ODOT Banner
TripCheck Logo--CLICK to return to Road | Weather entry page.
Road | Weather Travel Center Transportation Options About TripCheck CLICK to view Text Reports
Road Conditions Weather Outlook Cameras Custom Cams Trucking Center Twitter

Map Legend

Roadside Camera IconRoad cameras

Road Closed IconRoad closed
Greater than 2hr delay icon > 2hr delay
20min to 2hr delay icon20mn-2hr delay
Less than 20min delay icon < 20mn delay
No to Min. delay icon No to Min. delay
Unconfirmed icon Unconfirmed
Informational icon Informational

Severe Weather Hazard IconWeather hazard
Weather Warning IconWeather warning
Snow Zone IconSnow zone
Weather Station IconWeather stations

Road Construction IconConstruction

Trucking Restrictions iconTruck restrictions

Winter Travel

Chain Law

Traction Tires

Minimum Chain Requirements

Winter Road Maintenance

Related Links

California State Traveler Info

Idaho State Traveler Info

Nevada State Traveler Info

Washington State Traveler Info

City of Eugene

Save this as your Start Page?

CLICK to view travel services on Oregon highways.View Travel Services

Map of Eugene

RoadCam - ORE 569 Eugene Beltline
RoadCam - Eugene, Beltline at River Rd
Roadcam - Delta Hwy at Eugene -  Valley River
Roadcam - Delta Hwy at Valley River
RoadCam - ORE569 WB at Delta Hwy
RoadCam - ORE569 at Coburg
RoadCam - I-5 SB at I-105
RoadCam - I-5 Eugene at OR569
RoadCam - I-5 at Eugene - South
RoadCam - I-5 at Goshen
ORE569 MP 8.74, Informational only
I-5 MP 195.02 to 195.46, Informational only
I-5 MP 198.39 to 200.15, No to Minimum Delay
ORE126 MP .18 to .19, Informational only
ORE126 MP 1.34, Informational only
ORE126 MP 3.8 to 9.9, Informational only
ORE569 MP 9.71, Informational only
ORE569 MP 7.66 to 11.66, No to Minimum Delay
ORE569 MP 12.53 to 12.95, Informational only
ORE569 MP 12.26 to 13, Informational only
ORE569 MP 12.76, Informational only
ORE569 MP 12.79, Informational only
I-5 MP 192 to 193.5, Estimated delay under 20 minutes
I-5 MP 192.1 to 193.4, Estimated delay under 20 minutes
I-5 MP 192.27, Informational only
I-5 MP 192.8, Estimated delay under 20 minutes
I-5 MP 195.45 to 195.46, No to Minimum Delay
I-5 MP 195.45 to 195.46, Informational only
I-5 MP 195.45 to 195.46, Informational Only

Cameras | Construction | Truck Restrictions

Cameras

Highway

Camera Location

I-5 

I-5 Eugene at OR569

I-5 SB at I-105

I-5 at Eugene - South

I-5 at Goshen

<return to map

ORE569 

Eugene, Beltline at River Rd

ORE569 Eugene Beltline

ORE569 Eugene at Delta Hwy

ORE569 at Coburg

<return to map

City 

Delta Hwy at Eugene - Valley River

Delta Hwy at Valley River

<return to map

Construction

Highway

Details

I-5
MP 192 - 193.5

I-5, Intersection with McKenzie Highway ORE126

Incident #:136247

Estimated delay under 20 minutes
Construction Work

Comments: Watch for night time single lane closures. Be aware of construction vehicles, traffic signs and roadside work crews. Use caution. Interstate 5 (between mileposts 192.0 and 193.5): Watch for construction vehicles entering and exiting the travel lanes at the shoulder. Watch for temporary traffic signs, roadside work crews and equipment. Watch for nighttime single-lane and shoulder closures. Please drive carefully through the work zone. Reduce speed.

Public Contact: ODOT/NWTOC Salem

Last Updated: 05/16/2013 3:21 pm

<return to map

I-5
MP 192.1 - 193.4

I-5, Intersection with McKenzie Highway ORE126

Incident #:75796

Estimated delay under 20 minutes
Construction Work

Comments: Expect single lane closures in both directions controlled by flaggers. Watch for traffic congestion at Franklin and Jenkins Dr. Reduce speed. Caution. Expect single-lane closures in both directions until June 2013. The speed limit is reduced to 35 mph. Watch for roadside work crews and construction vehicles entering and exiting the travel lanes from the roadway shoulder and at the intersection of Franklin Boulevard and Jenkins Drive. Monday, May 13 through Wednesday, May 15, watch for overnight lane closures and alternating one-way traffic controlled by flaggers. Please drive carefully and obey all construction signs and flagger instructions. For the latest online information about the project, please visit willamettebridge.org, read the blog at willametteriverbridge.blogspot.com and follow us on Twitter: @OregonDOT. Construction has now begun on the NB Willamette River bridge and Patterson Slough Bridge. Use extreme caution while driving in the work zone. Cyclist and pedestrian path users should use caution and expect some delays for construction activity. This project will replace the I-5 bridge over the Willamette River.

Public Contact: OBDP
Phone: (503) 587-2900

Last Updated: 05/16/2013 3:23 pm

<return to map

I-5
MP 192.8

I-5, 1 mile North of Intersection with McKenzie Highway ORE126

Incident #:136246

Estimated delay under 20 minutes
Construction Work

Comments: North bound to Franklin Boulevard off ramp exit 192 is closed until October 2013. Detour via exit 191 and Glenwood Boulevard. Watch for work crews. The I-5 northbound Franklin Blvd. off-ramp Exit 192 (milepost 192.8) is closed until October 2013; detour via Exit 191 and Glenwood Blvd. Watch for roadside work crews and equipment. Please drive carefully through the work zone.

Public Contact: ODOT/NWTOC Salem

Last Updated: 05/16/2013 3:20 pm

<return to map

I-5
MP 195.45 - 195.46

I-5, Intersection with Beltline Highway

Incident #:150082

No to Minimum Delay
Construction Work

Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder
Comments: Expect a lot of activity on the off ramp at south bound I 5 and west bound Beltline. Watch for trucks. Observe speed reductions. Use caution There will be a lot of activity on the off-ramp between SB I5 and WB Beltline as well as the median of I-5. Look for trucks entering and exiting the roadway and advance signing. A speed limit reduction to 35 MPH is now in effect on Beltline. A speed limit reduction to 50 MPH is now in effect for I-5 through the construction zone. On May 22 and 23, the EB Beltline to SB I5 ramp will be closed between 8pm and 5:30am. Use the posted detour route. Project Summary: This project will rebuild the interchange at Interstate 5 and Randy Pape’ Beltline Highway to meet modern design and safety standards. State funds from the Jobs and Transportation Act will build: - A new I-5 southbound to westbound Beltline off-ramp. - A new I-5 southbound to eastbound Beltline off-ramp. - A new westbound Beltline to southbound I-5 on-ramp - A new Beltline Bridge over I-5 - And base construction and structures for a new multi-use path to connect south of the interchange to north of the interchange. The path will open upon completion of Unit 4 scheduled to be constructed in 2016. This is a two year project. Construction of Unit 3 is scheduled to be completed by November 2014.

Public Contact: Steve Templin, Project Manager
Phone: (541) 744-8080

Last Updated: 05/16/2013 3:25 pm

<return to map

I-5
MP 198.39 - 200.15

I-5, 3 miles North of Intersection with Beltline Highway

Incident #:135672

No to Minimum Delay
Construction Work
Off Ramp

Comments: Roberts Road is closed and all traffic is now using South Industrial Way. The project is on schedule to be completed by the end of June 2013. Ramps Affected. Roberts Road has been closed and all traffic is now using South Industrial Way. The project is on schedule to be completed by the end of June, 2013. This project will improve the I-5/Coburg interchange, and improve the efficiency and safety of travel on Pearl Street, Coburg Industrial Way, and Roberts Road in the City of Coburg. The project will, among other things: •Close access to Roberts Road on the south side of Pearl Street with a cul de sac. •Connect Roberts Road to the intersection of Coburg Industrial Way and Pearl Street by constructing a new road, Coburg Industrial Way South. •Widen and lengthen the I-5 southbound on-ramp to accept 2 lanes turning east to south from Pearl Street.

Public Contact: Steve Templin
Phone: (541) 744-8080

Last Updated: 05/16/2013 4:02 pm

<return to map

I-5
MP 195.45 - 195.46

I-5, Intersection with Beltline Highway

Incident #:152584

Informational only
Construction Work

Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes
Comments: The posted speed limit has been reduced to 35 on the Beltline bridge and 50 on Interstate 5 near the interchange due to construction work zone. New, lower speed limits have been implemented on the Randy Papé Beltline bridge over Interstate 5, and on I-5 beneath the bridge where construction has begun on a two-year project to improve the I-5/Beltline interchange. Beginning Wednesday, April 17, 2013, the posted, enforceable speed limit on the Beltline bridge over I-5 will be 35 miles per hour. The speed limit on I-5 near the interchange will be reduced to 50 miles per hour. The speed limit reductions will be enforced until the project is completed in fall of 2014. The speed limit reductions are intended to improve work zone safety for all highway users and construction workers. From 2007 through 2011 in Oregon, 53 people died and more than 2,200 were injured in work zone crashes. The majority of people injured or killed in these crashes were drivers, passengers or pedestrians, not workers. The single biggest factor in crashes is driver inattention; that’s why orange cones, variable message signs and other tools are used to alert motorists. The other major contributing factor is speed, which is why work zones often require lower speed limits. National Work Zone Awareness Week is April 16-19. To learn more about work zone safety, visit ODOT’s safety website at: http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx

Public Contact: External Agency

Last Updated: 05/16/2013 3:20 pm

<return to map

I-5
MP 195.45 - 195.46

I-5, Intersection with Beltline Highway

Incident #:154445

Future Event
Construction Work
Informational only
Off Ramp

Expected Start Date: 5/22/2013 5:00:00 PM
Comments: On May 22 and 23, the east bound Belt line to south bound I 5 ramp will be closed between 8 p m and 5 30 a m. Detour route posted. Use caution. Ramps Affected. On May 22 and 23, the EB Beltline to SB I5 ramp will be closed between 8pm and 5:30am. Use the posted detour route.

Public Contact: External Agency

Last Updated: 05/15/2013 09:43 am

<return to map

ORE126
MP 3.8 - 9.9

ORE126, Springfield

Incident #:153884

Informational only
Construction Work

Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Construction will begin mid May. Most work will occur at night with single lane and ramp closures. A weekend closure at 42 Street. Construction to begin mid-May and continue until late September. Much of the work will be completed at night to avoid peak travel times. During construction, motorists can expect single lane closures in both directions; ramp closures; and weekend closures of the 42nd Street interchange. "Q" St / Pioneer Parkway interchange: Single-lane closures and ramp closures anticipated at night in late May and early June. Watch for temporary traffic signs, traffic control devices, work crews and equipment. Please drive carefully through the work zone. Motorists should monitor www.tripcheck.com and www.keepusmoving.info for the latest closure information. Residents and businesses along the highway should anticipate noise consistent with road construction. This project will preserve the existing highway by grinding and replacing two inches of asphalt in most areas and reconstructing the eastbound portions of the 42nd Street interchange. The project will also improve safety by constructing cable median barrier between Mohawk Blvd. and East Main Street (MP 6.24-9.97).

Public Contact: External Agency

Last Updated: 05/16/2013 3:26 pm

<return to map

ORE569
MP 7.66 - 11.66

ORE569, Eugene

Incident #:145648

No to Minimum Delay
Construction Work
Off Ramp

Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Green Acres west bound ramp will be closed Thursday from 8 p m to 6 a m Friday. River Road east bound ramp closed May 18 from midnight to 6 a m. Ramps Affected. Nighttime paving operations will close two on-ramps to OR 569 (Randy Papé Beltline) in Eugene this week. Detours will use other, near-by ramps. - Effective Thursday night, May 16 and Friday morning, May 17 the on-ramp from SB Delta Hwy/Green Acres Road to Beltline westbound will be closed between the hours of 8 PM & 6 AM. The closure is necessary to facilitate a grinding and paving project on the ramp. When closed, traffic should travel SB on Delta Hwy., enter eastbound Beltline, take Coburg Rd exit, cross under the highway and re-enter westbound Beltline. - Effective Friday night, May 17, and Saturday morning, May 18, the on-ramp from River Rd to Beltline eastbound will be closed between the hours of Midnight & 6 AM. The closure is necessary to facilitate a grinding and paving project on the ramp. When closed, traffic should enter westbound Beltline, take NW Expressway exit, cross under the highway and re-enter eastbound Beltline. Note: This work is weather dependent. Should adverse weather cancel the project, it will be rescheduled to the next suitable time. Summary: This project adds ramp meters at various exits that access the Randy Papé Beltline in Eugene. The eastbound on-ramp at the River Road exit will also be widened. Safety features such as striping, guardrails, and concrete barrier will also be installed or modified. Ramp meters will be installed at the following locations: Eastbound On Ramps at River Road and River Avenue; Westbound On Ramps at Green Acres and Coburg Road. Construction is scheduled to be completed by June 30, 2013. Motorists should anticipate single night ramp closures, lane closures, and shoulder closures, flaggers controlling traffic, and construction vehicles entering and leaving the roadway at the four ramp meter locations. Motorists are encouraged to travel safely through the areas and respect the direction given by flaggers.

Public Contact: Steve Schultz
Phone: (541) 744-8080

Last Updated: 05/16/2013 4:01 pm

<return to map

Trucking (Commercial Vehicle) Restrictions

Highway

Details

I-5
MP 192.27

I-5, Intersection with McKenzie Highway ORE126

Incident #: 113240

Informational only
Commercial Vehicle Information

Details: I-5 NB Exit 192 off-ramp (to OR99/OR126 Business) - Eugene Effective October 3, 2011, the I-5 northbound Exit 192 off-ramp to OR99/OR126 Business will be closed. Estimated date of re-opening is January 1, 2014.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

I-5
MP 195.02 - 195.46

I-5, Intersection with Beltline Highway

Incident #: 150902

Informational only
Commercial Vehicle Information

Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April 9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in width and 16 feet 03 in. in height on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. Estimated date of completion is November 30, 2014.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE126
MP .18 - .19

ORE126B, Intersection with Pacific Highway I-5

Incident #: 147807

Informational only
Commercial Vehicle Information

Details: OR126 Business MP 0.18 to MP 0.19 EB & WB (crossing under I-5 in Eugene) Effective February 4, 2013, this section of OR126 Business (Franklin Blvd) will be restricted to 16 feet 02 in. in height. Estimated date of completion is July 1, 2013.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE126
MP 1.34

ORE126B, Springfield

Incident #: 73573

Informational only
Commercial Vehicle Information

Details: OR126 Business WB MP 1.34 (Main St. Springfield) MP 1.34 Willamette River Bridge (1 mile east of I-5 in Springfield) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE569
MP 8.74

ORE569, Eugene

Incident #: 152662

Informational only
Commercial Vehicle Information

Details: OR569 EB on-ramp from River Rd (Eugene) Effective May 17, 2013, the on-ramp from River Rd to OR569 eastbound will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is May 18, 2013.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE569
MP 9.71

ORE569, Eugene

Incident #: 152661

Informational only
Commercial Vehicle Information

Details: OR569 WB on-ramp from SB Delta Hwy / WB Green Acres Rd (Eugene) Effective May 16, 2013, the on-ramp from southbound Delta Hwy / westbound Green Acres Rd to OR569 westbound will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is May 17, 2013.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE569
MP 12.26 - 13

ORE569, Eugene

Incident #: 150904

Informational only
Commercial Vehicle Information

Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE569
MP 12.53 - 12.95

ORE569, Intersection with Pacific Highway I-5

Incident #: 150903

Informational only
Commercial Vehicle Information

Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE569
MP 12.76

ORE569, Intersection with Pacific Highway I-5

Incident #: 153920

Informational only
Commercial Vehicle Information

Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the ramp from OR569 westbound to I-5 southbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

ORE569
MP 12.79

ORE569, Intersection with Pacific Highway I-5

Incident #: 153921

Informational only
Commercial Vehicle Information

Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the ramp from OR569 eastbound to I-5 northbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.

Public Contact: Motor Carrier Over-Dimension Permit Unit
Phone: (503) 373-0000

Last Updated: 05/18/2013 10:00 am

<return to map

Print-ready format Printer-Friendly

     Contact Us


CLICK to view instructions for using the 511 travel information phone hotline.

CLICK to visit the Oregon Travel Information Council website.