|
|
Cameras | Construction | Truck Restrictions ConstructionHighway | Details |
|---|
I-5 MP 192 - 193.5
I-5, Intersection with McKenzie Highway ORE126 Incident #:136247 | Estimated delay under 20 minutes Construction Work Comments: Watch for night time single lane closures. Be aware of construction vehicles, traffic signs and roadside work crews. Use caution. Interstate 5 (between mileposts 192.0 and 193.5): Watch for construction vehicles entering and exiting the travel lanes at the shoulder. Watch for temporary traffic signs, roadside work crews and equipment. Watch for nighttime single-lane and shoulder closures. Please drive carefully through the work zone. Reduce speed.
Public Contact: ODOT/NWTOC Salem Last Updated: 05/16/2013 3:21 pm <return to map | I-5 MP 192.1 - 193.4
I-5, Intersection with McKenzie Highway ORE126 Incident #:75796 | Estimated delay under 20 minutes Construction Work Comments: Expect single lane closures in both directions controlled by flaggers. Watch for traffic congestion at Franklin and Jenkins Dr. Reduce speed. Caution. Expect single-lane closures in both directions until June 2013. The speed limit is reduced to 35 mph. Watch for roadside work crews and construction vehicles entering and exiting the travel lanes from the roadway shoulder and at the intersection of Franklin Boulevard and Jenkins Drive. Monday, May 13 through Wednesday, May 15, watch for overnight lane closures and alternating one-way traffic controlled by flaggers. Please drive carefully and obey all construction signs and flagger instructions.
For the latest online information about the project, please visit willamettebridge.org, read the blog at willametteriverbridge.blogspot.com and follow us on Twitter: @OregonDOT.
Construction has now begun on the NB Willamette River bridge and Patterson Slough Bridge. Use extreme caution while driving in the work zone. Cyclist and pedestrian path users should use caution and expect some delays for construction activity. This project will replace the I-5 bridge over the Willamette River.
Public Contact: OBDP Phone: (503) 587-2900 Last Updated: 05/16/2013 3:23 pm <return to map | I-5 MP 192.8 I-5, 1 mile North of Intersection with McKenzie Highway ORE126 Incident #:136246 | Estimated delay under 20 minutes Construction Work Comments: North bound to Franklin Boulevard off ramp exit 192 is closed until October 2013. Detour via exit 191 and Glenwood Boulevard. Watch for work crews. The I-5 northbound Franklin Blvd. off-ramp Exit 192 (milepost 192.8) is closed until October 2013; detour via Exit 191 and Glenwood Blvd. Watch for roadside work crews and equipment. Please drive carefully through the work zone.
Public Contact: ODOT/NWTOC Salem Last Updated: 05/16/2013 3:20 pm <return to map | I-5 MP 195.45 - 195.46
I-5, Intersection with Beltline Highway Incident #:150082 | No to Minimum Delay Construction Work Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder Comments: Expect a lot of activity on the off ramp at south bound I 5 and west bound Beltline. Watch for trucks. Observe speed reductions. Use caution There will be a lot of activity on the off-ramp between SB I5 and WB Beltline as well as the median of I-5. Look for trucks entering and exiting the roadway and advance signing. A speed limit reduction to 35 MPH is now in effect on Beltline. A speed limit reduction to 50 MPH is now in effect for I-5 through the construction zone. On May 22 and 23, the EB Beltline to SB I5 ramp will be closed between 8pm and 5:30am. Use the posted detour route.
Project Summary: This project will rebuild the interchange at Interstate 5 and Randy Pape’ Beltline Highway to meet modern design and safety standards. State funds from the Jobs and Transportation Act will build:
- A new I-5 southbound to westbound Beltline off-ramp.
- A new I-5 southbound to eastbound Beltline off-ramp.
- A new westbound Beltline to southbound I-5 on-ramp
- A new Beltline Bridge over I-5
- And base construction and structures for a new multi-use path to connect south of the interchange to north of the interchange. The path will open upon completion of Unit 4 scheduled to be constructed in 2016.
This is a two year project. Construction of Unit 3 is scheduled to be completed by November 2014.
Public Contact: Steve Templin, Project Manager Phone: (541) 744-8080 Last Updated: 05/16/2013 3:25 pm <return to map | I-5 MP 198.39 - 200.15
I-5, 3 miles North of Intersection with Beltline Highway Incident #:135672 | No to Minimum Delay Construction Work Off Ramp Comments: Roberts Road is closed and all traffic is now using South Industrial Way. The project is on schedule to be completed by the end of June 2013. Ramps Affected. Roberts Road has been closed and all traffic is now using South Industrial Way. The project is on schedule to be completed by the end of June, 2013.
This project will improve the I-5/Coburg interchange, and improve the efficiency and safety of travel on Pearl Street, Coburg Industrial Way, and Roberts Road in the City of Coburg. The project will, among other things:
•Close access to Roberts Road on the south side of Pearl Street with a cul de sac.
•Connect Roberts Road to the intersection of Coburg Industrial Way and Pearl Street by constructing a new road, Coburg Industrial Way South.
•Widen and lengthen the I-5 southbound on-ramp to accept 2 lanes turning east to south from Pearl Street.
Public Contact: Steve Templin Phone: (541) 744-8080 Last Updated: 05/16/2013 4:02 pm <return to map | I-5 MP 195.45 - 195.46
I-5, Intersection with Beltline Highway Incident #:152584 | Informational only Construction Work Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes Comments: The posted speed limit has been reduced to 35 on the Beltline bridge and 50 on Interstate 5 near the interchange due to construction work zone. New, lower speed limits have been implemented on the Randy Papé Beltline bridge over Interstate 5, and on I-5 beneath the bridge where construction has begun on a two-year project to improve the I-5/Beltline interchange.
Beginning Wednesday, April 17, 2013, the posted, enforceable speed limit on the Beltline bridge over I-5 will be 35 miles per hour. The speed limit on I-5 near the interchange will be reduced to 50 miles per hour. The speed limit reductions will be enforced until the project is completed in fall of 2014.
The speed limit reductions are intended to improve work zone safety for all highway users and construction workers.
From 2007 through 2011 in Oregon, 53 people died and more than 2,200 were injured in work zone crashes.
The majority of people injured or killed in these crashes were drivers, passengers or pedestrians, not workers. The single biggest factor in crashes is driver inattention; that’s why orange cones, variable message signs and other tools are used to alert motorists. The other major contributing factor is speed, which is why work zones often require lower speed limits.
National Work Zone Awareness Week is April 16-19. To learn more about work zone safety, visit ODOT’s safety website at: http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx
Public Contact: External Agency
Last Updated: 05/16/2013 3:20 pm <return to map | I-5 MP 195.45 - 195.46
I-5, Intersection with Beltline Highway Incident #:154445 | Future Event Construction Work Informational only Off Ramp Expected Start Date: 5/22/2013 5:00:00 PM Comments: On May 22 and 23, the east bound Belt line to south bound I 5 ramp will be closed between 8 p m and 5 30 a m. Detour route posted. Use caution. Ramps Affected. On May 22 and 23, the EB Beltline to SB I5 ramp will be closed between 8pm and 5:30am. Use the posted detour route.
Public Contact: External Agency
Last Updated: 05/15/2013 09:43 am <return to map | ORE126 MP 3.8 - 9.9
ORE126, Springfield Incident #:153884 | Informational only Construction Work Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane Comments: Construction will begin mid May. Most work will occur at night with single lane and ramp closures. A weekend closure at 42 Street. Construction to begin mid-May and continue until late September. Much of the work will be completed at night to avoid peak travel times. During construction, motorists can expect single lane closures in both directions; ramp closures; and weekend closures of the 42nd Street interchange.
"Q" St / Pioneer Parkway interchange: Single-lane closures and ramp closures anticipated at night in late May and early June. Watch for temporary traffic signs, traffic control devices, work crews and equipment. Please drive carefully through the work zone.
Motorists should monitor www.tripcheck.com and www.keepusmoving.info for the latest closure information.
Residents and businesses along the highway should anticipate noise consistent with road construction.
This project will preserve the existing highway by grinding and replacing two inches of asphalt in most areas and reconstructing the eastbound portions of the 42nd Street interchange. The project will also improve safety by constructing cable median barrier between Mohawk Blvd. and East Main Street (MP 6.24-9.97).
Public Contact: External Agency
Last Updated: 05/16/2013 3:26 pm <return to map | ORE569 MP 7.66 - 11.66
ORE569, Eugene Incident #:145648 | No to Minimum Delay Construction Work Off Ramp Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder Comments: Green Acres west bound ramp will be closed Thursday from 8 p m to 6 a m Friday. River Road east bound ramp closed May 18 from midnight to 6 a m. Ramps Affected. Nighttime paving operations will close two on-ramps to OR 569 (Randy Papé Beltline) in Eugene this week. Detours will use other, near-by ramps.
- Effective Thursday night, May 16 and Friday morning, May 17 the on-ramp from SB Delta Hwy/Green Acres Road to Beltline westbound will be closed between the hours of 8 PM & 6 AM. The closure is necessary to facilitate a grinding and paving project on the ramp.
When closed, traffic should travel SB on Delta Hwy., enter eastbound Beltline, take Coburg Rd exit, cross under the highway and re-enter westbound Beltline.
- Effective Friday night, May 17, and Saturday morning, May 18, the on-ramp from River Rd to Beltline eastbound will be closed between the hours of Midnight & 6 AM. The closure is necessary to facilitate a grinding and paving project on the ramp.
When closed, traffic should enter westbound Beltline, take NW Expressway exit, cross under the highway and re-enter eastbound Beltline.
Note: This work is weather dependent. Should adverse weather cancel the project, it will be rescheduled to the next suitable time.
Summary: This project adds ramp meters at various exits that access the Randy Papé Beltline in Eugene. The eastbound on-ramp at the River Road exit will also be widened. Safety features such as striping, guardrails, and concrete barrier will also be installed or modified.
Ramp meters will be installed at the following locations: Eastbound On Ramps at River Road and River Avenue; Westbound On Ramps at Green Acres and Coburg Road.
Construction is scheduled to be completed by June 30, 2013.
Motorists should anticipate single night ramp closures, lane closures, and shoulder closures, flaggers controlling traffic, and construction vehicles entering and leaving the roadway at the four ramp meter locations. Motorists are encouraged to travel safely through the areas and respect the direction given by flaggers.
Public Contact: Steve Schultz Phone: (541) 744-8080 Last Updated: 05/16/2013 4:01 pm <return to map | Trucking (Commercial Vehicle) RestrictionsHighway | Details |
|---|
I-5 MP 192.27 I-5, Intersection with McKenzie Highway ORE126 Incident #: 113240 | Informational only Commercial Vehicle Information Details: I-5 NB Exit 192 off-ramp (to OR99/OR126 Business) - Eugene Effective October 3, 2011, the I-5 northbound Exit 192 off-ramp to OR99/OR126 Business will be closed. Estimated date of re-opening is January 1, 2014. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | I-5 MP 195.02 - 195.46
I-5, Intersection with Beltline Highway Incident #: 150902 | Informational only Commercial Vehicle Information Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April 9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in width and 16 feet 03 in. in height on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. Estimated date of completion is November 30, 2014. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE126 MP .18 - .19
ORE126B, Intersection with Pacific Highway I-5 Incident #: 147807 | Informational only Commercial Vehicle Information Details: OR126 Business MP 0.18 to MP 0.19 EB & WB (crossing under I-5 in Eugene) Effective February 4, 2013, this section of OR126 Business (Franklin Blvd) will be restricted to 16 feet 02 in. in height. Estimated date of completion is July 1, 2013. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE126 MP 1.34 ORE126B, Springfield Incident #: 73573 | Informational only Commercial Vehicle Information Details: OR126 Business WB MP 1.34 (Main St. Springfield) MP 1.34 Willamette River Bridge (1 mile east of I-5 in Springfield) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE569 MP 8.74 ORE569, Eugene Incident #: 152662 | Informational only Commercial Vehicle Information Details: OR569 EB on-ramp from River Rd (Eugene) Effective May 17, 2013, the on-ramp from River Rd to OR569 eastbound will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is May 18, 2013. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE569 MP 9.71 ORE569, Eugene Incident #: 152661 | Informational only Commercial Vehicle Information Details: OR569 WB on-ramp from SB Delta Hwy / WB Green Acres Rd (Eugene) Effective May 16, 2013, the on-ramp from southbound Delta Hwy / westbound Green Acres Rd to OR569 westbound will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is May 17, 2013. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE569 MP 12.26 - 13
ORE569, Eugene Incident #: 150904 | Informational only Commercial Vehicle Information Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE569 MP 12.53 - 12.95
ORE569, Intersection with Pacific Highway I-5 Incident #: 150903 | Informational only Commercial Vehicle Information Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE569 MP 12.76 ORE569, Intersection with Pacific Highway I-5 Incident #: 153920 | Informational only Commercial Vehicle Information Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the ramp from OR569 westbound to I-5 southbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | ORE569 MP 12.79 ORE569, Intersection with Pacific Highway I-5 Incident #: 153921 | Informational only Commercial Vehicle Information Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the ramp from OR569 eastbound to I-5 northbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/18/2013 10:00 am <return to map | |
Printer-Friendly
Contact Us

|