Northwest Oregon Road Conditions

Road Conditions by Route

I-5 MP 233 to 244

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 03/31/2016 08:11 am

I-5 MP 250.15 to 251.76

ON RAMP
Estimated delay under 20 minutes; Construction Work
Comments: Construction activity near interchange. Expect night lane closures on I 5 south bound. Expect south bound I 5 ramp closure until May 28. Ramps Affected. Update: Since Friday, May 6, the south bound on ramp to I-5 has been closed until 6 a.m. on Friday, May 27. The closure was extended because of inclement weather. Traffic will be directed to enter I-5 northbound, take Exit 253 (OR 22/OR 99E Business Exit), cross over and enter I-5 southbound. Motorists should be aware of the increased construction activity around the interchange, proceed with caution through the work zone and obey posted speed limits. Expect intermittent night time lane closures on I-5 south bound. Project Summary: The I-5 Kuebler Interchange Project will address the increasing congestion at the interchange by modifying the existing southbound off ramp, which will decrease the conflicts at Kuebler that have caused back-ups on I-5 southbound. The new ramp will meet modern standards and contain excess capacity. The project will also add a westbound to southbound I-5 loop on ramp and modify the eastbound to southbound I-5 on ramp.
Updated: 05/20/2016 09:43 am

I-5 MP 251.09

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Kuebler Blvd (Salem) Effective May 6, 2016 at 9 PM, the ramp from Kuebler Blvd to I-5 southbound will be closed. Estimated date of re-opening is May 27, 2016.
Updated: 05/28/2016 7:00 pm

I-5 MP 288

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Northbound) Median , 1 Lane , Shoulder
Comments: A crash has the left lane closed NB at I-205, use caution.
Last Updated: 05/29/2016 05:51 am

I-5 MP 301.36

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Morrison Bridge (Portland) Effective June 15, 2016, the ramp from the Morrison Bridge to I-5 northbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is June 16, 2016.
Updated: 05/28/2016 7:00 pm

I-5 MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B to US26/OR99E/Oregon City/OMSI (Portland) Effective June 16, 2016, the ramp from I-5 southbound Exit 300B to US26/OR99E/Oregon City/OMSI will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is June 17, 2016.
Updated: 05/28/2016 7:00 pm

I-5 MP 302

Estimated delay under 20 minutes; Construction Work
Comments: Daytime shoulder closure on Broadway; new traffic alignment to Broadway Bridge. No lane or sidewalk closures, but there will be daytime shoulder closures. Southbound I-5 off-ramp (exit 302A) right turn lane (slip lane) is closed and traffic will travel in a new lane realignment that connects to the Broadway Bridge. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/I-5-Southbound-Off-Ramp-at-North-Broadway-Project.aspx or 24-hour noise hotline at (971) 673-5239
Updated: 05/27/2016 3:45 pm

I-5 MP 302.6

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 302A to Moda Center (Portland) Effective March 25, 2015, the ramp from I-5 southbound Exit 302A ramp to Moda Center will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, and on Friday nights between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.
Updated: 05/28/2016 7:00 pm

I-5 MP 302.6

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 302A to Moda Center (Portland) Effective June 11, 2016, the I-5 northbound and southbound Exit 302A ramp to Moda Center will be closed between the hours of 6 AM & 3 PM for one day only.
Updated: 05/28/2016 7:00 pm

I-84 MP 16.66

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 17 ramp to Troutdale Effective February 15, 2016, the ramp from I-84 eastbound Exit 17 to Troutdale will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is May 31, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 16.67

Informational only; Commercial Vehicle Information
Details: I-84 WB Exit 17 on-ramp from Troutdale Effective February 15, 2016, the ramp from Troutdale to I-84 westbound at Exit 17 will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is May 31, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 17

No to Minimum Delay; Construction Work
Comments: Daytime shoulder closures on N Frontage Road and Marine Drive Monday-Friday 7 a.m. to 4 p.m. For more information: www.I-84TroutdaleExit17.org
Updated: 05/27/2016 3:48 pm

I-84 MP 17.37 to 31.57

Informational only; Commercial Vehicle Information
Details: I-84 MP 17 to MP 32 EB & WB (Troutdale to Multnomah Falls) Effective June 15, 2016, this section of I-84 will be restricted to 12 feet 00 in. in width per the following schedule: eastbound, between the hours of 7 PM & 7 AM; westbound, between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 17.84 to 18.06

Informational only; Commercial Vehicle Information
Details: I-84 EB & WB Exit 18 ramps to/from Jordan Rd (east of Troutdale) Effective June 8, 2016, the I-84 eastbound and westbound Exit 18 ramps to/from Jordan Rd will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is June 13, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 22.1

Informational only; Commercial Vehicle Information
Details: I-84 MP 22.1 WB (crossing under Corbett Rd Exit 22) Effective June 7, 2016, I-84 westbound crossing under Corbett Rd Exit 22 will be restricted to 15 feet 06 in. in height between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 24.99

Informational only; Commercial Vehicle Information
Details: I-84 MP 24.99 EB (crossing under Rooster Rock Exit 25) Effective June 7, 2016, I-84 eastbound crossing under Rooster Rock Exit 25 will be restricted to 16 feet 07 in. in height between the hours of 7 PM & 7 AM. Estimated date of completion is August 31, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 40

Estimated delay under 20 minutes; Construction Work
Comments: Single WB lane closure; all 4 lanes open Memorial Day weekend and Bonneville Dam ramp open. Alternating single westbound lane closures Tuesday 6a.m. to Friday at noon; with all four lanes (east and westbound) open over the weekend. The continuous 10-week on-ramp closure (leaving Bonneville Dam) is finished; travelers will be able to return to I-84 when leaving Bonneville Dam without a detour. For more information: www.I84Construction.org
Updated: 05/27/2016 3:50 pm

I-84 MP 40.14 to 40.42

Informational only; Commercial Vehicle Information
Details: I-84 MP 39.82 to MP 40.61 EB & WB (Bonneville Dam) Effective May 6, 2016, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is July 15, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 40.17

Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 40 ramp to Bonneville Dam Effective May 6, 2016, the ramp from I-84 eastbound Exit 40 to Bonneville Dam will be intermittently closed between the hours of 8 PM & 8 AM. Estimated date of completion is July 15, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 45.33 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River) Effective July 26, 2015, this section of I-84 will be restricted to 19 feet 00 in. in width from Midnight Sunday night to 12 Noon on Fridays. Estimated date of completion is November 30, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 45.33 to 64.44

Informational only; Commercial Vehicle Information
Details: I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River) Effective May 1, 2016, this section of I-84 will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is October 21, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 51.22 to 54.77

Informational only; Commercial Vehicle Information
Details: I-84 MP 53 to MP 55 EB (E of Cascade Locks) Effective February 22, 2016, this section of I-84 will be restricted to 20 feet 00 in. in width Monday through Thursday between the hours of 6 AM & 6 PM. Estimated date of completion is May 26, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 53 to 55

Estimated delay under 20 minutes; Construction Work
Comments: Continuous, shoulder lane closure on eastbound I-84. Continuous shoulder closure on eastbound I-84 Tuesday-Friday. Trail access west of Starvation Creek rest area will be closed 6 a.m. Monday through 6 p.m. Friday, along with Trail 413 (Mt. Defiance Trail), Trail 414 (Starvation Ridge Trail), and Trail 414A (Starvation Ridge Cutoff Trail). For more information: flh.fhwa.dot.gov/projects/or/lindsey-starvation
Updated: 05/27/2016 4:07 pm

I-84 MP 54.77 to 54.99

Informational only; Commercial Vehicle Information
Details: I-84 MP 54 to MP 55 EB (Starvation Creek) Effective April 6, 2016, this section of I-84 eastbound will be restricted to 20 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 05/28/2016 7:00 pm

I-84 MP 62.05

Informational only; Commercial Vehicle Information
Details: I-84 MP 62.05 WB (Crossing Under Exit 62/US30 - Hood River) Effective July 26, 2015, I-84 westbound crossing under Exit 62 (US30) will be restricted to 15 feet 05 in. in height. Estimated date of completion is November 30, 2016.
Updated: 05/28/2016 7:00 pm

I-205 MP 11.98

No to Minimum Delay; Construction Work
Comments: No traffic impacts. SE Strawberry Lane at I-205 is now open for traffic, pedestrians, bicyclists & transit users as the Contractor cleans up the site. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/I-205-at-Strawberry-Lane.aspx or call the noise hotline at (503) 412-2371.
Updated: 05/22/2016 6:00 pm

I-205 MP 12 to 14

Estimated delay under 20 minutes; Construction Work
Comments: Night single and double lane closures on I-205 Tues-Thur; day shoulder closures on I-205. Travelers should be aware of changes to travel lanes during construction. I-205: Nighttime double lane closure southbound I-205 (Johnson Creek-Sunnyside) Tuesday 8 p.m.-5 a.m. the next morning for sign replacement. Nighttime single lane closure southbound I-205 at exit 13 off-ramp Wednesday 8 p.m.-5 a.m. the next morning for sign replacement. Nighttime double lane closure southbound I-205 at exit 12A Thursday 8 p.m.-5 a.m. the next morning for sign replacement; exit 12A will be open. Daytime I-205 (between exit 12 and 14) right shoulder closures Tuesday-Friday for installation of signs and landscape materials. SE 122 Avenue expect one way traffic controlled by flaggers for permanent striping, irrigation, and landscaping between OR 212/224 and SE Ford Street. For more information: www.sunrisejta.org
Updated: 05/27/2016 5:36 pm

I-205 MP 12.46

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is May 31, 2016.
Updated: 05/28/2016 7:00 pm

I-405 MP 1.601

Informational only; Commercial Vehicle Information
Details: I-405 NB Exit 2A ramp to Salmon St (Portland) Effective June 4, 2016, the ramp from I-405 northbound Exit 2A to Salmon St will be closed between the hours of 5 PM & 11:59 PM for one evening only.
Updated: 05/28/2016 7:00 pm

I-405 MP 2.11

Informational only; Commercial Vehicle Information
Details: I-405 NB Exit 2B ramp to Everett St (Portland) Effective June 26, 2016, the ramp from I-405 northbound Exit 2B to Everett St will be closed between the hours of 6 AM & 10 AM. Estimated date of completion is June 26, 2016.
Updated: 05/28/2016 7:00 pm

ORE8 MP 6.45 to 6.75

Estimated delay under 20 minutes; Construction Work
Comments: Day lane closures and speed reduction to 25 mph on TV Highway. NB turn lane from SW 185th permanently closed 5/31. Speed reduced to 25 mph on TV Highway through the construction workzone. Periodic daytime single lane closures on eastbound TV Highway and in both directions on SW 185th Avenue, Monday-Friday 9 a.m. to 3 p.m. Expect sidewalk closures with signed pedestrian detours on the south side of OR 8 at SW 185th; crosswalks will remain open. Construction work will take place behind the westbound sidewalk on OR 8 near the Big Lots parking lot. Permanent closure of the northbound turn lane from SW 185th starting Tuesday, May 31. A truck detour will be in place starting Tuesday, May 31 until the new intersection construction is complete. TriMet bus stop at 185th at OR 8 (heading north) has been temporarily moved. Go to TriMet.org or call (503) 238-7433 to see schedule or bus stop location changes. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/tv185th.aspx
Updated: 05/27/2016 4:44 pm

ORE8 MP 6.45 to 6.99

Informational only; Commercial Vehicle Information
Details: OR8 MP 6.29 to MP 6.99 EB & WB (Aloha) Effective November 10, 2015, this section of OR8 will be restricted to 14 feet 00 in. in width per the following schedule: Monday to Friday between the hours of 9 AM & 3 PM; Sunday to Thursday nights between the hours of 7 PM & 6:30 AM; Friday and Saturday nights between the hours of 7 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 29, 2016.
Updated: 05/28/2016 7:00 pm

ORE8 MP 11.28 to 14.66

No to Minimum Delay; Construction Work
Comments: No traffic impacts. For more information go to www.tvhwypaving.org.
Updated: 05/27/2016 4:41 pm

ORE18 MP 43.84

Informational only; Commercial Vehicle Information
Details: OR18 EB ramp to OR99W northbound (McMinnville) Effective June 19, 2016, the ramp from OR18 eastbound to OR99W northbound will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is June 30, 2016.
Updated: 05/28/2016 7:00 pm

ORE18 MP 51.57

Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 05/28/2016 7:00 pm

ORE22 MP 10.49

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 05/28/2016 7:00 pm

ORE22 MP 10.66

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 05/28/2016 7:00 pm

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 05/28/2016 7:00 pm

ORE22 MP 34 to 36

Estimated delay under 20 minutes; Maintenance Work
Comments: Herbicide Application
Updated: 04/27/2016 3:19 pm

ORE43 MP 3.67 to 9.98

Informational only; Commercial Vehicle Information
Details: OR43 MP 3.10 to MP 10.15 NB & SB (Lake Oswego to Oregon City) Effective May 23, 2016, this section of OR43 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7:30 PM & 5 AM. Estimated date of completion is June 15, 2016.
Updated: 05/28/2016 7:00 pm

ORE43 MP 6.04 to 9.02

Informational only; Commercial Vehicle Information
Details: OR43 MP 6.04 to MP 9.02 NB & SB (West Linn) Effective October 15, 2014, this section of OR43 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 05/28/2016 7:00 pm

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 05/28/2016 7:00 pm

ORE53 MP 5.981

Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Updated: 05/28/2016 7:00 pm

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.20 SB (Tualatin River Bridge - King City) OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 05/28/2016 7:00 pm

ORE104 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Updated: 05/28/2016 7:00 pm

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 05/28/2016 7:00 pm

ORE130 MP 3.23

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 05/28/2016 7:00 pm

ORE130 MP 3.6

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 05/28/2016 7:00 pm

ORE130 MP 3.82

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 05/28/2016 7:00 pm

ORE130 MP 4.15

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 05/28/2016 7:00 pm

ORE130 MP 4.76

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 05/28/2016 7:00 pm

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 05/28/2016 7:00 pm

ORE173 MP 5.49 to 0

No to Minimum Delay; Construction Work
Comments: Daytime lane closures Monday through Friday. Daytime single lane closures with flaggers directing traffic only where work is occurring on OR 173 (Timberline Road) between U.S. 26 and Timberline Lodge Monday-Friday from 8 a.m. to 5 p.m.
Updated: 05/27/2016 5:21 pm

ORE202 MP 24.87

Informational only; Commercial Vehicle Information
Details: OR202 MP 25 NB & SB (Jewell) Effective June 21, 2016 at 8 AM, this section of OR202 will be closed. Estimated date of completion is June 22, 2016 at 5 PM.
Updated: 05/28/2016 7:00 pm

ORE210 MP 9.03 to 9.2

No to Minimum Delay; Construction Work
Comments: No traffic impacts. For more information go to www.oregon.gov/ODOT/HWY/REGION1/Pages/SchollsCascade.aspx
Updated: 05/27/2016 5:31 pm

ORE213 MP .9 to 1

No to Minimum Delay; Construction Work
Comments: Day single lane closures and ped detours Tues-Fri 9 a.m.-3 p.m. as crews drill at corners. Daytime single lane closures Tuesday-Friday from 9 a.m. to 3 p.m. as crews drill at each corner for the traffic signal pole foundations. Pedestrians will be detoured around the construction work. TriMet bus stops in the area will be temporarily relocated for the project work. Go to TriMet.org or call (503) 238-7433 to see schedule or bus stop location changes. For more information: www.NE82ndAveatSandy.com or 24-hour noise hotline (503) 412-2356.
Updated: 05/27/2016 5:31 pm

ORE213 MP .95 to 1.04

Informational only; Commercial Vehicle Information
Details: OR213 (NE 82nd Ave) MP 0.94 to MP 1.07 NB & SB (Portland) Effective May 9, 2016, this section of OR213 (NE 82nd Ave) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 12, 2016.
Updated: 05/28/2016 7:00 pm

ORE213 MP 3 to 4.24

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Ave) MP 3.00 to MP 4.24 NB & SB (Portland) Effective February 1, 2016, this section of OR213 (82nd Ave) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 30, 2016.
Updated: 05/28/2016 7:00 pm

ORE213 MP 3 to 4.25

Estimated delay under 20 minutes; Construction Work
Comments: Day lane closures 7:30am-3pm both directions (Burnside-Division). Daytime single lane closures in both directions Tuesday-Friday from 7:30 a.m. to 3 p.m. between E Burnside and SE Division streets. TriMet bus stops in the area will be temporarily relocated for the project work. Go to TriMet.org or call (503) 238-7433 to see schedule or bus stop location changes. For more information: www.82ndAvenueIntersectionImprovements.org or 24-hour noise hotline (503) 412-2348.
Updated: 05/27/2016 5:34 pm

ORE213 MP 6.2 to 6.3

No to Minimum Delay; Construction Work
Comments: Single lane closure on southbound 82nd Avenue between SE Duke and SE Claybourne streets. For more information: www.SE82ndAveAtDuke.com or 24-hour noise hotline (503) 412-2363.
Updated: 05/27/2016 5:35 pm

ORE219 MP .18 to 10.05

Informational only; Commercial Vehicle Information
Details: OR219 MP 0.18 to MP 10.05 NB & SB (south of Hillsboro) Effective May 31, 2016, this section of OR219 will be restricted to 12 feet 00 in. in width between the hours of 7 AM & 7 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is June 24, 2016.
Updated: 05/28/2016 7:00 pm

ORE219 MP 23.46

Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 05/28/2016 7:00 pm

ORE224 MP 13.69 to 13.86

No to Minimum Delay; Construction Work
Comments: Periodic shoulder closures. Daytime lane and shoulder closures Tuesday-Friday 8 a.m. to 4:30 p.m. to start excavation on the north side of the road. TriMet bus stops in the area will be temporarily relocated for the project work. Go to TriMet.org or call (503) 238-7433 to see schedule or bus stop location changes. For more information: www.ClackamasHwyProjects.org or 24-hour noise hotline (503) 412-2396.
Updated: 05/27/2016 5:48 pm

ORE224 MP 13.77

Informational only; Commercial Vehicle Information
Details: OR224 MP 13.65 to MP 13.86 EB & WB (Barton) Effective June 2, 2016, this section of OR224 will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 4 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 20, 2016.
Updated: 05/28/2016 7:00 pm

ORE99W MP 25.49 to 27.1

Estimated delay under 20 minutes; Construction Work
Comments: Modernization: lanes, ramp and shoulder of traffic periodically interrupted by closure or flagging at night from 6:00pm to 5:00am. Sunday night through Friday morning and weekdays daytime from 9:00am to 2:00pm. Work to include grading, drainage, structures, paving, sidewalks, signing, illumination, signals and roadside development.
Updated: 04/11/2016 09:01 am

US20 MP 15.78 to 21.48

Informational only; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Construction - Phase 4 will begin on Monday 5/16 with burning slash piles near the West end of the project approximately MP 16. No delays anticipated. This project will accomplish movement of 2-3 million cubic yards of earthwork, landslide mitigation including placement of more than 400 ground anchors, construction of 70,000 feet of horizontal drains, erosion control, and landscaping. Project information: www.us20pme.com
Updated: 05/16/2016 4:10 pm

US20 MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville) Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 05/28/2016 7:00 pm

US26 MP .42 to 1.12

No to Minimum Delay; Construction Work
Comments: No traffic impacts. Some nighttime and/or weekend lane closures will be necessary at a later time and will be noted here when scheduled. For more information: www.RossIslandBridgeProject.org
Updated: 05/27/2016 4:21 pm

US26 MP 1 to 1.8

Estimated delay under 20 minutes; Construction Work
Comments: Northbound ramp from US 26 to SE 17th Avenue closed for 50 days. Sewer construction on Powell Boulevard will continuously close the northbound SE 17th Avenue Ramp though June 2016. Traffic will flow in both directions on Powell Boulevard throughout construction, but delays should be expected. For more information: www.portlandoregon.gov/bes/LowerPowell or contact Matt Gough at 503-823-5352 or matthew.gough@portlandoregon.gov.
Updated: 05/27/2016 4:24 pm

US26 MP 32 to 49

Estimated delay under 20 minutes; Construction Work
Comments: Expect nighttime lane and shoulder closures in moving operation with up to 20 minute delay on US-26 from 7 p.m. to 7 a.m. For more information: www.Oregon.gov/ODOT/HWY/REGION1/Pages/RumbleStrips.aspx
Updated: 05/22/2016 5:11 pm

US26 MP 49 to 56

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Delays Wed, June 1. Night and daytime lane closures and periodic stops. Travelers should avoid the area or plan for delays. Striping crews will delay travelers Wednesday, June 1. Travelers should expect traffic stops and will encounter daytime and nighttime lane closures Tuesday-Friday as crews work along the slopes; flaggers will direct traffic and perform drainage improvements. For more information: www.US26MtHoodSafety.org
Updated: 05/27/2016 4:30 pm

US26 MP 50.12 to 57.203

Informational only; Commercial Vehicle Information
Details: US26 MP 49.20 to MP 57.45 EB & WB (Government Camp) Beginning April 1, 2016, this section of US26 will be closed for approximately 30 minutes on Mon/Tues/Thurs nights between the hours of 5:30 PM & 6:30 PM. Beginning June 1, 2016, the 30 minute closures will occur between 6:30 PM & 7:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is September 30, 2016.
Updated: 05/28/2016 7:00 pm

US26 MP 60.86

Informational only; Commercial Vehicle Information
Details: US26 EB Exit 61 ramp to Helvetia Rd/Brookwood Pkwy (Hillsboro) Effective June 11, 2016, the ramp from US26 eastbound Exit 61 to Helvetia Rd/Brookwood Pkwy will be closed between the hours of 7:30 AM & 1:30 PM for one day only.
Updated: 05/28/2016 7:00 pm

US26 MP 61

No to Minimum Delay; Construction Work
Comments: Day lane closures on Brookwood/Helvetia Wed-Thur; Night lane closures on US 26/ramps and Brookwood/Helvetia Wed-Fri. Daytime lane closures on Brookwood Parkway/Helvetia Road in both directions (Meek Road to Jacobson Road) Wednesday-Thursday from 9 a.m.-3 p.m. Nighttime multiple lane closures on US 26 in both directions, US 26 ramps, and Brookwood Parkway/Helvetia Road Wednesday-Friday from 8 p.m.-5:30 a.m. the next morning for pavement markings. For more information: www.oregon.gov/ODOT/HWY/REGION1/pages/us26_brookwoodpkwy/index.aspx or call the noise hotline at (503) 646-0231.
Updated: 05/27/2016 4:14 pm

US26 MP 61.06

Informational only; Commercial Vehicle Information
Details: US26 WB crossing under Helvetia Rd Exit 61 (Hillsboro) Effective April 4, 2016, US26 westbound crossing under Helvetia Rd will be intermittently closed between the hours of 10 PM & 5 AM. When closed, all traffic can bypass the closure by taking Exit 61 (Brookwood Pkwy/Helvetia Rd), turn right onto Helvetia Rd then turn left and re-enter US26 westbound. Estimated date of completion is May 31, 2016.
Updated: 05/28/2016 7:00 pm

US26 MP 62.12

Informational only; Commercial Vehicle Information
Details: US26 EB Exit 62 ramp to Cornelius Pass Rd (Hillsboro) Effective June 11, 2016, the ramp from US26 eastbound Exit 62 to Cornelius Pass Rd will be closed between the hours of 6 AM & 8 AM for one day only.
Updated: 05/28/2016 7:00 pm

US26 MP 62.83

Informational only; Commercial Vehicle Information
Details: US26 EB ramp from NB Cornelius Pass Rd (Hillsboro) Effective April 1, 2016, the ramp from NB Cornelius Pass Rd to US26 eastbound will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is May 31, 2016.
Updated: 05/28/2016 7:00 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 05/28/2016 7:00 pm

US30 MP .87

Informational only; Commercial Vehicle Information
Details: US30 EB ramp to I-405 SB (Portland) Effective June 3, 2016, the ramp from US30 eastbound to I-405 southbound will be closed on Friday and Saturday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 12, 2016.
Updated: 05/28/2016 7:00 pm

US30 MP 1.32 to 1.47

Informational only; Commercial Vehicle Information
Details: US30 Bypass (N Ivanhoe St) MP 1.32 to MP 1.47 EB & WB (Portland) Effective May 23, 2016, this section of US30 Bypass (N Ivanhoe St) will be intermittently closed on Monday to Friday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 16, 2016.
Updated: 05/28/2016 7:00 pm

US30 MP 1.97 to 3.92

Informational only; Commercial Vehicle Information
Details: US30 MP 1.97 to MP 3.92 WB (Portland) Effective June 20, 2016, this section of US30 westbound will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is July 1, 2016.
Updated: 05/28/2016 7:00 pm

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 05/28/2016 7:00 pm

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 05/28/2016 7:00 pm

US30 MP 20.39

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 05/28/2016 7:00 pm

US30 MP 48.67

Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Updated: 05/28/2016 7:00 pm

US30 MP 51.32 to 61

Informational only; Commercial Vehicle Information
Details: US30 MP 50.5 to MP 61.0 EB & WB (west of Rainier) Effective June 19, 2016, this section of US30 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 6 PM & 6 AM. Estimated date of completion is September 30, 2016.
Updated: 05/28/2016 7:00 pm

US30 MP 80.35 to 87.75

Informational only; Commercial Vehicle Information
Details: US30 MP 79.45 to MP 87.75 EB & WB (Knappa) Effective June 19, 2016, this section of US30 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 6 PM & 6 AM. Estimated date of completion is September 30, 2016.
Updated: 05/28/2016 7:00 pm

US101 MP 2.78 to 3.26

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Bridge work is occurring. Use caution. Expect minor delays This project consists of recoating the steel below the bridge deck on the southern side of the Columbia River Bridge along U.S. 101 north of Astoria. The scheduled work includes installation of the work containment structures and preparation and coating of the steel beneath the bridge deck. Flaggers will control single lane traffic during construction activities as required. Lane delays will be allowed anytime on weekdays and weekends. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in September 2018.
Updated: 05/16/2016 11:20 am

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 05/28/2016 7:00 pm

US101 MP 4.91

Informational only; Commercial Vehicle Information
Details: US101 MP 4.91 NB & SB (New Young's Bay Bridge - Astoria) Effective June 9, 2016, this section of US101 will be closed between the hours of 9 PM & 6 AM. Estimated date of completion is June 11, 2016.
Updated: 05/28/2016 7:00 pm

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Updated: 05/28/2016 7:00 pm

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 EB & WB (Old Young's Bay Bridge - Astoria) Effective April 20, 2016, this section of US101 Business will be intermittently closed on Sunday to Thursday nights between the hours of 6 PM & 6 AM. Estimated date of completion is July 1, 2016.
Updated: 05/28/2016 7:00 pm

US101 MP 13.02

No to Minimum Delay; Crash/Hazard
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 05/29/2016 06:19 am

US101 MP 40.71

Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita) Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.
Updated: 05/28/2016 7:00 pm

US101 MP 43 to 43.34

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Road construction is occurring, use caution. Oregon Coast Highway, mile post 43.00 to 43.34) The work consists of replacement of an existing culvert at Neahkahnie Creek with a tunnel structure and enhancement of the stream bed as well as relocating and improving the highway alignment along U.S. 101 near Manzanita. Also, turning lane movements into downtown Manzanita will be enhanced. The scheduled work includes installation of retaining walls. Flaggers may need to occasionally control single lane traffic during construction when work is occurring. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in September 2017.
Updated: 05/16/2016 11:19 am

US101 MP 48.4 to 64.23

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median (Southbound) , Shoulder
Comments: Road construction is occurring, use caution. (Oregon Coast Highway, mile post 48.40 to 64.23) Construction will be conducted at night. Hours: 7:00 PM to 7:00 AM The work consists of repaving the roadway along U.S. 101 between Wheeler and Tillamook. Also, improvements to roadway features such as guardrail and traffic control signing and markings will be made throughout the project. The scheduled work includes paving the roadway. The majority of construction activities will be occurring during nighttime operations and flaggers will be controlling single lane traffic during the work. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in July 2016.
Updated: 05/16/2016 7:00 pm

US101 MP 111 to 111.6

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Work to continue during the day on the east side of US101. Intermittent daytime flagging may be necessary, expect minor delays. This project will add a left turn lane on US101 at NE Devil's Lake Road. It will also create a wider shoulders and improve sight distance, in an effort to reduce crashes.
Updated: 05/13/2016 3:54 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 05/28/2016 7:00 pm

US101B MP 4.78

Estimated delay under 20 minutes; Maintenance Work
Comments: The Lewis and Clark River Bridge is open to traffic, there will be flaggers on the bridge periodically. Expect up to 20 minute delays. The scheduled work includes reconstruction of the Lewis & Clark River Bridge.
Updated: 09/04/2015 2:48 pm

US101B MP 6.89 to 4.78

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Bridge construction is occurring at the Old Youngs Bay bridge on US101 Business, one lane traffic with flaggers, use caution. US101(Bus.): Old Youngs Bay & Lewis & Clark River Bridges (Warrenton - Astoria Highway, mile post 4.78 and 6.89) This project consists of performing bridge rehabilitation work at both the Old Youngs Bay and Lewis & Clark River Bridges along US101(Bus.). The scheduled work at the Lewis & Clark River Bridge includes coating the bridge steel underneath the bridge deck. Flaggers will control single lane traffic at the Lewis & Clark River Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The scheduled work at the Old Youngs Bay Bridge includes rehabilitation of the electrical and mechanical systems along with the substructure of the bridge. In addition, coating of the bridge steel underneath the bride deck will be occurring. Flaggers will control single lane traffic at the Old Youngs Bay Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. Between April 11 and July 1, the Old Youngs Bay Bridge will be closed to all traffic, including bicycles and pedestrians, intermittently on some nights to allow for replacement of structural supports underneath the bridge. The closures will be from 6:00 PM until 6:00 AM. Closures will not be occurring on Friday or Saturday nights.
Updated: 05/16/2016 11:18 am

Columbia Express New Map Tips ODOT RealTime The OReGO Interest List