Southeast Oregon Road Conditions

Alerts!

US20, 9 miles West of Tombstone SnoPark Area MP 54 - 57; Closure
Sheep Creek Bridge is out. The road is completely closed to all traffic until the end of September. Please use alternate routes of OR22 or OR126., Bridge is located 25 miles east of Sweet Home and 16 miles west of US20/OR126 intersection. This project will remove and repair the Sheep Creek Bridge that has been damaged by a landslide that has been pushing against it. All campgrounds in the area will remain open. This bridge will have to be completely removed and replaced before we can reopen this section of the highway.
Updated: 08/14/2016 02:46 am

Road Conditions by Route

ORE78 MP 45.6

No to Minimum Delay; Crash/Hazard
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 08/28/2016 2:56 pm

US95 MP 20.71 to 58.05

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 08/26/2016 1:57 pm

US95 MP 20.91 to 25.46

Informational only; Commercial Vehicle Information
Details: US95 MP 20.7 to MP 25.6 NB & SB (Jordan Valley) Effective August 8, 2016, this section of US95 will be restricted to 14 feet 00 in. in width on Monday through Friday between the hours of 6 AM & 9 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 30, 2016.
Updated: 08/28/2016 10:00 am

US95 MP 58

Informational only; Commercial Vehicle Information
Details: US95 MP 57.70 to MP 58.05 NB & SB (Rome) Effective August 8, 2016, this section of US95 will be restricted to 14 feet 00 in. in width on Monday through Friday between the hours of 6 AM & 9 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 30, 2016.
Updated: 08/28/2016 10:00 am

Columbia Express Point The OReGO Interest List