ODOT Banner  
TripCheck Logo--CLICK to return to Road | Weather entry page.
Road | Weather Travel Center Transportation Options About TripCheck CLICK to view graphic site with maps.
 

Select Report Type:

  Printer-Friendly Page    511 Travel Info     

Select Region:

State-Wide

Northwest

North

Northeast

West

Central

East

Southwest

South

Southeast

Or City:

Bend

Eugene

La Grande

Medford

Portland

Portland Metro

Salem

Related Links:

California State Traveler Info

Idaho State Traveler Info

Nevada State Traveler Info

Washington State Traveler Info

State of Oregon Road Conditions

Northwest Oregon Road Conditions by Route

Hwy100
MP 0 to 4

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures with flaggers Motorists can expect daytime lane closures throughout the project area with flaggers directing traffic between 7 a.m. and 5 p.m., Monday through Friday, for guardrail replacement. This project will replace seven sections of old guardrail on the Historic Columbia River Highway (U.S. 30) between the Troutdale Bridge over the Sandy River and Dabney State Park. The new guardrail will look just like the historic, white double-rail sections that are being replaced.
Updated: 05/17/2013 10:41 am

I-5
MP 291.89

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective July 15, 2013, the ramp from I-5 northbound Exit 292A to OR217 northbound will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 20, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 295.04 to 299.25

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramp from OR43/Hood St to SB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 295.041 to 298.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd & OR99W/Barbur Blvd to NB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 300.11 to 300.4

Informational only; Commercial Vehicle Information
Details: I-5 SB MP 300.1 to MP 300.4 SB (Marquam Bridge - Portland) Effective June 24, 2013, this section of I-5 southbound will be restricted to 15 feet 00 in. in height between the hours of 9 PM & 5:30 AM. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 301.36

Informational only; Commercial Vehicle Information
Details: I-5 NB ramp from Morrison Bridge (Portland) Effective June 24, 2013, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. The estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B ramp to EB Belmont St (Portland) Effective June 24, 2013, the ramp from I-5 southbound Exit 300B to Belmont St eastbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .01

ON RAMP
Closure with Detour; Crash/Hazard
Lanes Affected: (Westbound) 2 Lanes
Comments: A crash has occurred I-84 westbound on ramp to I-5 northbound Closed, use alternate route. Ramps Affected.
Last Updated: 06/19/2013 04:31 am

I-84
MP .02 to 5.78

Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March 27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the height will be restricted to 15 ft 07 in. in height eastbound, and 14 ft 11 in. in height westbound during the same time. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .07 to 5.79

Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March 27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the height will be restricted to 15 ft 07 in. in height eastbound, and 14 ft 11 in. in height westbound during the same time. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .54

Informational only; Commercial Vehicle Information
Details: I-84 EB ramp from Morrison Bridge (Portland) Effective June 24, 2013, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. The closure is NOT on the ramp from I-5 NB Exit 300 to I-84 EB. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 5.44 to 6.59

Informational only; Commercial Vehicle Information
Details: I-84 MP 5.42 to MP 6.60 EB (Portland) Effective April 29, 2013, this section of I-84 eastbound will be restricted to 12 feet 00 in. in width, and 18 feet 00 in. in height on Sunday - Thursday nights between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from I-84 eastbound Exit 7 to Halsey St will be intermittently closed during the same hours. Estimated date of completion is November 5, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 13.041

Informational only; Commercial Vehicle Information
Details: I-84 WB on-ramp from NB 181st Ave (Gresham) Effective June 23, 2013, the ramp from NB 181st Ave to I-84 westbound will be closed between the hours of 5 AM & 3 PM (DAYTIME). Estimated date of completion is June 23, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 17.37 to 18.06

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 7 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

I-84
MP 17.68

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.68 WB (Sandy River Bridge) I-84 MP 17.68 WB only Sandy River Bridge is restricted to STP's beyond Wt. Table 5.
Updated: 06/18/2013 7:00 pm

I-84
MP 17.82

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.82 EB & WB (Jordan Rd Underpass) Effective September 1, 2010, the Jordan Rd underpass at Exit 18 will be restricted to 13 feet 00 in. in width. This restriction is NOT on the I-84 mainline. Effective April 15, 2013, the height will be restricted to 14 feet 9 inches crossing under I-84 on Jordan Rd. Estimated date of completion is November 1, 2014.
Updated: 06/18/2013 7:00 pm

I-84
MP 18

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Expect alternating one-way traffic controlled by temporary signals on Jordan Road at I-84. Please obey parking restrictions in this area. Project Description: This project replaces two bridges on I-84 over the Sandy River east of exit 17 in Troutdale, and repairs two bridges over Jordan Road east of the Sandy River at exit 18. Traffic Impacts: None anticipated theis week. For more information:
Updated: 12/24/2012 3:58 pm

I-84
MP 18.15 to 17.37

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 7 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

I-84
MP 35 to 44

Estimated delay under 20 minutes; Construction Work
Comments: Expect single lane closures. Project Description: This project will replace the driving surface on four bridges on I-84 between exit 35 (Dodson/Ainsworth State Park) and exit 44 (Cascade Locks/Bridge of the Gods) in the Bonneville Dam area. The bridges being resurfaced are: • I-84 westbound at Dodson, just west of exit 35 • I-84 eastbound at Dodson, just west of exit 35 • I-84 eastbound over Eagle Creek (milepost 41.5) • I-84 westbound over Ruckel Creek (milepost 42) Traffic Impacts: Starting April 8, one right lane on the I-84 eastbound bridge at Eagle Creek and on the I-84 westbound bridge at Ruckel Creek will be closed continually for a total of six weeks. These lane closures may cause traffic backups on I-84 westbound the weekends. At Eagle Creek, the lane closures will start before the Tooth Rock Tunnel and end after the Eagle Creek Bridge. Traffic will be directed through the center of the tunnel. Access to the Eagle Creek Trail and Hatchery will be open at all times.
Updated: 04/09/2013 4:14 pm

I-84
MP 35.14 to 35.23

Informational only; Commercial Vehicle Information
Details: I-84 MP 35 EB & WB (Dodson) Effective July 8, 2013, this section of I-84 will be restricted to 10 feet 00 in. in width per the following schedule: Monday - Thursday nights between the hours of 6 PM & 6 AM; Friday - Sunday nights between the hours of 8 PM & 6 AM. In addition, the I-84 eastbound Exit 35 off-ramp to Dodson/Ainsworth State Park and the I-84 westbound on-ramp from Dodson/Ainsworth State Park will be intermittently closed at the same time. Estimated date of completion is August 15, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 35.16 to 35.31

Informational only; Commercial Vehicle Information
Details: I-84 MP 35 EB & WB (Dodson) Effective July 8, 2013, this section of I-84 will be restricted to 10 feet 00 in. in width per the following schedule: Monday - Thursday nights between the hours of 6 PM & 6 AM; Friday - Sunday nights between the hours of 8 PM & 6 AM. In addition, the I-84 eastbound Exit 35 off-ramp to Dodson/Ainsworth State Park and the I-84 westbound on-ramp from Dodson/Ainsworth State Park will be intermittently closed at the same time. Estimated date of completion is August 15, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 37.12 to 38.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 36.75 to MP 39 EB & WB Effective September 6, 2012, this section of I-84 is restricted to 19 feet 00 in. in width Monday-Friday between the hours of 7:30 AM & 5:30 PM. Estimated date of completion is October 1, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 41.25 to 41.9

Informational only; Commercial Vehicle Information
Details: I-84 MP 41 to MP 42 EB (West of Cascade Locks) Effective April 10, 2013, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM. Estimated date of completion is June 14, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 41.54 to 42.08

Informational only; Commercial Vehicle Information
Details: I-84 MP 41.5 to MP 42.5 WB (West of Cascade Locks) Effective April 11, 2013, this section of I-84 westbound will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM.. Estimated date of completion is June 16, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 10.79 to 11.23

Informational only; Commercial Vehicle Information
Details: I-205 on- and off-ramps to/from Exit 11 NB & SB (82nd Dr - Gladstone) Effective June 19, 2013, the on- and off-ramps to/from I-205 Exit 11 NB & SB will be intermittently closed between the hours of 9 PM & 6 AM. In addition, the 82nd Dr overpass will be closed at the same time. These closures are NOT on the I-205 mainline. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 10.83 to 11.13

Informational only; Commercial Vehicle Information
Details: I-205 on- and off-ramps to/from Exit 11 NB & SB (82nd Dr - Gladstone) Effective June 19, 2013, the on- and off-ramps to/from I-205 Exit 11 NB & SB will be intermittently closed between the hours of 9 PM & 6 AM. In addition, the 82nd Dr overpass will be closed at the same time. These closures are NOT on the I-205 mainline. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 20.05 to 20.37

Informational only; Commercial Vehicle Information
Details: I-205 MP 20.00 to MP 20.50 NB (Portland) Effective May 1, 2013, this section of I-205 northbound will be restricted to 19 feet 00 in. in width, and 18 feet 03 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 23.02 to 24.92

Informational only; Commercial Vehicle Information
Details: I-205 MP 23 to MP 25 NB (Portland) Effective June 12, 2013, this section of I-205 northbound will be restricted to 17 feet 00 in. in width, and 16 feet 10 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is July 19, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 24.5

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, daytime lane closures and bike/ped path impacts. Motorists can expect daytime single lane closures on Airport Way eastbound and westbound at I-205 and on the I-205 northbound on ramp, Monday through Friday from 8 a.m. to 2 p.m., for various construction activities. There will also be occasional daytime short-duration closures of the I-205 multi-use bike/ped path on the north side of Airport Way, Monday through Saturday from 7 a.m. to 5 p.m. for pile driving next to the path. Flaggers will stop trail users for no more than 20 minutes at a time. This project will help improve traffic flow at this busy interchange by constructing a new free-flowing on ramp from Airport Way westbound onto I-205 northbound. Motorists on Airport Way eastbound will have two left turn lanes onto I-205 northbound and will no longer have to share signal time with westbound motorists on Airport Way.
Updated: 05/17/2013 10:17 am

I-205
MP 24.92

Informational only; Commercial Vehicle Information
Details: I-205 NB on-ramp from Airport Way (Portland) Effective April 1, 2013, the ramp from Airport Way to I-205 northbound will be restricted to 16 feet 00 in. in width, and 18 feet 03 in. in height between the hours of 7 PM & 2 PM. No restrictions will be in place between 2 PM & 7 PM. Beginning June 18, 2013, these restrictions will be in place at all hours. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective June 24, 2013, the ramp from I-405 southbound to I-5 northbound will be restricted to 13 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP .8

Informational only; Commercial Vehicle Information
Details: I-405 SB on-ramp from SW 5th St (Portland) Effective June 28, 2013, the ramp from SW 5th St to I-405 southbound will be closed. Estimated date of completion is July 1, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP 1.29

Informational only; Commercial Vehicle Information
Details: I-405 SB Exit 1C ramp to 6th St (Portland) Effective June 22, 2013, the I-405 southbound Exit 1C ramp to 6th St will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 7 PM (DAYTIME). Estimated date of completion is June 23, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP 1.52 to 2.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 1.5 to MP 2.2 NB (Portland) Effective July 26, 2013, this section of I-405 northbound will be restricted to 12 feet 00 in. in width, and 15 feet 08 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 27, 2013.
Updated: 06/18/2013 7:00 pm

ORE6
MP .75 to 2.52

Estimated delay under 20 minutes; Construction Work
Comments: OR6 @ Wilson River Loop Road, flaggers are controlling traffic, expect delays and drive with caution. This project consists of rebuilding the roadway at the intersection of Wilson River Highway and Wilson River Loop Road just east of Tillamook. The scheduled work includes construction of the new roadway. Flaggers will control single lane traffic during construction activities as required. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in October 2013.
Updated: 03/27/2013 09:56 am

ORE6
MP 39 to 51.5

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring on OR 6 starting April 29. Please expect delays and drive with extreme caution. BANKS— A project that will pave OR 6 (Wilson River Highway) between milepost 39 and 51.5 and the ramp connections between OR 6 and U.S. 26 and OR 47 and OR 6 will begin at 7 p.m. on Monday, April 29, weather permitting. A contractor working for the Oregon Department of Transportation will begin with the paving of the OR 6/U.S. 26 ramps at 7 p.m. on Monday, April 29. This will require the closure of the ramp for two consecutive nights. The detour during the closure is OR 47 to and from U.S. 26. Most of the paving of OR 6 will take place between 7 a.m. to 6 p.m. Monday through Friday. Variable message signs will be posted in key locations for motorists warning them of the planned work. Motorists can expect some delays with at least one lane open with flaggers controlling two-way traffic. This project is weather dependent so the schedule could change.
Updated: 04/29/2013 11:56 am

ORE6
MP 42.28 to 51.62

Informational only; Commercial Vehicle Information
Details: OR6 MP 39.00 to MP 51.62 EB & WB (Banks) Effective April 24, 2013, this section of OR6 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 7 PM (DAYTIME). Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. Estimated date of completion is June 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE6
MP 49.09 to 49.4

Informational only; Commercial Vehicle Information
Details: OR6 MP 49.09 to MP 49.40 EB (Banks) Effective April 24, 2013, this section of OR6 eastbound will be intermittently closed (for up to one day) on Monday - Friday between the hours of 7 AM & 6 PM. In addition, the ramps to and from OR47 will be closed at the same time. OR6 westbound will remain open during this time. Estimated date of completion is June 1, 2013.
Updated: 06/18/2013 7:00 pm

ORE6
MP 49.1

Informational only; Commercial Vehicle Information
Details: OR6 EB ramp to OR47 SB (Banks) Effective April 24, 2013, the ramp from OR6 eastbound to OR47 southbound will be restricted to 14 feet 08 in. in height on Monday - Friday between the hours of 7 AM & 6 PM (DAYTIME). Estimated date of completion is June 1, 2013.
Updated: 06/18/2013 7:00 pm

ORE8
MP 11.28 to 14.66

Informational only; Commercial Vehicle Information
Details: OR8 MP 11.28 to MP 14.66 EB & WB (Hillsboro) Effective June 1, 2013, this section of OR8 will be restricted to 10 feet 00 in. in width between the hours of 6 PM & 6 AM, and 14 feet 00 in. in width between the hours of 9 AM & 3 PM. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE8
MP 14 to 17

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) 1 Lane (Westbound) 1 Lane
Comments: 8 pm to 5 am, M-F: Nighttime lane closures on OR 8 (TV Highway) between Mountainview Lane and OR 47/Quince Street This project will repave OR 8 (TV Highway) from 331st Avenue, west of Hillsboro, to OR 47/Quince Street in Forest Grove. Construction is nearly complete. Finishing work will be completed in spring/summer 2013.
Updated: 03/14/2013 12:25 pm

ORE8
MP 14.6 to 17.8

Estimated delay of 20 minutes - 2 hours; Construction Work
Lanes Affected: (Eastbound) Median , All Lanes , Shoulder (Westbound) Median , All Lanes , Shoulder
Comments: Expect intermittent shoulder closures. Project Description: This project will pave TV Highway (OR 8) from 331st Avenue, west of Hillsboro, to Quince Street/OR 47 in Forest Grove. Traffic Impacts: There will be intermittent daytime shoulder closures on OR 8 in both directions this week for finishing work. This project is nearly complete. There will be increased police enforcement in the work zone during these times. For more information:
Updated: 12/24/2012 4:05 pm

ORE18
MP 2.13 to 2.67

Informational only; Commercial Vehicle Information
Details: OR18 Business MP 2.13 to MP 2.67 EB & WB (Willamina) Effective July 4, 2013, this section of OR18 Business will be closed between the hours of 6 PM & 7 PM (DAYTIME) for one day only.
Updated: 06/18/2013 7:00 pm

ORE18
MP 7.35

Informational only; Commercial Vehicle Information
Details: OR18 Business MP 7.31 to MP 7.53 (Sheridan) Effective June 21, 2013, this section of OR18 Business will be closed between the hours of 5 PM & 7 PM (DAYTIME). Estimated date of completion is June 22, 2013.
Updated: 06/18/2013 7:00 pm

ORE18
MP 45

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 06/19/2013 03:46 am

ORE18
MP 51.57

Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 Yamhill River near Dayton MP 51.57 Yamhill River Bridge near Dayton is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
Updated: 06/18/2013 7:00 pm

ORE22
MP 1.29 to 2.12

Informational only; Commercial Vehicle Information
Details: OR22 EB MP 1.28 to MP 2.63 (east of Salem) Effective March 18, 2013, this section of OR22 eastbound will be restricted to 16 feet 00 in. in width, and 14 feet 07 in. in height during the following times: Monday-Thursday from 12:01 AM to 3 PM, and from 6 PM to midnight; Friday from 12:01 AM to 3 PM. Estimated date of completion is November 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE22
MP 1.38 to 2.08

Informational only; Commercial Vehicle Information
Details: OR22 WB MP 2.63 to MP 1.28 (east of Salem) Effective March 18, 2013, this section of OR22 westbound will be restricted to 16 feet 00 in. in width, and 14 feet 09 in. in height. Estimated date of completion is November 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE22
MP 1.6 to 5.2

Estimated delay under 20 minutes; Construction Work
Comments: Reduce speed in construction zone to 45 mph. Westbound reduced to one lane. Expect work on shoulders.
Updated: 06/14/2013 09:32 am

ORE22
MP 5.7 to 6.1

Estimated delay under 20 minutes; Construction Work
Comments: Expect work on the shoulders. 72nd Ave. over Hwy 22 closed June 17 through August 7. Use Aumsville Highway and Joseph Street as a detour.
Updated: 06/14/2013 09:31 am

ORE22
MP 10.49

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 Louie Creek Bridge OR22 Louie Creek Bridge at MP10.49 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only.
Updated: 06/18/2013 7:00 pm

ORE22
MP 10.66

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 Louie Creek Bridge OR22 Louie Creek Bridge at MP10.66 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only.
Updated: 06/18/2013 7:00 pm

ORE22
MP 30.03

Informational only; Commercial Vehicle Information
Details: OR22 Mill City Bridge (not on main OR22) Bridge actually on Connector 162AY MP 1C30.29 - 1st Street crossing over the Santiam River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 06/18/2013 7:00 pm

ORE43
MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Arch Bridge - Oregon City) The Oregon City Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 06/18/2013 7:00 pm

ORE47
MP 37.87 to 37.99

Informational only; Commercial Vehicle Information
Details: OR47 MP 37.8 to MP 38.1 NB & SB (Carlton) Effective June 22, 2013, this section of OR47 will be closed between the hours of 10 AM & 11:30 AM (DAYTIME). Estimated date of completion is June 22, 2013.
Updated: 06/18/2013 7:00 pm

ORE47
MP 83.62

Informational only; Commercial Vehicle Information
Details: OR47 NB & SB ramp to OR6 WB (Banks) Effective April 24, 2013, the ramp from OR47 northbound and southbound to OR6 westbound will be intermittently closed (for up to one day) on Monday - Friday between the hours of 7 AM & 6 PM. Estimated date of completion is June 1, 2013.
Updated: 06/18/2013 7:00 pm

ORE51
MP 0 to 2.35

Informational only; Commercial Vehicle Information
Details: OR51 MP 0 to MP 2.35 EB & WB (Monmouth-Independence) Effective July 4, 2013, this section of OR51 will be closed between the hours of 12 PM & 3 PM (DAYTIME). Estimated date of completion is July 4, 2013.
Updated: 06/18/2013 7:00 pm

ORE53
MP 5.981

Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 Jack Horner Creek OR53 Jack Horner Creek Bridge at MP5.98 is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle; Weight Table 3.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.22

Informational only; Commercial Vehicle Information
Details: OR99W/Naito Parkway NB on-ramp from US26/Kelly Ave Effective January 14, 2013, the OR99W/Natio Parkway northbound on-ramp from US26/Kelly Ave will be restricted to 10 feet 00 in. in width. Estimated date of completion is September 3, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.45 to 1.49

Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3, 2013, this section of OR99E will be restricted to 16 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the height will be restricted to 16 feet 03 in. in height northbound during the same time. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.49

Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3, 2013, this section of OR99E will be restricted to 16 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the height will be restricted to 16 feet 03 in. in height northbound during the same time. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 3.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 3.10 to MP 3.25 NB (Barbur Blvd) Effective August 24, 2010, this section of OR99W will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are allowed. In addition, the height will be restricted to 17 feet 00 in. in height at the same time. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 12.18 to 16.66

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.03 to MP 16.68 NB & SB (Tualatin) Effective April 15, 2013, this section of OR99W will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W SB MP 12.20 Tualatin River Bridge MP 12.20 Tualatin River Bridge in King City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 06/18/2013 7:00 pm

ORE99
MP 12.39 to 20.46

Informational only; Commercial Vehicle Information
Details: OR99E MP 12.00 to MP 20.63 NB & SB (Oregon City - Canby) Effective May 20, 2013, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 5 AM & 9:30 PM; & 10 feet 00 in. in width between the hours of 9:30 PM and 5 AM. In addition, the height will be restricted to 14 feet 00 in. in height at all hours. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE120
MP .38

Informational only; Commercial Vehicle Information
Details: OR120 MP 0.38 Columbia Slough Bridge (Swift Hwy in Portland) This bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
Updated: 06/18/2013 7:00 pm

ORE130
MP 3.23

Informational only; Commercial Vehicle Information
Details: OR130 MP 3.23 Panther Creek MP 3.23 Panther Creek 3.23 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 06/18/2013 7:00 pm

ORE130
MP 3.6

Informational only; Commercial Vehicle Information
Details: OR130 MP 3.60 Squaw Creek MP 3.60 Squaw Creek 3.60 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 06/18/2013 7:00 pm

ORE130
MP 3.82

Informational only; Commercial Vehicle Information
Details: OR130 MP 3.82 Austin Creek MP 3.82 Austin Creek 3.82 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 06/18/2013 7:00 pm

ORE130
MP 4.15

Informational only; Commercial Vehicle Information
Details: OR130 MP 4.15 Little Nestucca MP 4.15 Little Nestucca River 4.15 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 06/18/2013 7:00 pm

ORE130
MP 4.76

Informational only; Commercial Vehicle Information
Details: OR130 MP 4.76 Bear Creek MP 4.76 Bear Creek 4.76 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 06/18/2013 7:00 pm

ORE153
MP 5.88

Informational only; Commercial Vehicle Information
Details: OR153 MP 5.88 Bellvue-Hopewell Hwy OR153 MP 5.88 Salt Creek Bridge (Ash Swale) just west of Amity is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Wt. Table 3
Updated: 06/18/2013 7:00 pm

ORE164
MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge) - Jefferson OR164 at MP 6.24 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Updated: 06/18/2013 7:00 pm

ORE194
MP 7.17 to 7.56

Informational only; Commercial Vehicle Information
Details: OR194 MP 7.17 to MP 7.56 (Main St in Monmouth) Effective July 4, 2013, this section of OR194 will be closed between the hours of 12 PM & 3 PM (DAYTIME). Estimated date of completion is July 4, 2013.
Updated: 06/18/2013 7:00 pm

ORE202
MP 23.05

Informational only; Commercial Vehicle Information
Details: OR202 MP 23.65 NB & SB (west of Jewell) Effective May 20, 2013, this section of OR202 will be restricted to 12 feet 00 in. in width. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE211
MP 5

Informational only; Commercial Vehicle Information
Details: OR211 MP 4.80 to MP 5.10 EB & WB (Sandy) Effective April 15, 2013, this section of OR211 will be restricted to 16 feet 00 in. in width from 1/2 hr after sunset to 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is June 22, 2013.
Updated: 06/18/2013 7:00 pm

ORE213
MP 0 to .84

Informational only; Commercial Vehicle Information
Details: OR213 MP 0 to MP 1.00 NB & SB (Oregon City) Effective September 23, 2011, this section of OR213 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5:30 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. In addition, OR213 crossing under Holcomb Blvd will be restricted to 19 feet 00 in. in height northbound and 17 feet 00 in. in height southbound during the same times. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

ORE213
MP 24 to 25

Estimated delay under 20 minutes; Construction Work
Comments: One lane two-way traffic will be intermittently interrupted by flagging. Flagging control one lane traffic 24 hrs/day, 7 days/week. Speed 45 mph. OR213 1/4 mile south of intersection with Wagon Rd. to 1/2 mile north of Butte Creek Bridge. Grading, drainage, bridge replacement, paving, signing and roadside development project.
Updated: 05/20/2013 08:06 am

ORE213
MP 24.2 to 24.3

Informational only; Commercial Vehicle Information
Details: OR213 MP 23.8 to MP 24.5 NB & SB (north of Silverton) Effective May 15, 2013, this section of OR213 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE214
MP 22.06 to 38.94

Informational only; Commercial Vehicle Information
Details: OR214 MP 21.2 to MP 39.1 (south of Silverton) Effective July 15, 2013, this section of OR214 will be restricted to 12 feet 00 in. in width. Estimated date of completion is September 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE214
MP 37.5

Informational only; Commercial Vehicle Information
Details: OR214 MP 37.5 to MP 38.0 NB & SB (south of Silverton) Effective June 18, 2013, this section of OR214 will be closed between the hours of 9 AM & 3:30 PM (DAYTIME). Estimated date of completion is June 20, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 0 to 7.52

Informational only; Commercial Vehicle Information
Details: OR217 MP 0 to MP 7.5 NB & SB Effective February 25, 2013, OR217 will be restricted to 13 feet 00 in. in width between the hours of 9:30 PM & 5 AM. In addition, the height will be restricted to 15 feet 11 in. going northbound and 15 feet 07 in. going southbound between the hours of 8 PM & 5 AM. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 0 to 7.52

Estimated delay under 20 minutes; Construction Work
Comments: Expect nighttime construction and lane closures on OR 217. This project will make operational and safety improvements on OR 217, including widening the right shoulders on three sections of OR 217, paving both directions of OR 217 from TV Highway to I-5, improving signage in the OR 217 corridor, and upgrading the center median barrier. This week, motorists can expect the following impacts: ** nighttime lane closures on OR 217 northbound and southbound from 7:30 p.m. to 5:30 a.m. for various construction tasks ** daytime lane and shoulder closures on SW Wilshire and SW Walker in both directions, just west of OR 217, from 9 a.m. to 3 p.m. ** the ramp from OR 217 southbound to Allen Boulevard will be restricted to one lane, day and night, in April and May
Updated: 04/22/2013 4:52 pm

ORE217
MP 1.47 to 1.76

Informational only; Commercial Vehicle Information
Details: OR217 MP 1.31 to MP 1.99 NB & SB (Beaverton) Effective May 13, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). When closed, traffic should take Exit 2A and re-enter OR217. Estimated date of completion is August 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 2.85

Informational only; Commercial Vehicle Information
Details: OR217 MP 2.85 NB & SB (Beaverton) Effective June 17, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 3.56 to 4.95

Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective June 19, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM. Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 3.81 to 4.95

Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective June 19, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM. Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 4.95 to 5.9

Informational only; Commercial Vehicle Information
Details: OR217 MP 4.8 to MP 6.0 NB & SB (Beaverton) Effective July 1, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 13, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 6.19 to 6.69

Informational only; Commercial Vehicle Information
Details: OR217 MP 6.0 to MP 6.7 NB & SB (Tigard) Effective July 15, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 20, 2013.
Updated: 06/18/2013 7:00 pm

ORE219
MP 23.46

Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 Willamette River near Newberg MP 23.46 Willamette River Bridge near Newberg is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
Updated: 06/18/2013 7:00 pm

ORE224
MP -.01 to .93

Informational only; Commercial Vehicle Information
Details: OR224 MP 0 to MP 1.05 EB & WB (Milwaukie) Effective February 4, 2013, this section of OR224 will be restricted to 14 feet 00 in. in width between the hours of 9 AM and 3 PM (DAYTIME). Estimated date of completion is November 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE224
MP 2.38 to 4.04

Informational only; Commercial Vehicle Information
Details: OR224 MP 2.20 to MP 4.20 EB & WB (Milwaukie) Effective April 18, 2013, this section of OR224 will be restricted to 16 feet 06 in. in height on Monday - Friday between the hours of 7 PM & 5:30 AM. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE224
MP 2.42 to 4.17

Informational only; Commercial Vehicle Information
Details: OR224 MP 2.20 to MP 4.20 EB & WB (Milwaukie) Effective April 18, 2013, this section of OR224 will be restricted to 16 feet 06 in. in height on Monday - Friday between the hours of 7 PM & 5:30 AM. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99E
MP 1 to 1.5

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures Motorists can expect daytime lane closures with flaggers controlling traffic on the ramp from 7 a.m. to 4:30 p.m., Monday through Friday. The right lane on OR 99E (Martin Luther King, Jr. Boulevard) southbound starting at Division Street may also be closed this week between 9 a.m. and 3 p.m. This project will pave and adjust manhole covers on the “jughandle” on-ramp from SE Ivon Street/SE 4th Place onto the OR 99E (Martin Luther King, Jr. Boulevard) southbound viaduct. Construction will be complete by May 2013.
Updated: 05/17/2013 10:33 am

ORE99W
MP 10.95

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. This safety project will widen OR 99W at Beef Bend Road in Tigard/King City in order to build a dedicated right turn lane for southbound motorists. This week, there may be brief traffic delays during the day as trucks enter and exit the work zone from Beef Bend Road. The contractor will maintain the temporary bike/ped access through the project area this week. Bicyclists and pedestrians using the trail near Beef Bend Road should use caution and watch for equipment and construction activities along the path.
Updated: 04/22/2013 4:36 pm

ORE99W
MP 16.58 to 12.15

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime paving on OR 99W through the summer. Expect short delays between 8 p.m. and 6 a.m. This project will grind off the old pavement, repave and restripe OR 99W in both directions between the Tualatin River Bridge in King City and Sunset Boulevard in Sherwood. This week, motorists can expect nighttime single lane closures on OR 99W in both directions throughout the entire project area from 8 p.m. to 6 a.m., Monday through Friday, for paving.
Updated: 04/22/2013 4:33 pm

US20
MP 16.29 to 21.88

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Installing horizontal drains and rock drainage features. Delays are not anticipated.
Updated: 06/14/2013 1:13 pm

US20
MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 Effective May 19, 2006 at MP 23.38 Yaquina River Bridge near Eddyville is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 06/18/2013 7:00 pm

US26
MP .95

Informational only; Commercial Vehicle Information
Details: US26 EB ramp to OR99E SB (Portland) Effective July 11, 2013, the ramp from US26 eastbound (Ross Island Bridge) to OR99E southbound will be closed between the hours of 10 PM & 6 AM. Estimated date of completion is July 12, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 1.46

Informational only; Commercial Vehicle Information
Details: US26 WB on-ramp from NB 17th Ave - Portland Effective June 15, 2012, the ramp from northbound SE 17th Ave to US26 westbound will be closed. Estimated date of re-opening is September 1, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 6.03 to 9.96

Informational only; Commercial Vehicle Information
Details: US26 MP 6.00 to MP 10.15 EB & WB (East Portland) Effective June 24, 2013, this section of US26 will be restricted to 10 feet 00 in. in width per the following schedule: Sunday - Thursday nights between the hours of 8 PM & 6 AM; Friday night between the hours of 8 PM & 9 AM; Saturday night between the hours of 8 PM & 10 AM. The estimated date of completion is October 28, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 7.81 to 9.61

Informational only; Commercial Vehicle Information
Details: US26 MP 7.8 to MP 9.7 EB & WB (Portland) Effective June 5, 2013, this section of US26 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves allowed provided the base width does not exceed 14 feet 00 in. Estimated date of completion is July 7, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 23.87 to 24.61

Informational only; Commercial Vehicle Information
Details: US26 MP 23.87 to MP 24.61 EB & WB (Sandy) Effective July 11, 2013, this section of US26 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 6:30 PM & 9:30 PM for one day only.
Updated: 06/18/2013 7:00 pm

US26
MP 56.93 to 57.33

Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and off-ramp to/from Glencoe Rd will be intermittently closed per the following schedule: Monday through Friday nights, 9:30 PM to 5 AM; Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 56.98 to 57.38

Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and off-ramp to/from Glencoe Rd will be intermittently closed per the following schedule: Monday through Friday nights, 9:30 PM to 5 AM; Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 57

Estimated delay under 20 minutes; Construction Work
Comments: Construction is occurring near the roadway. Please use caution. Project Description: This project replaces the Glencoe Road overpass at U.S. 26 in North Plains and improves the highway ramps, bicycle and pedestrian connections, signs, traffic signals, striping and drainage at this interchange. A culvert under Glencoe Road will also be replaced with a bridge. Traffic Impacts: None this week as the contractor is working on tasks off the roadway. For more information:
Updated: 05/22/2013 08:42 am

US26
MP 57.15

Informational only; Commercial Vehicle Information
Details: US26 MP 57.15 EB & WB (crossing under Glencoe Rd - Hillsboro) Effective June 1, 2013, this section of US26 will be intermittently closed between the hours of 9 PM & 5 AM. When closed, traffic will be directed to take Glencoe Rd Exit 57 and re-enter US26. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 57.16

Informational only; Commercial Vehicle Information
Details: US26 MP 57.15 EB & WB (crossing under Glencoe Rd - Hillsboro) Effective June 1, 2013, this section of US26 will be intermittently closed between the hours of 9 PM & 5 AM. When closed, traffic will be directed to take Glencoe Rd Exit 57 and re-enter US26. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 65.9 to 64.3

Estimated delay of 20 minutes - 2 hours; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: The shoulders on U.S. 26 will be closed intermittently during the day. Project Description: This project widened U.S. 26 between NW Cornell Road and 185th Avenue in Beaverton to three lanes in each direction. When complete, there will also be median cable barrier, widened shoulders and new pavement and striping. Additional work includes improvements to on- and off-ramps at NW 185th and Betheny Boulevard. Traffic Impacts: The shoulders on U.S. 26 will be closed intermittently during the day. There may also be lane closures on U.S. 26 around the Bethany Boulevard overpass as part of a project being built by Washington County. Please call 503-846-ROAD/7623 for more information or visit www.wc-roads.com. For more information:
Updated: 05/13/2013 10:57 am

US30
MP .03

Informational only; Commercial Vehicle Information
Details: US30 MP 0.03 Historic Columbia River Highway Historic US30 MP 0.03 Sandy River Bridge is restricted to 30 tons Gross.
Updated: 06/18/2013 7:00 pm

US30
MP .91 to 1.24

Informational only; Commercial Vehicle Information
Details: US30 Bypass MP 0.91 to MP 1.24 EB & WB (St Johns Bridge - Portland) Effective July 29, 2013, US30 Bypass at the St Johns Bridge will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is August 8, 2013.
Updated: 06/18/2013 7:00 pm

US30
MP 3.12 to 3.92

Estimated delay of 20 minutes - 2 hours; Maintenance Work
Lanes Affected: (Westbound) All Lanes , Shoulder
Comments: Road work will have the WB lanes closed from 35th Avenue to Kittridge. Traffic will be using the center median, expect delays or use alternate route.
Updated: 04/11/2013 09:14 am

US30
MP 12.5 to 17.93

Estimated delay under 20 minutes; Construction Work
Comments: Daytime lane closures & delays for paving; some access restrictions This week, motorists can expect daily lane closures and traffic shifts on U.S. 30 westbound (towards Scappose) from 3 a.m. to 3 p.m., Monday through Friday, for grinding and paving. Direct access to driveways and cross-roads will be restricted at certain times as the paving operation moves through. Motorists will be able to drive past the paving work zone, make a u-turn and access these roads and driveways from the other direction. Motorists will be driving on a rough surface with a two-inch lip between lanes in certain areas. Please slow down and use caution. This project will repave US 30 in both directions between McNamee Road and milepost 17.93, just east of the Columbia County line, and apply a waterproof membrane to the bridge over McCarty Creek.
Updated: 05/17/2013 10:20 am

US30
MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 MP 13.14 Historic Columbia River Highway Historic US30 MP13.14 Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Table 1.
Updated: 06/18/2013 7:00 pm

US30
MP 13.24

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. There is daytime shoulder work planned this week on US 30 as the contractor begins work on this project. This project will improve safety and mobility at this intersection by lengthening existing turn lanes from US 30 onto Cornelius Pass Road, adding new dedicated right and left turn lanes from Cornelius Pass Road onto US 30 and upgrading traffic signals.
Updated: 05/09/2013 3:56 pm

US30
MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 MP 17.68 Historic Columbia River Highway (W Multnomah Falls Bridge) Historic US30 MP 17.68 West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 06/18/2013 7:00 pm

US30
MP 20.39

Informational only; Commercial Vehicle Information
Details: US30 MP 20.39 Historic Columbia River Highway Historic US30 MP 20.39 Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Table 1.
Updated: 06/18/2013 7:00 pm

US30
MP 31.7 to 37.2

Estimated delay under 20 minutes; Construction Work
Comments: Expect daytime and nighttime lane closures as a contractor paves U.S. 30 from Jones Road to Columbia City. A paving project is under way on U.S. 30 (Lower Columbia River Highway) in both directions from just north/west of Pacific Street in Columbia City to Jones Road, a distance of approximately 5.5 miles. Work will finish by the end of May 2013. The contractor plans to primarily work at night, Monday through Thursday, from 7 p.m. to 6 a.m. There will be occasional daytime work on weekdays between 9 a.m. and 4 p.m. This work is weather dependent and will be delayed in wet weather. Road users should expect short delays and increased congestion in this area during this project. Please drive carefully through the construction zone.
Updated: 04/22/2013 4:12 pm

US30
MP 48.67

Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) This bridge belongs to Washington State. Restricted to 21,500 lbs. per axle. No gross weight restriction.
Updated: 06/18/2013 7:00 pm

US30
MP 94.42 to 95.11

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. (Lower Columbia River Highway, mile post 94.42 to 95.11) This project consists of replacing a culvert with a bridge along US30 just east of Astoria. The scheduled work includes construction of the bridge and new roadway alignment. The access to the old Columbia River Highway located at the project site has been permanently closed. Flaggers will control single lane traffic during construction activities as required. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in September 2014.
Updated: 04/02/2013 12:23 pm

US101
MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge) MP 4.78 Drawbridge crossing Lewis & Clark River (2.5 miles south of Astoria) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Updated: 06/18/2013 7:00 pm

US101
MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge) MP 6.89. Effective November 10, 2009 the Old Youngs Bay Bridge in Astoria will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW Weight Table 2.
Updated: 06/18/2013 7:00 pm

US101
MP 39.53

Informational only; Commercial Vehicle Information
Details: US101 MP 39.53 NB & SB Effective August 1, 2013, this section of US101 will be restricted to 12 feet 00 in. in width between the hours of 9 AM & 12 noon (DAYTIME). Estimated date of completion is August 1, 2013.
Updated: 06/18/2013 7:00 pm

US101
MP 40.71

Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 Neahkahnie Mtn Chasm (near Manzanita) Effective November 15, 2004 at MP 40.71 Neahkahnie Mountain Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
Updated: 06/18/2013 7:00 pm

US101
MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for Non-Divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 06/18/2013 7:00 pm

US30BY
MP 12.4 to 13.7

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: No work is planned this week. Project Description: This safety improvement project will add a center left-turn lane to this section of Sandy Boulevard, striped bike lanes in both directions and sidewalk on the south side of the road. It will also upgrade the traffic signals at NE 122nd Avenue and NE 138th Avenue and making pedestrian crossing improvements at NE 131st Place. Traffic Impacts: None anticipated this week. This project is in "winter shutdown mode," with only limited work activities anticipated through early spring. For more information:
Updated: 12/24/2012 4:04 pm

North Oregon Road Conditions by Route

I-84
MP 35 to 44

Estimated delay under 20 minutes; Construction Work
Comments: Expect single lane closures. Project Description: This project will replace the driving surface on four bridges on I-84 between exit 35 (Dodson/Ainsworth State Park) and exit 44 (Cascade Locks/Bridge of the Gods) in the Bonneville Dam area. The bridges being resurfaced are: • I-84 westbound at Dodson, just west of exit 35 • I-84 eastbound at Dodson, just west of exit 35 • I-84 eastbound over Eagle Creek (milepost 41.5) • I-84 westbound over Ruckel Creek (milepost 42) Traffic Impacts: Starting April 8, one right lane on the I-84 eastbound bridge at Eagle Creek and on the I-84 westbound bridge at Ruckel Creek will be closed continually for a total of six weeks. These lane closures may cause traffic backups on I-84 westbound the weekends. At Eagle Creek, the lane closures will start before the Tooth Rock Tunnel and end after the Eagle Creek Bridge. Traffic will be directed through the center of the tunnel. Access to the Eagle Creek Trail and Hatchery will be open at all times.
Updated: 04/09/2013 4:14 pm

I-84
MP 37.12 to 38.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 36.75 to MP 39 EB & WB Effective September 6, 2012, this section of I-84 is restricted to 19 feet 00 in. in width Monday-Friday between the hours of 7:30 AM & 5:30 PM. Estimated date of completion is October 1, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 41.25 to 41.9

Informational only; Commercial Vehicle Information
Details: I-84 MP 41 to MP 42 EB (West of Cascade Locks) Effective April 10, 2013, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM. Estimated date of completion is June 14, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 41.54 to 42.08

Informational only; Commercial Vehicle Information
Details: I-84 MP 41.5 to MP 42.5 WB (West of Cascade Locks) Effective April 11, 2013, this section of I-84 westbound will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM.. Estimated date of completion is June 16, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 103 to 110

OFF RAMP
Informational only; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road construction is occurring, use caution. Ramps Affected.
Updated: 06/12/2013 4:59 pm

I-84
MP 137.92

Informational only; Commercial Vehicle Information
Details: I-84 MP 137.92 EB & WB (Arlington) Effective July 15, 2013, this section of I-84 will be restricted to 12 feet 00 in. in width on Monday - Thursday between the hours of 6 AM & 5 PM (DAYTIME). No restrictions will be in place from 5 PM on Thursday until 6 AM on Monday. Estimated date of completion is July 25, 2013.
Updated: 06/18/2013 7:00 pm

ORE35
MP 101.82

Informational only; Commercial Vehicle Information
Details: OR35 OR/WA Border at Hood River OR35 White Salmon Bridge at Hood River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW; Weight Table 1. Bridge belongs to Port of Hood River.
Updated: 06/18/2013 7:00 pm

ORE206
MP 2.92

Informational only; Commercial Vehicle Information
Details: OR206 MP 2.92 Deschutes River MP 2.92 crossing over the Deschutes River (1.2 miles south of I-84) 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 06/18/2013 7:00 pm

ORE207
MP 11.86

Informational only; Commercial Vehicle Information
Details: OR207 MP 11.86 MP11.86 (5.5 miles south of Hermiston) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Wt. Table 2 Divisible Load; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Non-divisible Load.
Updated: 06/18/2013 7:00 pm

ORE216
MP 8.3

Informational only; Commercial Vehicle Information
Details: OR216 MP 8.30 EB & WB (Sherar's Bridge) Effective July 1, 2013, this section of OR216 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is July 3, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 85.25

Informational only; Commercial Vehicle Information
Details: US26 MP 85.25 EB & WB (Warm Springs) Effective June 17, 2013, this section of US26 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 105.26

Informational only; Commercial Vehicle Information
Details: US26 MP 105.26 WB (Warm Springs) Effective July 29, 2013, this section of US26 westbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is August 16, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 110 to 117.5

Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Single lane closures at nightime on US97 between MP103 to MP106 for striping with traffic control. Work expect to be complete by June 30th.
Updated: 06/10/2013 2:36 pm

US30
MP 30.42

Informational only; Commercial Vehicle Information
Details: US30 Historic Columbia River Hwy (Bridge of the Gods) US30 Historic Columbia River Hwy at MP 30.42 Bridge of the Gods is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 60,000 lbs. GVW; Weight Table 1. Trucks up to 80,000 lbs GVW allowed Monday - Friday between 8 AM & 3PM. This bridge belongs to the Port of Cascade Locks.
Updated: 06/18/2013 7:00 pm

US97
MP .43 to 2

OFF RAMP
Informational only; Construction Work
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Road construction is occurring, use caution. Ramps Affected.
Updated: 06/11/2013 06:35 am

US197
MP 13.35

Informational only; Commercial Vehicle Information
Details: US197 MP 13.35 NB & SB (Dufur) Effective June 24, 2013, this section of US197 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 6 PM (DAYTIME). Estimated date of completion is June 28, 2013.
Updated: 06/18/2013 7:00 pm

US197
MP 14.46

Informational only; Commercial Vehicle Information
Details: US197 MP 14.46 NB & SB (Dufur) Effective June 24, 2013, this section of US197 will be restricted to 13 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 28, 2013.
Updated: 06/18/2013 7:00 pm

Northeast Oregon Road Conditions by Route

I-84
MP 217 to 245

No to Minimum Delay; Construction Work
Lanes Affected: (Eastbound) 1 Lane , Shoulder
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 05/07/2013 11:23 am

I-84
MP 228.78 to 229.11

Informational only; Commercial Vehicle Information
Details: I-84 Exit 228 on/off ramps WB (Deadman Pass) Effective June 13, 2013, the ramps to/from I-84 westbound Exit 228 will be closed between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 13, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 228.79 to 229.11

Informational only; Commercial Vehicle Information
Details: I-84 Exit 228 on/off ramps EB (Deadman Pass) Effective June 12, 2013, the ramps to/from I-84 eastbound Exit 228 will be closed between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 12, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 245.85 to 260.67

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect minimal slow lane closures for road construction in the area, use caution.
Updated: 05/29/2013 3:52 pm

I-84
MP 248.54 to 260.29

Informational only; Commercial Vehicle Information
Details: I-84 MP 248.0 to MP 260.7 EB (west of La Grande) Effective May 20, 2013, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width. Mobile homes with eaves allowed provided the base width does not exceed 13 feet 00 in. Estimated date of completion is November 1, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 256.4

Informational only; Commercial Vehicle Information
Details: I-84 Upper Perry Interchange Overcrossing MP 256.42 Upper Perry Interchange at Perry - 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Updated: 06/18/2013 7:00 pm

I-84
MP 295.6 to 296.6

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 05/29/2013 08:04 am

I-84
MP 306.26 to 306.78

Informational only; Commercial Vehicle Information
Details: I-84 on- and off-ramps to / from Exit 306 (Baker City) Effective June 29, 2013, the on- and off-ramps to / from I-84 Exit 306 will be closed between the hours of 8 AM & 8 PM (DAYTIME) for one day only. These closures are NOT on the I-84 mainline.
Updated: 06/18/2013 7:00 pm

I-84
MP 306.56 to 306.93

Informational only; Commercial Vehicle Information
Details: I-84 on- and off-ramps to / from Exit 306 (Baker City) Effective June 29, 2013, the on- and off-ramps to / from I-84 Exit 306 will be closed between the hours of 8 AM & 8 PM (DAYTIME) for one day only. These closures are NOT on the I-84 mainline.
Updated: 06/18/2013 7:00 pm

ORE7
MP 50.83 to 50.96

Informational only; Commercial Vehicle Information
Details: OR7 MP 50.83 to MP 50.96 (Baker City) Effective June 29, 2013, this section of OR7 will be closed between the hours of 8 AM & 8 PM (DAYTIME) for one day only.
Updated: 06/18/2013 7:00 pm

ORE82
MP 17.88

Informational only; Commercial Vehicle Information
Details: OR82 MP 17.88 Indian Creek/Grande Ronde River Bridge MP 17.88 Indian Creek/Grande Ronde River Bridge 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 06/18/2013 7:00 pm

ORE86
MP 51.33 to 63.71

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Guardrail construction is occurring, use caution.
Updated: 05/20/2013 3:52 pm

ORE334
MP 17.22 to 17.62

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 05/07/2013 11:22 am

ORE339
MP 2.76

Informational only; Commercial Vehicle Information
Details: OR339/Freewater Hwy MP 2.76 West Crockett Branch OR339 MP 2.76 West Crockett Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Wt. Table 4.
Updated: 06/18/2013 7:00 pm

ORE339
MP 3.16

Informational only; Commercial Vehicle Information
Details: OR339/Freewater Hwy MP 3.16 East Fork Little Walla Walla River OR339 MP 3.16 Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Wt. Table 4.
Updated: 06/18/2013 7:00 pm

ORE339
MP 3.31

Informational only; Commercial Vehicle Information
Details: OR339/Freewater Hwy MP 3.31 West Fork Little Walla Walla River OR339 MP 3.31 Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Wt. Table 4.
Updated: 06/18/2013 7:00 pm

US30
MP 51.67 to 52.04

Informational only; Commercial Vehicle Information
Details: US30 MP 51.67 to MP 52.04 (Baker City) Effective June 29, 2013, this section of US30 will be closed between the hours of 8 AM & 8 PM (DAYTIME) for one day only.
Updated: 06/18/2013 7:00 pm

US30
MP 51.79 to 52.05

Informational only; Commercial Vehicle Information
Details: US30 MP 51.79 to MP 52.05 NB & SB (Baker City) Effective July 12, 2013, this section of US30 will be closed between the hours of 8 AM & 3 PM. Estimated date of completion is July 14, 2013.
Updated: 06/18/2013 7:00 pm

West Oregon Road Conditions by Route

99
MP 12.21

Informational only; Commercial Vehicle Information
Details: Old OR99 (DC388) Old Winchester Bridge (Roseburg) Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.
Updated: 06/18/2013 7:00 pm

I-5
MP 192 to 193.5

Estimated delay under 20 minutes; Construction Work
Comments: Watch for night time single lane closures. Be aware of construction vehicles, traffic signs and roadside work crews. Use caution. Interstate 5 (between mileposts 192.0 and 193.5): Watch for construction vehicles entering and exiting the travel lanes at the shoulder. Watch for temporary traffic signs, roadside work crews and equipment. Watch for nighttime single-lane and shoulder closures. Please drive carefully through the work zone. Reduce speed.
Updated: 06/17/2013 4:59 pm

I-5
MP 192.1 to 193.4

Estimated delay under 20 minutes; Construction Work
Comments: Watch for traffic congestion at Franklin and Jenkins Dr. Reduce speed. Use caution in the area. The speed limit is reduced to 35 mph. Watch for roadside work crews and construction vehicles entering and exiting the travel lanes from the roadway shoulder and at the intersection of Franklin Boulevard and Jenkins Drive. Please drive carefully and obey all construction signs and flagger instructions. For the latest online information about the project, please visit willamettebridge.org, read the blog at willametteriverbridge.blogspot.com and follow us on Twitter: @OregonDOT. Construction has now begun on the NB Willamette River bridge and Patterson Slough Bridge. Use extreme caution while driving in the work zone. Cyclist and pedestrian path users should use caution and expect some delays for construction activity. This project will replace the I-5 bridge over the Willamette River.
Updated: 06/18/2013 11:55 am

I-5
MP 192.27

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 192 off-ramp (to OR99/OR126 Business) - Eugene Effective October 3, 2011, the I-5 northbound Exit 192 off-ramp to OR99/OR126 Business will be closed. Estimated date of re-opening is January 1, 2014.
Updated: 06/18/2013 7:00 pm

I-5
MP 192.8

Estimated delay under 20 minutes; Construction Work
Comments: North bound to Franklin Boulevard off ramp exit 192 is closed until October 2013. Detour via exit 191 and Glenwood Boulevard. Watch for work crews. The I-5 northbound Franklin Blvd. off-ramp Exit 192 (milepost 192.8) is closed until October 2013; detour via Exit 191 and Glenwood Blvd. Watch for roadside work crews and equipment. Please drive carefully through the work zone.
Updated: 06/07/2013 12:57 pm

I-5
MP 195.02 to 195.46

Informational only; Commercial Vehicle Information
Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April 9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in width and 16 feet 03 in. in height on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

I-5
MP 195.45 to 195.46

OFF RAMP
Informational only; Construction Work
Comments: Beginning Monday, motorists will use a new temporary ramp to exit south bound I 5 to both east bound and west bound belt line. Use caution. Ramps Affected. Beginning Monday, June 10, 2013: Motorists will use a new temporary ramp for exiting southbound I-5 to both eastbound and westbound Beltline A new temporary traffic signal will be placed where the new ramp intersects with Beltline, controlling the flow of traffic.
Updated: 06/07/2013 1:05 pm

I-5
MP 195.45 to 195.46

Informational only; Construction Work
Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes
Comments: The posted speed limit has been reduced to 35 on the Beltline bridge and 50 on Interstate 5 near the interchange due to construction work zone. New, lower speed limits have been implemented on the Randy Papé Beltline bridge over Interstate 5, and on I-5 beneath the bridge where construction has begun on a two-year project to improve the I-5/Beltline interchange. Beginning Wednesday, April 17, 2013, the posted, enforceable speed limit on the Beltline bridge over I-5 will be 35 miles per hour. The speed limit on I-5 near the interchange will be reduced to 50 miles per hour. The speed limit reductions will be enforced until the project is completed in fall of 2014. The speed limit reductions are intended to improve work zone safety for all highway users and construction workers. From 2007 through 2011 in Oregon, 53 people died and more than 2,200 were injured in work zone crashes. The majority of people injured or killed in these crashes were drivers, passengers or pedestrians, not workers. The single biggest factor in crashes is driver inattention; that’s why orange cones, variable message signs and other tools are used to alert motorists. The other major contributing factor is speed, which is why work zones often require lower speed limits. National Work Zone Awareness Week is April 16-19. To learn more about work zone safety, visit ODOT’s safety website at: http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx
Updated: 05/23/2013 4:01 pm

I-5
MP 195.45 to 195.46

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder
Comments: Regular closures of the eastbound Beltline to southbound I -5 ramp will continue weeknights between 8 p.m. and 5:30 a.m. Use the detour route posted. The northbound Interstate 5 on-ramp from eastbound Beltline will be closed overnight Monday, June 17 beginning at 8 pm and continuing until 5 am Tuesday, June 18. Motorists will access northbound I-5 by traveling east on Beltline to Gateway St, then north to Game Farm Road, the west to Coburg Rd, then north to Pearl Street, Coburg, then east to I-5. Watch for trucks entering and exiting the roadway and advance signing. A speed limit reduction to 35 MPH is now in effect on Beltline. A speed limit reduction to 50 MPH is now in effect for I-5 through the construction zone. There will be periodic rolling slowdowns on I-5 northbound beginning in Glenwood (MP 191) and southbound beginning in Coburg (MP 199) between 9 pm and 5 am. Project Summary: This project will rebuild the interchange at Interstate 5 and Randy Pape’ Beltline Highway to meet modern design and safety standards. State funds from the Jobs and Transportation Act will build: - A new I-5 southbound to westbound Beltline off-ramp. - A new I-5 southbound to eastbound Beltline off-ramp. - A new westbound Beltline to southbound I-5 on-ramp - A new Beltline Bridge over I-5 - And base construction and structures for a new multi-use path to connect south of the interchange to north of the interchange. The path will open upon completion of Unit 4 scheduled to be constructed in 2016. This is a two year project. Construction of Unit 3 is scheduled to be completed by November 2014.
Updated: 06/13/2013 4:08 pm

I-5
MP 198.39 to 199.38

Informational only; Commercial Vehicle Information
Details: I-5 MP 198.01 to MP 199.41 NB & SB (Coburg) Effective June 24, 2013, this section of I-5 will be restricted to 16 feet 00 in. in width on Monday to Thursday between the hours of 8 PM & 6 AM. In addition, the height will be restricted to 15 feet 10 in. in height southbound during the same time. Estimated date of completion is August 24, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 198.39 to 200.15

OFF RAMP
No to Minimum Delay; Construction Work
Comments: The project is on schedule to be completed by the end of June 2013. Ramps Affected. Roberts Road has been closed and all traffic is now using South Industrial Way. The project is on schedule to be completed by the end of June, 2013. This project will improve the I-5/Coburg interchange, and improve the efficiency and safety of travel on Pearl Street, Coburg Industrial Way, and Roberts Road in the City of Coburg. The project will, among other things: •Close access to Roberts Road on the south side of Pearl Street with a cul de sac. •Connect Roberts Road to the intersection of Coburg Industrial Way and Pearl Street by constructing a new road, Coburg Industrial Way South. •Widen and lengthen the I-5 southbound on-ramp to accept 2 lanes turning east to south from Pearl Street.
Updated: 06/07/2013 1:16 pm

I-5
MP 233 to 233.5

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes
Comments: Contractor will be removing the detour. Please proceed with caution. The reconstruction of the freeway is complete. The contractor will start removing the detour Tuesday night and continuing for the rest of the week. Expect the fast lane to be closed at night for this work. There will be heavy truck traffic in the work zone. No lanes will be closed during the daytime.
Updated: 06/18/2013 3:24 pm

ORE22
MP 30.03

Informational only; Commercial Vehicle Information
Details: OR22 Mill City Bridge (not on main OR22) Bridge actually on Connector 162AY MP 1C30.29 - 1st Street crossing over the Santiam River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 06/18/2013 7:00 pm

ORE34
MP 0

Informational only; Commercial Vehicle Information
Details: OR34 MP 0.0 to MP 0.5 (Waldport) Effective June 15, 2013, this section of OR34 will be closed between the hours of 10 AM & 1 PM for one day only.
Updated: 06/18/2013 7:00 pm

ORE34
MP .13

Informational only; Commercial Vehicle Information
Details: Old OR34 Van Buren St Bridge (Corvallis) MP 0.13 Willamette River (Van Buren Street) in Corvallis is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Updated: 06/18/2013 7:00 pm

ORE34
MP 1.62

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: From June 3rd to June 21st there will be single lane travel with flaggers directing traffic. This bridge repair replaces wood caps on the columns. This project is a routine bridge repair, replacing wooden bridge caps on the columns supporting the bridge. This work is on OR34 (Alsea Hwy), near Waldport, will restrict travel on the highway to a single lane during daytime hours for a three week period.
Updated: 05/29/2013 08:39 am

ORE36
MP 19.69

Informational only; Commercial Vehicle Information
Details: OR36 MP 19.69 Steinhauer Creek OR36 Steinhauer Creek Bridge at MP19.69 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
Updated: 06/18/2013 7:00 pm

ORE36
MP 19.69

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Bridge repair occurring. Use caution in the area. Expect delays of twenty minutes or less with flaggers controlling traffic across the bridge. A bridge repair project will restrict travel to one lane of traffic across Steinhauer Bridge, beginning Monday,June 17 and continuing until Friday, June 28, with 24 hr flagging. The project will replace structural components beneath the bridge, replace the bridge deck and install a new asphalt overlay on the deck.
Updated: 06/17/2013 06:01 am

ORE38
MP 17.8 to 18.2

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Traffic controlled by flaggers 24 hours, Monday through Friday, for excavation. All lanes will be open on the weekends. This is the Scottsburg-Wells Creek curve realignment project.
Updated: 06/17/2013 12:38 pm

ORE38
MP 18.04

Informational only; Commercial Vehicle Information
Details: OR38 MP 17.79 to MP 18.20 EB & WB (Scottsburg) Effective May 13, 2013, this section of OR38 will be restricted to 16 feet 00 in. in width. Estimated date of completion is July 1, 2013.
Updated: 06/18/2013 7:00 pm

ORE58
MP 56 to 56.2

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Monday to Thursday evening closures from 8 p.m. to 6 a.m. includes holiday. One lane will remain open during the day with up to 20 minute delay. Lane restrictions and nighttime closures at the OR 58: Salt Creek Tunnel has begun. The highway has been reduced to a single lane for two-way traffic during the day time. Flaggers and a pilot car will control travel in alternating directions. Motorists should anticipate delays of 5-20 minutes. The highway will be closed to all traffic in both directions Monday through Thursday nights only between 8 p.m. and 6 a.m. There is no local detour available and motorists will need to use an alternate route. There will be no nighttime complete closures from Friday at 6 a.m. until Monday at 8 p.m. during the construction season. The single lane restriction will remain in place during all hours when the tunnel is open. Project Summary: Built in 1939, the tunnel needs serious repair and the adjacent west half viaduct and the three east viaducts are failing and need to be replaced. The OR 58: Salt Creek Tunnel and Half-Viaduct project will: · Replace the half viaduct west of the tunnel · Replace the three half viaducts east of the tunnel · Repair the tunnel liner · Lower the tunnel floor Construction will take place over two construction seasons in 2012 and 2013.
Updated: 06/07/2013 1:13 pm

ORE58
MP 56.1

Informational only; Commercial Vehicle Information
Details: OR58 MP 56 to MP 59 EB & WB (Salt Creek Tunnel) Effective April 17, 2013, this section of OR58 at the Salt Creek Tunnel will be CLOSED to all traffic in both directions at night Monday-Thursday nights between the hours of 8 PM & 6 AM. In addition, this section of highway will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) and 14 feet 00 in. in height (LEGAL HEIGHT) at all times (day or night) when the highway is open (including Friday / Saturday / Sunday). Estimated date of completion is October 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 14.65 to 14.79

Informational only; Commercial Vehicle Information
Details: OR99 MP 14.65 to MP 14.79 SB (Cottage Grove) Effective April 22, 2013, this section of OR99 southbound will be closed on Monday - Friday nights between the hours of 10 PM & 7 AM. In addition, effective May 6, 2013, this section of OR99 southbound will be closed at all hours. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 14.69 to 14.86

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Highway 99 (Ninth Street) will close for 1 block between Gibbs and Whiteaker. Observe detour signs and traffic control devices. Use caution in area. Construction is underway. Highway 99 (9th Street) remains closed to through traffic for one block between Gibbs and Whiteaker Avenues. Local traffic heading from the Gibbs intersection will be allowed to drive a half-block south on Highway 99 to access local businesses. The Whiteaker intersection is currently closed but expected to reopen later in the week, when the block between Whiteaker and East Main will be closed. Local traffic may detour onto East Main Street, River Road and Woodson Place. Motorists should watch for detour signage and traffic control devices. Access to all local businesses will be maintained throughout construction. Blue business access signs will direct the public to the accesses. Pedestrians should watch for intermittent sidewalk and crosswalk closures. Nearby residents should anticipate nighttime noise consistent with road construction. This project will realign the intersection of East Main and OR 99 to improve safety, construct streetscape enhancements, improve bike and pedestrian facilities and upgrade and improve traffic signals at 4th and at East Main and OR 99. In addition, a new water main will be constructed for the City of Cottage Grove.
Updated: 06/17/2013 01:28 am

ORE99
MP 28.48 to 28.89

Informational only; Commercial Vehicle Information
Details: OR99E MP 28.48 to MP 28.89 NB & SB (Harrisburg) Effective July 4, 2013, this section of OR99E will be closed between the hours of 10:30 AM & 2 PM (DAYTIME) for one day only.
Updated: 06/18/2013 7:00 pm

ORE126
MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business WB MP 1.34 (Main St. Springfield) MP 1.34 Willamette River Bridge (1 mile east of I-5 in Springfield) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
Updated: 06/18/2013 7:00 pm

ORE126
MP 1.63 to 2.66

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.63 to MP 2.66 EB & WB (Springfield) Effective July 20, 2013, this section of OR126 Business (Main St) will be closed between the hours of 6 PM & 11 PM for one day only.
Updated: 06/18/2013 7:00 pm

ORE126
MP 2.67 to 1.66

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.63 to MP 2.66 EB & WB (Springfield) Effective July 20, 2013, this section of OR126 Business (Main St) will be closed between the hours of 6 PM & 11 PM for one day only.
Updated: 06/18/2013 7:00 pm

ORE126
MP 3.79

Informational only; Commercial Vehicle Information
Details: OR126 WB ramp to I-5 NB (Springfield) Effective July 23, 2013, the ramp from OR126 westbound to I-5 northbound will be intermittently closed on Monday - Thursday nights between the hours of 7 PM & 5:30 AM. Estimated date of completion is August 8, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 3.8 to 9.9

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road Construction Occurring. Use caution in the work zone. Watch for construction workers and equipment in the area. Construction will continue until late September. Much of the work will be completed at night to avoid peak travel times. During construction, motorists can expect single lane closures in both directions; ramp closures; and a night time weekend closure of the 42nd Street interchange in late June. "Q" St / Pioneer Parkway interchange will have single-lane closures and ramp closures anticipated at night through most of June. Watch for temporary traffic signs, traffic control devices, work crews and equipment. Please drive carefully through the work zone. Motorists should monitor www.tripcheck.com and www.keepusmoving.info for the latest closure information. Residents and businesses along the highway should anticipate noise consistent with road construction. This project will preserve the existing highway by grinding and replacing two inches of asphalt in most areas and reconstructing the eastbound portions of the 42nd Street interchange. The project will also improve safety by constructing cable median barrier between Mohawk Blvd. and East Main Street (MP 6.24-9.97).
Updated: 06/13/2013 4:14 pm

ORE126
MP 4.34 to 4.94

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Pioneer Pkwy (Springfield) Effective June 17, 2013, the on/off ramps to/from OR126 EB & WB to Pioneer Pkwy will be closed per the following schedule: Eastbound ramps closed Monday - Thursday nights between the hours of 8 PM & 11 AM. No closures will be in place from 11 AM Friday until 8 PM Monday. Westbound ramps closed Monday - Thursday nights between the hours of 7 PM & 5:30 AM. No closures will be in place from 5:30 AM Friday until 7 PM Monday. Estimated date of completion is August 5, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 5.9 to 6.29

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Mohawk Blvd (Springfield) Effective June 27, 2013, the on- and off-ramp to/from Mohawk Blvd will be intermittently closed per the following schedule: eastbound - Monday through Thursday nights, 7 PM to 11 AM; westbound - Monday through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126 mainline. Estimated date of completion is July 16, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 7.16 to 7.44

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield) Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be closed per the following schedule: eastbound - Monday through Thursday nights, 7 PM to 11 AM; westbound - Monday through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126 mainline. Estimated date of completion is July 27, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 7.19 to 7.47

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield) Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be closed per the following schedule: eastbound - Monday through Thursday nights, 7 PM to 11 AM; westbound - Monday through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126 mainline. Estimated date of completion is July 27, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 36.5

No to Minimum Delay; Crash/Hazard
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 06/19/2013 04:13 am

ORE164
MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge) - Jefferson OR164 at MP 6.24 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Updated: 06/18/2013 7:00 pm

ORE228
MP 6.16 to 6.58

Informational only; Commercial Vehicle Information
Details: OR228 MP 6.16 to MP 6.58 EB & WB (Brownsville) Effective June 22, 2013, this section of OR228 will be closed between the hours of 10 AM & 12 noon (DAYTIME) for one day only.
Updated: 06/18/2013 7:00 pm

ORE241
MP .51

Informational only; Commercial Vehicle Information
Details: OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Updated: 06/18/2013 7:00 pm

ORE569
MP 7.66 to 11.66

OFF RAMP
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Guardrail construction at Green Acres ramp. Traffic sensors being installed at all exits day and night shifts. Watch for lane and shoulder closures. Ramps Affected. Guardrail is under construction at the Green Acres Ramp. Traffic sensors will be installed at all exits during both day and night shift throughout the week. Permanent striping will be placed on all ramps at night when weather permits. There will be shoulder and lane closures throughout the week due to the construction. Watch for flaggers directing traffic and construction vehicles leaving and entering the roadway. Summary: This project adds ramp meters at various exits that access the Randy Papé Beltline in Eugene. The eastbound on-ramp at the River Road exit will also be widened. Safety features such as striping, guardrails, and concrete barrier will also be installed or modified. Ramp meters will be installed at the following locations: Eastbound On Ramps at River Road and River Avenue; Westbound On Ramps at Green Acres and Coburg Road. Construction is scheduled to be completed by June 30, 2013. Motorists should anticipate single night ramp closures, lane closures, and shoulder closures, flaggers controlling traffic, and construction vehicles entering and leaving the roadway at the four ramp meter locations. Motorists are encouraged to travel safely through the areas and respect the direction given by flaggers.
Updated: 06/07/2013 1:10 pm

ORE569
MP 12.26 to 13

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

ORE569
MP 12.53 to 12.95

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

ORE569
MP 12.76

Informational only; Commercial Vehicle Information
Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the ramp from OR569 westbound to I-5 southbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

ORE569
MP 12.79

Informational only; Commercial Vehicle Information
Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the ramp from OR569 eastbound to I-5 northbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

ORE42S
MP 3 to 16.9

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution. Traffic control with flaggers and pilot car, week day hours through June 28th.
Updated: 06/17/2013 08:52 am

ORE42S
MP 7 to 11

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution. Traffic will be controlled by flaggers and a pilot vehicle.
Updated: 06/19/2013 05:10 am

US20
MP 10.44

Informational only; Commercial Vehicle Information
Details: US20 MP 10.44 EB & WB (Willamette River Bridge - Albany) Effective July 10, 2013, this section of US20 will be restricted to 16 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is July 12, 2013.
Updated: 06/18/2013 7:00 pm

US20
MP 10.45

Informational only; Commercial Vehicle Information
Details: US20 MP 10.44 EB & WB (Willamette River Bridge - Albany) Effective July 10, 2013, this section of US20 will be restricted to 16 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is July 12, 2013.
Updated: 06/18/2013 7:00 pm

US20
MP 16.29 to 21.88

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Installing horizontal drains and rock drainage features. Delays are not anticipated.
Updated: 06/14/2013 1:13 pm

US20
MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 Effective May 19, 2006 at MP 23.38 Yaquina River Bridge near Eddyville is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 06/18/2013 7:00 pm

US20
MP 27.07 to 27.93

Informational only; Commercial Vehicle Information
Details: US20 MP 27.03 to MP 27.93 EB & WB (Sweet Home) Effective July 13, 2013, this section of US20 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 11 AM & 12 noon for one day only.
Updated: 06/18/2013 7:00 pm

US20
MP 49.87 to 50.79

Informational only; Commercial Vehicle Information
Details: US20 MP 49.87 to MP 50.79 (Philomath) Effective July 13, 2013, this section of US20 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 10 AM & 12 noon for one day only.
Updated: 06/18/2013 7:00 pm

US97
MP 197.65 to 200.3

Future Event: Informational only; Construction Work
Expected Start Date: 7/1/2013 7:00:00 AM
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Road construction is occurring, use caution.
Updated: 06/11/2013 06:19 am

US101
MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for Non-Divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 06/18/2013 7:00 pm

US101
MP 155

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: One lane of travel will be closed during the painting of the bridge. Flaggers will direct traffic. Delays are not expected. This project will remove rust and paint the outer and inner arches of the Alsea Bay Bridge in Waldport. In addition, the project will also paint the pedestrian rails and other portions of the bridge not painted before. Project will construct a new steel walkway below the bridge deck. This walkway will allow access for routine bridge inspections.
Updated: 06/14/2013 1:21 pm

US101
MP 155.9 to 156.16

Informational only; Commercial Vehicle Information
Details: US101 MP 155.90 to MP 156.16 (Waldport) Effective June 15, 2013, this section of US101 will be closed between the hours of 10 AM & 1 PM for one day only.
Updated: 06/18/2013 7:00 pm

US101
MP 190.98

Informational only; Commercial Vehicle Information
Details: US101 MP 190.98 Siuslaw River (Florence) Effective March 17, 2003 at MP 190.98 Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Updated: 06/18/2013 7:00 pm

US101
MP 233.47 to 234.5

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , 1 Lane (Southbound) Median , 1 Lane
Comments: Expect intermittent week-night lane closures on the McCullough Bridge.
Updated: 06/17/2013 12:33 pm

US101
MP 234 to 238

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: Expect intermittent lane and shoulder closures, use caution. There are nighttime lane closures, 7 PM to 7 AM, on US Hwy 101. This project is replacing traffic signals in preparation for paving, summer of 2013, from McCullough Bridge in North Bend to Fir Street. in Coos Bay.
Updated: 06/17/2013 12:34 pm

US101
MP 238.01 to 238.5

Informational only; Commercial Vehicle Information
Details: US101 MP 238.0 to MP 238.5 SB (Coos Bay) Effective June 17, 2013, this section of US101 southbound will be restricted to 14 feet 00 in. in width. Estimated date of completion is July 1, 2013.
Updated: 06/18/2013 7:00 pm

Central Oregon Road Conditions by Route

ORE27
MP 1.9

Informational only; Commercial Vehicle Information
Details: OR27 Irrigation Ditch at MP 1.90 This bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
Updated: 06/18/2013 7:00 pm

ORE27
MP 2.88

Informational only; Commercial Vehicle Information
Details: OR27 Irrigation Ditch at MP 2.88 This bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
Updated: 06/18/2013 7:00 pm

ORE27
MP 4.62

Informational only; Commercial Vehicle Information
Details: OR27 Irrigation Ditch at MP 4.59 This bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
Updated: 06/18/2013 7:00 pm

ORE27
MP 27.23

Informational only; Commercial Vehicle Information
Details: OR27 MP 27.23 Bear Creek OR27 MP27.23 Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW; Weight Table 2.
Updated: 06/18/2013 7:00 pm

US20
MP 66.5 to 65

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 06/18/2013 07:08 am

US20
MP 131.44 to 131.92

Informational only; Commercial Vehicle Information
Details: US20/US395 MP 131.44 to MP 131.92 EB & WB (Burns) Effective July 4, 2013, this section of US20/US395 will be closed between the hours of 10 AM and 12 noon for one day only.
Updated: 06/18/2013 7:00 pm

US26
MP 65.8 to 66.8

Unconfirmed; Crash/Hazard
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: An unconfirmed report of falling rock has been received, use caution.
Last Updated: 06/19/2013 03:59 am

US26
MP 105.26

Informational only; Commercial Vehicle Information
Details: US26 MP 105.26 WB (Warm Springs) Effective July 29, 2013, this section of US26 westbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is August 16, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 110 to 117.5

Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Single lane closures at nightime on US97 between MP103 to MP106 for striping with traffic control. Work expect to be complete by June 30th.
Updated: 06/10/2013 2:36 pm

US97
MP 91 to 106

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Starting May 28, single Lane Closures at nightime, including within the city of Madras for high performance striping installation.
Updated: 05/24/2013 4:35 pm

US97
MP 135.76

Informational only; Commercial Vehicle Information
Details: US97 NB Exit 135B ramp to Empire Blvd (Bend) Effective June 18, 2013, the ramp from US97 northbound Exit 135B to Empire Blvd will be closed between the hours of 7 PM & 7 AM. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

US97
MP 197.65 to 200.3

Future Event: Informational only; Construction Work
Expected Start Date: 7/1/2013 7:00:00 AM
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Road construction is occurring, use caution.
Updated: 06/11/2013 06:19 am

East Oregon Road Conditions by Route

I-84
MP 306.26 to 306.78

Informational only; Commercial Vehicle Information
Details: I-84 on- and off-ramps to / from Exit 306 (Baker City) Effective June 29, 2013, the on- and off-ramps to / from I-84 Exit 306 will be closed between the hours of 8 AM & 8 PM (DAYTIME) for one day only. These closures are NOT on the I-84 mainline.
Updated: 06/18/2013 7:00 pm

I-84
MP 306.56 to 306.93

Informational only; Commercial Vehicle Information
Details: I-84 on- and off-ramps to / from Exit 306 (Baker City) Effective June 29, 2013, the on- and off-ramps to / from I-84 Exit 306 will be closed between the hours of 8 AM & 8 PM (DAYTIME) for one day only. These closures are NOT on the I-84 mainline.
Updated: 06/18/2013 7:00 pm

I-84
MP 369.99 to 377.9

Informational only; Commercial Vehicle Information
Details: I-84 MP 368.16 to MP 377.93 EB & WB (near Ontario) Effective March 19, 2013, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 6 PM & 6 AM. In addition, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 6 PM. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 371.45

Informational only; Commercial Vehicle Information
Details: I-84 MP 371.45 EB & WB crossing under Stanton Blvd (west of Ontario) Effective March 19, 2013, this section of I-84 will be restricted to 16 feet 09 in. in height. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 371.46

Informational only; Commercial Vehicle Information
Details: I-84 MP 371.45 EB & WB crossing under Stanton Blvd (west of Ontario) Effective March 19, 2013, this section of I-84 will be restricted to 16 feet 09 in. in height. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 373.08

Informational only; Commercial Vehicle Information
Details: I-84 MP 373.08 EB & WB crossing under Chester Blvd (west of Ontario) Effective March 19, 2013, this section of I-84 will be restricted to 16 feet 04 in. in height. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 378 to 368

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes
Comments: Road construction is occurring, use caution. Detours are available. Travelers can expect lane closures over the next few weeks as crews install construction signs and build four crossovers in the median at different locations. Temporary ramp closures at the Stanton Blvd. Interchange (I-84 Exit 371), the North Ontario Interchange (Exit 374) and the East Idaho Avenue Interchange (Exit 376) will also be required to accommodate paving operations. A three-day closure of the westbound on-ramp at Exit 374 (OR 201 overpass) is scheduled to begin March 6. This closure will require travelers to detour eastbound on I-84 to Exit 376B, where they can cross the overpass and access the westbound freeway.
Updated: 06/08/2013 12:35 pm

ORE7
MP 50.83 to 50.96

Informational only; Commercial Vehicle Information
Details: OR7 MP 50.83 to MP 50.96 (Baker City) Effective June 29, 2013, this section of OR7 will be closed between the hours of 8 AM & 8 PM (DAYTIME) for one day only.
Updated: 06/18/2013 7:00 pm

ORE201
MP 14

No to Minimum Delay; Information
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: The road surface has degraded on the Parma Spur road from mp 14.5-15.21, expect rough road and slow moving vehicles.
Last Updated: 05/30/2013 2:56 pm

US20
MP 131.44 to 131.92

Informational only; Commercial Vehicle Information
Details: US20/US395 MP 131.44 to MP 131.92 EB & WB (Burns) Effective July 4, 2013, this section of US20/US395 will be closed between the hours of 10 AM and 12 noon for one day only.
Updated: 06/18/2013 7:00 pm

US30
MP .46

Informational only; Commercial Vehicle Information
Details: US30 (Huntington Hwy) MP 0.46 Effective June 16, 2011, the Burnt River Bridge on US30 at MP 0.46 in Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Updated: 06/18/2013 7:00 pm

US30
MP 2.75

Informational only; Commercial Vehicle Information
Details: US30 (Huntington Hwy) MP 2.75 Effective September 11, 2003 at MP 2.75 Burnt River Bridge (2.75 miles south of the I-84)is restricted to 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1
Updated: 06/18/2013 7:00 pm

Southwest Oregon Road Conditions by Route

I-5
MP 40

OFF RAMP
Informational only; Construction Work
Lanes Affected: (Southbound) , Shoulder
Comments: Road construction is occurring, use caution. Ramps Affected.
Updated: 06/17/2013 12:51 pm

I-5
MP 40.66 to 40.97

Informational only; Commercial Vehicle Information
Details: I-5 SB on/off ramps to/from Exit 40 (Gold Hill) Effective July 8, 2013, the on- and off- ramps to/from I-5 southbound Exit 40 to Gold Hill will be closed. In addition, the Exit 40 overpass will be closed. These closures are NOT on the I-5 mainline. Estimated date of completion is July 17, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 40.83

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 40 Overpass (Gold Hill) Effective July 8, 2013, the I-5 northbound Exit 40 overpass will be closed. The closure is NOT on the I-5 mainline, or the I-5 northbound Exit 40 on- or off-ramps. Estimated date of completion is July 17, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 48 to 83

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes , Shoulder
Comments: Expect nighttime rolling slow-downs, intermittent single lane closures both night and daytime. The NB shoulder from Hugo to Sexton Pass, (MP 66-69),is closed until this fall, for building a climbing lane. This is part of a project to pave I-5 between Hugo and Glendale, and make safety improvements. Use caution and watch for construction equipment and workers in the area.
Updated: 06/17/2013 12:41 pm

I-5
MP 66.55 to 81.08

Informational only; Commercial Vehicle Information
Details: I-5 MP 66.5 to MP 81.7 NB & SB (north of Grants Pass) Effective May 19, 2013, this section of I-5 will be restricted to 12 feet 00 in. in width and 16 feet 08 in. in height between the hours of 7 PM & 9 AM. In addition, the following ramps will be intermittently closed during the same time: Exit 71 (Sunny Valley); Exit 76 (Wolf Creek); Exit 78 (Speaker Rd); Exit 80 (Glendale). No restrictions will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 66.64 to 81.08

Informational only; Commercial Vehicle Information
Details: I-5 MP 66.5 to MP 81.7 NB & SB (north of Grants Pass) Effective May 19, 2013, this section of I-5 will be restricted to 12 feet 00 in. in width and 16 feet 08 in. in height between the hours of 7 PM & 9 AM. In addition, the following ramps will be intermittently closed during the same time: Exit 71 (Sunny Valley); Exit 76 (Wolf Creek); Exit 78 (Speaker Rd); Exit 80 (Glendale). No restrictions will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 68 to 70

Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 06/19/2013 03:01 am

I-5
MP 69.08 to 74.1

Informational only; Commercial Vehicle Information
Details: I-5 SB MP 75.5 to MP 69.7 SB (Sunny Valley) Effective June 17, 2013, this section of I-5 southbound will be restricted to 11 feet 00 in. in width between the hours of 7 PM & 9 AM. No restrictions will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is June 28, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 70 to 69

Informational only; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 06/19/2013 03:00 am

I-5
MP 79.78 to 81.08

Informational only; Commercial Vehicle Information
Details: I-5 MP 79.5 to MP 81.7 NB (Glendale) Effective May 27, 2013, this section of I-5 northbound will be restricted to 11 feet 00 in. in width between the hours of 7 PM & 9 AM. No restrictions will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is June 14, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 104.85

Informational only; Commercial Vehicle Information
Details: I-5 MP 104.85 Chadwick Ln crossing over I-5 MP 104.85 Chadwick Lane crossing over I-5 (near Riddle) 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1
Updated: 06/18/2013 7:00 pm

ORE39
MP -.14 to .15

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. Intermittent traffic control with flaggers.
Updated: 06/17/2013 12:15 pm

ORE62
MP 10 to 13

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Road construction is occurring, use caution. Intermittent traffic control with flaggers for utility work. This is in preparation for highway improvement project later this summer.
Updated: 06/17/2013 12:49 pm

ORE62
MP 10.09 to 12.99

Informational only; Commercial Vehicle Information
Details: OR62 MP 10.0 to MP 13.5 EB & WB (Eagle Point) Effective June 26, 2013, this section of OR62 will be restricted to 12 feet 00 in. in width. Estimated date of completion is October 18, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 17.02

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Expect intermittent lane closures and traffic control at the South Valley View intersection, for signal work.
Updated: 06/17/2013 12:49 pm

ORE234
MP .04

Informational only; Commercial Vehicle Information
Details: OR234 MP 0.04 - Rogue River Bridge - Gold Hill OR234 Rogue River Bridge at MP 0.04 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 Non-Divisible Loads.
Updated: 06/18/2013 7:00 pm

ORE238
MP 35

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution. Watch for flaggers and equipment in the area. This is a project for safety improvements to the intersection at Bybee Corner and Hwy 238 intersection. Work is expected to last one month.
Updated: 06/17/2013 12:44 pm

ORE255
MP 338

Informational only; Crash/Hazard
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Carpenterville Highway is closed at milepost 338 to thru traffic.
Last Updated: 05/30/2013 11:01 am

ORE255
MP 345

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: The road surface has collapsed, use caution. Expect traffic control with flaggers as crews repair roadway.
Last Updated: 06/17/2013 10:25 am

ORE422
MP 5

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic is on the detour bridge, with a temporary traffic signal. This bridge is in Chiloquin; the Williamson River bridge. Use caution.
Updated: 06/17/2013 12:15 pm

US101
MP 335.5

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Northbound) 1 Lane
Comments: The road surface has collapsed, use caution. The NB slow lane is closed.
Last Updated: 05/30/2013 11:00 am

US101
MP 336.1

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Southbound) 1 Lane
Comments: The road surface has collapsed, use caution. The SB slow lane is closed, watch for barricades and signs.
Last Updated: 05/30/2013 11:00 am

US101
MP 339.1 to 339.71

Informational only; Commercial Vehicle Information
Details: US101 MP 339.02 to MP 339.50 NB & SB Effective December 12, 2012, this section of US101 will be restricted to 17 feet 00 in. in height. Estimated date of completion is December 30, 2013.
Updated: 06/18/2013 7:00 pm

US101
MP 339.2 to 340

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Intermittent traffic control with flaggers for work on the Pistol River Bridge. There is a temporary traffic signal in place, expect delays. The temporary signal is the contractor's responsibility.
Updated: 06/17/2013 12:35 pm

US101
MP 339.71 to 339.1

Informational only; Commercial Vehicle Information
Details: US101 MP 339.02 to MP 339.50 NB & SB Effective December 26, 2012, this section of US101 will be restricted to 16 feet 00 in. in width. Estimated date of completion is June 16, 2013.
Updated: 06/18/2013 7:00 pm

US199
MP .79

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes
Comments: There will be night work as crews continue with finish work. All lanes are open 7 AM to 7 PM, as work continues on shoulders. The traffic signal at the fairgrounds has been removed. Traffic from the Fairgrounds and Fairgrounds Rd. can make right turns and U-turns at either Ringuette or Redwood Ave. This safety project also makes pedestrian improvements on the north side of US 199, and repaves the highway in the project area.
Updated: 06/17/2013 12:44 pm

US199
MP 6.9

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: Expect intermittent, weeknight, lane and shoulder closures for work on the Applegate River Bridge. Watch for workers and equipment on the shoulder of the highway on US 199 and Riverbanks Road.
Updated: 06/17/2013 12:43 pm

US199
MP 6.97

Informational only; Commercial Vehicle Information
Details: US199 MP 7.0 Applegate River Bridge MP 7.0 Applegate River Bridge (7 miles west of Grants Pass) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Updated: 06/18/2013 7:00 pm

South Oregon Road Conditions by Route

ORE39
MP -.14 to .15

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. Intermittent traffic control with flaggers.
Updated: 06/17/2013 12:15 pm

ORE70
MP 6.36 to 6.49

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. Intermittent traffic control with flaggers. This is the Bonanza Safe Walk Project in the City of Bonanza.
Updated: 06/17/2013 12:17 pm

ORE422
MP 5

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic is on the detour bridge, with a temporary traffic signal. This bridge is in Chiloquin; the Williamson River bridge. Use caution.
Updated: 06/17/2013 12:15 pm

Southeast Oregon Road Conditions by Route

No adverse road conditions reported at this time.

City of Bend Road Conditions by Route

US97
MP 20.99

Informational only; Commercial Vehicle Information
Details: US97 Business (3rd St) at railroad crossing south of US20 (Bend) Effective June 17, 2013, US97 Business (3rd St) at the railroad crossing south of US20 will be closed between the hours of 7 PM & 7 AM. Estimated date of completion is August 31, 2013.
Updated: 06/18/2013 7:00 pm

US97
MP 135.76

Informational only; Commercial Vehicle Information
Details: US97 NB Exit 135B ramp to Empire Blvd (Bend) Effective June 18, 2013, the ramp from US97 northbound Exit 135B to Empire Blvd will be closed between the hours of 7 PM & 7 AM. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

City of Eugene Road Conditions by Route

I-5
MP 192 to 193.5

Estimated delay under 20 minutes; Construction Work
Comments: Watch for night time single lane closures. Be aware of construction vehicles, traffic signs and roadside work crews. Use caution. Interstate 5 (between mileposts 192.0 and 193.5): Watch for construction vehicles entering and exiting the travel lanes at the shoulder. Watch for temporary traffic signs, roadside work crews and equipment. Watch for nighttime single-lane and shoulder closures. Please drive carefully through the work zone. Reduce speed.
Updated: 06/17/2013 4:59 pm

I-5
MP 192.1 to 193.4

Estimated delay under 20 minutes; Construction Work
Comments: Watch for traffic congestion at Franklin and Jenkins Dr. Reduce speed. Use caution in the area. The speed limit is reduced to 35 mph. Watch for roadside work crews and construction vehicles entering and exiting the travel lanes from the roadway shoulder and at the intersection of Franklin Boulevard and Jenkins Drive. Please drive carefully and obey all construction signs and flagger instructions. For the latest online information about the project, please visit willamettebridge.org, read the blog at willametteriverbridge.blogspot.com and follow us on Twitter: @OregonDOT. Construction has now begun on the NB Willamette River bridge and Patterson Slough Bridge. Use extreme caution while driving in the work zone. Cyclist and pedestrian path users should use caution and expect some delays for construction activity. This project will replace the I-5 bridge over the Willamette River.
Updated: 06/18/2013 11:55 am

I-5
MP 192.27

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 192 off-ramp (to OR99/OR126 Business) - Eugene Effective October 3, 2011, the I-5 northbound Exit 192 off-ramp to OR99/OR126 Business will be closed. Estimated date of re-opening is January 1, 2014.
Updated: 06/18/2013 7:00 pm

I-5
MP 192.8

Estimated delay under 20 minutes; Construction Work
Comments: North bound to Franklin Boulevard off ramp exit 192 is closed until October 2013. Detour via exit 191 and Glenwood Boulevard. Watch for work crews. The I-5 northbound Franklin Blvd. off-ramp Exit 192 (milepost 192.8) is closed until October 2013; detour via Exit 191 and Glenwood Blvd. Watch for roadside work crews and equipment. Please drive carefully through the work zone.
Updated: 06/07/2013 12:57 pm

I-5
MP 195.02 to 195.46

Informational only; Commercial Vehicle Information
Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April 9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in width and 16 feet 03 in. in height on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

I-5
MP 195.45 to 195.46

Informational only; Construction Work
Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes
Comments: The posted speed limit has been reduced to 35 on the Beltline bridge and 50 on Interstate 5 near the interchange due to construction work zone. New, lower speed limits have been implemented on the Randy Papé Beltline bridge over Interstate 5, and on I-5 beneath the bridge where construction has begun on a two-year project to improve the I-5/Beltline interchange. Beginning Wednesday, April 17, 2013, the posted, enforceable speed limit on the Beltline bridge over I-5 will be 35 miles per hour. The speed limit on I-5 near the interchange will be reduced to 50 miles per hour. The speed limit reductions will be enforced until the project is completed in fall of 2014. The speed limit reductions are intended to improve work zone safety for all highway users and construction workers. From 2007 through 2011 in Oregon, 53 people died and more than 2,200 were injured in work zone crashes. The majority of people injured or killed in these crashes were drivers, passengers or pedestrians, not workers. The single biggest factor in crashes is driver inattention; that’s why orange cones, variable message signs and other tools are used to alert motorists. The other major contributing factor is speed, which is why work zones often require lower speed limits. National Work Zone Awareness Week is April 16-19. To learn more about work zone safety, visit ODOT’s safety website at: http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx
Updated: 05/23/2013 4:01 pm

I-5
MP 195.45 to 195.46

OFF RAMP
Informational only; Construction Work
Comments: Beginning Monday, motorists will use a new temporary ramp to exit south bound I 5 to both east bound and west bound belt line. Use caution. Ramps Affected. Beginning Monday, June 10, 2013: Motorists will use a new temporary ramp for exiting southbound I-5 to both eastbound and westbound Beltline A new temporary traffic signal will be placed where the new ramp intersects with Beltline, controlling the flow of traffic.
Updated: 06/07/2013 1:05 pm

I-5
MP 195.45 to 195.46

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder
Comments: Regular closures of the eastbound Beltline to southbound I -5 ramp will continue weeknights between 8 p.m. and 5:30 a.m. Use the detour route posted. The northbound Interstate 5 on-ramp from eastbound Beltline will be closed overnight Monday, June 17 beginning at 8 pm and continuing until 5 am Tuesday, June 18. Motorists will access northbound I-5 by traveling east on Beltline to Gateway St, then north to Game Farm Road, the west to Coburg Rd, then north to Pearl Street, Coburg, then east to I-5. Watch for trucks entering and exiting the roadway and advance signing. A speed limit reduction to 35 MPH is now in effect on Beltline. A speed limit reduction to 50 MPH is now in effect for I-5 through the construction zone. There will be periodic rolling slowdowns on I-5 northbound beginning in Glenwood (MP 191) and southbound beginning in Coburg (MP 199) between 9 pm and 5 am. Project Summary: This project will rebuild the interchange at Interstate 5 and Randy Pape’ Beltline Highway to meet modern design and safety standards. State funds from the Jobs and Transportation Act will build: - A new I-5 southbound to westbound Beltline off-ramp. - A new I-5 southbound to eastbound Beltline off-ramp. - A new westbound Beltline to southbound I-5 on-ramp - A new Beltline Bridge over I-5 - And base construction and structures for a new multi-use path to connect south of the interchange to north of the interchange. The path will open upon completion of Unit 4 scheduled to be constructed in 2016. This is a two year project. Construction of Unit 3 is scheduled to be completed by November 2014.
Updated: 06/13/2013 4:08 pm

I-5
MP 198.39 to 199.38

Informational only; Commercial Vehicle Information
Details: I-5 MP 198.01 to MP 199.41 NB & SB (Coburg) Effective June 24, 2013, this section of I-5 will be restricted to 16 feet 00 in. in width on Monday to Thursday between the hours of 8 PM & 6 AM. In addition, the height will be restricted to 15 feet 10 in. in height southbound during the same time. Estimated date of completion is August 24, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 198.39 to 200.15

OFF RAMP
No to Minimum Delay; Construction Work
Comments: The project is on schedule to be completed by the end of June 2013. Ramps Affected. Roberts Road has been closed and all traffic is now using South Industrial Way. The project is on schedule to be completed by the end of June, 2013. This project will improve the I-5/Coburg interchange, and improve the efficiency and safety of travel on Pearl Street, Coburg Industrial Way, and Roberts Road in the City of Coburg. The project will, among other things: •Close access to Roberts Road on the south side of Pearl Street with a cul de sac. •Connect Roberts Road to the intersection of Coburg Industrial Way and Pearl Street by constructing a new road, Coburg Industrial Way South. •Widen and lengthen the I-5 southbound on-ramp to accept 2 lanes turning east to south from Pearl Street.
Updated: 06/07/2013 1:16 pm

ORE126
MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business WB MP 1.34 (Main St. Springfield) MP 1.34 Willamette River Bridge (1 mile east of I-5 in Springfield) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
Updated: 06/18/2013 7:00 pm

ORE126
MP 1.63 to 2.66

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.63 to MP 2.66 EB & WB (Springfield) Effective July 20, 2013, this section of OR126 Business (Main St) will be closed between the hours of 6 PM & 11 PM for one day only.
Updated: 06/18/2013 7:00 pm

ORE126
MP 2.67 to 1.66

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.63 to MP 2.66 EB & WB (Springfield) Effective July 20, 2013, this section of OR126 Business (Main St) will be closed between the hours of 6 PM & 11 PM for one day only.
Updated: 06/18/2013 7:00 pm

ORE126
MP 3.79

Informational only; Commercial Vehicle Information
Details: OR126 WB ramp to I-5 NB (Springfield) Effective July 23, 2013, the ramp from OR126 westbound to I-5 northbound will be intermittently closed on Monday - Thursday nights between the hours of 7 PM & 5:30 AM. Estimated date of completion is August 8, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 3.8 to 9.9

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road Construction Occurring. Use caution in the work zone. Watch for construction workers and equipment in the area. Construction will continue until late September. Much of the work will be completed at night to avoid peak travel times. During construction, motorists can expect single lane closures in both directions; ramp closures; and a night time weekend closure of the 42nd Street interchange in late June. "Q" St / Pioneer Parkway interchange will have single-lane closures and ramp closures anticipated at night through most of June. Watch for temporary traffic signs, traffic control devices, work crews and equipment. Please drive carefully through the work zone. Motorists should monitor www.tripcheck.com and www.keepusmoving.info for the latest closure information. Residents and businesses along the highway should anticipate noise consistent with road construction. This project will preserve the existing highway by grinding and replacing two inches of asphalt in most areas and reconstructing the eastbound portions of the 42nd Street interchange. The project will also improve safety by constructing cable median barrier between Mohawk Blvd. and East Main Street (MP 6.24-9.97).
Updated: 06/13/2013 4:14 pm

ORE126
MP 4.34 to 4.94

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Pioneer Pkwy (Springfield) Effective June 17, 2013, the on/off ramps to/from OR126 EB & WB to Pioneer Pkwy will be closed per the following schedule: Eastbound ramps closed Monday - Thursday nights between the hours of 8 PM & 11 AM. No closures will be in place from 11 AM Friday until 8 PM Monday. Westbound ramps closed Monday - Thursday nights between the hours of 7 PM & 5:30 AM. No closures will be in place from 5:30 AM Friday until 7 PM Monday. Estimated date of completion is August 5, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 5.9 to 6.29

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Mohawk Blvd (Springfield) Effective June 27, 2013, the on- and off-ramp to/from Mohawk Blvd will be intermittently closed per the following schedule: eastbound - Monday through Thursday nights, 7 PM to 11 AM; westbound - Monday through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126 mainline. Estimated date of completion is July 16, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 7.16 to 7.44

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield) Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be closed per the following schedule: eastbound - Monday through Thursday nights, 7 PM to 11 AM; westbound - Monday through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126 mainline. Estimated date of completion is July 27, 2013.
Updated: 06/18/2013 7:00 pm

ORE126
MP 7.19 to 7.47

Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield) Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be closed per the following schedule: eastbound - Monday through Thursday nights, 7 PM to 11 AM; westbound - Monday through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126 mainline. Estimated date of completion is July 27, 2013.
Updated: 06/18/2013 7:00 pm

ORE569
MP 7.66 to 11.66

OFF RAMP
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Guardrail construction at Green Acres ramp. Traffic sensors being installed at all exits day and night shifts. Watch for lane and shoulder closures. Ramps Affected. Guardrail is under construction at the Green Acres Ramp. Traffic sensors will be installed at all exits during both day and night shift throughout the week. Permanent striping will be placed on all ramps at night when weather permits. There will be shoulder and lane closures throughout the week due to the construction. Watch for flaggers directing traffic and construction vehicles leaving and entering the roadway. Summary: This project adds ramp meters at various exits that access the Randy Papé Beltline in Eugene. The eastbound on-ramp at the River Road exit will also be widened. Safety features such as striping, guardrails, and concrete barrier will also be installed or modified. Ramp meters will be installed at the following locations: Eastbound On Ramps at River Road and River Avenue; Westbound On Ramps at Green Acres and Coburg Road. Construction is scheduled to be completed by June 30, 2013. Motorists should anticipate single night ramp closures, lane closures, and shoulder closures, flaggers controlling traffic, and construction vehicles entering and leaving the roadway at the four ramp meter locations. Motorists are encouraged to travel safely through the areas and respect the direction given by flaggers.
Updated: 06/07/2013 1:10 pm

ORE569
MP 12.26 to 13

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

ORE569
MP 12.53 to 12.95

Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

ORE569
MP 12.76

Informational only; Commercial Vehicle Information
Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the ramp from OR569 westbound to I-5 southbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

ORE569
MP 12.79

Informational only; Commercial Vehicle Information
Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the ramp from OR569 eastbound to I-5 northbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

City of La Grande Road Conditions by Route

No adverse road conditions reported at this time.

City of Medford Road Conditions by Route

ORE238
MP 35

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution. Watch for flaggers and equipment in the area. This is a project for safety improvements to the intersection at Bybee Corner and Hwy 238 intersection. Work is expected to last one month.
Updated: 06/17/2013 12:44 pm

Portland Metro Road Conditions by Route

Hwy100
MP 0 to 4

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures with flaggers Motorists can expect daytime lane closures throughout the project area with flaggers directing traffic between 7 a.m. and 5 p.m., Monday through Friday, for guardrail replacement. This project will replace seven sections of old guardrail on the Historic Columbia River Highway (U.S. 30) between the Troutdale Bridge over the Sandy River and Dabney State Park. The new guardrail will look just like the historic, white double-rail sections that are being replaced.
Updated: 05/17/2013 10:41 am

I-5
MP 291.89

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective July 15, 2013, the ramp from I-5 northbound Exit 292A to OR217 northbound will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 20, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 295.04 to 299.25

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramp from OR43/Hood St to SB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 295.041 to 298.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd & OR99W/Barbur Blvd to NB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 300.11 to 300.4

Informational only; Commercial Vehicle Information
Details: I-5 SB MP 300.1 to MP 300.4 SB (Marquam Bridge - Portland) Effective June 24, 2013, this section of I-5 southbound will be restricted to 15 feet 00 in. in height between the hours of 9 PM & 5:30 AM. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 301.36

Informational only; Commercial Vehicle Information
Details: I-5 NB ramp from Morrison Bridge (Portland) Effective June 24, 2013, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. The estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B ramp to EB Belmont St (Portland) Effective June 24, 2013, the ramp from I-5 southbound Exit 300B to Belmont St eastbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .01

ON RAMP
Closure with Detour; Crash/Hazard
Lanes Affected: (Westbound) 2 Lanes
Comments: A crash has occurred I-84 westbound on ramp to I-5 northbound Closed, use alternate route. Ramps Affected.
Last Updated: 06/19/2013 04:31 am

I-84
MP .02 to 5.78

Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March 27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the height will be restricted to 15 ft 07 in. in height eastbound, and 14 ft 11 in. in height westbound during the same time. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .07 to 5.79

Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March 27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the height will be restricted to 15 ft 07 in. in height eastbound, and 14 ft 11 in. in height westbound during the same time. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .54

Informational only; Commercial Vehicle Information
Details: I-84 EB ramp from Morrison Bridge (Portland) Effective June 24, 2013, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. The closure is NOT on the ramp from I-5 NB Exit 300 to I-84 EB. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 5.44 to 6.59

Informational only; Commercial Vehicle Information
Details: I-84 MP 5.42 to MP 6.60 EB (Portland) Effective April 29, 2013, this section of I-84 eastbound will be restricted to 12 feet 00 in. in width, and 18 feet 00 in. in height on Sunday - Thursday nights between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from I-84 eastbound Exit 7 to Halsey St will be intermittently closed during the same hours. Estimated date of completion is November 5, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 13.041

Informational only; Commercial Vehicle Information
Details: I-84 WB on-ramp from NB 181st Ave (Gresham) Effective June 23, 2013, the ramp from NB 181st Ave to I-84 westbound will be closed between the hours of 5 AM & 3 PM (DAYTIME). Estimated date of completion is June 23, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP 17.37 to 18.06

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 7 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

I-84
MP 17.68

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.68 WB (Sandy River Bridge) I-84 MP 17.68 WB only Sandy River Bridge is restricted to STP's beyond Wt. Table 5.
Updated: 06/18/2013 7:00 pm

I-84
MP 17.82

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.82 EB & WB (Jordan Rd Underpass) Effective September 1, 2010, the Jordan Rd underpass at Exit 18 will be restricted to 13 feet 00 in. in width. This restriction is NOT on the I-84 mainline. Effective April 15, 2013, the height will be restricted to 14 feet 9 inches crossing under I-84 on Jordan Rd. Estimated date of completion is November 1, 2014.
Updated: 06/18/2013 7:00 pm

I-84
MP 18

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Expect alternating one-way traffic controlled by temporary signals on Jordan Road at I-84. Please obey parking restrictions in this area. Project Description: This project replaces two bridges on I-84 over the Sandy River east of exit 17 in Troutdale, and repairs two bridges over Jordan Road east of the Sandy River at exit 18. Traffic Impacts: None anticipated theis week. For more information:
Updated: 12/24/2012 3:58 pm

I-84
MP 18.15 to 17.37

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 7 AM. Estimated date of completion is November 30, 2014.
Updated: 06/18/2013 7:00 pm

I-205
MP 10.79 to 11.23

Informational only; Commercial Vehicle Information
Details: I-205 on- and off-ramps to/from Exit 11 NB & SB (82nd Dr - Gladstone) Effective June 19, 2013, the on- and off-ramps to/from I-205 Exit 11 NB & SB will be intermittently closed between the hours of 9 PM & 6 AM. In addition, the 82nd Dr overpass will be closed at the same time. These closures are NOT on the I-205 mainline. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 10.83 to 11.13

Informational only; Commercial Vehicle Information
Details: I-205 on- and off-ramps to/from Exit 11 NB & SB (82nd Dr - Gladstone) Effective June 19, 2013, the on- and off-ramps to/from I-205 Exit 11 NB & SB will be intermittently closed between the hours of 9 PM & 6 AM. In addition, the 82nd Dr overpass will be closed at the same time. These closures are NOT on the I-205 mainline. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 20.05 to 20.37

Informational only; Commercial Vehicle Information
Details: I-205 MP 20.00 to MP 20.50 NB (Portland) Effective May 1, 2013, this section of I-205 northbound will be restricted to 19 feet 00 in. in width, and 18 feet 03 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 23.02 to 24.92

Informational only; Commercial Vehicle Information
Details: I-205 MP 23 to MP 25 NB (Portland) Effective June 12, 2013, this section of I-205 northbound will be restricted to 17 feet 00 in. in width, and 16 feet 10 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is July 19, 2013.
Updated: 06/18/2013 7:00 pm

I-205
MP 24.5

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, daytime lane closures and bike/ped path impacts. Motorists can expect daytime single lane closures on Airport Way eastbound and westbound at I-205 and on the I-205 northbound on ramp, Monday through Friday from 8 a.m. to 2 p.m., for various construction activities. There will also be occasional daytime short-duration closures of the I-205 multi-use bike/ped path on the north side of Airport Way, Monday through Saturday from 7 a.m. to 5 p.m. for pile driving next to the path. Flaggers will stop trail users for no more than 20 minutes at a time. This project will help improve traffic flow at this busy interchange by constructing a new free-flowing on ramp from Airport Way westbound onto I-205 northbound. Motorists on Airport Way eastbound will have two left turn lanes onto I-205 northbound and will no longer have to share signal time with westbound motorists on Airport Way.
Updated: 05/17/2013 10:17 am

I-205
MP 24.92

Informational only; Commercial Vehicle Information
Details: I-205 NB on-ramp from Airport Way (Portland) Effective April 1, 2013, the ramp from Airport Way to I-205 northbound will be restricted to 16 feet 00 in. in width, and 18 feet 03 in. in height between the hours of 7 PM & 2 PM. No restrictions will be in place between 2 PM & 7 PM. Beginning June 18, 2013, these restrictions will be in place at all hours. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective June 24, 2013, the ramp from I-405 southbound to I-5 northbound will be restricted to 13 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP .8

Informational only; Commercial Vehicle Information
Details: I-405 SB on-ramp from SW 5th St (Portland) Effective June 28, 2013, the ramp from SW 5th St to I-405 southbound will be closed. Estimated date of completion is July 1, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP 1.29

Informational only; Commercial Vehicle Information
Details: I-405 SB Exit 1C ramp to 6th St (Portland) Effective June 22, 2013, the I-405 southbound Exit 1C ramp to 6th St will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 7 PM (DAYTIME). Estimated date of completion is June 23, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP 1.52 to 2.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 1.5 to MP 2.2 NB (Portland) Effective July 26, 2013, this section of I-405 northbound will be restricted to 12 feet 00 in. in width, and 15 feet 08 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 27, 2013.
Updated: 06/18/2013 7:00 pm

ORE8
MP 11.28 to 14.66

Informational only; Commercial Vehicle Information
Details: OR8 MP 11.28 to MP 14.66 EB & WB (Hillsboro) Effective June 1, 2013, this section of OR8 will be restricted to 10 feet 00 in. in width between the hours of 6 PM & 6 AM, and 14 feet 00 in. in width between the hours of 9 AM & 3 PM. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE43
MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Arch Bridge - Oregon City) The Oregon City Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.22

Informational only; Commercial Vehicle Information
Details: OR99W/Naito Parkway NB on-ramp from US26/Kelly Ave Effective January 14, 2013, the OR99W/Natio Parkway northbound on-ramp from US26/Kelly Ave will be restricted to 10 feet 00 in. in width. Estimated date of completion is September 3, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.45 to 1.49

Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3, 2013, this section of OR99E will be restricted to 16 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the height will be restricted to 16 feet 03 in. in height northbound during the same time. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.49

Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3, 2013, this section of OR99E will be restricted to 16 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the height will be restricted to 16 feet 03 in. in height northbound during the same time. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 3.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 3.10 to MP 3.25 NB (Barbur Blvd) Effective August 24, 2010, this section of OR99W will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are allowed. In addition, the height will be restricted to 17 feet 00 in. in height at the same time. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 12.18 to 16.66

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.03 to MP 16.68 NB & SB (Tualatin) Effective April 15, 2013, this section of OR99W will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W SB MP 12.20 Tualatin River Bridge MP 12.20 Tualatin River Bridge in King City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 06/18/2013 7:00 pm

ORE99
MP 12.39 to 20.46

Informational only; Commercial Vehicle Information
Details: OR99E MP 12.00 to MP 20.63 NB & SB (Oregon City - Canby) Effective May 20, 2013, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 5 AM & 9:30 PM; & 10 feet 00 in. in width between the hours of 9:30 PM and 5 AM. In addition, the height will be restricted to 14 feet 00 in. in height at all hours. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE120
MP .38

Informational only; Commercial Vehicle Information
Details: OR120 MP 0.38 Columbia Slough Bridge (Swift Hwy in Portland) This bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
Updated: 06/18/2013 7:00 pm

ORE213
MP 0 to .84

Informational only; Commercial Vehicle Information
Details: OR213 MP 0 to MP 1.00 NB & SB (Oregon City) Effective September 23, 2011, this section of OR213 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5:30 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. In addition, OR213 crossing under Holcomb Blvd will be restricted to 19 feet 00 in. in height northbound and 17 feet 00 in. in height southbound during the same times. Estimated date of completion is June 21, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 0 to 7.52

Informational only; Commercial Vehicle Information
Details: OR217 MP 0 to MP 7.5 NB & SB Effective February 25, 2013, OR217 will be restricted to 13 feet 00 in. in width between the hours of 9:30 PM & 5 AM. In addition, the height will be restricted to 15 feet 11 in. going northbound and 15 feet 07 in. going southbound between the hours of 8 PM & 5 AM. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 0 to 7.52

Estimated delay under 20 minutes; Construction Work
Comments: Expect nighttime construction and lane closures on OR 217. This project will make operational and safety improvements on OR 217, including widening the right shoulders on three sections of OR 217, paving both directions of OR 217 from TV Highway to I-5, improving signage in the OR 217 corridor, and upgrading the center median barrier. This week, motorists can expect the following impacts: ** nighttime lane closures on OR 217 northbound and southbound from 7:30 p.m. to 5:30 a.m. for various construction tasks ** daytime lane and shoulder closures on SW Wilshire and SW Walker in both directions, just west of OR 217, from 9 a.m. to 3 p.m. ** the ramp from OR 217 southbound to Allen Boulevard will be restricted to one lane, day and night, in April and May
Updated: 04/22/2013 4:52 pm

ORE217
MP 1.47 to 1.76

Informational only; Commercial Vehicle Information
Details: OR217 MP 1.31 to MP 1.99 NB & SB (Beaverton) Effective May 13, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). When closed, traffic should take Exit 2A and re-enter OR217. Estimated date of completion is August 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 2.85

Informational only; Commercial Vehicle Information
Details: OR217 MP 2.85 NB & SB (Beaverton) Effective June 17, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 3.56 to 4.95

Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective June 19, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM. Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 3.81 to 4.95

Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective June 19, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM. Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 4.95 to 5.9

Informational only; Commercial Vehicle Information
Details: OR217 MP 4.8 to MP 6.0 NB & SB (Beaverton) Effective July 1, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 13, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 6.19 to 6.69

Informational only; Commercial Vehicle Information
Details: OR217 MP 6.0 to MP 6.7 NB & SB (Tigard) Effective July 15, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 20, 2013.
Updated: 06/18/2013 7:00 pm

ORE224
MP -.01 to .93

Informational only; Commercial Vehicle Information
Details: OR224 MP 0 to MP 1.05 EB & WB (Milwaukie) Effective February 4, 2013, this section of OR224 will be restricted to 14 feet 00 in. in width between the hours of 9 AM and 3 PM (DAYTIME). Estimated date of completion is November 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE224
MP 2.38 to 4.04

Informational only; Commercial Vehicle Information
Details: OR224 MP 2.20 to MP 4.20 EB & WB (Milwaukie) Effective April 18, 2013, this section of OR224 will be restricted to 16 feet 06 in. in height on Monday - Friday between the hours of 7 PM & 5:30 AM. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE224
MP 2.42 to 4.17

Informational only; Commercial Vehicle Information
Details: OR224 MP 2.20 to MP 4.20 EB & WB (Milwaukie) Effective April 18, 2013, this section of OR224 will be restricted to 16 feet 06 in. in height on Monday - Friday between the hours of 7 PM & 5:30 AM. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99E
MP 1 to 1.5

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures Motorists can expect daytime lane closures with flaggers controlling traffic on the ramp from 7 a.m. to 4:30 p.m., Monday through Friday. The right lane on OR 99E (Martin Luther King, Jr. Boulevard) southbound starting at Division Street may also be closed this week between 9 a.m. and 3 p.m. This project will pave and adjust manhole covers on the “jughandle” on-ramp from SE Ivon Street/SE 4th Place onto the OR 99E (Martin Luther King, Jr. Boulevard) southbound viaduct. Construction will be complete by May 2013.
Updated: 05/17/2013 10:33 am

ORE99W
MP 10.95

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. This safety project will widen OR 99W at Beef Bend Road in Tigard/King City in order to build a dedicated right turn lane for southbound motorists. This week, there may be brief traffic delays during the day as trucks enter and exit the work zone from Beef Bend Road. The contractor will maintain the temporary bike/ped access through the project area this week. Bicyclists and pedestrians using the trail near Beef Bend Road should use caution and watch for equipment and construction activities along the path.
Updated: 04/22/2013 4:36 pm

ORE99W
MP 16.58 to 12.15

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime paving on OR 99W through the summer. Expect short delays between 8 p.m. and 6 a.m. This project will grind off the old pavement, repave and restripe OR 99W in both directions between the Tualatin River Bridge in King City and Sunset Boulevard in Sherwood. This week, motorists can expect nighttime single lane closures on OR 99W in both directions throughout the entire project area from 8 p.m. to 6 a.m., Monday through Friday, for paving.
Updated: 04/22/2013 4:33 pm

US26
MP .95

Informational only; Commercial Vehicle Information
Details: US26 EB ramp to OR99E SB (Portland) Effective July 11, 2013, the ramp from US26 eastbound (Ross Island Bridge) to OR99E southbound will be closed between the hours of 10 PM & 6 AM. Estimated date of completion is July 12, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 1.46

Informational only; Commercial Vehicle Information
Details: US26 WB on-ramp from NB 17th Ave - Portland Effective June 15, 2012, the ramp from northbound SE 17th Ave to US26 westbound will be closed. Estimated date of re-opening is September 1, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 6.03 to 9.96

Informational only; Commercial Vehicle Information
Details: US26 MP 6.00 to MP 10.15 EB & WB (East Portland) Effective June 24, 2013, this section of US26 will be restricted to 10 feet 00 in. in width per the following schedule: Sunday - Thursday nights between the hours of 8 PM & 6 AM; Friday night between the hours of 8 PM & 9 AM; Saturday night between the hours of 8 PM & 10 AM. The estimated date of completion is October 28, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 7.81 to 9.61

Informational only; Commercial Vehicle Information
Details: US26 MP 7.8 to MP 9.7 EB & WB (Portland) Effective June 5, 2013, this section of US26 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves allowed provided the base width does not exceed 14 feet 00 in. Estimated date of completion is July 7, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 56.93 to 57.33

Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and off-ramp to/from Glencoe Rd will be intermittently closed per the following schedule: Monday through Friday nights, 9:30 PM to 5 AM; Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 56.98 to 57.38

Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and off-ramp to/from Glencoe Rd will be intermittently closed per the following schedule: Monday through Friday nights, 9:30 PM to 5 AM; Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 57

Estimated delay under 20 minutes; Construction Work
Comments: Construction is occurring near the roadway. Please use caution. Project Description: This project replaces the Glencoe Road overpass at U.S. 26 in North Plains and improves the highway ramps, bicycle and pedestrian connections, signs, traffic signals, striping and drainage at this interchange. A culvert under Glencoe Road will also be replaced with a bridge. Traffic Impacts: None this week as the contractor is working on tasks off the roadway. For more information:
Updated: 05/22/2013 08:42 am

US26
MP 57.15

Informational only; Commercial Vehicle Information
Details: US26 MP 57.15 EB & WB (crossing under Glencoe Rd - Hillsboro) Effective June 1, 2013, this section of US26 will be intermittently closed between the hours of 9 PM & 5 AM. When closed, traffic will be directed to take Glencoe Rd Exit 57 and re-enter US26. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 57.16

Informational only; Commercial Vehicle Information
Details: US26 MP 57.15 EB & WB (crossing under Glencoe Rd - Hillsboro) Effective June 1, 2013, this section of US26 will be intermittently closed between the hours of 9 PM & 5 AM. When closed, traffic will be directed to take Glencoe Rd Exit 57 and re-enter US26. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 65.9 to 64.3

Estimated delay of 20 minutes - 2 hours; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: The shoulders on U.S. 26 will be closed intermittently during the day. Project Description: This project widened U.S. 26 between NW Cornell Road and 185th Avenue in Beaverton to three lanes in each direction. When complete, there will also be median cable barrier, widened shoulders and new pavement and striping. Additional work includes improvements to on- and off-ramps at NW 185th and Betheny Boulevard. Traffic Impacts: The shoulders on U.S. 26 will be closed intermittently during the day. There may also be lane closures on U.S. 26 around the Bethany Boulevard overpass as part of a project being built by Washington County. Please call 503-846-ROAD/7623 for more information or visit www.wc-roads.com. For more information:
Updated: 05/13/2013 10:57 am

US30
MP .03

Informational only; Commercial Vehicle Information
Details: US30 MP 0.03 Historic Columbia River Highway Historic US30 MP 0.03 Sandy River Bridge is restricted to 30 tons Gross.
Updated: 06/18/2013 7:00 pm

US30
MP .91 to 1.24

Informational only; Commercial Vehicle Information
Details: US30 Bypass MP 0.91 to MP 1.24 EB & WB (St Johns Bridge - Portland) Effective July 29, 2013, US30 Bypass at the St Johns Bridge will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is August 8, 2013.
Updated: 06/18/2013 7:00 pm

US30
MP 3.12 to 3.92

Estimated delay of 20 minutes - 2 hours; Maintenance Work
Lanes Affected: (Westbound) All Lanes , Shoulder
Comments: Road work will have the WB lanes closed from 35th Avenue to Kittridge. Traffic will be using the center median, expect delays or use alternate route.
Updated: 04/11/2013 09:14 am

US30
MP 12.5 to 17.93

Estimated delay under 20 minutes; Construction Work
Comments: Daytime lane closures & delays for paving; some access restrictions This week, motorists can expect daily lane closures and traffic shifts on U.S. 30 westbound (towards Scappose) from 3 a.m. to 3 p.m., Monday through Friday, for grinding and paving. Direct access to driveways and cross-roads will be restricted at certain times as the paving operation moves through. Motorists will be able to drive past the paving work zone, make a u-turn and access these roads and driveways from the other direction. Motorists will be driving on a rough surface with a two-inch lip between lanes in certain areas. Please slow down and use caution. This project will repave US 30 in both directions between McNamee Road and milepost 17.93, just east of the Columbia County line, and apply a waterproof membrane to the bridge over McCarty Creek.
Updated: 05/17/2013 10:20 am

US30
MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 MP 13.14 Historic Columbia River Highway Historic US30 MP13.14 Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Table 1.
Updated: 06/18/2013 7:00 pm

US30
MP 13.24

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. There is daytime shoulder work planned this week on US 30 as the contractor begins work on this project. This project will improve safety and mobility at this intersection by lengthening existing turn lanes from US 30 onto Cornelius Pass Road, adding new dedicated right and left turn lanes from Cornelius Pass Road onto US 30 and upgrading traffic signals.
Updated: 05/09/2013 3:56 pm

US30
MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 MP 17.68 Historic Columbia River Highway (W Multnomah Falls Bridge) Historic US30 MP 17.68 West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 06/18/2013 7:00 pm

US30BY
MP 12.4 to 13.7

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: No work is planned this week. Project Description: This safety improvement project will add a center left-turn lane to this section of Sandy Boulevard, striped bike lanes in both directions and sidewalk on the south side of the road. It will also upgrade the traffic signals at NE 122nd Avenue and NE 138th Avenue and making pedestrian crossing improvements at NE 131st Place. Traffic Impacts: None anticipated this week. This project is in "winter shutdown mode," with only limited work activities anticipated through early spring. For more information:
Updated: 12/24/2012 4:04 pm

City of Salem Road Conditions by Route

ORE22
MP 1.29 to 2.12

Informational only; Commercial Vehicle Information
Details: OR22 EB MP 1.28 to MP 2.63 (east of Salem) Effective March 18, 2013, this section of OR22 eastbound will be restricted to 16 feet 00 in. in width, and 14 feet 07 in. in height during the following times: Monday-Thursday from 12:01 AM to 3 PM, and from 6 PM to midnight; Friday from 12:01 AM to 3 PM. Estimated date of completion is November 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE22
MP 1.38 to 2.08

Informational only; Commercial Vehicle Information
Details: OR22 WB MP 2.63 to MP 1.28 (east of Salem) Effective March 18, 2013, this section of OR22 westbound will be restricted to 16 feet 00 in. in width, and 14 feet 09 in. in height. Estimated date of completion is November 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE22
MP 1.6 to 5.2

Estimated delay under 20 minutes; Construction Work
Comments: Reduce speed in construction zone to 45 mph. Westbound reduced to one lane. Expect work on shoulders.
Updated: 06/14/2013 09:32 am

ORE22
MP 5.7 to 6.1

Estimated delay under 20 minutes; Construction Work
Comments: Expect work on the shoulders. 72nd Ave. over Hwy 22 closed June 17 through August 7. Use Aumsville Highway and Joseph Street as a detour.
Updated: 06/14/2013 09:31 am

City of Portland Road Conditions by Route

I-5
MP 291.89

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective July 15, 2013, the ramp from I-5 northbound Exit 292A to OR217 northbound will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 20, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 295.04 to 299.25

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramp from OR43/Hood St to SB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 295.041 to 298.93

Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd & OR99W/Barbur Blvd to NB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 300.11 to 300.4

Informational only; Commercial Vehicle Information
Details: I-5 SB MP 300.1 to MP 300.4 SB (Marquam Bridge - Portland) Effective June 24, 2013, this section of I-5 southbound will be restricted to 15 feet 00 in. in height between the hours of 9 PM & 5:30 AM. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 301.36

Informational only; Commercial Vehicle Information
Details: I-5 NB ramp from Morrison Bridge (Portland) Effective June 24, 2013, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. The estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-5
MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B ramp to EB Belmont St (Portland) Effective June 24, 2013, the ramp from I-5 southbound Exit 300B to Belmont St eastbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .01

ON RAMP
Closure with Detour; Crash/Hazard
Lanes Affected: (Westbound) 2 Lanes
Comments: A crash has occurred I-84 westbound on ramp to I-5 northbound Closed, use alternate route. Ramps Affected.
Last Updated: 06/19/2013 04:31 am

I-84
MP .02 to 5.78

Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March 27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the height will be restricted to 15 ft 07 in. in height eastbound, and 14 ft 11 in. in height westbound during the same time. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .07 to 5.79

Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March 27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the height will be restricted to 15 ft 07 in. in height eastbound, and 14 ft 11 in. in height westbound during the same time. Estimated date of completion is September 30, 2013.
Updated: 06/18/2013 7:00 pm

I-84
MP .54

Informational only; Commercial Vehicle Information
Details: I-84 EB ramp from Morrison Bridge (Portland) Effective June 24, 2013, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed between the hours of 8:30 PM & 4:30 AM. The closure is NOT on the ramp from I-5 NB Exit 300 to I-84 EB. Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective June 24, 2013, the ramp from I-405 southbound to I-5 northbound will be restricted to 13 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is June 30, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP .8

Informational only; Commercial Vehicle Information
Details: I-405 SB on-ramp from SW 5th St (Portland) Effective June 28, 2013, the ramp from SW 5th St to I-405 southbound will be closed. Estimated date of completion is July 1, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP 1.29

Informational only; Commercial Vehicle Information
Details: I-405 SB Exit 1C ramp to 6th St (Portland) Effective June 22, 2013, the I-405 southbound Exit 1C ramp to 6th St will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 7 PM (DAYTIME). Estimated date of completion is June 23, 2013.
Updated: 06/18/2013 7:00 pm

I-405
MP 1.52 to 2.2

Informational only; Commercial Vehicle Information
Details: I-405 MP 1.5 to MP 2.2 NB (Portland) Effective July 26, 2013, this section of I-405 northbound will be restricted to 12 feet 00 in. in width, and 15 feet 08 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 27, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.22

Informational only; Commercial Vehicle Information
Details: OR99W/Naito Parkway NB on-ramp from US26/Kelly Ave Effective January 14, 2013, the OR99W/Natio Parkway northbound on-ramp from US26/Kelly Ave will be restricted to 10 feet 00 in. in width. Estimated date of completion is September 3, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.45 to 1.49

Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3, 2013, this section of OR99E will be restricted to 16 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the height will be restricted to 16 feet 03 in. in height northbound during the same time. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 1.49

Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3, 2013, this section of OR99E will be restricted to 16 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the height will be restricted to 16 feet 03 in. in height northbound during the same time. Estimated date of completion is July 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE99
MP 3.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 3.10 to MP 3.25 NB (Barbur Blvd) Effective August 24, 2010, this section of OR99W will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are allowed. In addition, the height will be restricted to 17 feet 00 in. in height at the same time. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 0 to 7.52

Informational only; Commercial Vehicle Information
Details: OR217 MP 0 to MP 7.5 NB & SB Effective February 25, 2013, OR217 will be restricted to 13 feet 00 in. in width between the hours of 9:30 PM & 5 AM. In addition, the height will be restricted to 15 feet 11 in. going northbound and 15 feet 07 in. going southbound between the hours of 8 PM & 5 AM. Estimated date of completion is December 31, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 0 to 7.52

Estimated delay under 20 minutes; Construction Work
Comments: Expect nighttime construction and lane closures on OR 217. This project will make operational and safety improvements on OR 217, including widening the right shoulders on three sections of OR 217, paving both directions of OR 217 from TV Highway to I-5, improving signage in the OR 217 corridor, and upgrading the center median barrier. This week, motorists can expect the following impacts: ** nighttime lane closures on OR 217 northbound and southbound from 7:30 p.m. to 5:30 a.m. for various construction tasks ** daytime lane and shoulder closures on SW Wilshire and SW Walker in both directions, just west of OR 217, from 9 a.m. to 3 p.m. ** the ramp from OR 217 southbound to Allen Boulevard will be restricted to one lane, day and night, in April and May
Updated: 04/22/2013 4:52 pm

ORE217
MP 1.47 to 1.76

Informational only; Commercial Vehicle Information
Details: OR217 MP 1.31 to MP 1.99 NB & SB (Beaverton) Effective May 13, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). When closed, traffic should take Exit 2A and re-enter OR217. Estimated date of completion is August 30, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 2.85

Informational only; Commercial Vehicle Information
Details: OR217 MP 2.85 NB & SB (Beaverton) Effective June 17, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 3.56 to 4.95

Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective June 19, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM. Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 3.81 to 4.95

Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective June 19, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM. Estimated date of completion is June 29, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 4.95 to 5.9

Informational only; Commercial Vehicle Information
Details: OR217 MP 4.8 to MP 6.0 NB & SB (Beaverton) Effective July 1, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 13, 2013.
Updated: 06/18/2013 7:00 pm

ORE217
MP 6.19 to 6.69

Informational only; Commercial Vehicle Information
Details: OR217 MP 6.0 to MP 6.7 NB & SB (Tigard) Effective July 15, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 20, 2013.
Updated: 06/18/2013 7:00 pm

ORE224
MP -.01 to .93

Informational only; Commercial Vehicle Information
Details: OR224 MP 0 to MP 1.05 EB & WB (Milwaukie) Effective February 4, 2013, this section of OR224 will be restricted to 14 feet 00 in. in width between the hours of 9 AM and 3 PM (DAYTIME). Estimated date of completion is November 15, 2013.
Updated: 06/18/2013 7:00 pm

ORE99E
MP 1 to 1.5

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures Motorists can expect daytime lane closures with flaggers controlling traffic on the ramp from 7 a.m. to 4:30 p.m., Monday through Friday. The right lane on OR 99E (Martin Luther King, Jr. Boulevard) southbound starting at Division Street may also be closed this week between 9 a.m. and 3 p.m. This project will pave and adjust manhole covers on the “jughandle” on-ramp from SE Ivon Street/SE 4th Place onto the OR 99E (Martin Luther King, Jr. Boulevard) southbound viaduct. Construction will be complete by May 2013.
Updated: 05/17/2013 10:33 am

ORE99W
MP 10.95

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. This safety project will widen OR 99W at Beef Bend Road in Tigard/King City in order to build a dedicated right turn lane for southbound motorists. This week, there may be brief traffic delays during the day as trucks enter and exit the work zone from Beef Bend Road. The contractor will maintain the temporary bike/ped access through the project area this week. Bicyclists and pedestrians using the trail near Beef Bend Road should use caution and watch for equipment and construction activities along the path.
Updated: 04/22/2013 4:36 pm

US26
MP .95

Informational only; Commercial Vehicle Information
Details: US26 EB ramp to OR99E SB (Portland) Effective July 11, 2013, the ramp from US26 eastbound (Ross Island Bridge) to OR99E southbound will be closed between the hours of 10 PM & 6 AM. Estimated date of completion is July 12, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 1.46

Informational only; Commercial Vehicle Information
Details: US26 WB on-ramp from NB 17th Ave - Portland Effective June 15, 2012, the ramp from northbound SE 17th Ave to US26 westbound will be closed. Estimated date of re-opening is September 1, 2013.
Updated: 06/18/2013 7:00 pm

US26
MP 65.9 to 64.3

Estimated delay of 20 minutes - 2 hours; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: The shoulders on U.S. 26 will be closed intermittently during the day. Project Description: This project widened U.S. 26 between NW Cornell Road and 185th Avenue in Beaverton to three lanes in each direction. When complete, there will also be median cable barrier, widened shoulders and new pavement and striping. Additional work includes improvements to on- and off-ramps at NW 185th and Betheny Boulevard. Traffic Impacts: The shoulders on U.S. 26 will be closed intermittently during the day. There may also be lane closures on U.S. 26 around the Bethany Boulevard overpass as part of a project being built by Washington County. Please call 503-846-ROAD/7623 for more information or visit www.wc-roads.com. For more information:
Updated: 05/13/2013 10:57 am

US30
MP 3.12 to 3.92

Estimated delay of 20 minutes - 2 hours; Maintenance Work
Lanes Affected: (Westbound) All Lanes , Shoulder
Comments: Road work will have the WB lanes closed from 35th Avenue to Kittridge. Traffic will be using the center median, expect delays or use alternate route.
Updated: 04/11/2013 09:14 am