville) Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 04/30/2016 7:00 pm

US26 MP .42 to 1.12

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Some nighttime and/or weekend lane closures will be necessary at a later time and will be noted here when scheduled. For more information: www.RossIslandBridgeProject.org
Updated: 04/29/2016 4:50 pm

US26 MP 1 to 1.8

Future Event: No to Minimum Delay; Construction Work
Expected Start Date: 5/4/2016 12:00:00 PM
Comments: Nighttime single lane closures Wed-Fri Nighttime single lane closures on US 26 (SE Powell Boulevard) in both directions (SE 10th to 15th Avenues) Wednesday-Friday 7 p.m. to 6 a.m. in preparation for sewer construction. Beginning May 9 sewer construction on Powell Boulevard will continuously close the northbound SE 17th Avenue Ramp for 50 days. For more information: www.portlandoregon.gov/bes/LowerPowell or contact Matt Gough at 503-823-5352 or matthew.gough@portlandoregon.gov.
Updated: 04/29/2016 4:33 pm

US26 MP 49 to 56

Estimated delay under 20 minutes; Construction Work
Comments: Night and daytime lane closures and periodic stops. Travelers should avoid the area or plan for delays. Travelers will also encounter daytime and nighttime lane closures Monday-Friday as crews work along the slopes; flaggers will direct traffic. Drivers should expect periodic traffic stops. For more information: www.US26MtHoodSafety.org
Updated: 04/29/2016 5:30 pm

US26 MP 50.12 to 57.203

Informational only; Commercial Vehicle Information
Details: US26 MP 49.20 to MP 57.45 EB & WB (Government Camp) Beginning April 1, 2016, this section of US26 will be closed for approximately 30 minutes on Mon/Tues/Thurs nights between the hours of 5:30 PM & 6:30 PM. Beginning June 1, 2016, the 30 minute closures will occur between 6:30 PM & 7:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is September 30, 2016.
Updated: 04/30/2016 7:00 pm

US26 MP 58.42 to 59.14

Informational only; Commercial Vehicle Information
Details: US26 EB & WB Exit 59 on- and off-ramps to/from Jackson School Rd (North Plains) Effective May 7, 2016, the US26 eastbound and westbound Exit 59 on- and off-ramps to/from Jackson School Rd will be closed between the hours of 6 AM & 2 PM for one day only. In addition, the Jackson School Rd bridge over US26 will be closed at the same time. These closures are NOT on the US26 mainline.
Updated: 04/30/2016 7:00 pm

US26 MP 61

No to Minimum Delay; Construction Work
Comments: No traffic impacts as crews work off the roadway during the day. For more information: www.oregon.gov/ODOT/HWY/REGION1/pages/us26_brookwoodpkwy/index.aspx or call the noise hotline at (503) 646-0231.
Updated: 04/29/2016 4:23 pm

US26 MP 61.06

Informational only; Commercial Vehicle Information
Details: US26 WB crossing under Helvetia Rd Exit 61 (Hillsboro) Effective April 4, 2016, US26 westbound crossing under Helvetia Rd will be intermittently closed between the hours of 10 PM & 5 AM. When closed, all traffic can bypass the closure by taking Exit 61 (Brookwood Pkwy/Helvetia Rd), turn right onto Helvetia Rd then turn left and re-enter US26 westbound. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

US26 MP 62.83

Informational only; Commercial Vehicle Information
Details: US26 EB ramp from NB Cornelius Pass Rd (Hillsboro) Effective April 1, 2016, the ramp from NB Cornelius Pass Rd to US26 eastbound will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

US26 MP 73.53

Informational only; Commercial Vehicle Information
Details: US26 MP 73.53 EB & WB (Vista Ridge Tunnel - Portland) Effective May 13, 2016, this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is May 14, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 04/30/2016 7:00 pm

US30 MP .87

Informational only; Commercial Vehicle Information
Details: US30 EB ramp to I-405 SB (Portland) Effective June 3, 2016, the ramp from US30 eastbound to I-405 southbound will be closed on Friday and Saturday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 12, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP 1.32 to 1.47

Informational only; Commercial Vehicle Information
Details: US30 Bypass (N Ivanhoe St) MP 1.32 to MP 1.47 EB & WB (Portland) Effective May 23, 2016, this section of US30 Bypass (N Ivanhoe St) will be intermittently closed on Monday to Friday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 16, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 04/30/2016 7:00 pm

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 04/30/2016 7:00 pm

US30 MP 20.39

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 04/30/2016 7:00 pm

US30 MP 48.67

Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Updated: 04/30/2016 7:00 pm

US101 MP 2.78 to 3.26

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Bridge work is occurring. Use caution. Expect minor delays This project consists of recoating the steel below the bridge deck on the southern side of the Columbia River Bridge along U.S. 101 north of Astoria. The scheduled work includes installation of the work containment structures and preparation and coating of the steel beneath the bridge deck. Flaggers will control single lane traffic during construction activities as required. Lane delays will be allowed anytime on weekdays and weekends. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in September 2018.
Updated: 04/11/2016 08:01 am

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 04/30/2016 7:00 pm

US101 MP 4.91

Informational only; Commercial Vehicle Information
Details: US101 MP 4.91 NB & SB (New Young's Bay Bridge - Astoria) Effective June 9, 2016, this section of US101 will be closed between the hours of 9 PM & 6 AM. Estimated date of completion is June 11, 2016.
Updated: 04/30/2016 7:00 pm

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 EB & WB (Old Young's Bay Bridge - Astoria) Effective April 20, 2016, this section of US101 Business will be intermittently closed on Sunday to Thursday nights between the hours of 6 PM & 6 AM. Estimated date of completion is July 1, 2016.
Updated: 04/30/2016 7:00 pm

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Updated: 04/30/2016 7:00 pm

US101 MP 40.71

Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita) Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.
Updated: 04/30/2016 7:00 pm

US101 MP 43 to 43.34

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Road construction is occurring, use caution. Oregon Coast Highway, mile post 43.00 to 43.34) The work consists of replacement of an existing culvert at Neahkahnie Creek with a tunnel structure and enhancement of the stream bed as well as relocating and improving the highway alignment along U.S. 101 near Manzanita. Also, turning lane movements into downtown Manzanita will be enhanced. The scheduled work includes stabilizing the soil around the tunnel mining area. Flaggers may need to occasionally control single lane traffic during construction when work is occurring. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in October 2016.
Updated: 11/02/2015 09:47 am

US101 MP 111 to 111.6

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Nighttime lane closures and intermittent daytime flagging may be necessary, expect minor delays. This project will add a left turn lane on US101 at NE Devil's Lake Road. It will also create a wider shoulders and improve sight distance, in an effort to reduce crashes.
Updated: 04/22/2016 11:56 am

US101 MP 139.32 to 140.73

Informational only; Commercial Vehicle Information
Details: US101 MP 139.32 to MP 140.73 NB & SB (Newport) Effective April 30, 2016, this section of US101 will be closed between the hours of 11:45 AM & 2 PM for one day only.
Updated: 04/30/2016 7:00 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 04/30/2016 7:00 pm

US101B MP 4.78

Estimated delay under 20 minutes; Maintenance Work
Comments: The Lewis and Clark River Bridge is open to traffic, there will be flaggers on the bridge periodically. Expect up to 20 minute delays. The scheduled work includes reconstruction of the Lewis & Clark River Bridge.
Updated: 09/04/2015 2:48 pm

US101B MP 6.89 to 4.78

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Bridge construction is occurring at the Old Youngs Bay bridge on US101 Business, one lane traffic with flaggers, use caution. US101(Bus.): Old Youngs Bay & Lewis & Clark River Bridges (Warrenton - Astoria Highway, mile post 4.78 and 6.89) This project consists of performing bridge rehabilitation work at both the Old Youngs Bay and Lewis & Clark River Bridges along US101(Bus.). The scheduled work at the Old Youngs Bay Bridge includes rehabilitation of the electrical and mechanical systems. Flaggers will control single lane traffic at the Old Youngs Bay Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in November 2017.
Updated: 10/19/2015 09:35 am

North Oregon Road Conditions by Route

I-84 MP 40

Estimated delay under 20 minutes; Construction Work
Comments: WB I-84 traffic splits around workzone with WB left lane closed Mon-Fri; trucks use right lane. Day/night closure one EB lane and WB on-ramp. Westbound I-84 traffic will be split into two separate (Left/Right) lanes to go around the work-zone in the middle. Travelers should expect the left lane to be closed Monday 6a.m. to Friday at noon; the left travel lane will remain closed the weekend of Apr. 30-May 1, but both westbound lanes will be open the weekend of May 7-8. Trucks will be directed to use the right travel lane. A continuous 10-week eastbound lane closure and westbound on-ramp closure (leaving Bonneville Dam) is in place; follow detour signs for the ramp closure to Cascade Locks to access westbound I-84. For more information: www.I84Construction.org // http://www.oregon.gov/ODOT/HWY/REGION1/Pages/I84TannerCreek.aspx
Updated: 04/29/2016 3:59 pm

I-84 MP 40.14 to 40.42

Informational only; Commercial Vehicle Information
Details: I-84 MP 39.82 to MP 40.61 EB (Bonneville Dam) Effective February 29, 2016, this section of I-84 eastbound will be restricted to 18 feet 00 in. in width. Estimated date of completion is May 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.14 to 40.42

Informational only; Commercial Vehicle Information
Details: I-84 MP 39.82 to MP 40.61 EB & WB (Bonneville Dam) Effective May 6, 2016, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is July 15, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.17

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 40 ramp to Bonneville Dam Effective May 6, 2016, the ramp from I-84 eastbound Exit 40 to Bonneville Dam will be intermittently closed between the hours of 8 PM & 8 AM. Estimated date of completion is July 15, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.18

Informational only; Commercial Vehicle Information
Details: I-84 WB on-ramp from Exit 40 (Bonneville Dam) Effective February 29, 2016, the I-84 westbound on-ramp from Bonneville Dam will be closed. Estimated date of completion is May 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 40.18 to 40.57

Informational only; Commercial Vehicle Information
Details: I-84 MP 40.61 to MP 39.82 WB (Bonneville Dam) Effective April 9, 2016, this section of I-84 westbound will be restricted to 18 feet 00 in. in width. In addition, between the hours of 12 noon Friday to 8 PM Sunday, the left lane will have reduced width. Trucks must stay in the right lane through this area. Estimated date of completion is May 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 45.33 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River) Effective May 1, 2016, this section of I-84 will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is October 21, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 45.33 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River) Effective July 26, 2015, this section of I-84 will be restricted to 19 feet 00 in. in width from Midnight Sunday night to 12 Noon on Fridays. Estimated date of completion is November 30, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 51.22 to 54.77

Informational only; Commercial Vehicle Information
Details: I-84 MP 53 to MP 55 EB (E of Cascade Locks) Effective February 22, 2016, this section of I-84 will be restricted to 20 feet 00 in. in width Monday through Thursday between the hours of 6 AM & 6 PM. Estimated date of completion is May 26, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 53 to 55

Estimated delay under 20 minutes; Construction Work
Comments: Continuous, right lane closure on eastbound I-84 6 a.m. Monday to 6 p.m. Thursday from MP 53 to MP 55. Continuous right lane closure on I-84 starting 6 a.m. Monday and reopening Thursday at 6 p.m. Trail access west of Starvation Creek rest area will be closed 6 a.m. Monday through 6 p.m. Friday, along with Trail 413 (Mt. Defiance Trail), Trail 414 (Starvation Ridge Trail), and Trail 414A (Starvation Ridge Cutoff Trail). For more information: flh.fhwa.dot.gov/projects/or/lindsey-starvation
Updated: 04/29/2016 3:19 pm

I-84 MP 54.77 to 54.99

Informational only; Commercial Vehicle Information
Details: I-84 MP 54 to MP 55 EB (Starvation Creek) Effective April 6, 2016, this section of I-84 eastbound will be restricted to 20 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 62.05

Informational only; Commercial Vehicle Information
Details: I-84 MP 62.05 WB (Crossing Under Exit 62/US30 - Hood River) Effective July 26, 2015, I-84 westbound crossing under Exit 62 (US30) will be restricted to 15 feet 05 in. in height. Estimated date of completion is November 30, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 63.92

Informational only; Commercial Vehicle Information
Details: I-84 MP 63.92 WB (Crossing Under Exit 63/2nd St - Hood River) Effective July 26, 2015, I-84 westbound crossing under Exit 63 (2nd St) will be restricted to 15 feet 09 in. in height. Estimated date of completion is November 30, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 69.79

Informational only; Commercial Vehicle Information
Details: I-84 MP 69.79 EB & WB (crossing under US30 Exit 69 - Mosier) Effective May 16, 2016, I-84 crossing under US30 Exit 69 will be restricted to 16 feet 06 in. in height between the hours of 7 AM & 5:30 PM. Estimated date of completion is May 26, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 70.42 to 84.31

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments: For the week of May 1st, I-84 is reduced to a single lane in both the East and Westbound direction, with speeds reduced to 50mph in the work zone. The contractor will be removing the old substandard barrier and the median asphalt. After all materials have been removed, new barrier and asphalt will be installed in the median.
Updated: 04/29/2016 09:57 am

I-84 MP 71.13 to 84.28

Informational only; Commercial Vehicle Information
Details: I-84 MP 70.42 to MP 84.31 EB & WB (west of The Dalles) Effective April 11, 2016, this section of I-84 will be restricted to 19 feet 00 in. in width. No restrictions will be in place from 11 AM Friday to 7 PM Sunday. Estimated date of completion is June 20, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 82.07

Informational only; Commercial Vehicle Information
Details: I-84 crossing under River Rd Exit 82 (The Dalles) Effective April 4, 2016, this section of I-84 will be restricted to 16 feet 10 in. in height eastbound, and 19 feet 09 in. in height westbound. No restrictions will be in place from 11 AM Friday to 7 PM Sunday. Estimated date of completion is May 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 82.62 to 87.45

Informational only; Commercial Vehicle Information
Details: I-84 MP 82.5 to MP 88.0 EB & WB (The Dalles) Effective November 30, 2015, this section of I-84 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is May 27, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 83.5 to 88.5

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: For the week of May 1st, I-84 is reduced to a single lane in both the East and Westbound direction, with speeds reduced to 50mph in the work zone. The contractor will be concrete paving and performing minor traffic control adjustments. Work continues on the 3-Mile Creek Bridge structure.
Updated: 04/29/2016 09:52 am

I-84 MP 85.3 to 85.72

Informational only; Commercial Vehicle Information
Details: I-84 EB & WB Exit 85 on- and off-ramps to/from City Center (The Dalles) Effective January 25, 2016, the I-84 eastbound and westbound Exit 85 on- and off-ramps to/from City Center/The Dalles will be intermittently closed between the hours of 10 PM & 5 AM. These closures are NOT on the I-84 mainline. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 85.51

Informational only; Commercial Vehicle Information
Details: I-84 EB & WB crossing under Brewery Grade Interchange Exit 85 (The Dalles) Effective November 30, 2015, this section of I-84 will be restricted 16 feet 09 in. in height. Estimated date of completion is May 27, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 86.77 to 87.23

Informational only; Commercial Vehicle Information
Details: I-84 EB & WB Exit 87 on- and off-ramps to/from US197 (The Dalles) Effective February 1, 2016, the I-84 eastbound and westbound Exit 87 on- and off-ramps to/from US197 will be intermittently closed between the hours of 10 PM & 5 AM. These closures are NOT on the I-84 mainline. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 87.01

Informational only; Commercial Vehicle Information
Details: I-84 EB & WB crossing under US197 Exit 87 (The Dalles) Effective November 30, 2015, this section of I-84 will be restricted 16 feet 03 in. in height. Estimated date of completion is May 27, 2016.
Updated: 04/30/2016 7:00 pm

ORE35 MP 101.82

Informational only; Commercial Vehicle Information
Details: OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Updated: 04/30/2016 7:00 pm

ORE207 MP .05 to 4.24

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:55 am

ORE207 MP .45 to 27.13

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:56 am

ORE207 MP 9.29 to 17.75

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 12:03 pm

US26 MP 49 to 56

Estimated delay under 20 minutes; Construction Work
Comments: Night and daytime lane closures and periodic stops. Travelers should avoid the area or plan for delays. Travelers will also encounter daytime and nighttime lane closures Monday-Friday as crews work along the slopes; flaggers will direct traffic. Drivers should expect periodic traffic stops. For more information: www.US26MtHoodSafety.org
Updated: 04/29/2016 5:30 pm

US26 MP 50.12 to 57.203

Informational only; Commercial Vehicle Information
Details: US26 MP 49.20 to MP 57.45 EB & WB (Government Camp) Beginning April 1, 2016, this section of US26 will be closed for approximately 30 minutes on Mon/Tues/Thurs nights between the hours of 5:30 PM & 6:30 PM. Beginning June 1, 2016, the 30 minute closures will occur between 6:30 PM & 7:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is September 30, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP 30.42

Informational only; Commercial Vehicle Information
Details: US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Updated: 04/30/2016 7:00 pm

US97 MP 18.85 to 88.45

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: For the week of April 25th, flaggers will control traffic for Northbound and Southbound lanes for paving operations. Expect delays under 20 minutes.
Updated: 04/30/2016 8:09 pm

US395 MP .04 to 6

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: For the week of April 25th, crews will be working nighttime hours, with alternating lane closures and minor detours. Night Shift: 6 pm 7 am Monday Tuesday April 25 & 26: Paving will continue between Theater Lane and U.S. 730. Traffic will be reduced to one lane each direction. Flaggers will be utilized to control the signalized intersections when working in these areas. (Theater Lane, Punkin Center Road, and Devore Road/U.S. 730) Jennie Avenue intersection: Contractor will be back to construct the ADA ramps & fire hydrant relocation at Jennie Avenue. Delays may include one-lane traffic each direction and flaggers, as needed. Lane reductions will not occur until after 6 p.m. For these work areas, traffic can expect minor delays. The construction project includes rebuilding dozens of ADA sidewalk ramps, updating traffic signal controls at several intersections, installing new traffic signals at the Jennie Avenue intersection, installing median curbs to control turning movements at the Elm Street (OR 207) intersection, and repaving the six-mile-long section of highway between S.E. Fourth Street (mile post 6) and U.S. 730 (mile post zero). Paving work may begin the week of April 18th. All work is scheduled to be completed by July 4.
Updated: 04/25/2016 09:51 am

US395 MP 93.2

REST AREA
Informational only
Comments: Carter Park Rest Area is closed for the season.
Last Updated: 10/29/2015 3:46 pm

US730 MP 168.15 to 179.88

Informational only; Construction Work
Comments: Road construction is occurring, use caution.
Updated: 04/29/2016 10:41 am

US730 MP 186 to 203.3

No to Minimum Delay; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:59 am

US730 MP 190 to 203.3

Informational only; Construction Work
Comments: Road construction is occurring, use caution.
Updated: 04/29/2016 10:38 am

Northeast Oregon Road Conditions by Route

I-84 MP 245.85 to 260.67

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments: During daylight hours, contractor will have intermittent closures of lanes and ramps both East and Westbound for striping. Expect minor delays. Ramps Affected. Contractors will be installing durable pavement markings and rumble strips in the main travel lanes and interchange ramps during daylight hours Monday - Friday. Over-dimension vehicles will be accommodated during intermittent lane closures.
Updated: 04/25/2016 09:40 am

I-84 MP 256.4

Informational only; Commercial Vehicle Information
Details: I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

I-84 MP 264.84 to 265.26

Informational only; Commercial Vehicle Information
Details: I-84 MP 264.5 to MP 265.5 EB & WB (La Grande) Effective May 25, 2016, this section of I-84 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is June 15, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 277.1 to 307.1

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments: Alternating closures of travel lanes, shoulders, and median are occurring both Eastbound and Westbound for sign installation. No to minimum delay.
Updated: 04/25/2016 09:45 am

I-84 MP 278.64

Informational only; Commercial Vehicle Information
Details: I-84 EB crossing under Clover Creek Exit 278 (east of La Grande) Effective May 9, 2016, I-84 eastbound crossing under Clover Creek Exit 278 will be restricted to 16 feet 08 in. in height. Estimated date of completion is September 30, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 285.68 to 289.2

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: For the week of April 25th, traffic will be reduced to one lane in both East and Westbound directions for bridge rail work. Expect minor delays. Ramps Affected. The slow lanes Eastbound and Westbound are closed. Traffic control is in place for on-ramps and off-ramps.
Updated: 04/28/2016 12:15 pm

I-84 MP 285.68 to 289.17

Informational only; Commercial Vehicle Information
Details: I-84 MP 285.68 to MP 289.17 EB & WB (North Powder) Effective April 4, 2016, this section of I-84 will be restricted to 20 feet 00 in. in width. Estimated date of completion is June 6, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 298.51 to 317.36

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 12:01 pm

I-84 MP 305 to 314

No to Minimum Delay; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: For the week of April 25th, the contractor is removing rumble strips in the Eastbound and Westbound slow lanes. No to minimum delay. No work is planned for the weekend, 4/30-5/1.
Updated: 04/29/2016 4:08 pm

ORE11 MP 2.03 to 4.35

Informational only; Construction Work
Comments: Road construction is occurring, use caution.
Updated: 04/29/2016 10:56 am

ORE11 MP 11 to 26.3

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:57 am

ORE204 MP 21

Unconfirmed; Crash/Hazard
Lanes Affected: (Eastbound) 1 Lane
Comments: An unconfirmed report of a crash has been received, use caution.
Last Updated: 02/06/2016 12:14 am

ORE331 MP 0 to 3.48

Future Event: Informational only; Construction Work
Expected Start Date: 5/2/2016 10:00:00 AM
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:54 am

ORE339 MP 2.76

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 04/30/2016 7:00 pm

ORE339 MP 3.16

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 04/30/2016 7:00 pm

ORE339 MP 3.31

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 04/30/2016 7:00 pm

US395 MP 93.2

REST AREA
Informational only
Comments: Carter Park Rest Area is closed for the season.
Last Updated: 10/29/2015 3:46 pm

US730 MP 186 to 203.3

No to Minimum Delay; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:59 am

US730 MP 190 to 203.3

Informational only; Construction Work
Comments: Road construction is occurring, use caution.
Updated: 04/29/2016 10:38 am

West Oregon Road Conditions by Route

99 MP 128.99

Informational only; Commercial Vehicle Information
Details: Old OR99 (DC388) Old Winchester Bridge (Roseburg) Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.
Updated: 04/30/2016 7:00 pm

HWY372 MP 21.98

Seasonal Closure; Information
Lanes Affected: (Eastbound) 1 Lane (Westbound) 1 Lane
Comments: Cascade Lakes Hwy is closed for the Winter south of Mt Bachelor.
Last Updated: 11/24/2015 12:58 pm

I-5 MP 151.81

Informational only; Commercial Vehicle Information
Details: I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

I-5 MP 154.54 to 162.57

Informational only; Commercial Vehicle Information
Details: I-5 MP 154 to MP 163 NB & SB (Anlauf) Effective January 4, 2016, this section of I-5 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Beginning May 20, 2016 through September 5, 2016 and November 23, 2016 through January 3, 2017 there will be no restrictions per the following schedule: Monday through Thursday between the hours of 10:00am and 5:00 pm; and no restrictions on the weekends from 10 am Friday through 8 pm Sunday. Estimated date of completion is November 22, 2017.
Updated: 04/30/2016 7:00 pm

I-5 MP 156.65

Informational only; Commercial Vehicle Information
Details: I-5 MP 156.65 NB & SB (crossing under Cox Rd - Anlauf) Effective February 4, 2016, this section of I-5 will be restricted to 16 feet 07 in. in height. Estimated date of completion is May 20, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 156.65

Informational only; Commercial Vehicle Information
Details: I-5 MP 156.65 NB & SB (crossing under Cox Rd - Anlauf) Effective January 4, 2016, this section of I-5 will be restricted to 16 feet 07 in. in height. Beginning May 20, 2016 through September 5, 2016 and November 23, 2016 through January 3, 2017 there will be no restrictions per the following schedule: Monday through Thursday between the hours of 10:00am and 5:00 pm; and no restrictions on the weekends from 10 am Friday through 8 pm Sunday. Estimated date of completion is November 22, 2017.
Updated: 04/30/2016 7:00 pm

I-5 MP 159.23 to 159.51

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 159 on- and off-ramps to/from Elk Creek (south of Anlauf) Effective April 1, 2016, the I-5 northbound Exit 159 on- and off-ramps to/from Elk Creek will be closed. Estimated date of completion is May 20, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 159.96

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 160 to Salt Springs Rd (south of Anlauf) Effective April 1, 2016, the ramp from I-5 northbound Exit 160 to Salt Springs Rd will be closed. Estimated date of completion is May 20, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 162.19

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from OR38/OR99 EB (Drain) Effective March 1, 2016, the ramp from OR38/OR99 eastbound to I-5 southbound will be closed. Estimated date of completion is September 30, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 163 to 154

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes
Comments: I-5 traffic is limited to a single lane in each direction until mid-May. Expect intermittent rolling slowdowns, with traffic delays. Ramps Affected. Lane closures and 19' width restrictions are in place both NB and SB. Three NB I-5 ramps will be closed for about 6 weeks: the on-off ramps at Exit 159, and the off-ramp at Exit 160. The SB on-ramp at Exit 162 will remain closed until this Fall. Ore 38 motorists are encouraged to take I-5 N to Exit 163 and turn around.
Updated: 04/26/2016 2:57 pm

I-5 MP 233 to 244

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 03/31/2016 08:11 am

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 04/30/2016 7:00 pm

ORE22 MP 34 to 36

Estimated delay under 20 minutes; Maintenance Work
Comments: Herbicide Application
Updated: 04/27/2016 3:19 pm

ORE34 MP .13

Informational only; Commercial Vehicle Information
Details: Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Updated: 04/30/2016 7:00 pm

ORE34 MP 1.5

No to Minimum Delay; Crash/Hazard
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 04/30/2016 9:03 pm

ORE38 MP 11 to 12.5

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 1 Lane
Comments: Traffic is reduced to a single, sixteen foot wide travel lane. Traffic controlled with a temporary signal, and intermittent flagging as needed. Culvert replacement at Luder Creek, with a new bridge.
Updated: 04/26/2016 2:45 pm

ORE38 MP 11.79

Informational only; Commercial Vehicle Information
Details: OR38 MP 11.5 to MP 12.5 EB & WB (East of Reedsport) Effective February 29, 2016, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 15, 2016.
Updated: 04/30/2016 7:00 pm

ORE99 MP 121.14 to 122.25

No to Minimum Delay; Construction Work
Comments: Expect intermittent lane closures during day time. Sidewalk and electrical work continues. Businesses remain open. Watch for workers. Update: Work will continue on the NW side of the SE bound lanes of OR99. Expect intermittent lane closures of on the left side of OR99 SE Bound, starting at the intersection with W. 5th Avenue. Sidewalk and electrical work will continue on the business frontage to the NW of the 5th Ave and OR99 intersection, adjacent to the west side of OR99, which will push traffic into one lane along portions of the frontage as the work progresses. Watch for intermittent lane restrictions during weekday daylight hours. Access to the businesses along this frontage will be maintained. Bridge work will continue. Watch for truck traffic, workers and equipment entering and exiting the work area directly adjacent to the traveled way. Project Summary: Modifications to the traffic signal are being made and detection loops installed on Highway 99 at intersection of 7th and 5th avenues. The project will provide a continuous pedestrian path between Garfield and Roosevelt on Hwy 99, including a new bike/pedestrian bridge over the railroad tracks near Roosevelt.
Updated: 04/29/2016 11:09 am

ORE126 MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield) OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

ORE138 MP .1

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Expect 24 hour flagging at the Douglas and Stephens intersection as workers install traffic signal poles. Expect heavy congestion and delays during peak travel times. Motorists are advised to use alternate routes and give themselves extra travel time. Traffic on Stephens Street is limited to one lane in each direction between Diamond Lake Blvd. and Oak Ave. The Oak Ave. Bridge is reduced to one lane until mid-February. Pedestrians should watch for sidewalk and crosswalk closures throughout the work zone. Look for pedestrian detour signs.
Updated: 04/26/2016 2:56 pm

ORE138 MP 33.14 to 38.88

Informational only; Commercial Vehicle Information
Details: OR138 MP 29.5 to MP 39.0 EB & WB (Steamboat) Effective January 25, 2016, this section of OR138 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 7 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 17, 2016.
Updated: 04/30/2016 7:00 pm

ORE138 MP 38 to 46

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Alternating lane closures, with flaggers, Monday through Friday, during daylight hours. Expect delays. This is for guardrail and turnout improvements along the North Umpqua Highway.
Updated: 04/26/2016 2:59 pm

ORE138 MP 86

No to Minimum Delay; Information
Lanes Affected: (Eastbound) 1 Lane
Comments: North Entrance to Crater Lake is closed for the winter season. South entrance is open via Highway 62.
Last Updated: 04/23/2016 07:05 am

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

ORE226 MP 9.65 to 9.8

Informational only; Commercial Vehicle Information
Details: OR226 MP 9.65 to MP 9.80 EB & WB (Scio) Effective May 21, 2016, this section of OR226 will be closed between the hours of 11 AM & 1 PM for one day only.
Updated: 04/30/2016 7:00 pm

ORE241 MP .51

Informational only; Commercial Vehicle Information
Details: OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Updated: 04/30/2016 7:00 pm

ORE242 MP 61.91 to 84

Seasonal Closure; Information
Comments: McKenzie pass closed for season, Nov. 14 9am A single lane has been cleared of snow all the way across the pass to expedite melting of remaining snow. Road is closed to motor vehicles and not maintained for other modes of travel. Users should watch for ice, gravel, rock and other debris and be cautious around road maintenance operations and equipment on the pass. This year, the earliest date of opening to motor vehicles will be June 20, if conditions allow.
Last Updated: 04/29/2016 3:24 pm

ORE242 MP 90

No to Minimum Delay; Information
Comments: Burning is taking place along the highway causing no to minimum delays. Use caution.
Last Updated: 04/30/2016 1:37 pm

ORE540 MP 3.5 to 4.5

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic control with flaggers and short detours throughout the work zone, during daylight hours. Expect traffic shifts, delays, and watch for signs. This project is making upgrades in Empire Blvd section of Coos Bay, from Newmark Ave. to Fulton Ave. Access to all local businesses will be maintained during construction.
Updated: 04/26/2016 1:24 pm

US20 MP 16.29 to 21.88

Informational only; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Construction of Phase 3 is complete. Construction of Phase 4 will begin in late May or early June. This project will accomplish movement of 2-3 million cubic yards of earthwork, landslide mitigation including placement of more than 400 ground anchors, construction of 70,000 feet of horizontal drains, erosion control, and landscaping. Project information: www.us20pme.com
Updated: 04/22/2016 11:55 am

US20 MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville) Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 04/30/2016 7:00 pm

US20 MP 90

No to Minimum Delay; Information
Comments: Burning is taking place along the highway causing no to minimum delays. Use caution.
Last Updated: 04/30/2016 08:55 am

US101 MP 139.32 to 140.73

Informational only; Commercial Vehicle Information
Details: US101 MP 139.32 to MP 140.73 NB & SB (Newport) Effective April 30, 2016, this section of US101 will be closed between the hours of 11:45 AM & 2 PM for one day only.
Updated: 04/30/2016 7:00 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 04/30/2016 7:00 pm

US101 MP 184.8 to 167.23

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane
Comments: Work continues requiring lane closures with 24 hour flagging and up to 20 minute delays at Cape Perpetua near mile post 167. Watch for workers. Update: Shoulder widening work will be taking place this week at Cape Perpetua (about a quarter mile south of MP 167). This work requires 24 hour flagging. Pavement repairs will also be done just to the South of Mill Creek towards the middle to end of the week. Watch for truck traffic, workers and equipment entering and exiting the work area. Maintenance activities may also be taking place within the project limits as well. Project Summary: This project will pave approximately 17 miles on the Oregon Coast Highway. Signs and guardrail will be replaced and/or adjusted. A new bridge membrane will be placed to protect Sutton Creek Bridge and surfacing stabilization work will be done on the bridge ends at both Sutton Creek and Big Creek. A new retaining wall will be constructed in the vicinity of the Heceta Head lighthouse, as well as two others just to the south of Sunnyview Lane. The majority of the work on the south 5.5 miles of the job should be completed by the end of October this year, with the remainder of the job to be completed by the end of August 2016.
Updated: 04/29/2016 11:11 am

US101 MP 190.87 to 191.21

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Expect lane closures and flagging with up to 20 minute delays day and night. One bridge sidewalk is open. Businesses remain open. Update: Work will continue on the north end of the bridge within the containment above the parking lot south of Bay Street and EB Bay Street. Placing zinc will continue often in the night time hours. Some touchup work will also be done on the spans above and either side of Bay Street and on the corner of the Bent splitting Bay Street. Bay Street is now open to 2-way traffic under the bridge, though some flagger controlled short duration single lane closures may be needed from time to time. Work will be ongoing for most hours of the day. Also on the north end of the bridge, access and containment will continue to be installed, which may require some flagger controlled single lane closures. On the south end of the bridge, new bridge rail installation will continue. U.S. 101 flagger-controlled single lane closures will be required while rail work occurs. The overall plan is to start on the City of Florence side of the bridge with the cathodic protection work and progress to the south. Bridge rail work will happen concurrently, starting on the south end and working north. Single lane closures, controlled by flaggers and for a short duration with pilot car, will be used for materials transfers, bridge rail and other roadwork on the approaches to the bridge. Delays may be up to 20 minutes, but will usually be of a shorter duration. Project Summary: This project will make repairs to the existing concrete and reinforcement and replace the cathodic protection system on the Siuslaw River Bridge Seismic restraints to help maintain the integrity of the bridge in an earthquake will also be added. Sidewalk closure on one side of bridge.A new ornamental bridge rail will replace the existing rail along with improved pedestrian access to the bridge. Work is to be completed by the end of March in 2019.
Updated: 04/29/2016 11:12 am

US101 MP 190.98

Informational only; Commercial Vehicle Information
Details: US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

US101 MP 190.98

Informational only; Commercial Vehicle Information
Details: US101 crossing over Bay St (Florence) Effective November 13, 2015, US101 crossing over Bay St will be restricted to 14 feet 00 in. in height. This restriction is NOT on the US101 mainline. Estimated date of completion is May 1, 2016.
Updated: 04/30/2016 7:00 pm

US101 MP 198.58 to 229

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: Road construction is occurring causing no to minimum delays, use caution. Expect intermittent lane and shoulder closures. This project replaces culverts and upgrades fish passages at various locations. Traffic will be controlled by flaggers as needed.
Updated: 04/26/2016 1:25 pm

US101 MP 211

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction on the Umpqua River Bridge. Watch for intermittent lane closures and traffic control with flaggers.
Updated: 04/26/2016 2:44 pm

US101 MP 211.21

Informational only; Commercial Vehicle Information
Details: US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport) Effective January 25, 2016, this section of US101 will be restricted to 14 feet 00 in. in width on Monday to Thursday between the hours of 7 AM & 7 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 1, 2017.
Updated: 04/30/2016 7:00 pm

US101 MP 211.21

Informational only; Commercial Vehicle Information
Details: US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport) Effective January 25, 2016, this section of US101 will be restricted to 11 feet 06 in. in width on Monday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 1, 2017.
Updated: 04/30/2016 7:00 pm

US101 MP 233.4 to 234.5

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring causing no to minimum delays, use caution. Intermittent night lane closures on McCullough Bridge. Both sidewalks on the bridge are open. Pedestrians are advised to use caution.
Updated: 04/26/2016 1:24 pm

US101 MP 233.99

Informational only; Commercial Vehicle Information
Details: US101 MP 233.99 (McCullough Bridge - Coos Bay) Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.
Updated: 04/30/2016 7:00 pm

Central Oregon Road Conditions by Route

HWY372 MP 21.98

Seasonal Closure; Information
Lanes Affected: (Eastbound) 1 Lane (Westbound) 1 Lane
Comments: Cascade Lakes Hwy is closed for the Winter south of Mt Bachelor.
Last Updated: 11/24/2015 12:58 pm

ORE27 MP 1.9

Informational only; Commercial Vehicle Information
Details: OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 04/30/2016 7:00 pm

ORE27 MP 2.88

Informational only; Commercial Vehicle Information
Details: OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 04/30/2016 7:00 pm

ORE27 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 04/30/2016 7:00 pm

ORE27 MP 27.23

Informational only; Commercial Vehicle Information
Details: OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE138 MP 86

No to Minimum Delay; Information
Lanes Affected: (Eastbound) 1 Lane
Comments: North Entrance to Crater Lake is closed for the winter season. South entrance is open via Highway 62.
Last Updated: 04/23/2016 07:05 am

ORE242 MP 61.91 to 84

Seasonal Closure; Information
Comments: McKenzie pass closed for season, Nov. 14 9am A single lane has been cleared of snow all the way across the pass to expedite melting of remaining snow. Road is closed to motor vehicles and not maintained for other modes of travel. Users should watch for ice, gravel, rock and other debris and be cautious around road maintenance operations and equipment on the pass. This year, the earliest date of opening to motor vehicles will be June 20, if conditions allow.
Last Updated: 04/29/2016 3:24 pm

ORE242 MP 90

No to Minimum Delay; Information
Comments: Burning is taking place along the highway causing no to minimum delays. Use caution.
Last Updated: 04/30/2016 1:37 pm

ORE361 MP 1 to 11

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 03/17/2016 05:40 am

US20 MP 83.95 to 171

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping at various location on the highway. No delays at this time.
Updated: 04/29/2016 12:17 pm

US20 MP 90

No to Minimum Delay; Information
Comments: Burning is taking place along the highway causing no to minimum delays. Use caution.
Last Updated: 04/30/2016 08:55 am

US26 MP 50

Unconfirmed; Crash/Hazard
Comments: An unconfirmed report of a crash has been received, use caution.
Last Updated: 04/30/2016 9:08 pm

US97 MP 164.91 to 166.26

No to Minimum Delay; Construction Work
Comments: For the week of May 2nd, contractors are continuing work on both shoulders of the highway. No lanes affected.
Updated: 04/29/2016 1:02 pm

US395 MP 17.75 to 24.83

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:58 am

US395 MP 31.46 to 44.3

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 12:01 pm

US395 MP 93.2

REST AREA
Informational only
Comments: Carter Park Rest Area is closed for the season.
Last Updated: 10/29/2015 3:46 pm

East Oregon Road Conditions by Route

I-84 MP 298.51 to 317.36

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 12:01 pm

I-84 MP 305 to 314

No to Minimum Delay; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: For the week of April 25th, the contractor is removing rumble strips in the Eastbound and Westbound slow lanes. No to minimum delay. No work is planned for the weekend, 4/30-5/1.
Updated: 04/29/2016 4:08 pm

I-84 MP 317 to 335

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Eastbound) 2 Lanes
Comments: Road maintenance operations are occurring, use caution.
Updated: 03/17/2016 07:32 am

I-84 MP 327.17 to 331.53

Informational only; Commercial Vehicle Information
Details: I-84 MP 327 to MP 332 EB & WB (Durkee) Effective March 21, 2016, this section of I-84 will be restricted to 17 feet 06 in. in width. Loads wider than 17 feet 06 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 4, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 327.45 to 331.44

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , 2 Lanes (Eastbound) Median , 2 Lanes
Comments: Westbound traffic has been rerouted to the Eastbound side of the highway for construction. This traffic pattern change is in place through July. Traffic is reduced to a single lane both Eastbound and Westbound. Bicycle detour: Bicycles will be routed along Old US HWY 30 (adjacent to the freeway) between Durkee at Exit 237 and Nelson Point (cement plant) at Exit 330.
Updated: 04/28/2016 2:58 pm

I-84 MP 342 to 341.5

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 04/29/2016 10:01 am

I-84 MP 346.13 to 353.55

Informational only; Commercial Vehicle Information
Details: I-84 MP 354 to MP 346 WB (west of Ontario) Effective June 1, 2016, this section of I-84 westbound will be restricted to 12 feet 00 in. in width between the hours of 6 PM & 6 AM. In addition, this section of I-84 westbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 15, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 347.85

Informational only; Commercial Vehicle Information
Details: I-84 MP 347.85 WB (west of Ontario) Effective June 1, 2016, this section of I-84 westbound will be restricted to 18 feet 09 in. in height. Estimated date of completion is July 15, 2016.
Updated: 04/30/2016 7:00 pm

ORE245 MP 20.9 to 35.8

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 1 Lane (Northbound) 1 Lane
Comments: Removal of hazard trees is occurring. Flaggers will be used for lane closures during daylight hours. Delays of up to 20 mins. Motorists are advised to plan extra travel time along this highway or use alternate routes to avoid traffic impacts.
Updated: 04/16/2016 11:51 pm

US20 MP 83.95 to 171

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping at various location on the highway. No delays at this time.
Updated: 04/29/2016 12:17 pm

US20 MP 198 to 203

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 04/18/2016 07:05 am

US20 MP 223.22 to 245.42

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 12:00 pm

US20 MP 254

Unconfirmed; Crash/Hazard
Comments: An unconfirmed report of a crash has been received, use caution.
Last Updated: 04/30/2016 8:59 pm

US20 MP 257.73 to 264.48

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:11 am

US26 MP 163.52 to 190.53

Informational only; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 04/29/2016 10:57 am

US26 MP 219 to 221

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: For the week of April 25th, contractor will be performing excavation work on rock slopes. Traffic control is in place, expect minor delays. From 7am - 5pm, flaggers are controlling traffic. From 5pm - 7am, an automated signal is in place for traffic control. Delays up to 10 minutes are expected.
Updated: 04/25/2016 10:08 am

US26 MP 220.99

Informational only; Commercial Vehicle Information
Details: US26 MP 220.0 to MP 220.5 (east of Unity) Effective April 1, 2016, this section of US26 will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP .46

Informational only; Commercial Vehicle Information
Details: US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

US395 MP 17.75 to 24.83

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 11:58 am

US395 MP 31.46 to 44.3

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping. No delays at this time.
Updated: 04/29/2016 12:01 pm

US395 MP 93.2

REST AREA
Informational only
Comments: Carter Park Rest Area is closed for the season.
Last Updated: 10/29/2015 3:46 pm

Southwest Oregon Road Conditions by Route

I-5 MP 10.35 to 13.29

Informational only; Commercial Vehicle Information
Details: I-5 MP 10.0 to MP 13.5 NB (Ashland) Effective April 19, 2016, this section of I-5 northbound will be restricted to 20 feet 00 in. in width. Loads wider than 20 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is June 27, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 11 to 12.5

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder
Comments: Construction continues on the Siskiyou Rest Area Welcome Center. The NB slow lane is closed, use caution, and watch for workers. The contractor is building a retaining wall south of Crowson Road, just east of the interstate bridge. Expect traffic controlled by flaggers on Crowson Road, with minor delays. This part of the project is building a gated access road for the facility staff.
Updated: 04/26/2016 1:23 pm

I-5 MP 11.93

Informational only; Commercial Vehicle Information
Details: I-5 NB MP 11.93 (crossing under railroad bridge - Ashland) Effective April 19, 2016, I-5 northbound crossing under the railroad bridge at MP 11.93 will be restricted to 16 feet 04 in. in height. Estimated date of completion is June 27, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 24

OFF RAMP
No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) , Shoulder (Northbound) , Shoulder
Comments: The SB on-ramp will be closed from Monday, May 9 through Friday, May 13. SB commercial trucks will be directed to use Exit 27. Ramps Affected. The SB Oregon 99, slow lane, is under construction. Bolz Road is closed to all but residential traffic. The contractor is working toward permanent striping of the interchange area. Speeds are reduced to 50 MPH in the work zone.
Updated: 04/26/2016 1:14 pm

I-5 MP 24.12

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Fern Valley Rd Exit 24 (Phoenix) Effective May 9, 2016, the ramp from Fern Valley Rd to I-5 southbound will be closed. Estimated date of completion is May 13, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 28.66 to 28.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 29.0 to MP 28.6 SB (Medford) Effective May 12, 2016, this section of I-5 southbound will be restricted to 17 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is May 13, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 104.85

Informational only; Commercial Vehicle Information
Details: I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Updated: 04/30/2016 7:00 pm

ORE62 MP 56.3 to 57

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Alternating lane closures, with flaggers, during day light hours for guardrail and turnout improvements. Expect delays.
Updated: 04/26/2016 3:03 pm

ORE66 MP 12

No to Minimum Delay; Crash/Hazard
Comments: The road surface has collapsed causing no to minimum delays. Log trucks may use the highway however other commercial vehicles are prohibited.
Last Updated: 04/29/2016 10:12 am

ORE99 MP 19.09

Informational only; Commercial Vehicle Information
Details: OR99 MP 19.09 SB (Ashland Creek Bridge - Ashland) Effective June 12, 2015, OR99 southbound crossing Ashland Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. Effective January 14, 2016, 5-axle single unit vehicles will be limited to 58,000 lbs. GVW, 6-axle single unit vehicles will be limited to 64,000 lbs. GVW, 7-axle single unit vehicles will be limited to 72,000 lbs. GVW.
Updated: 04/30/2016 7:00 pm

ORE138 MP 86

No to Minimum Delay; Information
Lanes Affected: (Eastbound) 1 Lane
Comments: North Entrance to Crater Lake is closed for the winter season. South entrance is open via Highway 62.
Last Updated: 04/23/2016 07:05 am

ORE230 MP 0 to 10.3

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Alternating lane closures, with flaggers, during daylight hours, for guardrail and turnout improvements. Expect delays.
Updated: 04/26/2016 3:03 pm

ORE234 MP .04

Informational only; Commercial Vehicle Information
Details: OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

US97 MP 240.5 to 221

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic control with flaggers and pilot cars, 24/7, for paving work on Spring Creek Hill.
Updated: 04/26/2016 12:45 pm

US97 MP 266

Closure; Crash/Hazard
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: A crash has occurred, use caution.
Last Updated: 01/29/2016 11:07 am

US101 MP 358.6

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: U.S. 101 reopened south of Brookings at 5 a.m. with a paved lane of traffic in each direction. Sinkhole repairs continue with work focusing on utilities, sidewalks, curbs, drainage, etc. on U.S. 101, Shopping Center Avenue and the parking lot where the sinkhole first appeared. Motorists should expect intermittent, minor delays. Please watch for workers and equipment in the work zone.
Updated: 04/26/2016 1:26 pm

US199 MP 7.09 to 12.86

Informational only; Commercial Vehicle Information
Details: US199 MP 7 to MP 14 NB & SB (south of Grants Pass) Effective May 10, 2016, this section of US199 will be restricted to 11 feet 00 in. in width on Sunday through Friday from 1/2 hr after sunset to 1/2 hr before sunrise. Estimated date of completion is May 23, 2016.
Updated: 04/30/2016 7:00 pm

US199 MP 7.09 to 12.86

Informational only; Commercial Vehicle Information
Details: US199 MP 7 to MP 14 NB & SB (south of Grants Pass) Effective May 10, 2016, this section of US199 will be restricted to 16 feet 00 in. in width on Sunday through Friday from 7 PM to 1/2 hr after sunset, and from to 1/2 hr before sunrise to 7 AM. Estimated date of completion is May 23, 2016.
Updated: 04/30/2016 7:00 pm

US199 MP 7.09 to 12.86

Informational only; Commercial Vehicle Information
Details: US199 MP 7 to MP 14 NB & SB (south of Grants Pass) Effective May 23, 2016, this section of US199 will be restricted to 11 feet 00 in. in width on Sunday through Friday from 7 PM to 7 AM. Estimated date of completion is September 16, 2016.
Updated: 04/30/2016 7:00 pm

South Oregon Road Conditions by Route

ORE138 MP 86

No to Minimum Delay; Information
Lanes Affected: (Eastbound) 1 Lane
Comments: North Entrance to Crater Lake is closed for the winter season. South entrance is open via Highway 62.
Last Updated: 04/23/2016 07:05 am

ORE140 MP 22.23

Informational only; Commercial Vehicle Information
Details: OR140 MP 22.1 to MP 22.3 EB & WB (Bly Mountain) Effective May 19, 2016, this section of OR140 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is May 19, 2016.
Updated: 04/30/2016 7:00 pm

ORE140 MP 25 to 34.4

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Traffic controlled by flaggers and pilot cars, 24/7, for road work. Use caution and expect delays.
Updated: 04/26/2016 12:47 pm

ORE140 MP 25.17 to 34.43

Informational only; Commercial Vehicle Information
Details: OR140 MP 25 to MP 35 EB & WB (Bly Mountain) Effective February 24, 2015, this section of OR140 will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2016.
Updated: 04/30/2016 7:00 pm

ORE140 MP 41.27

Informational only; Commercial Vehicle Information
Details: OR140 MP 41.3 to MP 41.5 EB & WB (Beatty) Effective May 18, 2016, this section of OR140 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is May 18, 2016.
Updated: 04/30/2016 7:00 pm

US97 MP 240.5 to 221

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic control with flaggers and pilot cars, 24/7, for paving work on Spring Creek Hill.
Updated: 04/26/2016 12:45 pm

US395 MP 50 to 73.3

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic control with flaggers and pilot cars, 24/7, for road construction and paving.
Updated: 04/26/2016 12:46 pm

US395 MP 148.65

Informational only; Commercial Vehicle Information
Details: US395 MP 148.6 to MP 148.8 NB & SB (south of Lakeview) Effective May 17, 2016, this section of US395 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is May 17, 2016.
Updated: 04/30/2016 7:00 pm

Southeast Oregon Road Conditions by Route

US95 MP 0 to 121.35

Informational only; Construction Work
Comments: Contractor will be installing rumble strips and striping at various locations along the highway. No delays at this time.
Updated: 04/29/2016 11:15 am

City of Bend Road Conditions by Route

No adverse road conditions reported at this time.

City of Eugene Road Conditions by Route

ORE99 MP 121.14 to 122.25

No to Minimum Delay; Construction Work
Comments: Expect intermittent lane closures during day time. Sidewalk and electrical work continues. Businesses remain open. Watch for workers. Update: Work will continue on the NW side of the SE bound lanes of OR99. Expect intermittent lane closures of on the left side of OR99 SE Bound, starting at the intersection with W. 5th Avenue. Sidewalk and electrical work will continue on the business frontage to the NW of the 5th Ave and OR99 intersection, adjacent to the west side of OR99, which will push traffic into one lane along portions of the frontage as the work progresses. Watch for intermittent lane restrictions during weekday daylight hours. Access to the businesses along this frontage will be maintained. Bridge work will continue. Watch for truck traffic, workers and equipment entering and exiting the work area directly adjacent to the traveled way. Project Summary: Modifications to the traffic signal are being made and detection loops installed on Highway 99 at intersection of 7th and 5th avenues. The project will provide a continuous pedestrian path between Garfield and Roosevelt on Hwy 99, including a new bike/pedestrian bridge over the railroad tracks near Roosevelt.
Updated: 04/29/2016 11:09 am

ORE126 MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield) OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 04/30/2016 7:00 pm

City of La Grande Road Conditions by Route

I-84 MP 264.84 to 265.26

Informational only; Commercial Vehicle Information
Details: I-84 MP 264.5 to MP 265.5 EB & WB (La Grande) Effective May 25, 2016, this section of I-84 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is June 15, 2016.
Updated: 04/30/2016 7:00 pm

City of Medford Road Conditions by Route

I-5 MP 28.66 to 28.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 29.0 to MP 28.6 SB (Medford) Effective May 12, 2016, this section of I-5 southbound will be restricted to 17 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is May 13, 2016.
Updated: 04/30/2016 7:00 pm

Portland Metro Road Conditions by Route

I-5 MP 299.52 to 300.66

Informational only; Commercial Vehicle Information
Details: I-5 MP 299.52 to MP 300.66 NB (Marquam Bridge - Portland) Effective May 20, 2016, this section of I-5 northbound will be closed between the hours of 9 PM & 5 AM. In addition, the following ramps will be closed during the same time: I-405 southbound to I-5 northbound; I-5 northbound Exit 300 to I-84 eastbound; OR43 (Macadam Ave) to I-5 northbound. Estimated date of completion is May 21, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 302

Estimated delay under 20 minutes; Construction Work
Comments: Night and daytime single lane closures on Broadway Mon-Fri. Expect nighttime single lane closures Monday-Friday 8 p.m. to 5 a.m. the next morning. Crews will be working off the roadway from 5 to 9 a.m. Travelers should expect daytime, perdiodic single lane closures and sidewalk closures on North Broadway Street Monday-Friday from 9 a.m. to 3 p.m. Bicyclists and pedestrians will be provided access through detour routes. Please be alert and follow detour signs. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/I-5-Southbound-Off-Ramp-at-North-Broadway-Project.aspx or 24-hour noise hotline at (971) 673-5239
Updated: 04/29/2016 2:34 pm

I-5 MP 302.6

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 302A to Moda Center (Portland) Effective March 25, 2015, the ramp from I-5 southbound Exit 302A ramp to Moda Center will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, and on Friday nights between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 0 to .5

Future Event: Closure; Maintenance Work
Expected Start Date: 5/6/2016 10:00:00 PM
Comments: Road maintenance operations Fri and Sat 10 p.m. to 6 a.m., use an alternate route from WB I-84 to SB I-5. Expect nighttime full closure of the westbound I-84 to southbound I-5 ramp Friday and Saturday nights from 10 p.m. to 6 a.m. the following morning. The center lane of westbound I-84 near Lloyd Center will also be closed at this time. Please be alert and detour to northbound I-5 to southbound I-405 before reconnecting with southbound I-5.
Updated: 04/29/2016 2:33 pm

I-84 MP .37

Informational only; Commercial Vehicle Information
Details: I-84 WB ramp to I-5 SB (Portland) Effective May 6, 2016, the ramp from I-84 westbound to I-5 southbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 8, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 16.66

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 17 ramp to Troutdale Effective February 15, 2016, the ramp from I-84 eastbound Exit 17 to Troutdale will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 16.67

Informational only; Commercial Vehicle Information
Details: I-84 WB Exit 17 on-ramp from Troutdale Effective February 15, 2016, the ramp from Troutdale to I-84 westbound at Exit 17 will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 17

No to Minimum Delay; Construction Work
Comments: Daytime shoulder closures on N Frontage Road and Marine Drive Monday-Friday 7 a.m. to 4 p.m. For more information: www.I-84TroutdaleExit17.org
Updated: 04/29/2016 2:58 pm

I-205 MP 11.98

No to Minimum Delay; Construction Work
Comments: No traffic impacts. SE Strawberry Lane at I-205 is now open for traffic, pedestrians, bicyclists & transit users as the Contractor cleans up the site. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/I-205-at-Strawberry-Lane.aspx or call the noise hotline at (503) 412-2371.
Updated: 04/29/2016 4:45 pm

I-205 MP 12 to 14

Estimated delay under 20 minutes; Construction Work
Comments: Shoulder closures on I-205 between exit 12 and exit 14 Mon-Fri. Travelers should be aware of changes to travel lanes during construction. I-205 (between exit 12 and 14) daytime right shoulder closures Monday-Friday for installation of signs and landscape materials. OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures in both directions Monday-Friday 9 a.m. to 2 p.m. for signal, permanent signs, striping, and landscaping work. Lane and shoulder closures on I-205 ramps, OR 224 (Milwaukie Expressway) ramps, and OR 213 (SE 82nd Avenue) from Mt Scott Creek Bridge to I-205 Monday-Friday 9 a.m. to 3 p.m. for permanent striping. SE 122 Avenue expect one way traffic controlled by flaggers for permanent striping, irrigation, and landscaping between OR 212/224 and SE Ford Street. For more information: www.sunrisejta.org
Updated: 04/29/2016 5:57 pm

I-205 MP 12.46

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is April 30, 2016.
Updated: 04/30/2016 7:00 pm

I-205 MP 19 to 23

No to Minimum Delay; Construction Work
Comments: Daytime shoulder closures in both directions for drilling. No traffic impacts; work will resume in May.
Updated: 04/10/2016 11:22 am

I-405 MP 3.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 3.20 SB (Fremont Bridge - Portland) Effective October 23, 2015, this section of I-405 southbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is April 29, 2016.
Updated: 04/30/2016 7:00 pm

ORE8 MP 6.45 to 6.75

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures and speed reduction to 25 mph on TV Highway. Temporary sidewalk closures with pedestrian detours. Speed reduced to 25 mph on TV Highway through the construction workzone. Periodic daytime single lane closures on westbound TV Highway and in both directions on SW 185th Avenue, Monday-Friday 9 a.m. to 3 p.m. Expect sidewalk closures with signed pedestrian detours on the north side of OR 8 at SW 185th; crosswalks will remain open. Temporary driveway closures along westbound OR 8, no more than two days at a time; alternative business access will be provided. Pedestrians on SW 185th southbound to OR8 detoured around driveway replacement work, via SW Alton. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/tv185th.aspx
Updated: 04/29/2016 5:34 pm

ORE8 MP 6.45 to 6.99

Informational only; Commercial Vehicle Information
Details: OR8 MP 6.29 to MP 6.99 EB & WB (Aloha) Effective November 10, 2015, this section of OR8 will be restricted to 14 feet 00 in. in width per the following schedule: Monday to Friday between the hours of 9 AM & 3 PM; Sunday to Thursday nights between the hours of 7 PM & 6:30 AM; Friday and Saturday nights between the hours of 7 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 29, 2016.
Updated: 04/30/2016 7:00 pm

ORE8 MP 11.28 to 14.66

No to Minimum Delay; Construction Work
Comments: No traffic impacts. For more information go to www.tvhwypaving.org
Updated: 04/29/2016 5:31 pm

ORE43 MP 3.67 to 5.742

Informational only; Commercial Vehicle Information
Details: OR43 MP 3.10 to MP 5.75 NB & SB (Lake Oswego) Effective May 16, 2016, this section of OR43 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7:30 PM & 5 AM. Estimated date of completion is May 20, 2016.
Updated: 04/30/2016 7:00 pm

ORE43 MP 6.04 to 9.02

Informational only; Commercial Vehicle Information
Details: OR43 MP 6.04 to MP 9.02 NB & SB (West Linn) Effective October 15, 2014, this section of OR43 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 04/30/2016 7:00 pm

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 04/30/2016 7:00 pm

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.20 SB (Tualatin River Bridge - King City) OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 04/30/2016 7:00 pm

ORE210 MP 9.03 to 9.2

No to Minimum Delay; Construction Work
Comments: No traffic impacts. For more information go to www.oregon.gov/ODOT/HWY/REGION1/Pages/SchollsCascade.aspx
Updated: 04/29/2016 5:37 pm

ORE212 MP 4.9 to 6.56

Estimated delay under 20 minutes; Construction Work
Comments: OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures Mon-Fri. Travelers should be aware of changes to travel lanes during construction. I-205 (between exit 12 and 14) daytime right shoulder closures Monday-Friday for installation of signs and landscape materials. OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures in both directions Monday-Friday 9 a.m. to 2 p.m. for signal, permanent signs, striping, and landscaping work. Lane and shoulder closures on I-205 ramps, OR 224 (Milwaukie Expressway) ramps, and OR 213 (SE 82nd Avenue) from Mt Scott Creek Bridge to I-205 Monday-Friday 9 a.m. to 3 p.m. for permanent striping. SE 122 Avenue expect one way traffic controlled by flaggers for permanent striping, irrigation, and landscaping between OR 212/224 and SE Ford Street. For more information: www.sunrisejta.org
Updated: 04/29/2016 6:00 pm

ORE213 MP .95 to 1.04

Informational only; Commercial Vehicle Information
Details: OR213 (NE 82nd Ave) MP 0.94 to MP 1.07 NB & SB (Portland) Effective May 9, 2016, this section of OR213 (NE 82nd Ave) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 12, 2016.
Updated: 04/30/2016 7:00 pm

ORE213 MP 3 to 4.24

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Ave) MP 3.00 to MP 4.24 NB & SB (Portland) Effective February 1, 2016, this section of OR213 (82nd Ave) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 30, 2016.
Updated: 04/30/2016 7:00 pm

ORE213 MP 3 to 4.25

Estimated delay under 20 minutes; Construction Work
Comments: Daytime single lane closures Monday-Friday 7:30 am-3 p.m. in both directions between E Burnside and SE Division streets. Single lane closures in both directions Monday-Friday from 7:30 a.m. to 3 p.m. between E Burnside and SE Division streets for sidewalk removal and installation of temporary signals. Work will start at 6 a.m. at E Burnside Street. Expect intermittent single nighttime lane closures on 82nd Avenue from SE Burnside to SE Yamhill Monday-Friday from 7p.m. 6 a.m. TriMet bus stops in the area will be temporarily relocated for the project work. Go to TriMet.org or call (503) 238-7433 to see schedule or bus stop location changes. For more information: www.82ndAvenueIntersectionImprovements.org or 24-hour noise hotline (503) 412-2348.
Updated: 04/29/2016 5:44 pm

ORE213 MP 3.45 to 5.24

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Ave) MP 5.24 to MP 3.45 NB (Portland) Effective April 30, 2016, this section of OR213 (82nd Ave) northbound will be closed between the hours of 9:15 AM and 12 noon for one day only.
Updated: 04/30/2016 7:00 pm

ORE213 MP 4.36

Estimated delay under 20 minutes; Construction Work
Comments: Lane and shoulder closures on OR 213 (82nd Avenue) Monday-Friday. Travelers should be aware of changes to travel lanes during construction. I-205 (between exit 12 and 14) daytime right shoulder closures Monday-Friday for installation of signs and landscape materials. OR 212/224 between SE 106th and SE 130th Avenues expect daytime lane closures in both directions Monday-Friday 9 a.m. to 2 p.m. for signal, permanent signs, striping, and landscaping work. Lane and shoulder closures on I-205 ramps, OR 224 (Milwaukie Expressway) ramps, and OR 213 (SE 82nd Avenue) from Mt Scott Creek Bridge to I-205 Monday-Friday 9 a.m. to 3 p.m. for permanent striping. SE 122 Avenue expect one way traffic controlled by flaggers for permanent striping, irrigation, and landscaping between OR 212/224 and SE Ford Street. For more information: www.sunrisejta.org
Updated: 04/29/2016 6:02 pm

ORE213 MP 6.2 to 6.3

Estimated delay under 20 minutes; Construction Work
Comments: Night and daytime single lane closures Mon-Fri. Nighttime single lane closures on 82nd Avenue in both directions Monday-Friday 8 p.m. to 5 a.m. for pavement grinding and paving; signals will be shut off and flaggers directing traffic. Daytime single lane closure on 82nd Avenue in both directions as crews work on new curb ramps and storm drain work on three corners. Pedestrians will be detoured around construction work with signs in place. Additionally, City of Portland will be finishing water service work which will include pavement grinding and paving south of Duke Street in both southbound lanes of 82nd Avenue on Saturday. For more information: www.SE82ndAveAtDuke.com or 24-hour noise hotline (503) 412-2363.
Updated: 04/29/2016 5:47 pm

ORE219 MP .18 to 10.05

Informational only; Commercial Vehicle Information
Details: OR219 MP 0.18 to MP 10.05 NB & SB (south of Hillsboro) Effective May 16, 2016, this section of OR219 will be restricted to 12 feet 00 in. in width between the hours of 7 AM & 7 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is June 30, 2016.
Updated: 04/30/2016 7:00 pm

ORE224 MP 3.96

Informational only; Commercial Vehicle Information
Details: OR224 EB ramp to I-205 NB (Milwaukie) Effective May 16, 2016, the ramp from OR224 eastbound to I-205 northbound will be closed. Estimated date of completion is May 23, 2016.
Updated: 04/30/2016 7:00 pm

ORE224 MP 3.96

Informational only; Commercial Vehicle Information
Details: OR224 crossing over I-205 (Milwaukie) Effective May 16, 2016, OR224 crossing over I-205 will be closed. Estimated date of completion is May 23, 2016.
Updated: 04/30/2016 7:00 pm

ORE99W MP -5.5 to -4.75

No to Minimum Delay; Construction Work
Comments: Project complete. No traffic impacts. For more information: www.NorthDenverAve.org
Updated: 04/03/2016 1:38 pm

ORE99W MP 5.6

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. This project is complete.
Updated: 04/10/2016 11:56 am

US26 MP .42 to 1.12

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Some nighttime and/or weekend lane closures will be necessary at a later time and will be noted here when scheduled. For more information: www.RossIslandBridgeProject.org
Updated: 04/29/2016 4:50 pm

US26 MP 1 to 1.8

Future Event: No to Minimum Delay; Construction Work
Expected Start Date: 5/4/2016 12:00:00 PM
Comments: Nighttime single lane closures Wed-Fri Nighttime single lane closures on US 26 (SE Powell Boulevard) in both directions (SE 10th to 15th Avenues) Wednesday-Friday 7 p.m. to 6 a.m. in preparation for sewer construction. Beginning May 9 sewer construction on Powell Boulevard will continuously close the northbound SE 17th Avenue Ramp for 50 days. For more information: www.portlandoregon.gov/bes/LowerPowell or contact Matt Gough at 503-823-5352 or matthew.gough@portlandoregon.gov.
Updated: 04/29/2016 4:33 pm

US26 MP 58.42 to 59.14

Informational only; Commercial Vehicle Information
Details: US26 EB & WB Exit 59 on- and off-ramps to/from Jackson School Rd (North Plains) Effective May 7, 2016, the US26 eastbound and westbound Exit 59 on- and off-ramps to/from Jackson School Rd will be closed between the hours of 6 AM & 2 PM for one day only. In addition, the Jackson School Rd bridge over US26 will be closed at the same time. These closures are NOT on the US26 mainline.
Updated: 04/30/2016 7:00 pm

US26 MP 61

No to Minimum Delay; Construction Work
Comments: No traffic impacts as crews work off the roadway during the day. For more information: www.oregon.gov/ODOT/HWY/REGION1/pages/us26_brookwoodpkwy/index.aspx or call the noise hotline at (503) 646-0231.
Updated: 04/29/2016 4:23 pm

US26 MP 61.06

Informational only; Commercial Vehicle Information
Details: US26 WB crossing under Helvetia Rd Exit 61 (Hillsboro) Effective April 4, 2016, US26 westbound crossing under Helvetia Rd will be intermittently closed between the hours of 10 PM & 5 AM. When closed, all traffic can bypass the closure by taking Exit 61 (Brookwood Pkwy/Helvetia Rd), turn right onto Helvetia Rd then turn left and re-enter US26 westbound. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

US26 MP 62.83

Informational only; Commercial Vehicle Information
Details: US26 EB ramp from NB Cornelius Pass Rd (Hillsboro) Effective April 1, 2016, the ramp from NB Cornelius Pass Rd to US26 eastbound will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is May 31, 2016.
Updated: 04/30/2016 7:00 pm

US26 MP 73.53

Informational only; Commercial Vehicle Information
Details: US26 MP 73.53 EB & WB (Vista Ridge Tunnel - Portland) Effective May 13, 2016, this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is May 14, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 04/30/2016 7:00 pm

US30 MP .87

Informational only; Commercial Vehicle Information
Details: US30 EB ramp to I-405 SB (Portland) Effective June 3, 2016, the ramp from US30 eastbound to I-405 southbound will be closed on Friday and Saturday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 12, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP 1.32 to 1.47

Informational only; Commercial Vehicle Information
Details: US30 Bypass (N Ivanhoe St) MP 1.32 to MP 1.47 EB & WB (Portland) Effective May 23, 2016, this section of US30 Bypass (N Ivanhoe St) will be intermittently closed on Monday to Friday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 16, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 04/30/2016 7:00 pm

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 04/30/2016 7:00 pm

City of Salem Road Conditions by Route

I-5 MP 250.15 to 251.76

Estimated delay under 20 minutes; Construction Work
Comments: Construction activity near interchange. Expect night lane closures on I 5 south bound. On May 6, expect south I 5 on ramp closure for 2 weeks. Detour. Update: Motorists should be aware of the increased construction activity around the interchange, proceed with caution through the work zone and obey posted speed limits. Expect intermittent night time lane closures on I-5 south bound. Starting at 9 p.m., Friday, May 6, the south bound on-ramp to I-5 will be closed through Sunday, May 22. Traffic will be directed to enter I-5 northbound, take Exit 253 (OR 22/OR 99E Business Exit), cross over and enter I-5 southbound. Project Summary: The I-5 Kuebler Interchange Project will address the increasing congestion at the interchange by modifying the existing southbound off ramp, which will decrease the conflicts at Kuebler that have caused back-ups on I-5 southbound. The new ramp will meet modern standards and contain excess capacity. The project will also add a westbound to southbound I-5 loop on ramp and modify the eastbound to southbound I-5 on ramp.
Updated: 04/29/2016 09:42 am

I-5 MP 251.09

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Kuebler Blvd (Salem) Effective May 6, 2016 at 9 PM, the ramp from Kuebler Blvd to I-5 southbound will be closed. Estimated date of re-opening is May 23, 2016.
Updated: 04/30/2016 7:00 pm

City of Portland Road Conditions by Route

I-5 MP 299.52 to 300.66

Informational only; Commercial Vehicle Information
Details: I-5 MP 299.52 to MP 300.66 NB (Marquam Bridge - Portland) Effective May 20, 2016, this section of I-5 northbound will be closed between the hours of 9 PM & 5 AM. In addition, the following ramps will be closed during the same time: I-405 southbound to I-5 northbound; I-5 northbound Exit 300 to I-84 eastbound; OR43 (Macadam Ave) to I-5 northbound. Estimated date of completion is May 21, 2016.
Updated: 04/30/2016 7:00 pm

I-5 MP 302

Estimated delay under 20 minutes; Construction Work
Comments: Night and daytime single lane closures on Broadway Mon-Fri. Expect nighttime single lane closures Monday-Friday 8 p.m. to 5 a.m. the next morning. Crews will be working off the roadway from 5 to 9 a.m. Travelers should expect daytime, perdiodic single lane closures and sidewalk closures on North Broadway Street Monday-Friday from 9 a.m. to 3 p.m. Bicyclists and pedestrians will be provided access through detour routes. Please be alert and follow detour signs. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/I-5-Southbound-Off-Ramp-at-North-Broadway-Project.aspx or 24-hour noise hotline at (971) 673-5239
Updated: 04/29/2016 2:34 pm

I-5 MP 302.6

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 302A to Moda Center (Portland) Effective March 25, 2015, the ramp from I-5 southbound Exit 302A ramp to Moda Center will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, and on Friday nights between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.
Updated: 04/30/2016 7:00 pm

I-84 MP 0 to .5

Future Event: Closure; Maintenance Work
Expected Start Date: 5/6/2016 10:00:00 PM
Comments: Road maintenance operations Fri and Sat 10 p.m. to 6 a.m., use an alternate route from WB I-84 to SB I-5. Expect nighttime full closure of the westbound I-84 to southbound I-5 ramp Friday and Saturday nights from 10 p.m. to 6 a.m. the following morning. The center lane of westbound I-84 near Lloyd Center will also be closed at this time. Please be alert and detour to northbound I-5 to southbound I-405 before reconnecting with southbound I-5.
Updated: 04/29/2016 2:33 pm

I-84 MP .37

Informational only; Commercial Vehicle Information
Details: I-84 WB ramp to I-5 SB (Portland) Effective May 6, 2016, the ramp from I-84 westbound to I-5 southbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 8, 2016.
Updated: 04/30/2016 7:00 pm

I-405 MP 3.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 3.20 SB (Fremont Bridge - Portland) Effective October 23, 2015, this section of I-405 southbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is April 29, 2016.
Updated: 04/30/2016 7:00 pm

ORE8 MP 6.45 to 6.75

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures and speed reduction to 25 mph on TV Highway. Temporary sidewalk closures with pedestrian detours. Speed reduced to 25 mph on TV Highway through the construction workzone. Periodic daytime single lane closures on westbound TV Highway and in both directions on SW 185th Avenue, Monday-Friday 9 a.m. to 3 p.m. Expect sidewalk closures with signed pedestrian detours on the north side of OR 8 at SW 185th; crosswalks will remain open. Temporary driveway closures along westbound OR 8, no more than two days at a time; alternative business access will be provided. Pedestrians on SW 185th southbound to OR8 detoured around driveway replacement work, via SW Alton. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/tv185th.aspx
Updated: 04/29/2016 5:34 pm

ORE8 MP 6.45 to 6.99

Informational only; Commercial Vehicle Information
Details: OR8 MP 6.29 to MP 6.99 EB & WB (Aloha) Effective November 10, 2015, this section of OR8 will be restricted to 14 feet 00 in. in width per the following schedule: Monday to Friday between the hours of 9 AM & 3 PM; Sunday to Thursday nights between the hours of 7 PM & 6:30 AM; Friday and Saturday nights between the hours of 7 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 29, 2016.
Updated: 04/30/2016 7:00 pm

ORE43 MP 3.67 to 5.742

Informational only; Commercial Vehicle Information
Details: OR43 MP 3.10 to MP 5.75 NB & SB (Lake Oswego) Effective May 16, 2016, this section of OR43 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7:30 PM & 5 AM. Estimated date of completion is May 20, 2016.
Updated: 04/30/2016 7:00 pm

ORE99W MP 5.6

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts. This project is complete.
Updated: 04/10/2016 11:56 am

US26 MP .42 to 1.12

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Some nighttime and/or weekend lane closures will be necessary at a later time and will be noted here when scheduled. For more information: www.RossIslandBridgeProject.org
Updated: 04/29/2016 4:50 pm

US26 MP 1 to 1.8

Future Event: No to Minimum Delay; Construction Work
Expected Start Date: 5/4/2016 12:00:00 PM
Comments: Nighttime single lane closures Wed-Fri Nighttime single lane closures on US 26 (SE Powell Boulevard) in both directions (SE 10th to 15th Avenues) Wednesday-Friday 7 p.m. to 6 a.m. in preparation for sewer construction. Beginning May 9 sewer construction on Powell Boulevard will continuously close the northbound SE 17th Avenue Ramp for 50 days. For more information: www.portlandoregon.gov/bes/LowerPowell or contact Matt Gough at 503-823-5352 or matthew.gough@portlandoregon.gov.
Updated: 04/29/2016 4:33 pm

US26 MP 73.53

Informational only; Commercial Vehicle Information
Details: US26 MP 73.53 EB & WB (Vista Ridge Tunnel - Portland) Effective May 13, 2016, this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is May 14, 2016.
Updated: 04/30/2016 7:00 pm

US30 MP .87

Informational only; Commercial Vehicle Information
Details: US30 EB ramp to I-405 SB (Portland) Effective June 3, 2016, the ramp from US30 eastbound to I-405 southbound will be closed on Friday and Saturday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 12, 2016.
Updated: 04/30/2016 7:00 pm